APPENDIX F. SECTION 404(B)(1) EVALUATION SHORT VERSION. Herbert Hoover Dike Dam Safety Modification Study

Similar documents
EVALUATION OF SECTION 404(b)(1) GUIDELINES (SHORT FORM)

Appendix C. Clean Water Act: Section 404(b)(1) Evaluation

EVALUATION - SECTION 404 OF THE CLEAN WATER ACT DISCHARGE OF SEDIMENTS FROM OR THROUGH A DAM

ENVIRONMENTAL RESTORATION IN COASTAL MISSISSIPPI: MARSH RE-ESTABLISHMENT PROJECT HARRISON AND JACKSON COUNTIES, MISSISSIPPI

DRAFT SECTION 404(b)(1) EVALUATION REPORT CONTINUED MAINTENANCE DREDGING OF THE FEDERALLY AUTHORIZED EASTPOINT NAVIGATION PROJECT

SECTION 404(b)(1) EVALUATION REPORT FOR THE FOR THE OPERATIONS AND MAINTENANCE OF THE FEDERALLY AUTHORIZED BILOXI HARBOR NAVIGATION PROJECT OTT BAYOU

Appendix A Section 404(b)(1) Evaluation

404(b)(1) EVALUATION

Compliance with the USEPAs Section 404(b)(1) Guidelines

Table 1. Proposed R-400 Quantities and Scour Lengths.

Appendix D 404(b) Analysis

Montrose Irving: Chicago Shoreline Project

APPENDIX 2. Evaluation under Section 404 (b)(1) of the Clean Water Act Two Moon Bay

Encinitas-Solana Beach Coastal Storm Damage Reduction Project. San Diego County, California. Appendix D. 404(b)(1) Evaluation

APPENDIX A SECTION 404(B)(1) EVALUATION TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT RENOURISHMENT

APPENDIX E SECTION 404 (B) (1) EVALUATION OF DREDGE AND FILL MATERIAL

Environmental Assessment Appendix H: Section 404(b)(1) Guidelines Evaluation. U.S. Army Corps of Engineers New York District

Appendix D Coastal Zone Management Act and Florida Coastal Management Program Federal Consistency Determination

APPENDIX B Section 404(b)(1) Guidelines Evaluation

Appendix 1 CWA Section 404 Compliance Forms Section 404(b)(1) Guideline Short Form and Coastal Zone Consistency

Environmental Protection Agency Pt. 230

Section 404(b)(1) Evaluation

Appendix D 404(b) Analysis

PUBLIC NOTICE NO. FP13-AB03-05 August 30, 2013 CESAM-PD-EC JOINT PUBLIC NOTICE

Draft Feasibility Report with Integrated Environmental Assessment Harlow Island HREP. Appendix I Clean Water Act Section 404(B)(1) Evaluation

DRAFT Subject to Modifications

Issuing Office: CELRB-PM-EA Published: 22 FEB 2019 Notice No: SANDUSKY-19 Expires: 25 MAR 2019

EPA and the Corps agree that the proposed discharge can reasonably be expected to result in environmental gain or insignificant losses.

U.S. Army Corps of Engineers Sacramento District

Navigating Section 404 Clean Water Act Permitting

Part III will be filled out by all applicants applying for a permit to perform dredging.

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

SEPTEMBER 18, 2018 SUBMITTED TO: STATE OF NEW YORK DEPARTMENT OF STATE COASTAL ZONE MANAGEMENT PROGRAM

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT

Errata sheet for the Connecticut General Permits May 2, 2017

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

Department of the Army Permit Application

Summary of 2017 NWPs NWP #3 NWP #5 NWP #7 NWP #12 NWP #13 NWP #14 NWP #15 NWP #18 NWP #19 NWP #21 NWP #23 NWP #25 NWP #27 NWP #29 NWP #30 NWP #31 NWP

U.S. Army Corps of Engineers. Regulatory Branch Program Overview

Public Notice NATIONWIDE PERMIT REISSUANCE FOR THE STATE OF OHIO

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Texas Commission on Environmental Quality 401 Water Quality Certification Conditions for Nationwide Permits Attachment 1

Errata sheet for the Connecticut General Permits March 26, 2019

Alternatives Analysis Framework

JOINT PUBLIC NOTICE. February 13, Leake Avenue Post Office Box 4313 New Orleans, Louisiana Baton Rouge, Louisiana

DRAFT. Appendix B 404(b)(1) Clean Water Act Pigs Eye Lake Ramsey County, MN Section 204

