SOLAR ENERGY SYSTEMS APPLICATION

Similar documents
WIND ENERGY CONVERSION SYSTEMS APPLICATION

ADMINISTRATIVE SITE PLAN REVIEW FOR SINGLE- AND TWO-FAMILY DWELLINGS AND MULTIPLE-FAMILY DWELLINGS HAVING THREE OR FOUR DWELLING UNITS

CITY OF SCANDIA ORDINANCE NO. 193

CITY OF ST. MICHAEL WRIGHT COUNTY, MINNESOTA ORDINANCE NO THE CITY COUNCIL OF THE CITY OF ST. MICHAEL HEREBY ORDAINS:

SOLAR ENERGY FARMS AND SOLAR ENERGY SYSTEMS

ORDINANCE NO. BE IT ORDAINED by the City Council of the City of Waukee:

ORDINANCE NO. 465 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF HUXLEY, IOWA:

ORDINANCE NO

CITY OF ORONO HENNEPIN COUNTY, MINNESOTA

CITY OF HARTFORD GUIDELINES FOR SOLAR ON HISTORIC PROPERTIES SECTIONS ADOPTED 2017

SECTION ENERGY SYSTEMS (WIND AND SOLAR)

The requirements set forth in this Section shall govern the construction and/or installation of all Renewable Energy Systems:

CHIPPEWA COUNTY LAND AND RELATED RESOURCE MANAGEMENT ORDINANCE SECTION 16 SOLAR POWER MANAGEMENT TABLE OF CONTENTS SUBDIVISION 1.

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION

SOLAR ENERGY CONVERSION FACILITIES. Carroll County Code of Public Local Laws & Ordinances As of December 1, 2015

CHARTER TOWNSHIP OF PORT HURON

ALTERNATIVE ENERGY RESOURCES ORDINANCE


MOBILE HOME DISTRICT OR "MH" DISTRICT AND MOBILE HOMES EXCLUSIVE OF MOBILE HOME DISTRICTS (Ord.No )

VB Draft December 5 th Ben s Comments

Commercial Solar Photovoltaic System Permit

Section 11.01: Zoning Ordinance Subdivision 9.4: Utility and Communication Uses. 96 Chapter 11: Planning and Development

THERFORE, the Board of Supervisors hereby adopts the following amendments to the Zoning Ordinance by adding the following:

ORDINANCE NO. THE LENT TOWNSHIP BOARD OF SUPERVISORS ORDAINS: The following language is hereby added to the Lent Township Zoning Ordinance:

Solar Photovoltaic System Permit

Ground Mount All All All All All except HM IRO. Ground Mount. Site Plan Review. Building - Zoning Permit

CITY OF TONKA BAY COUNTY OF HENNEPIN STATE OF MINNESOTA ORDINANCE NO

Form CITY OF SILVER BAY BUILDING PERMIT APPLICATION INFORMATION SHEET

LOCAL LAW #4 OF 2018 OF THE TOWN OF TYRE TOWN OF TYRE SOLAR ENERGY LAW

ARTICLE X TRANSMISSION TOWER REGULATIONS

APPLICATION FOR SOLAR PERMIT

FIRST DRAFT. Local Law No. 7 of Town of Marbletown A LOCAL LAW AMENDING CHAPTER 200 OF THE TOWN CODE, ZONING, REGARDING SOLAR GENERATION

TOWN OF EASTCHESTER BUILDING & PLANNING DEPARTMENT BUILDING PERMIT APPLICATION PACKAGE

TOWN OF EASTCHESTER BUILDING & PLANNING DEPARTMENT BUILDING PERMIT APPLICATION PACKAGE

TOWNSHIP OF WEYMOUTH ATLANTIC COUNTY NEW JERSEY ORDINANCE NO

TOWN OF MARILLA LOCAL LAW NO.2 OF THE YEAR 2017 A Local Law to regulate Solar Energy Systems in the Town. ARTICLE I Enactment and Intent

SCREENING & FENCING PERMIT ISSUANCE PROCEDURES. 1) Complete all parts of the Screening and Fencing Application Form.

