Gas Network Innovation Strategy

Similar documents
Electricity Network Innovation Strategy

Gas Network Innovation Strategy at a glance. March 2018

Open Networks Project

a) Seek clarification from the Department for Transport in respect of future core funding for the work of the Strategic Transport Forum.

Electricity Market Reform Capacity Market Implementation Plan

Five-Year Strategy

Operating Margins Report July 2016

DS3 System Services Project Plan Detailed Design and Implementation Phase

Draft Refined Incremental Proposal GAC WS 2

NATIONAL GRID. NTS Shrinkage Incentive Methodology Statement Submitted for Approval

European Developments

NIA Project Registration and PEA Document

Air quality sensing in europe

NATIONAL GRID. NTS Shrinkage Incentive Methodology Statement

GC0114: System Operation Guideline: Prequalification Processes

Joint European Stakeholder Group. Tuesday 9 January 2018 Meeting 28 WebEx

Implementing the Leapfrog Hospital Rewards Program

Nelson Hospital Redevelopment. Proposed Approach to Business Case Development

Revised SMIS+ implementation plan. 4 th August 2015 SMIS+ Team

SO incentives from February 2012

Open Networks Project Phase Project Initiation Document

Gas Daft. Unaccounted for Gas Report. National Grid. Gas Transmission. October Target audience. Ofgem and other interested industry parties

European Developments

Energy Networks Association Open Networks Project 2019 Workplan Webinar. February 13 th :30 pm

Finch Drinking Water System O. Reg 170/03 Schedule 22 - Summary Report for Municipalities

EFSA Strategy 2020 AF meeting. Luxembourg, 8 9 December 2015

Investor Webinar. UK Transmission Incentives. October 2010

Demand Estimation Sub Committee 2018/19 Demand Models. 24 th July 2018

Submitted to: Project Charter outlining the process to establish a credible. Revision: 1. Author: Kuben Naicker. Date:

European Update. 2nd July 2015

OPTIMISATIONS IN THE USE OF DIGITAL DOCUMENT MANAGEMENT FOR COLLABORATIVE ENGINEERING DESIGN. deliver projects better, faster, together

Storage as a Transmission Asset:

3. What this will mean for Electoral Registration Officers and Electoral Administrators

Thank you for joining the Future Worlds consultation webinar. The webinar will start at 14:03.

Agenda. Document Name. Date 09 November 2018 Reference

The questions have been finalised and they are in the following sections: Perceptions of the job and the organisation

Stakeholder Engagement Plan for the Distribution System Security and Planning Standards Review Project

CMP286. Mod Title: Improving TNUoS Predictability Through Increased Notice of the Target Revenue used in the TNUoS Tariff Setting Process.

Finch Drinking Water System O. Reg. 170/03 Schedule 22 - Summary Report for Municipalities

UNC 0658 (Urgent): CDSP to identify and develop improvements to LDZ settlement processes. UNC Modification

P295 Submission and publication of Transparency regulation data via the BMRS

Machinery and Equipment

Procurement Guidelines Report Procurement Guidelines Report

Explanation of the NTS SO and TO Commodity Charges for the formula year 2014/15 October 2014

Energy Networks Association - Response to Call for Evidence from BEIS/Ofgem

Corporate Information CMP

Initial Modification Report No.39. Transfer of Exit Capacity between Northern Ireland Exit Points to permit Secondary Trading of Exit Capacity

Diabetic Retinopathy Screening Service Wales (DRSSW)

The Voice of the Networks Energy Networks Association

Customer Satisfaction& Stakeholder Engagement Measures

Joint European Stakeholder Group. Thursday 21 September 2017 Meeting 24 WebEx

Enterprise Risk Management

UK Link Committee Meeting. xoserve Report Pack SEPTEMBER 2009

2017 KEY INSIGHTS ON. Employee Attendance and Tardiness

Energy UK response to the Electricity System Operator Forward Plan

Market-wide Half-Hourly Settlement

NHS Supply Chain May SME participation figure is 28% by sales value across both transacted and nontransacted

