StormwaterWise Landscapes: Pervious Surfaces Specifications

Similar documents
Permeable Pavement. Pavements constructed with these units create joints that are filled with permeable

Inspection Guide Permeable Pavers

4.8. Subsurface Infiltration

Permeable Pavement Fact Sheet

4.8. Subsurface Infiltration

Inspection and Maintenance of Stormwater Best Management Practices

Sherman Library Maintenance Handbook for Porous Asphalt

PERVIOUS PAVEMENT. Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers

C-1. Infiltration System

Permeable Pavement Facilities and Surfaces

BMP 6.4.4: Infiltration Trench

SUPPORTING DOCUMENT STORMWATER BEST MANAGEMENT PRACTICE (BMP) INFEASIBILITY WORKSHEET FOR ON-SITE STORMWATER MANAGEMENT

4.3 Permeable Pavement Systems

Suggested Stormwater Management Practices For Individual House Lots

PERMEABLE PAVERS PHYSICAL AND GEOMETRICAL CHARACTERISTICS - PAVERS DRIVEWAYS, PERMEABLE DRIVEWAYS & PATIOS CHARACTERISTICS CSA A231.

Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual)

CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND

Stormwater Management Fact Sheet: Porous Pavement

PROJECT AT THE DENVER

Intended users: City and County public works Young engineers Developers Public officials and other non-engineers

and Green Infrastructure

How to Build a Residential Soakage Trench

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

Infiltration Trench. Image: Cahill Associates, Inc.

WQ-06 SAND FILTER. 1.0 Sand Filter. Greenville County Technical Specification for: 1.1 Description

Pervious Concrete Pavements. Mainstreaming Urban Water Conservation and Efficiency

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

9.7 PERVIOUS PAVING SYSTEMS

Site Design Measures A-3

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development

A. Division 01 Specification Sections, Drawings, General Conditions, Supplementary General Conditions, and Special Conditions apply to this section.

3.2 INFILTRATION TRENCH

Escondido Best Management Practices (BMP s)

Inlet Protection. Fe= (Depends on soil type)

and Green Infrastructure

Permeable Interlocking Concrete Pavements

Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) DRAFT

Plaza and Sidewalk Cleaning

SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO)

Rhode Island Stormwater Design and Installation Standards Manual

3.11 Sand Filter Basin

3.7 Guidance for Large Bioretention/Biofiltration BMP Facilities

APPENDIX G: CONSTRUCTION INSPECTION CHECKLISTS AND CERTIFICATION TEMPLATES

TURFSTONE PAVERS SECTION CONCRETE GRID PAVEMENTS (1995 MasterFormat Section 02795)

CONCRETE TILE PAVERS

Low Impact Development Construction, Inspection & Maintenance Field Handbook Edition 1.0 September 2016

SECTION CONCRETE GRID PAVEMENTS (1995 MasterFormat Section 02795)

Rock Sock (RS) Rock Sock height.

Storm Drain Inlet Protection for Construction Sites (1060)

Best Management Practices (BMPs) for Construction Sites & Home Remodeling Projects

PUBLIC WORKS STANDARD DETAILS

Modular Porous Paver Systems

15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES

Pervious Concrete and Construction

PERMEABLE INTERLOCKING PAVERS

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

WQ-08 ENHANCED DRY SWALE

SECTION CONCRETE GRID PAVEMENTS (Turfstone) (1995 MasterFormat Section 02795)

Storm Drain Inlet Protection

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

LOT GRADING GUIDELINES FOR LOW DENSITY RESIDENTIAL PROPERTIES

VA DEQ STORMWATER DESIGN SPECIFICATION NO. 7 PERMEABLE PAVEMENT. VERSION 1.8 March 1, 2011 SECTION 1: DESCRIPTION

Permeable Pavement. Kristen Buccier Program Manager Chagrin River Watershed Partners, Inc.

Bioretention and the Visual Indicators Approach to Inspecting and Maintaining Stormwater BMPs

Stabilizer Solutions, Inc. All Rights Reserved. Page 1 of 5

100-yr Design Runoff (cfs) Basin ID 103b A a B B C Totals

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Table Related Arlington County Standards, Specification and Policies

ACTIVITY: Infiltration Systems and Methods ST 03

Infiltration Guidelines

Practices that capture and temporarily store the WQ v before allowing it to infiltrate into the soil.