HISTORIC LANDMARK COMMISSION STAFF REPORT. Gibson Solar Panels Minor Alterations PLNHLC South 600 East Meeting Date: November 6, 2014

Appendix H Solar Energy Systems (SES) (Revised Ord. No )

From Policy to Reality

Morgan County Planning Commission. Petition for: Text Amendment. Article 7, Regulations for Specific Uses

Commercial Remodel Permit

ORDINANCE NO , Series of 2018

IT IS HEREBY ENACTED AND ORDAINED by Paradise Township, York County, Pennsylvania as follows:

INCORPORATED VILLAGE OF OYSTER BAY COVE BUILDING DEPARTMENT 68 WEST MAIN ST., OYSTER BAY NEW YORK (516)

A Local Law amending Chapter Section 139, The Zoning Law of the Town of Lysander, New York.

ARCHITECTURAL REVIEW CHECKLIST ARCHITECTURAL REVIEW SUBMITTAL REQUIREMENTS SINGLE MODEL

Town of Worcester Local Law No. 1 of 2018 Solar Energy Systems

WIRELESS COMMUNICATIONS FACILITY (WCF) ADMINISTRATIVE APPROVAL APPLICATION

COMMERCIAL OR RESIDENTIAL NEW BUILDINGS, REMODELS AND ADDITIONS

2012 International Building Code 2011 National Electrical Code Local amendments to the codes are in Chapter 6 of the Code of City Ordinances

AN ORDINANCE ADOPTING A SOLAR ENERGY SYSTEM ORDINANCE FOR DEKALB COUNTY

ARTICLE 10: Wireless Services and Communications

WIRELESS COMMUNICATIONS FACILITY (WCF) ADMINISTRATIVE APPROVAL APPLICATION

Phone Fax Phone Fax. Owner/Agent Signature (Agents must provide written proof of authorization) OFFICE USE ONLY

APPENDIX A MOHAWK HOMEOWNERS ASSOCIATION GUIDELINES FOR INSTALLATION OF SOLAR ENERGY DEVICES

CITY OF DELANO COUNTY OF WRIGHT STATE OF MINNESOTA ORDINANCE NO.

Submittal Requirements for Administrative Design Review of Signage

BUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE

City of Rome, NY Site Plan Review Application Checklist Consult Chapter 80 of the City of Rome Code of Ordinances.

Revised June Board of Zoning Appeals How-to Guide

Garrett Farms Solar Guidelines

TOWN OF DEWITT PLANNING AND ZONING PERMIT REQUIREMENTS FOR ENERGY CONVERSION SYSTEM S

Accessory Dwelling Unit Permit Submittal Requirement Checklist (Corte Madera Municipal Code Section 18.31)

NEW SINGLE-FAMILY, MAJOR MODIFICATION, AND ACCESSORY DWELLING UNIT Submittal Checklist

DESIGN GUIDELINES FOR ON-PREMISE SIGNS AND AWNINGS (Adopted June 17, 2003)

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

-01k( Rec.by:DZ. ARTICLE IX - STANDARDS FOR TELECOMMUNICATIONS TOWERS AND ANTENNAS. Section Intent

New York State Unified Solar Permit Expedited Solar Permit Process for Small-Scale Roof-Mounted Residential and Commercial Solar Electric

TOWN OF BRUNSWICK, MAINE

Addition to Section 4 - Special Use Regulations

ACCESSORY STRUCTURES (Garages/Sheds) BUILDING AND ZONING REQUIREMENTS (REVISED 4/21/16)

Residential Design Standards Draft 9 August 2013

HISTORIC LANDMARK COMMISSION STAFF REPORT

SECTION GENERAL PROVISIONS PURPOSE.

SIGN AREA (SQ. FT.): SIGN DIMENSIONS: STREET FRONTAGE OF PROPERTY (ft):

ORDINANCE NO. IIq 1-11

BUILDING PERMIT APPLICATION CHECKLIST SINGLE FAMILY OR DUPLEX Use this checklist for NEW construction of a Single Family Home or Duplex Unit

DRAFT Commercial Solar Bylaw November 8, 2011

ARTICLE XII. (O-1, O-2, O-3, O-4) OFFICE DISTRICT REGULATIONS

COMMERCIAL RE-ROOF BUILDING PERMIT GUIDE

CARLTON COUNTY RENEWABLE ENERGY ORDINANCE #32

SANTA BARBARA COUNTY PLANNING COMMISSION Staff Report for Revising Freestanding Solar Energy Systems Permit Requirements