Communities Roadmap. As of July 24, PJM 2018

AMENDMENT REPORT. STC Proposed Amendment CA039 Amendment of outage planning timescales to enable more coordinated outage planning

Ambient Air Quality Directives. Fitness Check

Electricity System Operator Forward Plan 2018/19

Future arrangements of the System Operator. Cathy McClay Head of Commercial Operations

Unidentified Gas. Executive Summary

Operationalizing" Excellence with ERM. Wesley Morgan Andrew Bent

Primary Care Workforce Centre Delivery Plan 2018/2019 to 2019/2020

Establishing a Medical Licensing Assessment Programme Board

GC0104 Mod Title: EU Connection Codes GB Implementation Demand Connection Code

Open Networks Project 2018 Work Plan Consultation innogy renewables UK response

HIGHLANDS AND ISLANDS AIRPORTS LIMITED

APPLICATION INFORMATION: 1. All five sections of the application must be completed.

CAPACITY BUILDING OF THE BURBERRY SUPPLY CHAIN THROUGH AWARENESS AND COMMITMENT MARCH 2017

Open Networks Project Phase 2 Work Programme Webinar (15 Feb)

Open letter: Cooperation with revised Project Nexus Governance Arrangements

Gas Network Innovation Strategy. March 2018

Consultation on DS3 System Services Contracts for Interim Arrangements. DS3 System Services Implementation Project

University of Worcester Concordat to Support the Career Development of Researchers Action Plan

The GNSO Council welcomes the opportunity to comment on the Long Term Options to Adjust the Timeline of the Reviews.

The Future of Electricity: A Market with Costs of Zero? Marginal

His Worship Mayor Don Darling and Members of Common Council. SUBJECT: Project Performance Update Safe, Clean Drinking Water Project

Transmission Charging Methodologies Forum & CUSC Issues Steering Group. 11 th July 2018

Operating the Electricity Transmission Networks in 2020

Case study: Experian plc

Publication of Risk Management Plan (RMP) summaries:

TARGET Services: advanced market infrastructure for Europe

NSW Council Amalgamations

CANADIAN NUCLEAR SAFETY COMMISSION

The Future of Electricity: A Market with Costs of Zero? Marginal

Consulting on our Business Plan

CUSTOMER ENGAGEMENT OUTCOMES REPORT

AoC and Organizational Reviews: Supporting ICANN Accountability. ICANN53 24 June 2015

DCC Business Case for DCC activities during the Transitional Phase of the Switching Programme

Concept Paper Recommendation 6 The SCCP Prepare a Roadmap and Implementation Plan to Achieve the Single Window Vision

Resource Adequacy Enhancements Straw Proposal - Part 1. Stakeholder Call January 23, 2019

UNC 0630R: Review of the consequential changes required in UNC as a result of the Ofgem Switching Programme. UNC Request Workgroup Report

Stakeholder Engagement Session on Long-Term Load and DER Forecasting July 14, 2017

CM061: Amendment to the OFTO STC Panel Representative election process

WELCOME TO THE PUBLIC INFORMATION OPEN HOUSE!

Targeted Charging Review SCR, Regulating the Future Energy System and the Charging Futures Forum. 11 October 2017

SSEN Consultation: Unlocking Orkney s renewable potential

Independent Formative Evaluation of the World Health Organization

Transcription:

Gas Network Innovation Strategy Delivery Plan 31 August 2017

Table of Contents 1 Introduction... 1 2 Plan... 2 2.1 Approach... 2 2.2 Requirements... 2 2.3 Timeline... 2 2.4 Stakeholder engagement... 4 List of Tables Table 1 Gas Network Licence Holders... 1 Table 2 Licence Condition Requirements... 2 Table 3 Plan for development of the Gas Networks Innovation Strategy... 3 Table 4 Key Stakeholder Groups... 4 T +44 (0) 20 7706 5100 W www.energynetworks.org.uk E info@energynetworks.org