WQ-16 Pervious Pavement

Engineering Division 701 Laurel Street Menlo Park, CA Phone: (650) Fax: (650)

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Operation & Maintenance (OM) Manual v01. Bioretention Systems ENGINEERED SOLUTIONS

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

Gravity Wall. A force to be reckoned with... Gravity (SRW) segmental retaining wall systems are structures

BRADLEY UNIVERSITY. The Performance and Sustainability of Permeable Pavement Progress Report on the Work Performed Under IAPA Scholarship

Greening the Black Porous Pavement Demonstration Project City of Boston

DRIVABLE GRASS GUIDELINE FOR NON PLANTED DRY INFILL INSTALLATIONS

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.

EAGLE DRAINAGE DESIGN STANDARDS

PERVIOUS PAVEMENT: HOW S IT WORKING?

Downspout Disconnection Program FAQs

Dry Swale Wet Swale Grass Channel Dry Well Permeable Pavement Bioretention DESIGN ELEMENTS

Construction Specification for Concrete Unit Pavers

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)

HIGH PERFORMANCE MODULAR BIOFILTRATION SYSTEM (HPMBS) Operations & Maintenance

Permeable Interlocking Concrete Pavements Selection, Design, Construction and Maintenance

PERVIOUS CONCRETE PAVEMENT

Ordinance No Lot Surface Drainage

4.2 Permeable Pavement Systems

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

Chapter 3 Dispersion BMPs

SECTION TRENCHING

MACHINE-LAY Installation Manual

Construction Entrance / Construction Road Stabilization Alturnamats & Versamats Dewatering Dandy Dewatering Bag / Dirt Bag...

BIOPOD TM BIOFILTER WITH STORMMIX BIOFILTRATION MEDIA. Inspection and Maintenance Guide

BIOPOD TM BIOFILTER. with StormMix Biofiltration Media. Inspection and Maintenance Guide

Transcription:

StormwaterWise Landscapes: Pervious Surfaces Specifications Purpose & Benefits Stormwater runoff reduction High pollutant removal Control localized drainage problems Attractive alternative for walkways and driveways Description Pervious surfaces are alternatives to traditional paving materials that allow water to seep into the ground. They can be used in a wide range of residential settings, from a simple pathway or small patio up to a large driveway. Over the last few years, the market for these materials has grown. Currently, some very attractive and cost-effective options are available for small projects. What to Expect Pervious surfaces are quite similar to and replace traditional paving or hardscaped areas, except the water is intended to move through the surface and infiltrate into the ground, instead of running off as quickly as possible. The gravel bed underneath the pavement is designed to hold water temporarily, so it is deeper than that of traditional paving. Finally, the paved surface itself is different, and the contractor needs to ensure that the surface is installed correctly and does not become clogged during construction. Routine maintenance of pervious surface includes sweeping or using a leaf blower to remove fine particles from the pores in the concrete or between the pavers. A vacuum sweeper may be needed occasionally to keep the pavement surface from clogging. 1

1. Submittals The following items must be submitted to the Arlington County StormwaterWise program as part of a pervious surface implementation project. Pre- Construction: Contractor name Contractor s ICPI Certification information (permeable pavers) or NRMCA Certification information (pervious concrete) Plan of the site depicting: Dimensions and area of the pervious surface Dimensions and area of the external drainage to the proposed pervious surface (if any) Location of the observation well Location of internal flow barriers (if slope is greater than 5%) Cross section of the pervious surface, including layers, depths and dimensions. If the slope necessitates a flow barrier, it should be included in the cross section. Manufacturer s specifications for the pavement type to be used. Manufacturer s specifications for the filter fabric (woven) type to be used (see table below) Run-On - If you are directing additional drainage on the pavement or into the pavement bedding, such as from the roof or another downspout, you may need to have a deeper bedding layer and there are additional submission requirements below. Infiltration test results (See details below on how to perform the test and report the information.) Site drainage calculations (See details below on how to report the information.) Note: All of the required elements above must be submitted as one package. Post-Construction: Photograph of excavated pervious surface area prior to adding reservoir stone, including a tape measure documenting the depth of excavation Photograph of excavated pervious surface area after to adding reservoir stone, including a tape measure documenting the depth of excavation Photograph of flow barriers (if used) 2