JOINT PUBLIC NOTICE August 4, 2014

U.S. Army Corps of Engineers, Alaska District PRECONSTRUCTION NOTIFICATION FORM

Regulatory Program Workshop 26 September 2013

Nationwide Permit General Conditions

JOINT PUBLIC NOTICE. April 16, Leake Avenue Post Office Box 4313 New Orleans, Louisiana Baton Rouge, Louisiana

GREAT KILLS HARBOR, STATEN ISLAND, NEW YORK FEDERAL NAVIGATION PROJECT MAINTENANCE DREDGING

JOINT PUBLIC NOTICE May 29, 2018

Nationwide Permit General Conditions

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

PUBLIC NOTICE LOS ANGELES DISTRICT. APPLICATION FOR PERMIT Port of Los Angeles Berths : Wilmington Waterfront Promenade

JOINT PUBLIC NOTICE. February 8, United States Army Corps of Engineers State of Louisiana

' MY () Interim Risk Reduction Measures Grubbing in Cleared Areas Chena River Lakes Project Fairbanks, Alaska

Navigating the U.S. Army Corps of Engineers Regulatory Process

J O I N T P U B L I C N O T I C E

Appendix C-6. Coastal Zone Management Act Coordination Consistency Determination

NATIONWIDE PERMIT 18 Minor Discharges Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

Department of the Army; Corps of Engineers

Nationwide Permit 34 - Cranberry Production Activities Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

Nationwide Permit 40 - Agricultural Activities Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

JOINT PUBLIC NOTICE. February 18, 2014

30 DAY PUBLIC NOTICE MAINTENANCE OF THE NEW HAVEN HARBOR FEDERAL NAVIGATION PROJECT NEW HAVEN, CONNECTICUT

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

Public Notice: Application for Permit

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

ATTACHMENT 2 PROJECT NEED AND JUSTIFICATION

Public Notice of Application for Permit

NATIONWIDE PERMIT 52 Water-Based Renewable Energy Generation Pilot Projects Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

Using the Transportation Planning Process to Support the NEPA Process

JOINT PUBLIC NOTICE. October 14, 2014

JOINT PUBLIC NOTICE June 4, 2018

Nationwide Permit 19 - Minor Dredging Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

PUBLIC NOTICE Application for Permit

Federal and State Regulation of Stormwater Discharges From Construction Sites

Public Notice: Application for Permit

CESAM-RD-A December 4, 2017 PUBLIC NOTICE NO. SAM SBC

PUBLIC NOTICE. REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd 30 DAY NOTICE Littleton, CO FAX (303)

Nationwide Permit 22 - Removal of Vessels Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

PUBLIC NOTICE REQUEST FOR PERMISSION TO ALTER A U.S. ARMY CORPS OF ENGINEERS PROJECT PURSUANT TO 33 U.S.C. SECTION 408

CELRN-OP-F (1145b1) 19 March 2014 Application LRN

NATIONWIDE PERMIT 31 Maintenance of Existing Flood Control Facilities Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

JOINT PUBLIC NOTICE. 29 January Leake Avenue Post Office Box 4313 New Orleans, Louisiana Baton Rouge, Louisiana

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

Nationwide Permit 52 - Water-Based Renewable Energy Generation Pilot Projects

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE PLYMOUTH HARBOR FEDERAL NAVIGATION PROJECT PLYMOUTH, MASSACHUSETTS

JOINT PUBLIC NOTICE October 24, 2016

Department of Army Permitting Process: Dredging

15 DAY PUBLIC NOTICE. MAINTENANCE DREDGING OF THE FEDERAL NA VIGA TION PROJECT IN PA WTUXET COVE CRANSTON and WARWICK, RHODE ISLAND

Santa Clara Valley Habitat Plan Regional General Permit #18. Training and Workshop for Co-Permittees April 5, 2016

A. Nationwide Permit General Conditions

JOINT PUBLIC NOTICE. July 7, 2014

NATIONWIDE PERMIT 7 Outfall Structures and Associated Intake Structures Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

APPENDIX G. Applicable or Relevant and Appropriate Requirements (ARARs) Revised EE/CA. Lower Duwamish Waterway Superfund Site: T-117 Early Action Area

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

Transcription:

Appendix F Section 404(b)(1) APPENDI F. SECTION 404(B)(1) EVALUATION SHORT VERSION Herbert Hoover Dike Dam Safety Modification Study HHD Dam Safety Modification Study EIS June 2016 E i

