COSVR649 - SQA Unit Code H0WP 04 Produce stencils designs using pre-cut stencil plates

Similar documents
COSVR653 - SQA Unit Code H0WW 04 Produce quality replica marble finishes

Producing Stencil Designs using Pre-cut Stencil Plates in the Workplace D/615/0405

COSVR333 - SQA Unit Code F Apply paint systems by brush and roller

COSVR339 - SQA Unit Code F Apply coatings by the airless spray method

Producing and Applying Complex Stencil Designs in the Workplace J/615/0138

COSVR322 (SQA Unit Code - H0HR 04) Apply insulation and finishes to cylindrical and flat surfaces

COSVR71 SQA Unit Code HL77 04 Install mechanically fixed plasterboard

COSVR166 (SQA Unit Code - FW1E 04) Cut and bend reinforcement steel to shape

COSVR332 - SQA Unit Code F Prepare surfaces for painting/decorating

COSVR324 (SQA Unit Code - H0HT 04) Fit sheet metal insulation protection

COSVR257 HL4M 04 Commission lightning conductor installation systems

COSVR188 SQA Unit Code HP85 04 Produce standard stonemasonry components

COSVR618 - SQA Unit Code FW1L 04 Finish dry lining walls or ceilings

COSVR767 SQA Unit Code HG63 04 Prepare and mix earth plasters and earth renders

COSVR157 - SQA Unit Code H1P0 04 Demolish/dismantle timber-framed structures

FY68 04 Operate Ancillary Equipment (Pecker/hammer)

FY66 04 Operate Ancillary Equipment (Auger)

Overview. COSVR204 - SQA Unit Code HP7M 04. Contribute to stone cladding lifting procedures

COSVR290 - SQA Unit Code H36A 04 Erect timber roof structures

Overview COSVR130. Install plasterboard linings

COSVR448 - SQA Unit Code H1RK 04 Install external wall insulation

COSVR400 Operate powered units, tools or pedestrian plant, machinery or equipment

COSVR296 Install supplementary steel frame finishings

COSVR242 (SQA Unit Code - H1PF 04) Install insulated cladding walls

COSVR329 - SQA Unit Code H0XR 04 Produce decorative metal roofing and weathering details

COSVR133 - SQA Unit Code DY1W 04 Install raised access flooring systems

COSVR11 - SQA Unit Code DY13 04 Erect structural carcassing components

COSVR676 SQA Unit Code HM1L 04 Install door systems

COSVR186 - SQA Unit Code FW1A 04 Remove existing wall cladding systems

COSVR67 - SQA Unit Code DY92 04 Produce external solid render finishes

COSVR221 - SQA Unit Code HM0W 04 Form drill holes or core in the structural fabric

COSVR221 (SQA Unit Code - H1P5 04) Form drill holes or core in the structural fabric

FY5P 04 Operate Road Rail Plant (Road Rail - rough terrain forklift truck)

COSVR389 SQA Unit Code HN4K 04 Operate plant or machinery to excavate

COSVR374 - SQA Unit Code DY9N 04 Reinstate excavation and highway surfaces

COSVR509 - SQA Unit Code FW18 04 Fabricate and maintain timber and proprietary formwork systems

COSVR50 - SQA Unit Code DY9V 04 Repair and maintain masonry structures

COSVR130 Install plasterboard linings

COSVR358 SQA Unit Code HM34 04 Install fire resisting timber door assemblies and doorsets

COSVR69 - SQA Unit Code DY3K 04 Lay sand and cement screeds

COSVR09 Install first fixing components

COSVR143 SQA Unit Code HN48 04 Produce tiled, mosaic and stone surface finishes

COSVR664 - SQA Unit Code H4HB 04 Diagnose faults in plant or machinery systems or components

COSVR141 Prepare backgrounds for tiling

COSVR654(SQA Unit Code-H4X9 04) Fabricate joints in thermal insulation protection using sheet metal

COSVR10 - SQA Unit Code F Install second fixing components

FY4N 04 Operate Plant or Machinery to Receive and Transport Loads (Dump Truck - rigid chasis all sizes wheeled)

COSVR248 HL4T 04 Erect and dismantle mobile and static scaffold towers

COSVR274 SQA Unit Code HM24 04 Install single-lap roof tiles to a variable gauge

COSVR660 - SQA Unit Code H4HL 04 Service plant or machinery

COSVR391 SQA Unit Code HN0C 04 Operate plant or machinery to receive and transport loads

FY52 04 Operate Plant or Machinery to lay and distribute (Asphalt paver)

COSVR96 - SQA Unit Code DY2G 04 Install roof sheeting and cladding rainwater goods

COSVR184 - SQA Unit Code FW15 04 Install wall cladding systems

COSVR256 HL53 04 Install lightning conductor systems

V COSVR??? Dynamic load and integrity testing of piles

COSVR670 - SQA Unit Code H4HC 04 Determine and complete service to maintain plant or machinery