Photograph of the filter fabric used, including the fabric roll s label or a manufacturer s number Photograph of the completed pervious surface 2. Materials Figure 1. Typical Residential Permeable Paver Detail (N.T.S.) 3

Table 1 includes a list of materials needed to install pervious surface: Table 1. Material Specifications for Pervious Surfaces Material Specification Notes Acceptable pavement materials include permeable interlocking pavers with Pavement 5-15% open area, pervious concrete, and interlocking grids with gravel fill. ASTM D448 size No. 8 stone (e.g. 3/8 to 3/16 inch in size). Should be doublewashed and clean and free of all fines. Bedding Layer Pervious Concrete: None Pavers: 2 inches of No. 8 stone Note: If you are adding additional drainage ( Run-On ) an infiltration test must be performed. Additional bedding depth may be required depending on the infiltration rate. See infiltration test specification below. Reservoir Layer Filter Fabric (Woven) Observation Well 12 inches of No. 57 stone* The underlying native soils should be separated from the stone reservoir by a layer of filter fabric. The filter fabric must have a flow rate greater than 125 gpm/sq. ft. (ASTM D4491), and an Apparent Opening Size (AOS) equivalent to a US #70 or #80 sieve (ASTM D4751). ASTM D448 size No. 57 stone (e.g. 1 1/2 to 1/2 inch in size). Should be washed and clean and free of all fines. Not all filter fabric is the same. The flow rate and apparent opening size specifications are essential to the proper function of the filter fabric. Product examples that meet these specifications include Tencate Mirafi 140N or 140NC, Terratex SD, Propex 451, SRW NW4, and U.S. Fabrics US 100 NW Use a perforated 4 to 6 inch vertical PVC pipe (AASHTO M 252) with a lockable cap, installed flush with the surface. Applications in driveways shall have a metal cap. Run-On - If any additional drainage will be directed to the pavement (i.e., roof gutter) there are two additional requirements. Refer to the Site Drainage section below for additional information. 1) Infiltration Test - If an infiltration test is performed that documents an infiltration rate of at least 0.5 inches per hour, the reservoir layer depth can remain at 6 inches. However, if the soils do not infiltrate sufficiently, or less than 0.5 inches per hour, you must calculate the Run-On in order to determine the additional bedding depth that is needed to sufficiently store the additional water. Note that any additional Run-On would require a minimum of 12 inches of stone bedding. Instructions for conducting a soil infiltration test are available on the StormwaterWise Landscapes web site (http://arlingtonva.s3.amazonaws.com/wp-content/uploads/sites/13/2013/10/soil-test.pdf). 2) Run-On Calculation 4

3. Location, Feasibility, and Design The following must be considered when installing a pervious surface: Location - If the permeable surface is replacing an existing impervious surface, check to see how dirty the existing surface is after a rain storm. This is a good indication of how much dirt and sediment will wash onto the permeable replacement. If the area appears to receive a significant amount of water and/or sediment from upslope areas, this may not be the best location for pervious paving. If it is really desired, it is important to consider installing a swale or French drain to divert runoff around the new pavement and preferably, stabilize upslope or eroding areas with more dense vegetation. Although pervious surfaces are designed to infiltrate stormwater, heavy rains may overwhelm a pervious surface, regardless of the soil quality below the stone. When designing a pervious surface, make sure that the overflow from the surface is considered. This is no different than traditional pavement. The water flowing away from the pavement should be directed to a stable surface that will not erode and that can handle the volume of water, such as the street. Size A pervious pavement project for StormwaterWise must be a minimum of 150 square feet for a residential project, and 300 square feet for an HOA project. Groundwater Depth Pervious surfaces filter pollutants as runoff flows through the natural soils. If the groundwater comes too close to the bottom of of the stone reservoir layer, pollutants can potentially flow through to the groundwater. In addition, these surfaces are more likely to have problems over the long term. Setbacks To avoid the risk of seepage, pervious surfaces should not be hydraulically connected to structure foundations. Pervious surface must be located at least 5 feet away from a building foundation if the surface is down-gradient from the building. Pervious surface must be located 25 feet away if the surface is located upgradient from the building. These setback requirements can be relaxed if a 30 mil impermeable liner is installed along the sides and bottom of the pervious surface system wherever the setback distance is infringed upon. Proximity to Utilities - Always call Miss Utility before digging. Interference with underground utilities should be avoided whenever possible, particularly water, sewer, electric and gas lines. Conflicts with water and sewer lateral pipes (e.g., house connections) might be unavoidable, in which case excavation should be done very carefully to avoid damaging those pipes. Also, be aware that Miss Utility may not always mark private cable, propane, electric, and similar lines, so some additional site work may be necessary to locate these. Proximity to Trees If tree branches extended over the proposed pervious surface, an arborist must be consulted to ensure that the required excavation will not harm the tree. Site Drainage Permeable pavement will function best if run-on from adjacent impervious and pervious surfaces is minimized. If additional Run-On from adjacent areas will occur, the following requirements apply: All contributing areas must be fully stabilized. Areas of bare soil cannot be allowed to drain to the pervious surface. Turf and landscaped area should be minimized in the contributing drainage area if possible. 5

