MNL, SEL DIMENSIONS, SITE AW PLANNING GUIDE ARTWORK SIZE A SHEET 1 OF 1

Similar documents
Selenia Digital Breast Imaging Saving Time, Saving Lives.

MultiCare Platinum & StereoLoc II Prone and Upright Stereotactic Biopsy Solutions


Gerber M Series Site Requirements

Saphyr System Safety Guide for Saphyr P/N 60325

Customer Responsibilities

Pre-installation Manual CONCEPT 301 D/401 D/501 D

SPECIFICATION DIGITAL MAMMOGRAPHY UNIT AND ASSOCIATED SERVICES

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS

Introduction. FDA Approval. Breast Tomosynthesis From the Ground Up

Installation plan. Tumble dryer. PT 8807 EL (Electrically heated) en - US Mat. NR / 02

Agilent Technologies 7620-AS Sample Changer Site Preparation Checklist Hardware Site Preparation Specification

SECTION SECONDARY UNIT SUBSTATIONS

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS

Installation. Basic Rack Power Distribution Units AP9560 AP9561

FrostGuard 120 V 120 V PREASSEMBLED ELECTRIC HEATING CABLES FOR PIPE FREEZE PROTECTION AND ROOF & GUTTER DE-ICING INSTALLATION INSTRUCTIONS

SECTION FIELD PANELS

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS

Streamline workflow for higher productivity and patient throughput. DirectView. Classic CR System

Gerber. Scientific Products. Dear Gerber Sabre Customer:

VP2 SidePOD Instructions

QV-800. Digital Universal System. Innovations in Digital Imaging.

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS

DIN Panels and Accessories

228 EXPRESS CASH RECYCLER 8, 10 OR 12 ROLLED STORAGE MODULES IN A UL SAFE (FRONT LOAD) PERSPECTIVE PLAN VIEW PAGE 1 OF 5

Telecab RESIDENTIAL ELEVATOR. Planning Guide

Sentron Low Amp Busway

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS

For the 2008 Code, the minimum clear distances were revised to reflect an accurate metric conversion (also known as a soft conversion).

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding.

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS

TRS100 Rapid Assay System Pre-Installation Guide

Pre-Installation Guide

RENA XPS-3000 Base. User Guide. SC2000 Media Transport System

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS

E-Series Installing E-Series U Cabinet

SECTION ENCLOSED BUS ASSEMBLIES

Fluoroscan InSight Ultra-fine Detail. Unprecedented Flexibility.

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard

Agilent 7696A Sample Prep WorkBench

RapID Raw Materials Verification System

Introduction. Disclaimer. Table of contents

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC

Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment.

Telecommunication Spaces

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS

Shur-Shot X-Proof Hydrogen Fluoride Alarm Operations Manual

Customer Responsibilities

Site Preparation Guide. Scodix Ultra Press and Scodix Ultra-Pro Press and Scodix Ultra Foil Station

a) Line and load compartments must be separated by a stable barrier.

Creating the Improved Standard in Healthcare Sterilization

SLIM lamp CEILING version

CARESTREAM DRX-Evolution SIMPLE. GENIUS.

Rack Power Distribution Unit AP7562, AP7563, AP7564 General Information

Latex 3000 Printer series. Site Preparation Checklist

Introduction. Disclaimer. Table of contents

Site Preparation Guide for CX3-Series Storage Systems in a 40U-C Cabinet

USER S MANUAL release 2.0

MGE Galaxy /50/60/80/100/130 kva. The recommended power protection for all critical applications

Gerber Scientific Products

Ultimate DR flexibility to fit your room, workflow, and budget

INSULATION GUARD MEG (Code ) INSTRUCTION MANUAL ( M / 99A ) (c) CIRCUTOR S.A.

Conversion Station Model 812

Quick-release pins swing the rack open from left to right to simplify installing and maintaining your equipment.