COSVR95 - SQA Unit Code DY2K 04 Install roof sheeting and cladding systems

SKSVR332 Prepare surfaces for painting/decorating

COSVR250 - SQA Unit Code DX8Y 04 Erect and dismantle access/working platforms

COSVR254 - SQA Unit Code DY0A 04 Erect and remove specialist access equipment

COSVR546 SQA Unit Code HG66 04 Working on conservation and restoration projects

COSVR277 Install double-lap artificial roof slates

COSVR273 - SQA Unit Code DY1M 04 Install pre-formed weathering flashings to roofs

COSVR49 SQA Unit HN2H 04 Erect complex masonry structures

COSVR202 - SQA Unit Code DY0H 04 Erect complex stonemasonry structures

COSVR284 - SQA Unit Code DY0E 04 Install double-lap concrete roof slates

COSVR118 SQA Unit Code HM2D 04 Thatch structures

COSVR118 SQA Unit Code HG6X 04 Thatch structures

COSVR628 SQA Unit Code HM3J 04 Set up and use transportable cutting and shaping machines

COSVR272 - SQA Unit Code DY1C 04 Install roofing backgrounds and components

COSVR67 SQA Unit Code HL75 04 Apply solid render to background surfaces and produce finishes

FY4W 04 Operate Plant or Machinery for Accessing (Mobile elevated working platform boom self propelled)

COSVR252 HL56 04 Utilise provision of fall protection systems

COSVR278 SQA Unit Code HN36 04 Install natural roof slate to mitred and vertical roof details

COSVR81 - SQA Unit Code DY8P 04 Produce complex plasterwork moulds

COSVR280 - SQA Unit Code F Strip and reclaim pitched roof coverings

COSVR276 Install regular sized natural roof slate to standard roof details

COSVR557 SQA Unit Code HG61 04 Conserve, restore or repair solid plaster or render surfaces

COSVR550 SQA Unit Code HG6M 04 Select, prepare and apply surface finishing to structures

COSVR121 SQA Unit Code HN8E 04 Install fitted furniture

COSVR761 SQA Unit Code HN0L 04 Operate plant or machinery to sweep, clean or clear

FY38 04 Operate Plant or Machinery to Lift and Transfer Loads (Mobile crane blocked duties)

Overview COSVR272. Install underlay, battens and roofing components. Install underlay, battens and roofing components

FY36 04 Operate Plant or Machinery to Lift and Transfer Loads (Lorry loader)

FY30 04 Operate Plant or Machinery to Lift and Transfer Loads (Hoist rack and pinion goods)

COSVR121 - SQA Unit Code F7A7 04 Install fitted furniture

COSVR117 Prepare thatching materials

COSVR375 SQA Unit Code HL5P 04 Lay flexible pavement materials

Proposed National Occupational Standards for Wood Occupations Timber Frame Erection (Construction)

COSVR107 Apply reinforced bitumen membrane systems

Overview COSVR681. Install external blinds, screens or solar shading systems

COSVR643(SQA Unit Code-FN2V 04) Move, handle or store resources

COSVR560 SQA Unit Code HG62 04 Install fibrous plaster on conservation or restoration projects

COSVR402 revised Nov 2013 Slinging and signalling the movement of suspended loads

COSVR110 Apply single ply membrane systems(sqa Unit Code-H7DD 04)

COSVR477 SQA Unit Code HM2F 04 Machinery and equipment maintenance

Overview COSVR678. Service and maintain or commission door, gate or shutter systems

Cutting and Bending Reinforcement Steel to Shape in the Workplace T/504/9585

COSVR119 Thatch roof structures with specialist features

Transcription:

Produce stencils designs using pre-cut stencil plates Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting and preparing materials and associated equipment 4 providing protection to the work area 5 preparing grounds 6 positioning pre-cut stencil plates and applying paint to produce stencil designs COSVR649 1

Performance criteria You must be able to: P1 interpret the given information relating to the work and resources to confirm its relevance P2 comply with the given, relevant legislation and official guidance to carry out your work and maintain safe and healthy work practices P3 select the required quantity and quality of resources for the methods of work P4 comply with organisational procedures to minimise the risk of damage to the work and surrounding area P5 comply with the given contract information to carry out the work efficiently to the required specification P6 complete the work within the allocated time, in accordance with the programme of work COSVR649 2

Knowledge and understanding Performance Criteria 1 Interpretation of information K1 the organisational procedures developed to report and rectify inappropriate information and unsuitable resources, and how they are implemented K2 the types of information, their source and how they are interpreted K3 the organisational procedures to solve problems with the information and why it is important they are followed Performance Criteria 2 Safe work practices K4 the level of understanding operatives must have of information for relevant, current legislation and official guidance and how it is applied K5 how emergencies should be responded to and who should respond K6 the organisational security procedures for tools, equipment and personal belongings K7 what the accident reporting procedures are and who is responsible for making the report K8 why, when and how health and safety control equipment should be used Performance Criteria 3 Selection of resources K9 the characteristics, quality, uses, sustainability, limitations and defects associated with the resources and how defects should be rectified K10 how the resources should be used and how any problems associated with the resources are reported K11 the organisational procedures to select resources, why they have been developed and how they are used K12 the hazards associated with the resources and methods of work and how they are overcome COSVR649 3