ORDINANCE OF THE NEWTON COUNTY BOARD OF COMMISSIONERS TO REPEAL CONFLICTING PROVISIONS; AND TO AMEND THE ZONING ORDINANCE OF NEWTON COUNTY, GEORGIA

MEETING DATE: ADOPTED ON EARTH DAY: APRIL 22, 2008 AGENDA ITEM COMMENTARY

Tatum Ranch Community Association Guidelines for Installation of Solar Energy Devices

Town of Grantham, NH Building Permit Application Procedures

HALIFAX REGIONAL MUNICIPALITY BY-LAW NUMBER B-201 RESPECTING THE BUILDING CODE

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

A. -Application Form Ensure following is filled out on your building permit application:

Cherrywood Estates Homeowners Association Architectural Control Committee Guidelines

Section 7.25 REGULATION OF SOLAR FARMS AND SOLAR PANELS

City of Lorena 107-A S. Frontage Road Lorena, Texas Phone: (254) Fax: (254)

ACCESSORY BUILDINGS DEFINITIONS - RESIDENTIAL

BUILDING PERMIT APPLICATION CHECKLIST SINGLE FAMILY OR DUPLEX Use this checklist for NEW construction of a Single Family Home or Duplex Unit

DETACHED GARAGES. Construction requirements for detached garages and storage sheds for residential dwellings. Portage la Prairie Planning District

SUBMITTAL REQUIREMENTS FOR EXPEDITED ROOF TOP SOLAR PERMITTING

THE DEVELOPMENT REVIEW BOARD. 1. New construction or relocation of single-family homes, including mobile/modular and manufactured homes.

LOCAL LAW # OF 2017 ADDING CHAPTER 105 TO THE ALBION TOWN CODE CONCERNING SOLAR ENERGY SYSTEMS AND SOLAR ENERGY FARMS

Ordinance No Lot Surface Drainage

Transcription:

For reasonable accommodations or alternative formats please contact 311 at 612-673-3000. People who are deaf or hard of hearing can use a relay service to call 311 at 612-673-3000. TTY users call 612-673-2157 or 612-673-2626. Para asistencia 612-673-2700 - Rau kev pab 612-673-2800 - Hadii aad Caawimaad u baahantahay 612-673-3500. Revised December 2017 SOLAR ENERGY SYSTEMS APPLICATION Community Planning and Economic Development Development Services Division 250 South 4 th Street, Room 300 Minneapolis MN 55415-1316 612-673-3000 535.820. Purpose. Regulations governing solar energy systems are established to provide for appropriate locations for solar energy systems, to ensure compatibility with surrounding uses, and to promote safe and effective use of solar energy to increase opportunities for generation of renewable energy. 535.830. Definitions. As used in this article, the following words shall mean: Building-integrated solar energy system. A solar energy system that is an integral part of a principal or accessory building, rather than a separate mechanical device, replacing or substituting for an architectural or structural component of the building. Building-integrated systems include but are not limited to active photovoltaic or hot water systems that are contained within roofing materials, windows, walls, skylights, and awnings, or passive systems that are designed to capture direct solar heat. Building-mounted solar energy system. A solar energy system affixed to a principal or accessory building. Freestanding solar energy system. A solar energy system with a supporting framework that is placed on, or anchored in, the ground and that is independent of any building or other structure. Garages, carports or similar structures that incorporate building-integrated or building-mounted solar energy systems shall not be classified as freestanding solar energy systems and shall instead be subject to regulations governing accessory structures. Solar collector surface. Any part of a solar energy system that absorbs solar energy for use in the system's transformation process. The collector surface does not include frames, supports, and mounting hardware. Solar energy. Radiant energy received from the sun that can be collected in the form of heat or light by a solar collector. Solar energy system. A device or structural design feature intended to provide for collection, storage, and distribution of solar energy for heating or cooling, electricity generating, or water heating. 535.840. Permitted uses and specific standards, subject to administrative review and approval. (a) In general. Solar energy systems shall be permitted in all zoning districts, subject to the standards of this article. Solar collector surfaces and all mounting devices shall comply with the minimum yard requirements of the district in which they are located. Screening of solar collector surfaces shall not be required. (b) Building-mounted solar energy systems. (1) Notwithstanding the height limitations of the zoning district, building mounted solar energy systems shall not extend higher than three (3) feet above the ridge level of a roof on a structure with a gable, hip, or gambrel roof and shall not extend higher than ten (10) feet above the surface of the roof when installed on flat or shed roof. (2) The solar collector surface and mounting devices for building-mounted solar energy systems shall be set back not less than one (1) foot from the exterior perimeter of a roof for every one (1) foot that