An infiltration test must be performed as close to the proposed pervious surface as is practicable, and calculations must be provided that show that the reservoir layer has sufficient depth to capture 1 inch of rainfall from the contributing drainage area (including the pervious surface itself) and that the reservoir will fully drain within 48 hours. Sump pumps should not discharge to the pervious pavement. The external drainage area must be less than 2.5 times the area of the pervious surface. Example Calculation The surface area of the proposed pervious surface is 480 square feet. Runoff from an additional 1,000 square feet of impervious surface will be directed toward the pervious surface. The following steps are required to ensure that this design meets the site drainage requirements. 1. Check that the external drainage area is less than 2.5 times the area of the pervious surface: 1,000 sf/480sf = 2.1 Requirement met. 2. Determine the required volume of reservoir layer to capture 1 inch of rainfall: 3. Perform infiltration test: (480 sf + 1,000 sf) 1in 1 ft = 123.3 cubic feet 12in Infiltration test yields and infiltration rate of 0.6 in / hr. (Since this rate is above 0.5 in / hr, the reservoir depth may be reduced to 6 inches, depending on the results of step 4 below.) 4. Determine the required depth of the reservoir layer, using a stone porosity of 0.4: [(123.3 cf/480 sf)/0.4] ( 12in ) = 7.7 in 1ft Use reservoir depth of 8 inches. 5. Check that the water in the reservoir layer will drain within 48 hours: (8in 0.4) 1hr = 5.3 hours 0.6in Requirement met. This example design will drain within 48 hours and has an external drainage area less than 2.5 times the pervious surface area. Therefore, it meets the site drainage area requirements. Slopes Pervious surfaces are most effective when they are used on flat or nearly flat areas (less than or equal to 5% slope). Pervious surfaces may not be installed in areas adjacent to 20% or greater slopes, and the slope of the final, installed surface must be 10% or less. The slope of the excavated area for a pervious surface installation should be as flat as possible (i.e., 0 percent 6

longitudinal and lateral slopes) to enable even distribution and infiltration of stormwater. On sloped sites (greater than 5%), internal flow barriers (i.e. check dams) can be used to achieve the 0% slope on the bottom. To reduce the depth of gravel fill needed to achieve a flat bottom, internal flow barriers (i.e. check dams) can be used to achieve the 0% slope on the bottom. Flow barriers must be constructed of concrete or impermeable geotextile. See figures 2 and 3. Figure 2. Typical Pervious Surface Concrete Flow Barrier Detail. (N.T.S.) 7