1 Introduction (ENA) is the voice of the networks, representing the wires and pipes transmission and distribution network operators for gas and electricity in the UK and Ireland (known as Member Companies). On 30 June 2017, Ofgem issued a Direction notice to modify the standard conditions of the gas transporters licence. The effect of these modifications requires the affected licensees to work together to develop and consult with stakeholders on a Gas Network Innovation Strategy. The licensees are coordinating the development of the Gas Network Innovation Strategy through the Gas Innovation and Governance Group of ENA. This document outlines the plan for developing the initial Gas Network Innovation Strategy to be published by the 31st March 2018. This plan has been developed by ENA alongside the Network Licence holders in Table 1 who will be referred to throughout this document as the Gas Networks. Note that this includes both the transmission and distribution networks. As per sections A28.3 & A28.6 of Licence Conditions, the gas distribution and transmission networks have agreed to make all reasonable endeavours to cooperate in the development and maintenance of the Gas Network Innovation Strategy. This includes a two-yearly review and potential update where necessary, as per sections A28.5 of the relevant licence conditions. Company Distribution Transmission Cadent National Grid Northern Gas Networks SGN Wales & West Utilities Table 1 Gas Network Licence Holders T +44 (0) 20 7706 5100 W www.energynetworks.org.uk E info@energynetworks.org 1

2 Plan 2.1 Approach ENA is coordinating the delivery of the Gas Network Innovation Strategy and plan on behalf of its Member Companies. This work will be managed within the ENA Gas Innovation and Governance Group (GIGG), who will be responsible for representing their respective Member Companies. An independent consultant has been contracted to assist in the coordination and development of the Gas Network Innovation Strategy, and to help test Gas Network thinking against other geographies and the wider industry. The procurement of the independent consultant involved an open tendering process, judged against specific criteria identified in this plan. Together ENA, the Gas Networks and the independent consultant will engage with relevant stakeholders, Ofgem and BEIS to produce a high quality, forward thinking and collaborative innovation strategy for the Gas Networks. 2.2 Requirements The requirements for the Gas Network Innovation Strategy are detailed in Clause A28 of the Gas standard special licence conditions. In particular, Clause A28.7 of the licence conditions describe explicitly what must be included within the Gas Network Innovation Strategy in a series of points labelled (a) to (f). For simplicity, these sections will subsequently be referred to as (a), (b), (c) etc. as set out in the Table 2 Licence Condition Requirements Licence Description Clause A28.7 (a) Description of the challenges and uncertainties which are pertinent to the Gas Networks that could be addressed through innovative projects. A28.7 (b) Description of the innovative projects and plans the Gas Networks intend to make in order to address the challenges referred to in (a). A28.7 (c) Description of the challenges which are not currently being addressed through industry projects or plans. A28.7 (d) Description of the innovative projects and plans the Gas Networks intend to make in relation to the challenges identified in (c). A28.7 (e) Description of how Gas Networks will coordinate their activities on Innovation Projects to minimise unnecessary duplication of effort. A28.7 (f) Description of how Gas Networks will share the learning that they have gained through Innovation Projects. Table 2 Licence Condition Requirements 2.3 Timeline The plan for developing the strategy is described in Table 4, which shows the various tasks, any related clauses from the licences conditions, predicted start and finish dates for the respective tasks and finally the responsible parties. The development of this plan has been carried out in compliance with section A28 of the licence conditions. T +44 (0) 20 7706 5100 W www.energynetworks.org.uk E info@energynetworks.org 2