the system extends above the parapet wall or roof surface, if no parapet wall exists, on which the system is mounted. Solar energy systems that extend less than three (3) feet above the roof surface shall be exempt from this provision. (3) All solar energy systems using a reflector to enhance solar production shall minimize glare from the reflector that affects adjacent or nearby properties. Measures to minimize nuisance glare include selective placement of the system, screening on the north side of the solar array, modifying the orientation of the system, reducing use of the reflector system, or other remedies that limit glare. (c) Freestanding solar energy systems. (1) Freestanding solar energy systems, measured to the highest point of the system, shall not exceed the height of the principal structure or twenty (20) feet, whichever is less. The height of the principal structure shall be measured as provided in Chapter 520, Introductory Provisions. Freestanding solar energy systems up to sixteen (16) feet in height shall be subject to the minimum yard requirements of an accessory structure. Freestanding solar energy systems greater than sixteen (16) feet in height shall be subject to the minimum yard requirements of a principal structure. The required yard shall be measured from the property line to the closest part of the structure at minimum design tilt. (2) In the residence and office residence districts, the area of the solar collector surface of freestanding solar energy systems shall not exceed five (5) percent of the lot area. Notwithstanding any other provision to the contrary, the maximum area of solar energy systems shall be calculated independently of the floor area of all other accessory structures on the zoning lot. (3) The supporting framework for freestanding solar energy systems shall not include unfinished lumber. (4) All abandoned or unused freestanding solar energy systems shall be removed within twelve (12) months of the cessation of operations. (5) All solar energy systems using a reflector to enhance solar production shall minimize glare from the reflector that affects adjacent or nearby properties. Measures to minimize nuisance glare include selective placement of the system, screening on the north side of the solar array, modifying the orientation of the system, reducing use of the reflector system, or other remedies that limit glare. 535.850. Administrative review process. (a) In general. The zoning administrator, in consultation with the planning director, shall have up to fifteen (15) working days following the submittal of a complete application to approve or deny such application. The zoning administrator may impose such conditions and require such guarantees deemed reasonable and necessary to protect the public interest and to ensure compliance with the standards and purposes of this zoning ordinance and policies of the comprehensive plan. (b) Submittal requirements. An application for a solar energy system shall be filed on a form approved by the zoning administrator, as specified in Chapter 525, Administration and Enforcement. In addition, the applicant shall submit the following: (1) Written evidence that the electric utility service provider that serves the proposed site has been informed of the applicant's intent to install a solar energy system, unless the applicant does not plan, and so states so in the application, to connect the system to the electricity grid. 535.860. Conditional uses. Solar energy systems that do not comply with the standards of section 535.840 above may be allowed by conditional use permit, subject to the provisions of Chapter 525, Administration and Enforcement, provided that requests to reduce minimum yard requirements shall be by variance. 535.870. Solar access. Solar access easements may be filed consistent with Minn. Statute Section 500.30. Any property owner may purchase an easement across nearby properties to protect access to sunlight. The easement is purchased or granted by owners of nearby properties and can apply to buildings, trees, or other structures that would diminish solar access. 2