TM Wallbox Power Module HWI-WPM-6D VAC, 50/60Hz HWI-WPM-6D VAC, 50/60Hz

OmniCenter/Color Touch

Foundation Manual. Part Number: Version: Updated: July 5, S. Meadows Pkwy. A-9, #329 Reno, NV

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT

A. Section includes busway and fittings including plug-in units.

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

EC Type-Approval Certificate

GE Healthcare SENOGRAPHE PRISTINA FINAL STUDY. Typical A REV DATE MODIFICATIONS

SERIES SURGICAL LIGHTS

QuickNet-RK QUICKNET AND CERAPRO HEATING CABLE REPAIR KIT INSTALLATION INSTRUCTIONS

Simple operation and a built-in bypass function make the CSX series a pleasure to use with many benefits in a tidy package.

VPL-3300B Commercial Vertical Platform Lift Technical Specifications rev: (5) ILS-01100

OPERATOR S INSTRUCTIONS

1 data PIC location (with 2 ports) typically asf for multiple staff members

GENERAL MECHANICAL SYSTEM REQUIREMENTS

Site Preparation Guide. Stratasys J750 3D Printing System. DOC Rev. D1

Compression Superstructure TELETOM 500/700 Series Equipment Management Booms TELETOM 400/600 Series Anesthesia Booms

SINGLE-PHASE TWO-WIRE, DIRECT TYPE, 5(5A) User Manual for SGE-1Y-10100M

! CAUTION: Read and follow these instructions.

SERIES SURGICAL LIGHTS

Temporary Wiring. Low-Voltage Electrical Safety Orders

SYSTEM 1E LIQUID CHEMICAL STERILANT PROCESSING SYSTEM

CH-200M. Ceiling Type X-ray Tube Support GENERAL FEATURES PD

SECTION BASIC ELECTRICAL REQUIREMENTS

Accent Floor Heating. Tmat System Installation Manual. Floor heating system

POWER PINNER BENCH HAND WELDER 7250 OPERATOR S MANUAL

SECTION COPPER/ SOLDERED RF SYSTEM SPECIFICATIONS

SECTION ENCLOSED BUS ASSEMBLIES

MTS Criterion Series 40

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 7/14/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

3M Intelligent Return Classic and Sorter System SL. Architect/Contractor's Package

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp,

Transcription:

Artwork and Signature File for: MAN-01120, MNL, SEL DIMENSIONS, SITE PLANNING GUIDE Artwork consists of: Thirty-Six (36) 8 ½ inch x 11 inch sheet(s) attached. REV AUTHORED BY DATE A.TAMBASCIO 01/20/10 REV DRAFTED BY DATE J. SHARP 01/20/10 PROPRIETARY INFORMATION: The content of this document is the exclusive property of Hologic and may not, without prior written permission of Hologic, be reproduced, copied or used for any purpose whatsoever. TITLE DOCUMENT NUMBER REV MNL, SEL DIMENSIONS, SITE AW-02832 002 PLANNING GUIDE ARTWORK SIZE A SHEET 1 OF 1 ENG-0034-T33, Rev. 002

for Selenia Dimensions System Part Number MAN-01120 Revision 002 January 2010 This manual is for permanent Selenia Dimensions installations. For Mobile Selenia Dimensions installations, refer to MAN-01411. Service Support: USA: +1.877.371.4372 Europe: +32.2.711.4690 All Other: +1.781.999.7750 Corporate Headquarters 35 Crosby Drive, Bedford, MA 01730-1401 USA Tel: +1.781.999.7300 Sales: +1.781.999.7453 Fax: +1.781.280.0668 www.hologic.com Europe (EU Representative) Hologic NV Leuvensesteenweg 250A 1800 Vilvoorde, Belgium Tel: +32.2.711.4680 Fax: +32.2.725.2087 Refer to the corporate website for more facilities worldwide. Copyright Hologic 2010. All rights reserved. Printed in USA. This manual was originally written in English. Hologic and the Hologic Logo are trademarks or registered trademarks of Hologic, Inc. Other trademarks registered or used by Hologic and its divisions and subsidiaries in the United States and other countries include: Dimensions, DSM, FAST Paddle, HTC, Lorad, MIMS plus, M-IV, MultiCare, ScoutMarc, SecurView, Selenia, Smart Paddle, SmartWindow, StereoLoc, and TechMate. Microsoft and Windows are trademarks or registered trademarks of Microsoft Corporation in the United States and other countries. Any other product and company names mentioned herein are the trademarks or registered trademarks of their respective owners.

