PROCESS MANAGEMENT OF THE COMPANY AS A STANDARD OF THE HOLISTIC VIEW OF RISK

Similar documents
The concept of the new organization of statistical surveys

IMPORTANCE OF AUDITING ISO 9001: 2015

Activities for Public Service Quality Improvement in Public Administration Institutions of Latvia

Conducting Quality Audit based on ISO 9001:2015

PROCESS APPROACH TO THE EVALUATION OF INFORMATION SYSTEMS EFFECTIVENESS

Influence of quality management systems on the environmental changes and the work conditions in industry

The Development of Public Internal Financial Control in Albania And His Role in Strengthening the Managerial Accountability

Global Markets, Governance and Internal Control Systems

The role of laboratory managerial personnel in improvement of the management system

Conducting Quality Audit based on ISO 9001:2015

VACANCIES NSSF KWANZA. Jiunge Nasi. Boresha Maisha Yako

MARKETING COMMUNICATION PROBLEMS ILLUSTRATED WITH AN EXAMPLE OF AGRICULTURAL TRADE SHOWS AND EXHIBITIONS

Correlation Matrix & Change Summary

Design of Controlling Supported Sustainability of Manufacturing Enterprises

EXPERIENCES CONCERNING THE INTEGRATED MANAGEMENT SYSTEM IMPLEMENTATION IN CONSTRUCTION COMPANY AND BUILDING

The non-financial factors of enterprise value growth of brewing industry in Poland research results

Balanced Scorecard Strategic Management Tool of Performance in Public Institutions

Quality management as a tool forming foundry competitive capacity in the process of market globalisation

HCEU for employers in the Healthcare sector

TASKS OF RISK MANAGER IN THE CONSTRUCTION ENTERPRISE

Involvement of employees on the background of sustainable development

DÓRA CSERVENYI NATIONAL UNIVERSITY OF PUBLIC SERVICE DOCTORATE SCHOOL OF MILITARY SCIENCES. Supervisor: dr. habil. Béla Réger PhD

INTEGRATED MANAGEMENT SYSTEM

METHODOLOGY OF RESEARCH EFFICIENCY IN THE DISTRIBUTION AREA

GSR Management System - A Guide for effective implementation

A Public Administration Based on Project Management

Outsourcing as a Decision Having a Strategic Dimension that Influences the Creation of Competitive Advantage of Companies

An Indian Journal FULL PAPER ABSTRACT KEYWORDS. Trade Science Inc. Research of sales process improvement based on customer satisfaction

Quality Without Complexity. CDG Certification

LIFE CYCLE MANAGEMENT CONCEPT AND PRACTICAL POSSIBILITIES OF IMPLEMENTATION IN ORGANIZATIONS

Financial Management Innovation Model under New Accounting System Environment

Corporate Governance Statement Australian Men s Shed Association

INTRODUCTION TO QUALITY ASSURANCE

Description of the program

A model of the cost of environmental management systems based on ISO

THE INFLUENCE OF STOPPAGES ON PRODUCTIVITY DURING CONSTRUCTION OF WATER SUPPLY AND SEWAGE SYSTEMS

The Creation of the Performance Measurement System - House Model

Strengthening the Three Lines of Defence in Terms of More Efficient Operational Risk Management in Central Banks

DYNAMIC OF THE BUSINESS MODEL OF METALLURGICAL PRODUCTS SERVICING AND TRADING COMPANY VERSUS THE GROWTH OF ITS EFFECTIVENESS AND VALUE.

LOGISTICS AND MARKETING MANAGEMENT AS AN ELEMENT OF CREATING VALUE SYSTEM

The Governmental Entities in Egypt

Traditional methods versus modern methods of determining unitary cost in forestry

Result 14 Definition of new Learning Outcomes

FUNDAMENTALS OF SAFETY MANAGEMENT SYSTEMS IN NUCLEAR POWER PLANTS

CERTIFICATES AND TRADEMARKS CONFIRMING THE HIGH QUALITY OF WOODEN PRODUCTS

1: NATURE CONCEPTS AND FUNCTIONS OF HRM

Laboratory Quality Assurance Manager & Laboratory Assessor RULES & HANDBOOK

SUPPLY PROCESSES IN A MACHINE-BUILDING ENTERPRISE CONCERNING METALLURGICAL PRODUCTS CASE STUDY

International Standards for the Professional Practice of Internal Auditing (Standards)

Quality in Latvian Public Sector: Where to Go?

ISO 9001:2015 Gap Analysis Check Sheet

ISO 9001:2000 What does it mean in the supply chain?