Appendix F Section 404(b)(1) This page intentionally left blank HHD Dam Safety Modification Study EIS June 2016 E ii

Appendix F Section 404(b)(1) HHD Dam Safety Modification Study Draft EIS June 2016 E iii

HHD DSMS EIS CWA Section 404 Compliance Forms Section 404(b)(1) Guideline Short Form

EVALUATION OF SECTION 404(b)(1) GUIDELINES (SHORT FORM) Herbert Hoover Dike Dam Safety Modification Study Description of Action: During staging or preparing site access for construction of the proposed alternative, it is possible that up to one half acre of wetlands may be temporarily impacted. These impacts would be minor and short term. The impacts would be considered during the Water Quality Certification process.

EVALUATION OF SECTION 404(b)(1) GUIDELINES (SHORT FORM) PROPOSED PROJECT: Herbert Hoover Dike Dam Safety Modification Study 1. Review of Compliance (230.10(a)-(d)) A review of the proposed project indicates that: a. The placement represents the least environmentally damaging practicable alternative and, if in a special aquatic site, the activity associated with the placement must have direct access or proximity to, or be located in the aquatic ecosystem, to fulfill its basic purpose (if no, see section 2 and information gathered for EA alternative). b. The activity does not appear to: 1) Violate applicable state water quality standards or effluent standards prohibited under Section 307 of the Clean Water Act; 2) Jeopardize the existence of Federally listed endangered or threatened species or their habitat; and 3) Violate requirements of any Federally designated marine sanctuary (if no, see section 2b and check responses from resource and water quality certifying agencies). c. The activity will not cause or contribute to significant degradation of waters of the U.S. including adverse effects on human health, life stages of organisms dependent on the aquatic ecosystem, ecosystem diversity, productivity and stability, and recreational, aesthetic, an economic values (if no, see values, Section 2) d. Appropriate and practicable steps have been taken to minimize potential adverse impacts of the discharge on the aquatic ecosystem (if no, see Section 5) No* 2. Technical Evaluation Factors (Subparts C-F) (where a Significant category is checked, add explanation below.) a. Physical and Chemical Characteristics of the Aquatic Ecosystem (Subpart C) Not Applicable Not Significant 1) Substrate impacts Significant* 2) Suspended particulates/turbidity impacts 3) Water column impacts 4) Alteration of current patterns and water circulation 5) Alteration of normal water fluctuation/hydroperiod 6) Alteration of salinity gradients b. Biological Characteristics of the Aquatic Ecosystem (Subpart D) 1) Effect on threatened/endangered species and their habitat 2) Effect on the aquatic food web 1

3) Effect on other wildlife (mammals, birds, reptiles and amphibians) 2. Technical Evaluation Factors (Subparts C-F) (where a Significant category is checked, add explanation below.) c. Special Aquatic Sites (Subpart E) Not Applicable 1) Sanctuaries and refuges 2) Wetlands 3) Mud flats 4) Vegetated shallows 5) Coral reefs 6) Riffle and pool complexes d. Human Use Characteristics (Subpart F) 1) Effects on municipal and private water supplies Not Significant Significant* 2) Recreational and Commercial fisheries impacts 3) Effects on water-related recreation 4) Aesthetic impacts 5) Effects on parks, national and historical monuments, national seashores, wilderness areas, research sites, and similar preserves 3. Evaluation of Dredged or Fill Material (Subpart G) a. The following information has been considered in evaluating the biological availability of possible contaminants in dredged or fill material (check only those appropriate) 1) Physical characteristics 2) Hydrography in relation to known or anticipated sources of contaminants 3) Results from previous testing of the material or similar material in the vicinity of the project 4) Known, significant sources of persistent pesticides from land runoff or percolation 5) Spill records for petroleum products or designated (Section 311 of Clean Water Act) hazardous substances 6) Other public records of significant introduction of contaminants from industries, municipalities or other sources 7) Known existence of substantial material deposits of substances which could be released in harmful quantities to the aquatic environment by man-induced discharge activities 8) The material to be placed in the water consists of sand and rock. The material is considered to be exempt from contaminant testing. NA 2