SOLAR ENERGY SYSTEMS APPLICATION REQUIREMENTS CHECKLIST Staff will accept only complete applications that include all of the items listed below and any specific application requirements. If any of the items are missing at the time of submittal, the application will be deemed incomplete and staff will not accept the application. 1 Completed Application Worksheet. A letter from the property owner, if other than the applicant, authorizing the application. Photos of the property and existing structures. Written evidence that the electric utility service provider that serves the proposed site has been informed of the applicant's intent to install a solar energy system, unless the applicant does not plan, and so states so in the application, to connect the system to the electricity grid. Interconnection guidelines for Xcel Energy can be found at www.xcelenergy.com (Energy Partners > Electric Generation Owners > MN Interconnection Guidelines for Customer-Owned Generation). If the property is a locally-designated historic landmark and the development project requires a certificate of appropriateness, the General Land Use Application may be deemed incomplete until a complete Certificate of Appropriateness application has been submitted to CPED. If the property is not already locally-designated and the proposed development project requires demolition of an existing structure, you are strongly encouraged to obtain a Historic Review Letter from CPED in order to determine whether the structure is a historic resource and may be eligible for local historic designation. Complete application for a conditional use permit, if applicable. Correct fees paid (checks payable to Minneapolis Finance Department), if applicable. Requirements Specific to Building Mounted Solar Energy Systems Three copies of a scaled and dimensioned building elevation plans where the solar energy system is visible. The following items must be included: Roof pitch. Eave overhangs or parapets, if applicable. Solar collector surface & mounting devices including height above roof surface & distance to roof perimeter. 1 City staff will review the initial application submission to determine completeness and will notify the applicant of what, if any, additional information must be submitted. Please be aware that supplemental information may also be requested during the evaluation and hearing process. 3

Requirements Specific to Freestanding Solar Energy Systems Two copies of a scaled and dimensioned site plan. 2 The following items must be included: All property lines. Streets and alleys. Adjacent uses (show location and identify if they are residential or nonresidential). Location of the proposed solar energy system(s) at minimum design tilt. On-site building footprints (including garages and other accessory structures). Indicate north arrow and date the plan was drawn. Two copies of scaled schematic drawings showing the structure of the solar energy system. The following items must be included: Height. Size of solar collection surface. Minimum design tilt. Materials and colors of all components, including supporting framework. FEES APPLICATION TYPE FEE (DOLLARS) Conditional use permits for solar energy systems: 0 9,999 square feet of lot area 650 10,000 43,559 square feet of lot area 875 43,560 square feet of lot area or more 1,085 After notification of a public hearing has taken place, a request by the applicant to continue an application to a subsequent public hearing of the city planning commission or board of adjustment shall be charged a fee totaling one hundred fifty dollars ($150.00) when such request is granted. The fee shall be applied on a projectby-project basis and only when the continuance was requested by the applicant for the sole benefit of the applicant and when the Zoning Administrator determines that substantial additional staff time is required to review the project. 2 The site plan must be prepared by a certified architect, landscape architect, engineer, or land surveyor that is licensed in the State of Minnesota. A license stamp, or registration number, whichever is applicable, together with the signature, shall be provided on the face of the site plan. Site plan information may be combined with the survey of the property. The requirement that one of the above professionals prepare the site plan may be waived by the Zoning Administrator, Planning Director or their authorized representative where the application does not involve a new principal structure, provided the plan is accurately dimensioned and is drawn to an architectural or engineering scale. Applications will not be accepted and permits will not be issued for a new principal structure if a survey is not provided. If the project is subject to Chapter 530, Site Plan Review, it is recommended that the applicant provide a copy of the site plan review ordinance to the registered professional prior to preparation of a site plan. 4

Property Owner/Applicant Name APPLICATION WORKSHEET Mailing Address Including City, State and Zip Code Phone Number Fax Email Applicant s Representative This person will be the primary contact for staff, and is the authorized agent in place of the property owner Name Mailing Address Including City, State and Zip Code Phone Number Fax Email Property Information Address(es) Identification Number Legal Description Lot Area (square feet) Solar Energy System Data Type of solar energy system (circle one) Building Mounted Freestanding Building Data Area of the solar collector surface of freestanding solar energy systems Roof type where system will be installed (circle one) Principal building height Square feet: Gable, hip, or gambrel Feet: Flat or shed ACCURACY DECLARATION My signature attests to the fact that the attached application is complete and accurate to the best of my knowledge. I understand that the staff review of this application is dependent upon the accuracy of the information provided and that any inaccurate or inadequate information provided may delay review of my application or may result in denial of my request. Property owner s signature (if different from applicant): Applicant s name (please print): Applicant s signature: 5