Licence Clause (if applicable) A28.3 & A28.6 Description Scope Start Date End Date Report writing and coordination of content as required by Ofgem, setting procedures for updating the strategy and comparison to other strategies Internal Members' review Producing draft for consultation A28.8 Stakeholder consultation A28.8 ENA LCNI Conference A28.8 A28.4 & A28.6 Summarise stakeholder feedback with presentation to Gas Networks Finalise the Innovation Strategy & complete internal reviews Submit strategy Table 3 Plan for development of the Gas Networks Innovation Strategy The consultant and gas networks will put together a first draft of the Gas Network Innovation Strategy. This process will include procedures for updating the strategy, and enable gas networks to assess alignment with the individual gas networks Innovation Strategies, electricity network strategies, and other external strategies. Review of the first draft of the report, including presentation by consultant at GIGG meeting on 21 Sep. Duration (weeks) 31-Aug-17 14-Sep-17 2 Responsible 14-Sep-17 21-Sep-17 1 GIGG Updates to take account of GIGG Members comments. 21-Sep-17 1-Oct-17 2 Gas networks to review second draft of the report, and confirm internal sign off by each network. 1-Oct-17 19-Oct-17 2 GIGG and ENA to finalise consultation document. 19-Oct-17 31-Oct-17 2 Public consultation to ensure that the Strategy takes in a wide range of viewpoints. The format will comprise of an open call for comment (posted on ENA and gas network websites and sent out for comment), and dedicated sessions at the LCNI conference on 6-7 December in Telford. Dissemination of the first draft of the Gas Network Innovation Strategy to the attendees at ENA's LCNI Conference in Telford, alongside the Electricity Networks innovation Strategy. The consultant will review feedback from the formal consultation and events, and share with the networks through a presentation and summary report. The consultant and gas networks update Innovation Strategy based on feedback and issue as final. Submit Gas Network Innovation Strategy to Ofgem and publish on ENA and networks websites. 31-Oct-17 31-Dec-17 13 06-Dec-17 07-Dec-17 1 08-Jan-18 01-Feb-18 4 01-Feb-18 29-Mar-18 8 /ENA / GIGG / GIGG 30-Mar-18 30-Mar-18 0 ENA / GIGG T +44 (0) 20 7706 5100 W www.energynetworks.org.uk E info@energynetworks.org 3

2.4 Stakeholder engagement The importance of stakeholder consultation for the Gas Network Innovation Strategy is highlighted by Part C (section A28.8) of the Licence Conditions, and the Gas Networks consider this an important part of the process of developing the Strategy. In order to identify and address all of the challenges and uncertainties which network innovation could help to resolve, it is essential that the views of wider industry stakeholders are taken into account. The Networks believe that the ideas and considerations contributed by other parties during consultation will strengthen the projects and programmes identified to address the challenges and uncertainties. The consultation will be held online, giving all interested parties adequate opportunity to review the draft strategy and provide valuable feedback. In addition, the draft strategy will be presented at ENA s LCNI conference, and an interactive session will give attendees the opportunity to give feedback directly and ask questions. The presentation of the plan at the LCNI conference will take place alongside the Electricity Network Innovation Strategy, enhancing the opportunity for whole systems thinking on innovation and the future of the networks. Table 4 below shows a sample of the groups of stakeholders who will be engaged as a part of this plan. Type Gas Networks External Stakeholders Ofgem/BEIS Description The Gas Networks have agreed to work together to develop the Gas Network Innovation Strategy and will provide their internal innovation strategies which will be key inputs to the joint strategy. External stakeholders and interested parties will be invited to contribute to the Gas Network Innovation Strategy by providing their views in response to the stakeholder consultations described in the plan. Ofgem and BEIS will be key inputs to the strategy, and will be consulted with throughout the development of the strategy. The Electricity transmission and distribution networks will be consulted (both directly and through the ENA Innovation Team) throughout the Electricity Networks development of the strategy, to ensure that cross-vector thinking is applied and that the Gas Network Innovation Strategy is completed with consideration to the whole energy system. Table 4 Key Stakeholder Groups T +44 (0) 20 7706 5100 W www.energynetworks.org.uk E info@energynetworks.org 4