List appropriate references: Draft EA Sections, 3.1.4, 3.1.5, 3.3.7, 4.1.4, 4.1.5, 4.3.7 b. An evaluation of the appropriate information in 3a above indicates that there is reason to believe the proposed dredge or fill material is not a carrier of contaminants, or that levels of contaminants are substantively similar at extraction and placement sites and not likely to degrade the placement sites, or the material meets the testing exclusion criteria. No 4. Placement Site Delineation (230.11(f)) a. The following factors as appropriate, have been considered in evaluating the placement site: 1) Depth of water at placement site 2) Current velocity, direction, and variability at placement site 3) Degree of turbulence 4) Water column stratification 5) Discharge vessel speed and direction 6) Rate of discharge 7) Fill material characteristics (constituents, amount, and type of material, settling velocities) 8) Number of discharges per unit of time 9) Other factors affecting rates and patterns of mixing (specify) List appropriate references: 1) Some fill may be temporarily placed in the toe ditch adjacent to the levee or other adjacent water body/ wetland during to facilitate construction or site access to the levee. The toe ditch is one to four foot deep has low quality aquatic vegetation along the shoreline. 2) The toe ditches typically are in a non-flowing state with stagnant water. Isolated low areas also have minimal flow. 3) No flow / stagnant conditions will dominate during placement of temparary fill. 4) The toe ditch or low areas are shallow and not prone to stratification from either temperature or water salinity. 5) Placement by hydraulic excavator or bulldozer in a manner that minimizes turbidity. 6) Discharge of fill will be from side bank using "dry" fill rather than dredge slurry. 7) Material composition of existing levee fill is primarily shelly sand with peat soils. Material brought onsite will be either clean sand or sand/limerock mix. 3

8) Discharge of fill for temporary work pads or access will be done continuously over a period of a couple of weeks at each site. After each discharge, there will be significant periods of no discharge until the next work area is prepared. 9) For reasons discussed in 3) and 8) transport and current forces affecting rate of mixing are not issues. b. An evaluation of the appropriate factors in 4a above indicates that the placement site and/or size of mixing zone are acceptable. 5. Actions to Minimize Adverse Effects (Subpart H) All appropriate and practicable steps have been taken, through application of recommendations of 230.70-230.77 to ensure minimal adverse effects of the proposed discharge. List actions taken: No No Specifically, the actions listed in 230.70(a) Locating and confining the discharge to minimize smothering of organisms, (d) Selecting a disposal site at which the substrate is composed of material similar to that being discharged, and (3) Selecting the disposal site, the discharge point, and the method of discharge to minimize the extent of any plume. No* 6. Factual Determination (230.11) A review of appropriate information as identified in items 2-5 above indicates that there is minimal potential for short- or long-term environmental effects of the proposed discharge as related to: a. Physical substrate at the placement site (review Sections 2a. 3, 4, and 5 above) b. Water circulation, fluctuation and salinity (review Sections 2a. 3, 4, and 5) c. Suspended particulates/turbidity (review Sections 2a. 3, 4, and 5) d. Contaminant availability (review Sections 2a. 3, and 4) e. Aquatic ecosystem structure and function (review Sections 2b and c, 3, and 5) f. Placement site (review Sections 2, 4, and 5) g. Cumulative impacts on the aquatic ecosystem h. Secondary impacts on the aquatic ecosystem 7. Evaluation Responsibility a. This evaluation was prepared by: Mark D Shafer, P.E. Position: Environmental Engineer, US Army Corps of Engineers, Planning Division Jacksonville District. 4

8. Findings a. The proposed placement site for discharge of or fill material complies with the Section 404(b )(1) Guidelines. x b. The proposed placement site for discharge of dredged or fill material complies with the Section 404(b)(l) Guidelines with the inclusion of the following conditions: x List of conditions: I) Fill acton may require wetland mitigation if the local regulatory authority FDEP determines that this is necessary to obtain the WQC. c. The proposed placement site for discharge of dredged or fill material does not comply with the Section 404(b)(l) Guidelines for the following reason(s): 1) There is a less damaging practicable alternative 2) The proposed discharge will result in significant degradation of the aquatic ecosystem 3) The proposed discharge does not include all practicable and appropriate measures to minimize potential harm to the aquatic ecosystem NIA ~ I Date NOTES: * A negative, significant, or un compliance with the Section permit application may not be in Negative responses to three or more of the compliance criteria at the preliminary stage indicate that the proposed projects may not be evaluated using this "short form" procedure. Care should be used in assessing pertinent portions of the technical information of items 2a-e before completing the final review of compliance. Negative response to one of the compliance criteria at the final stage indicates that the proposed project does not comply with the Guidelines. If the economics of navigation and anchorage of Section 404(b )(2) are to be evaluated in the decision-making process, the "short form" evaluation process is inappropriate. 5