SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

Similar documents
SECTION (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

Facility Repairs - MCAS Cherry Point - Tank Farm A SECTION STRUCTURAL STEEL 05/14

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

Student Services & Classroom Addition SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

SECTION COLD-FORMED METAL TRUSSES

1. Hangers and supports for electrical equipment and systems.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

DIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

SECTION HANGERS AND SUPPORTS FOR PLUMBING

UNISTRUT CORPORATION GENERAL NOTES 1. THIS UNISTRUT SUPPORT SYSTEM IS DESIGNED TO SUPPORT A MAXIMUM UNIFORM LOAD OF PSF.

SECTION METAL STAIRS

SECTION VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT

SEISMIC RESTRAINT SYSTEM

STRUCTURAL STEEL FRAMING

Student Services & Classroom Addition

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB ADPH #B

SUPPORT AND ANCHORS SECTION 15090

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1 SECTION SUPPORTING DEVICES

SECTION TIMBER FLOATS

A. This Section includes steel cable trays and accessories.

Home Depot Page 1 of 5 HDPB Humacao, PR 10/19/09

SECTION NON-STRUCTURAL METAL FRAMING

SECTION METAL STAIRS

Preassembled steel stairs with concrete-filled treads.

Union County Vocational - Technical Schools Scotch Plains, New Jersey

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

2016 CDM Smith All Rights Reserved July 2016 SECTION COMPOSITE STEEL FLOOR DECK

Division MEDICAL EQUIPMENT SUPPORT SYSTEMS PART 1 GENERAL

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System

SECTION NON-STRUCTURAL METAL FRAMING

SECTION PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

Houston First Corporation Package 1

B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.

B. Shop Drawings: Include plans, elevations, sections, details, and attachments.

SECTION MISCELLANEOUS METALS

SECTION SHOWER AND DRESSING COMPARTMENTS

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION METAL FLOOR PLATE STAIRS

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

DBI-SALA Uni 8 Horizontal Lifeline Cable System

SECTION COMPOSITE METAL DECKING

SECTION ORCHESTRA PIT FILLER

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system.

METAL FABRICATION..1 General Conditions and Division 1 shall govern Work of this section.

SECTION FABRICATED ENGINEERED STRUCTURES. A. Pre-engineered, shop-fabricated structural steel building with formed purlin framing.

1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Provide submittals in accordance with Section Submittal Procedures.

Project No

SECTION TOILET PARTITIONS. A. Section Structural Steel: Supports for ceiling hung compartments.

2016 CDM Smith All Rights Reserved July 2016 SECTION STEEL ROOF DECK

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

.1 American Institute of Steel Construction (AISC) Specifications for Steel Buildings AISC

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

SECTION ACOUSTICAL PANEL CEILINGS

CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS

East Central College HANSEN HALL LEVEL 300/400 RENOVATIONS CONSTRUCTION PACKAGE

SECTION STEEL DECKING

SECTION Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

Union County Vocational - Technical Schools Scotch Plains, New Jersey

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

Daytona Beach Pier Building Renovation Jun 2010

SECTION VIBRATION ISOLATION

SECTION STRUCTURE MOUNT RAILING SYSTEM

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

. SECTION HANGERS AND SUPPORTS

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION STRUCTURAL METAL FRAMING

C. OSHPD: Office of Statewide Health Planning and Development for the State of California.

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION (formerly 05425) PRE-ENGINEERED, PRE-FABRICATED COLD-FORMED STEEL ROOF & FLOOR TRUSSES

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION ALTERNATING TREAD STEEL STAIRS

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

SECTION MANUAL FOUR FOLD DOORS MODEL 38 DECORATIVE PANEL DESIGN

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

B. All materials shall be listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).

SECTION ACCORDION FOLDING PARTITIONS

SUMMARY OF ADDENDUM NUMBER FOUR

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

Summary of Modifications/Changes in this Update

SECTION ALTERNATING TREAD STEEL STAIRS

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

DIVISION 5 METALS SECTION COLD-FORMED METAL FRAMING

A. Product Data: Submit manufacturer's descriptive literature, and recommendations and instructions for installation.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION (05300) - STEEL DECKING

JAMISON SOUND DOOR SPECIFICATIONS VERTICAL SLIDING SOUND REDUCTION DOOR - STC 53 POWERED OPERATION

Transcription:

SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required to furnish and install hangers and supports for electrical systemns. 2. Area Classifications: Materials shall by suitable for the area classification(s) shown or indicated on the Drawings, and specified in Section 26 05 05, General Provisions. B. Related Sections: 1. Section 05 05 33, Anchor Systems. 2. Section 26 05 05, General Provisions. 3. Section 26 05 33.13, Rigid Conduits. 1.2 REFERENCES A. Standards referenced in this section are: 1. ASTM A123/A123M, Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products. 2. ASTM A1011/A1011M, Specification for Steel, Sheet and Strip, Hot- Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low- Alloy with Improved Formability, and Ultra-High Strength. 3. ASTM E84, Test Method For Surface Burning Characteristics of Building Materials 1.3 QUALITY ASSURANCE A. Qualifications: 1. Manufacturer: a. Minimum of five years of experience producing substantially similar equipment and able to show evidence of at least five installations, each in satisfactory operation for at least five years in the continental United States. b. Equipment shall be manufactured in the United States. 2. Professional Engineer for Delegated Design: a. Engage a registered professional engineer legally qualified to practice in the jurisdiction where the Project is located and experienced in providing engineering services of the kind indicated. GA064015.0004 26 05 29-1 Hangers and Supports

1.4 SUBMITTALS b. Submit qualifications data. c. Responsibilities include but are not necessarily limited to: 1) Carefully reviewing system performance and design criteria stated in the Contract Documents. 2) Preparing written requests for clarifications or interpretations of performance or design criteria for submittal to Engineer by Contractor. 3) Preparing or supervising the preparation of design calculations and related drawings, Shop Drawings, testing plan development, test-result interpretation and a comprehensive engineering analysis verifying compliance of the system with the requirements of the Contract Documents. 4) Signing and sealing all calculations and design drawings, and Shop Drawings. 5) Certifying that: a) it has performed the design of the system in accordance with the performance and design criteria stated in the Contract Documents, and b) the said design conforms to all applicable local, state and federal codes, rules and regulations, and to the prevailing standards of practice. A. Action Submittals: Submit the following: 1. Shop Drawings: a. Detailed installation drawings showing dimensions and compatibility with proposed layout. b. Delegated Design: all drawings, design calculations, and a letter indicating that the hanger and support systems have been properly designed shall be signed and sealed by a registered professional engineer legally qualified to practice in the jurisdiction where the Project is located. c. Certification by the delegated design Registered Professional Engineer that professional engineer has performed design of the hanger and support systems in accordance with performance and design criteria stated in the Contract Documents, and that design conforms to all applicable local, state, and federal Laws and Regulations, and to prevailing standards of practice. 2. Product Data: a. Manufacturer s name, product designation, and catalog number of each material item proposed for use. b. Manufacturer s specifications including material, dimensional and weight data, and load capacity for each supporting system component proposed for use. GA064015.0004 26 05 29-2 Hangers and Supports

c. Pictorial views and corresponding identifying text of each component proposed for installation. d. Documentation that confirms product compatibility with Laws and Regulations. B. Informational Submittals: Submit the following: 1. Certifications: a. Submit certifications required under this Section. 2. Manufacturer s Instructions: a. Manufacturer s installation instructions, including recommended tightening torque values for all nuts and bolts. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Provide products of one of the following: 1. B-Line. 2. Kindorf. 3. Unistrut 4. Approved equivalent. 2.2 MATERIALS A. Strut, Fittings, and Accessories: 1. General a. Unless otherwise shown or indicated, strut shall be 1-5/8 inches by 1-5/8 inches. Double struts shall be two pieces of the same strut, welded back-to-back at the factory. b. Attachment holes, when required, shall be factory-punched on hole centers approximately equal to the cross-sectional width and shall be 9/16-inch diameter. c. Fittings, braces, brackets, hardware, and accessories shall be Type 304 stainless steel. d. Strut nuts shall be spring captured Type 304 stainless steel. e. Square and round washers shall be Type 304 stainless steel. 2. Strut materials shall be suitable for area classifications indicated in Section 26 05 05, General Provisions, and shown or indicated on the Drawings. a. Dusty Locations: 1) Strut shall be 12-gage carbon steel, hot-dip galvanized after fabrication, complying with ASTM A123/A123M. b. Wet Locations: 1) Strut shall be 12-gage Type 316 stainless steel. c. Corrosive Locations: GA064015.0004 26 05 29-3 Hangers and Supports