Table of Contents Table of Contents Chapter 1 Introduction and General Information 1 1.0 Introduction...1 2.0 System Description...1 3.0 Room Layout Considerations...2 4.0 Safety...3 4.1 Isolation Integrity...3 4.2 Shielding...3 4.3 Remote X-ray On/Power On Indicators...3 5.0 Compliance...4 5.1 Compliance Requirements...4 5.2 Compliance Statement...4 Chapter 2 Specifications and Reference Information 5 1.0 Unit Measurements...5 2.0 Electrical Input...7 3.0 Environmental...7 4.0 Center-of-Gravity Reference...8 Chapter 3 Site Planning Checklist 11 Room Requirements...11 Clearance Requirements...13 Power Requirements...15 Environmental Requirements...17 Cable Requirements...19 Wireway and Threshold Requirements...21 X-Ray Shielding Requirements...23 Mounting Requirements...25 Room Planning Templates 27 P/N MAN-01120 v

Table of Contents vi P/N MAN-01120

Chapter 1 Introduction and General Information Chapter 1 Introduction and General Information 1.0 Introduction This guide, an aid for the Installation Coordinator responsible for site planning and preparation, contains all product information, specifications, and directions necessary for determining the installation requirements. All information in this guide is important and relevant to the planning process. Note Refer to MAN-01411 for Mobile applications. Note The mounting diagrams provided in this manual are recommendations only; the final responsibility for proper installation belongs to the Installation Coordinator. Note 2.0 System Description Ensure all installations meet local regulations. A licensed electrician must perform the necessary electrical services. Figure 1-1: The Selenia Dimensions System Legend for Figure 1-1 1. The Gantry 2. The C-Arm 3. The Acquisition Workstation P/N MAN-01120 1

Chapter 1 Introduction and General Information 3.0 Room Layout Considerations Chapter 3 Site Planning Checklist is setup to assist you with the following topics when selecting a location for the system: 1. System component sizes and weight Flooring type for mounting and weight considerations Doorway clearance Installation space Relocation of equipment 2. Room size Movement clearance Allocate space for patient and technologist movement. Avoid obstructions in the room that may hinder access to the unit controls or the patient. Storage Provide convenient storage for system accessories. If it is not possible to store accessories within the exam room, arrange for safe storage close by. 3. Location for patient throughput 4. Power source requirements Interlocks (room, door, lights, etc.) Service access 5. Networking requirements (DICOM, PACS, etc.) 6. Physical and environmental requirements 7. Shielding requirements 8. Cabling and wireways 2 P/N MAN-01120

Chapter 1 Introduction and General Information 4.0 Safety 4.1 Isolation Integrity WARNING! To keep the isolation quality for the system, attach only approved accessories or options to the system. Only the authorized personnel can make changes to the connections. WARNING! Keep a 1.5 meter safe distance between the patient and any non-patient devices. Non-patient system components (like the Workflow Manager, the diagnostic review workstation, or the hard copy printer) must not be installed in the Patient Area. 1.5m 4.2 Shielding 4.2.1 Structural Shielding A Medical Physicist should review the room walls in which this system is used to ensure the room meets local guidelines for radiation shielding. 4.2.2 The Operator Radiation Shield The operator radiation shield, attached to the Acquisition Workstation, provides a minimum of 0.5 mm of lead equivalent attenuation. 4.3 Remote X-ray On/Power On Indicators Selenia Dimensions gives the user the ability to operate remote lights which indicate when the system is On and when X-rays are being taken. These lights are normally installed outside the exam room, above the door. Installation should be done by a certified electrician. The relay contacts are rated: 10 A, 250 VAC (normally open) 10 A, 30 VDC (normally open) P/N MAN-01120 3