Figure 3. Typical Pervious Surface Fabric Flow Barrier Detail. (N.T.S.) Edging Edge restraints are required for all pervious surface installations. Concrete curbing/edging is preferred, but plastic edge restraints are also acceptable. Existing curbs may also be used as the edge restraint. Public Right-of-Way Driveway replacements may include impacts to the public right-of-way (i.e. the sidewalk, driveway apron, street, and adjacent County-owned land). If a portion of the project will be within the public right-of-way, a Public Right-of-Way Permit is required from the Permitting & Inspections Office. Permit information is available at http://topics.arlingtonva.us/permits-licenses/public-right-way-permit-guide/. Additional information on driveway apron replacements can be found at http://transportation.arlingtonva.us/streets/curbs-sidewalks/. Certified Installer For permeable interlocking concrete pavers, installation must be done by an Interlocking Concrete Pavement Institute (ICPI) Certified Installer. 8

4. Construction Surfaces should align and be flat, the base layers should be evenly applied and uniformly compacted to an appropriate degree. Pay particular attention to areas where pervious surface edges meet other surfaces (e.g., asphalt, grass areas). It is best to work from a thorough plan, including plan view, profile or cross-section views, with depths and dimensions labeled. Measure carefully and frequently to ensure the installation is staying on plan. Step 1 Call Miss Utility: Call Miss Utility before excavating, and also check for private cable, propane, electric, and other lines. Also try to identify private propane, cable, electric, and other small lines. Make sure to have a plan and phone numbers of whom to call in case there is any damage to utilities. Step 2 - Outline the Project & Mark Utilities: Mark the excavation area for the proposed hardscape. Step 3 Excavate: It is best to excavate when the weather is expected to be dry for several days. Excavate to dimensions and depths, as per the plan. *Remember to take a photograph with a tape measure! Step 4 Rake or Till: Rake or till the bottom soils to promote greater infiltration. Step 5 Filter Fabric: Line the bottom and sides of the excavated area with filter fabric. This can be held in place with landscape staples. Step 6 Install Flow Barriers (if necessary) Step 7 Install Observation Well Step 8 Install Reservoir Layer and Bedding Layer: Install the various layers called for in the plans. Place gravel and other base materials in layers of no more than 4-6 inches. Compact layers of gravel and base materials with a vibratory plate compactor until there is no visible movement of aggregate. *Remember to take a photograph with a tape measure! Step 9 Install Paving: Install permeable paving material at the surface. Ensure that the surface is even and flat, and level or with a very slight slope, based on the plans. When installing pavers, it is best to limit the difference between the elevations of two adjacent blocks to no more than ¼ inch to avoid tripping hazards and additional disturbance to the pavers. Spacing between pavers must be filled with #8 stone. Step 10 Install Gravel Fill between the pavers Step 11 Inspect: Inspect the area after several rain events to look for any needed adjustments. Ensure that the surface is draining properly and not becoming clogged. 9

5. Maintenance The following maintenance should be performed to keep pervious pavement functioning properly: Prevent erosion in the area that drains to the pervious pavement to keep sediment from clogging the surface. During winter weather the snow may belt faster because of capillary action (the flow of air up through the paving). If you want to prevent icing however, do not use sand, kitty litter, or salt but instead shovel immediately after each snowfall or use an environmentally-friendly deicer. Do not seal the pervious pavement surface. Sweep up leaf litter and other debris regularly to limit clogging or blow this material off the driveway. Once a year, inspect the surface of the permeable pavement for evidence of clogging. Signs that your permeable pavement may be clogged include sediment deposition, staining or water ponding on the surface. If any signs of clogging are noted, the surface should be swept or vacuumed. Then, test sections by pouring water from a five gallon bucket to ensure they work. Once a year, inspect the surface for signs of deterioration, such as slumping, cracking, spalling, or broken pavers. Replace or repair affected areas, as necessary. As needed, replace the gravel fill between the pavers. 6. Resources Arlington County, VA. 2016. Stormwater Manual: A Guide to Stormwater Requirements for Land Disturbing Activities in Arlington County. Available at: http://topics.arlingtonva.us/building/stormwater-managementordinance/ Smith, D. 2006. Permeable Interlocking Concrete Pavement-selection design, construction and maintenance. Third Edition. Interlocking Concrete Pavement Institute. Herndon, VA Virginia Department of Environmental Quality. 2013. Virginia Stormwater BMP Specifications Rev. 2013 (DRAFT). Richmond, VA. Available at: http://www.deq.virginia.gov/programs/water/stormwatermanagement/publications.aspx 10