1) Strut shall be 12-gage Type 316 stainless steel. B. Hanger Rods: 1. Material: a. Dry Locations: All-thread, zinc-coated b. Wet, Corrosive, or Hazardous Areas: Stainless steel. 2. Size: Not less than 3/8-inch diameter, unless otherwise shown on the Drawings or specified. C. Beam Clamps for Attaching Threaded Rods or Bolts to Beam Flanges for Hanging Struts or Conduit Hangers: 1. Beam clamps shall be stainless steel equipped with stainless steel squarehead set screw, and shall include threaded hole sized for attaching the allthread rod or threaded bolt. D. Miscellaneous Hardware: 1. Bolts, screws, and washers shall be stainless steel. 2. Hex Nuts: Shall be stainless steel and include nylon inserts. PART 3 EXECUTION 3.1 INSPECTION A. Examine conditions under which the Work will be installed and notify ENGINEER in writing of conditions detrimental to the proper and timely completion of the Work. Do not proceed with the Work until unsatisfactory conditions are corrected. 3.2 INSTALLATION A. Provide hangers and supports for electrical systems with necessary channels, fittings, brackets, and related hardware for mounting and supporting materials and equipment. Provide anchor systems, concrete inserts, and associated hardware for proper support of electrical systems. B. Install equipment and devices on hangers and supports as shown on the Drawings, as specified, and as required. C. Install hangers and supports level, true, free of rack, and parallel and perpendicular to building walls and floors, so that the hangers and supports are installed in a neat, professional, workmanlike manner. D. Holes in suspended ceilings for rods for hangers and supports and other equipment shall be provided adjacent to bars, where possible, to facilitate removal of ceiling panels. GA064015.0004 26 05 29-4 Hangers and Supports

E. Coordinate installation of hangers and supports with equipment, cabinets, consoles, panels, enclosures, boxes, conduit, cable tray, wireway, busway, cablebus, piping, ductwork, lighting fixtures, and other systems and equipment. Locate hangers and supports clear of interferences and access ways. F. Anchor Bolts, Expansion Anchors, and Concrete Inserts: Shall be in accordance with Section 05 05 33, Anchor Systems, and requirements of this Section. G. Mounting of Conduit: 1. Provide space of not less than 1/4-inch between conduit surfaces and abutting or near surfaces except struts, cable trays, steel beams, and columns. 2. Fasten conduit to struts, cable trays, steel beams, and columns using specified clamps and straps as shown, specified, and required. 3. Devices shall be compatible with size of conduit and type of support. Following installation, size identification shall be visible and legible. 4. Install conduit supports and fasteners in accordance with Section, 26 05 33.13, Rigid Conduits. H. Supports for Cabinets, Consoles, Panels, Enclosures, and Boxes: 1. Freestanding: Unless otherwise specified or shown on the Drawings, provide supports for floor-mounted equipment, cabinets, consoles, panels, enclosures, and boxes. Such supports shall be 3.5-inch high concrete equipment base with a 45 degree chamfered edge. Base shall extend two inches beyond outside dimensions of equipment on all sides. 2. Wall-Mounted: a. Provide space not less than 1/4-inch between cabinets, consoles, panels, enclosures, and boxes and the surface on which each is mounted. Provide non-metallic or stainless steel spacers as required. b. Do not mount equipment, enclosures, panels, and boxes directly to beams or columns. Mount struts to beams or columns using beam clamps, and mount equipment, enclosures, panels, and boxes to the struts. 3. Floor Stand Rack: a. Where equipment, cabinets, consoles, panels, enclosures, and boxes cannot be wall-mounted, provide an independent floor stand rack. b. Floor stand rack shall consist of struts, plates, brackets, connection fittings, braces, accessories, and hardware assembled in a rigid framework suitable for mounting of intended materials and equipment. c. Equip floor stand racks with brackets and bases for rigidly-mounting the framework to the ceiling or floor, as applicable; or equip floor stand racks with beam clamps, angle plates, washers, and bolts for fastening to beam flanges, as applicable. d. When equipment, cabinets, consoles, panels, enclosures, and boxes weigh more than 100 pounds: GA064015.0004 26 05 29-5 Hangers and Supports

1) Main vertical supports of floor stand rack assemblies shall be backto-back struts. 2) Bracing, clamping and anchoring of each floor stand rack shall be sufficient to ensure rigidity of the floor stand rack with the intended equipment, enclosures, conduit, cable tray, busway, cablebus, and wireway installed. Floor stand racks shall not be deflected more than 1/8-inch by a 100-pound force applied at any point on the floor stand rack in any direction. I. Drilling into beams or columns is not allowed unless authorized by ENGINEER. J. Tighten nuts and bolts to the manufacturer s recommended torque values. K. Field Cutting: 1. Cut edges of strut and hanger rod shall have rounded corners, edges beveled, and burrs removed. If field cutting the strut is required, use clean, sharp, dedicated tools. Remove oil, shavings, and other residue of cuttings prior to installation. 2. Coatings: To prevent corrosion: a. Coat cut edges with epoxy-base touchup paint. b. Coat cut edges with zinc-rich paint. + + END OF SECTION + + GA064015.0004 26 05 29-6 Hangers and Supports