Chapter 1 Introduction and General Information 5.0 Compliance The following section details the mammography system compliance requirements and the manufacturer s responsibilities. 5.1 Compliance Requirements The manufacturer is responsible for the effects of safety, reliability and performance of this equipment with the following provisions: The electrical installation of the room complies with the appropriate requirements. The equipment is used in accordance with instructions for use. Assembly operations, extensions, re-adjustments, modifications, or repairs are performed by Hologic authorized personnel only. The installed network and communications equipment must comply with an IEC Standard and the complete installed system (network and communications equipment and the Selenia Dimensions System) must comply with IEC 60601-1 and IEC 60601-1-1. 5.2 Compliance Statement The manufacturer states that this device is manufactured/conforms to: CAN/CSA ISO 13485:2003 EN 60601-1:1990 +A1+A11+A12+A2+A13 Medical Electrical Equipment General Requirements for Basic Safety and Essential Performance FDA, 21 CFR [Parts 820, 900 and 1020] IEC 60601-1:1988 +A1+A2:1995 +A13:1996 Medical Electrical Equipment General Requirements for Safety IEC 60601-1-1:2000-12 Medical Electrical Equipment Collateral Standard: Safety Requirements for Medical Electrical Systems IEC 60601-1-2:2001 Medical Electrical Equipment Collateral Standard: Electromagnetic Compatibility for Medical Electric Systems IEC 60601-1-3:1994 Medical Electrical Equipment Collateral Standard: Requirements for Radiation Protection in Diagnostic X-ray Equipment IEC 60601-1-4:1996 +A1:1999 Medical Electrical Equipment Collateral Standard: Programmable Electrical Medical Systems IEC 60601-2-7:1998 Medical Electrical Equipment Particular Requirements for the Safety of High-Voltage Generators of Diagnostic X-ray Equipment IEC 60601-2-28:1993-03 Medical Electrical Equipment Particular Requirements for the Safety of X-ray Source Assemblies and X-ray Tube Assemblies for Medical Diagnosis IEC 60601-2-32:1994 Medical Electrical Equipment Particular Requirements for the Safety of Associated Equipment of X-ray Equipment IEC 60601-2-45:2001 Medical Electrical Equipment Particular Requirements for the Safety of Mammographic X-ray Equipment and Mammographic Stereotactic Devices UL 60601-1: Medical Electrical Equipment, Part 1 General Requirements for Safety CAN/CSA: Medical Electrical Equipment Part 1: C22.2 No. 601.1 M90 General Requirements for Safety 4 P/N MAN-01120

Chapter 2 Specifications and Reference Information Chapter 2 Specifications and Reference Information 1.0 Unit Measurements Figure 2-1: Tubestand Dimensions Height Width Depth Weight 223 cm (87.8 in.) at highest C-arm travel 66 cm (26 in.) 138 cm (54.25 in.) Maximum of 400 kg (882 lb) P/N MAN-01120 5

Chapter 2 Specifications and Reference Information 207 cm (81.5 in.) 92.7 cm (36.5 in.) 58.5 cm (23 in.) Figure 2-2: Acquisition Workstation Dimensions Height Width Depth Weight 207 cm (81.5 in.) 92.7 cm (36.5 in.) 58.5 cm (23 in.) 154 kg (340 Ib) 6 P/N MAN-01120