Performance Criteria 4 Minimise the risk of damage K13 how to protect work from damage and the purpose of protection K14 why disposal of waste should be carried out safely and how it is achieved Performance Criteria 5 Meet the contract specification K15 how methods of work, to meet the specification, are carried out and problems reported K16 how maintenance of tools and equipment is carried out Performance Criteria 6 Allocated time K17 what the programme is for the work to be carried out in the estimated, allocated time and why deadlines should be kept COSVR649 4

Additional Information Scope/range related to performance criteria Performance Criteria 1 1 interpretation of specifications, current regulations, risk assessments, method statements and manufacturers' information related to the work to be carried out Performance Criteria 2 2 avoidance of risk by complying with the given information relating to the following 2.1 methods of work 2.2 safe use of health and safety control equipment 2.3 safe use of access equipment 2.4 safe use and storage of materials, tools and equipment 2.5 specific risks to health Performance Criteria 3 3 selection of resources associated with own work 3.1 materials 3.2 tools and equipment Performance Criteria 4 4 protection of the work and its surrounding area from damage 5 minimise damage and maintain a clean work space 6 disposal of waste in accordance with legislation Performance Criteria 5 7 demonstration of work skills to protect, move, match, mix, pour, dilute, position, secure, apply and transfer 8 use and maintain hand tools and associated equipment 9 prepare high quality ground, set out and position pre-cut stencils to produce stencil designs using water-borne or solvent-borne coatings to linear runs and/or wall applications to given working instructions Performance Criteria 6 10 completion of own work within the estimated, allocated time to meet the needs of other occupations and/or client COSVR649 5

Scope/range related to knowledge and understanding Disposal of waste 1 environmental responsibilities, organisational procedures, manufacturers information, statutory regulations and official guidance Emergencies 2 operative's response to situations in accordance with organisational authorisation and personal skills when involved with 2.1 fires, spillages, injuries 2.2 emergencies relating to occupational activities Hazards 3 those identified by risk assessment, method of work, manufacturers technical information, statutory regulations and official guidance Health and safety control equipment 4 identified by the principles of protection for occupational use, types and purpose of each type, work situations and general work environment 4.1 collective protective measures 4.2 personal protective equipment (PPE) 4.3 respiratory protective equipment (RPE) 4.4 local exhaust ventilation (LEV) Information 5 specifications, current legislation, risk assessments, method statements and manufacturers' information Legislation and official guidance 6 this relates to the operative's responsibilities regarding potential accidents and health hazards whilst working in the workplace, in confined spaces, at height, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling Maintenance 7 operative care of hand tools and associated equipment COSVR649 6

Methods of work 8 application of knowledge for safe and healthy work practices, procedures and skills relating to the method/area of work and materials used to: 8.1 establish access requirements 8.2 check suitability of previously prepared surface and bring up to suitable finish/ground 8.3 prepare paint products 8.4 prepare brushes, rollers, specialised tools and equipment 8.5 set out and position pre-cut stencil plates 8.6 apply stencil designs to linear runs and walls 8.7 apply stencil designs using brush, roller and spray equipment 8.8 maintain the integrity of the stencil plate (cleanliness and structure) 8.9 apply protective glaze/varnish 8.10 identify how atmospheric conditions affect coatings and their application process 8.11 use access equipment 8.12 use hand tools and associated equipment 9 team work and communication 10 needs of other occupations associated with producing stencil designs Problems 11 those arising from information, resources and methods of work 11.1 own authority to rectify 11.2 organisational reporting procedures Programme 12 types of progress charts, timetables and estimated times 13 organisational procedures for reporting circumstances which will affect the work programme Protect work 14 protect work against damage from general workplace activities, other occupations and adverse weather conditions COSVR649 7

Resources 15 materials, components and equipment relating to types, quantity, quality, sizes and the sustainability of standard and/or specialist 15.1 water-borne and solvent-borne coatings 15.2 stainers, solvents/thinners, driers and glaze/varnish 15.3 pre-cut stencil plates 15.4 protective sheeting and masking materials 15.5 rubbish containers/bags 15.6 access equipment 15.7 paint application equipment, stencilling tools and stencil setting-out equipment 16 methods of calculating quantity of material required associated with the method/procedure to produce stencil designs Security procedures 17 site, workplace, company and operative COSVR649 8

Developed by ConstructionSkills Version number 1 Date approved January 2012 Indicative review date Validity Status Originating organisation Original URN Relevant occupations Suite Key words January 2017 Current Original ConstructionSkills VR649 Painters and Decorators Decorative Finishing and Industrial Painting Occupations (Construction) Brushing; Roller; Water-borne coatings; Solvent-borne coatings; Stencils; Stainers COSVR649 9