Chapter 2 Specifications and Reference Information 2.0 Electrical Input Tubestand Mains Voltage 200/208/220/230/240 VAC ±10% Mains Impedance Mains Frequency 50/60 Hz ±5% Average Current over 24 Hours Peak Line Current Acquisition Workstation Maximum line impedance not to exceed 0.20 ohms for 208/220/230/240 VAC, 0.16 ohms for 200 VAC < 5 A 65 A for 2 seconds Mains Voltage 200/208/220/230/240 VAC ±10% Mains Frequency 50/60 Hz ±5% Power Consumption 3.0 Environmental General Conditions for Operation < 1000 watts Temperature Range 20 C to 30 C Relative Humidity Range Storage Environment Gantry Temperature Range 10 C to 40 C Relative Humidity Range X-ray Detector Temperature Range Max. rate of temperature change Relative Humidity Range Acquisition Workstation 10% to 80% Without condensing moisture 0% to 95% Without condensing moisture (Put in a package for storage in a building) 10 C to 30 C indefinitely 10 C to 35 C for a maximum of 12 hours Less than 10 C per hour Temperature Range 10 C to 40 C Relative Humidity Range 10% to 80% Without condensing moisture (Put in a package for storage in a building) 0% to 95% Without condensing moisture (Put in a package for storage in a building) P/N MAN-01120 7

Chapter 2 Specifications and Reference Information 4.0 Center-of-Gravity Reference Figure 2-3: Gantry Center-of-Gravity Reference 8 P/N MAN-01120

Chapter 2 Specifications and Reference Information Figure 2-4: Acquisition Workstation Center-of-Gravity Reference P/N MAN-01120 9

Chapter 2 Specifications and Reference Information 10 P/N MAN-01120

Chapter 3 Site Planning Checklist Room Requirements Item Requirements Actual Corrective Action Done (Init/Date) Room Size Length 3.65 m (12 ft.) Width 2.75 m (9 ft.) Ceiling 2.44 m (8 ft.) Door 203 x 76 cm (6.6 ft. x 2.5 ft.) Notes: The exam room layout should be pre-planned before the arrival of the system. Refer to Room Layout Work Sheet, pg. 29. A typical room layout is shown here. Check specific local or hospital requirements for additional data. Legend 1. Phone Line 2. Wall Outlet for CAT 5 cable 3. 120 VAC Outlet 4. Wireway 5. Circuit Breaker P/N MAN-01120 11

Additional Notes Note # Topic Notes P/N MAN-01120 12

Clearance Requirements Item Access Clearance Acquisition Workstation Gantry Rear Gantry Front Work Area Working Clearance Gantry with C-Arm Work and Patient Area Minimum Requirements 61 cm (2.0 ft.) on 3 sides 30 cm (1 ft.) 76 cm (2.5 ft.) 76 x 76 cm diameter (2.5 ft. x 2.5 ft.) 76.2 cm (30 in.) each side of C-arm (for complete C-arm rotation) 76.2 cm (30 in.) diameter (min) between Tubestand and Acquisition Workstation Actual Corrective Action Done (Init/Date) P/N MAN-01120 13

Additional Notes Note # Topic Notes P/N MAN-01120 14

Power Requirements Item Requirements Actual Corrective Action Power Requirements Dedicated Power Dedicated disconnect box Line with lockout capability, circuit breaker or fuse (per local codes), and remote emergency OFF trip switch if required (the location is determined by local codes). Done (Init/Date) Acquisition Workstation Light Indicator Relay Contact Ratings 1 Notes: Refer to Chapter 2, Section 2.0, page 7. 10 A, 250 VAC (N.O.) 10 A, 30 VDC (N.O.) Refer to NEC Article 660 X-ray Equipment 1 There are provisions in the system to accommodate local regulations that require an X-ray System Power-On, and X-ray On Indicators at the door. These lights are normally installed above the door to the exam room. P/N MAN-01120 15

Additional Notes Note # Topic Notes P/N MAN-01120 16

Environmental Requirements Item Requirements Actual Corrective Action Environmental Requirements: Operating Temperature Range 20 C to 30 C (68 F to 86 F) Relative Humidity 10% to 80% non condensing Range Notes: Done (Init/Date) P/N MAN-01120 17

Additional Notes Note # Topic Notes P/N MAN-01120 18

Cable Requirements Item Requirements Actual Corrective Action Cables (Length) Gantry Power Cable 7.5 m (25 ft.) If Mains box is over 15 m (50 ft.) away, custom lengths should drop 2 gauges when length is doubled. 12.2 m (40 ft.) Workstation to Gantry Interconnect Cable Ground Wire 12.2 m (40 ft.) Workstation to Gantry 13 m (42.65 ft.) Interconnect (Fiber Optic Cable) Acquisition Workstation 3.05 m (10 ft.) Power cord Notes: Strain relief for Mains cable: Cable should not flex, move, etc. Considered permanently connected per its safety classification. Done (Init/Date) Hologic does not provide the Gantry power cable for some countries. If the power cable is not provided, the installed cable must meet the following requirements and all local codes that apply: 3 conductor, 8 AWG (10 mm 2) copper not more than 25 feet (7.62 meters) in length. P/N MAN-01120 19

Additional Notes Note # Topic Notes P/N MAN-01120 20

Wireway and Threshold Requirements Interconnects Wireways Thresholds (if required) Notes: Item Requirements Actual Corrective Action Horizontal surface wireway, 1-3/4 in. x 5-1/4 in. divided with removable covers. Vertical surface flushmounted wireway, 1-3/4 in. x 5-3/4 in. divided with removable covers. Horizontal surface mounted floor duct wireway, 1-3/4 in. x 5-1/4 in. divided with removable covers, grommeted on open end. Length depends on cable run. Done (Init/Date) P/N MAN-01120 21

Additional Notes Note # Topic Notes P/N MAN-01120 22

X-Ray Shielding Requirements X-ray Shielding Room Notes: Item Requirements Actual Corrective Action Per state and local codes based on Medical Physicist s test results. Done (Init/Date) P/N MAN-01120 23

Additional Notes Note # Topic Notes P/N MAN-01120 24

Mounting Requirements Item Requirements Actual Corrective Action Mounting Requirements Gantry Anchors embedded 2-1/2 in. minimum and appropriate bolts/hardware 1 Acquisition Anchors embedded 2-1/2 in. Workstation minimum and appropriate bolts/hardware 2 Seismic Strongly recommended that the customer consults with a professional structural engineer familiar with seismic requirements 3 Notes: Done (Init/Date) The mounting diagrams provided in this document are recommendations only; the final responsibility for proper installation belongs to the site field engineer. Ensure all installations meet local regulations. 1 The Gantry base has four 11/16 inch mounting holes. 2 The Acquisition Workstation base has four (two additional holes are available, if needed) 5/8 inch mounting holes. 3 Seismic installations are dependant on local regulations. P/N MAN-01120 25

Additional Notes Note # Topic Notes P/N MAN-01120 26

Room Planning Templates P/N MAN-01120 27

P/N MAN-01120 28

Room Layout Work Sheet These templates can be used to establish a functional room layout. 1. Make copies of the grid and the system component cutouts. Each grid square is equal to 930 square cm (1 square foot). 2. Outline the designated room size (to scale) on the grid. 3. Cut out the system components from the copy. 4. Position the component cutouts on the grid to layout the desired work space. Allow sufficient and convenient storage for accessories. Be sure to include access clearances for service personnel. Avoid areas that may hinder access to the equipment and patient. Also avoid equipment positioning near heat ducts or air-conditioning vents. To protect from radiation exposure, locate the Acquisition Workstation so the radiation shield provides complete protection for the operator. If possible, include extra space and power outlets for future expansion of clinical services. When completed, use this final floor plan layout as a guide during the final installation phase. P/N MAN-01120 29

P/N MAN-01120 30