Features of the Modern System of Management of Development of Enterprises

IMPACT AND IMPORTANCE OF INTERNAL AUDIT IN SUCCESSFUL MANAGEMENT OF THE ENTERPRISE

Dependability Assurance of Industrial Production Processes

INTERNATIONAL STANDARDS FOR THE PROFESSIONAL PRACTICE OF INTERNAL AUDITING (STANDARDS)

QUALITY MANAGEMENT PRINCIPLES

The development of science and. Coherence of Policies. Summary: Albena Vutsova *

Environmental impact identified from company accounts in the Czech Republic

Basic Plan for Monitoring Audit Firms in Fiscal 2016

Book 1.1 Introduction to Business

Risk management as a determinant of the effectiveness of the quality management system in a building company Jolanta Harasymiuk*, Janusz Barski

THE PROJECT MANAGER'S PROFESSION

and managers on management improvement in enterprises

MOTIVATION IN WORK. JEL classification: M12, M52, M53. Keywords: motivation, behavior, human resources, performance, objectives

International Conference on Management Science and Management Innovation (MSMI 2015)

Building Life Cycle and Tacit Knowledge Base of Best Practice

The Process of Designing a Company s Organizational System in Light of Empirical Research

ISO 14001: 2015 Environmental Gap Analysis

International Standards for the Professional Practice of Internal Auditing (Standards)

Strengthening Control and integrity: A Checklist for government Managers

CHAPTER 1. Business Process Management & Information Technology

Internationalization of enterprise - theory and characteristics

IntegratedManagementSystemin constructioncompany-effectivetool ofquality,environmentandsafety levelimproving

The importance of Balanced Scorecard in business operations

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies

2.2. REMUNERATION AND TRAININGS AS HR AUDIT COMPONENTS INCREASING THE EMPLOYEE MOTIVATION AND COMMITMENT

In this unit we are going to speak about Business Process Reengineering and its relationship with Information Technologies Business Process

Our Ref. April 28, 2005 Page 1/9. 1. Introduction References Certification... 4

International Journal of Advanced Engineering and Management Research Vol. 2 Issue 3, 2017

A System for Management of Urbanized Areas in the Aspect of Acoustic Effects

Johan G Nel Centre for Environmental Management. North-West University Potchefstroom Campus Private Bag X6001 POTCHEFSTROOM 2520

QUALITY MANAGEMENT SYSTEM IN SELECTED ENTERPRISE:CASE STUDY

EA-7/04 Legal Compliance as a part of accredited ISO 14001: 2004 certification

Management of purchase process in realization of building investment

CHAPTER 8 INTEGRATION OF QMS AND LMS

IT Governance Security Awareness Programme. Service Description. Protect Comply Thrive

Competency Based Training

Otto Nagy 1* , Arad, Romania

Pillar II. Institutional Framework and Management Capacity

Quality Commitment. Quality Management System Manual

Quality and Empowerment Framework

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy

Effectiveness of planning internal audits of the quality system

CONCEPTUAL SPECIFICATIONS REGARDING THE PRIMACY OF SYSTEM AUDITING OVER OTHER TYPES OF AUDITING WITHIN THE MINISTRY OF DEFENSE

Quality management plan

THE FACTORS OF SELF-ASSESSMENT IN A QUALITY MANAGEMENT SYSTEM-WITHIN A CLIENT ORIENTATION CRITERION

Unit-V. Internal commerce is the application of electronic commerce to processes or operations.

BELDEN QUALITY SYSTEM OVERVIEW

Perry Johnson Registrars, Inc. Licensed Copy #2 RECYCLING INDUSTRY OPERATING STANDARD. Prepared for ISRI Services Corporation

Transcription:

Jadwiga BIZON-GÓRECKA Faculty of Civil and Environmental Engineering and Architecture UTP University of Science and Technology, Bydgoszcz, Poland PROCESS MANAGEMENT OF THE COMPANY AS A STANDARD OF THE HOLISTIC VIEW OF RISK Keywords: processes perspective, risk, holistic view Abstract Risk management in a holistic perspective leads to an improvement of business performance. Such concept of the enterprise management may become a fundamental way to achieve a success. A consequence of the paradigm is a close correlation between an enterprise management risk (manager s risk) and enterprise risk management structure. Modelling such a system structure, with a use of the process approach, is essential for the sake of coherent manager s decisions across business at planning and implementation levels. Process approach to management was described in the article. A scheme of map of ideological processes presents a model of the structure of enterprise. Risk problems in the organizational processes were described. Introduction It is a cliché that any economic venture is burdened with risk. Nevertheless, the main problem for an entrepreneur is to locate the risk, determine its dimension and its impact on the enterprise as well as, in the following phase, verify what actions may be undertaken in order to eliminate of decrease the risk, if elimination of risk is not possible (Czekaj, Dresler, 1995). ISO 9001:2015 norm defines process as a set of correlated actions or mutually influencing one another that transfer inputs into outputs. Certain reminders are to be found in the comments to the aforementioned definition stating that process inputs are usually outputs of other processes and also that the processes in an organization are usually planned and implemented in supervision conditions in order to increase value. Enterprises, therefore, can be modelled as a holistic set of processes correlated in such way to enable meeting the goals of an organisation. Due to the necessity of adjusting of organisations to the changing macroeconomic conditions and verified goals of an organisation this coordination should be liable to changes flexible. Flexibility should be the main characteristics of the processes in their internal structure. The process character of the organization impacts a high level of its flexibility. Its implementation requires a spectrum of changes in the entire organization, indispensible cultural changes included (Grajewski, Nogalski, 2004).

60 Jadwiga Bizon-Górecka Process risk in an economic system (enterprise) can be understood as a phenomenon of parting of an expected and factual level of reaching the goal of a given process. The process approach to the management of organizations shows the way of how to improve the enterprise: improvement of processes. This improvement can occur in a radical way in the form of reengineering, or relatively through systematic improvement. The management of a number of processes identified in an organisation and the mutual relations between them can be described as process approach. It assumes that each work leads to achievement of goals, and these goals are achieved more effectively if actions and resources necessary in their achievement are managed as a process. Process approach encompasses the outlook on all processes within an organisation as a system; therefore it has a systemic character. The rule, paradigm of system approach is holism comprehensive apprehension. System approach in management proposes treating an organisation as a unified, purposeful system, which is composed of interconnected parts. The idea of enterprise management by processes The enterprise is the whole consisting of processes of different type, which take place in it. At present, the enterprise is less and less perceived as being a set of functions and professional specializations, structured hierarchically, but as being a set of horizontal processes in the crosssection of these functions and specializations. Also coordination and solution of problems gradually changes its character from top to bottom in terms of processes, regulated by the client-supplier relationship. Such a reformulation of the concept of the enterprise was caused by the changing environment, the necessity of constantly trying to improve indicators of value for the client, and also new management techniques (Brilman, 2002). The process, in system terms, is a set of action and means transforming input into output. There are many disturbances that impact system. Production processes proceed according to specific rules of conduct, in the conditions of volatility and production, which results from having to perceive them in dynamic terms. Processes are broad-spectrum, from very big and complicated ones to very simple ones. Each work is the process. Production processes include the process of preparing production, manufacturing processes, and also distribution processes and service of clients. The process approach in the management of the organization consists in describing processes, ascribing responsibility, aims and measures for those processes, and also systematic identification of the sources of risk

Process management of the company as a standard of the holistic view of risk 61 and modification of the style of management and the culture of the organization, conducive to the management of the course of processes in the organization with regard to the phenomena of risk. In order to manage mutually interlinked processes and increase efficiency and effectiveness the system approach is applicable. A volatile character of the phenomena of risk requires adopting a dynamic attitude to the problems of the functioning of processes, and constant improvement should refer to the entire organization in all its areas of activity both at the level of processes, and also at the level of the management of its structure. Defining the processes occurring in an enterprise, their connections and progress is related with building a map of processes. It illustrates in a clear way the implemented processes and staff involved. Obtaining clear information about the current state, or in other words, the real progress of processes provides the information whether they are implemented in an optimal manner allowing for reaching the set goals. If their progress does not guarantee an optimal level, therefore the processes require redesign for an improved effectiveness and efficiency. Redesigning may be connected with the change of progress in the actual processes or with a brand new design of a process that is not currently implemented. Risk analysis in enterprise processes Detailed knowledge about the character and scope of potential risk makes it possible to select preventive activities early enough (e.g. insurance against some kinds of risk) relatively minimizing its impact and effects. Risk management deals with the whole of such activities. Depending on the concrete industry, or organizational culture of the given enterprise, it can take different shape. However, it should always mean organization and a comprehensive approach to risk in the entire enterprise and in its business surrounding. Risk management in the enterprise is important for the whole economic system, according to the principle as follows: an ill organism "infects" a healthy one. For instance: if one of the suppliers fails to supply in time even insignificant, but indispensible detail in the production process, the enterprise can face serious trouble. All the processes in the given organization are present in order for the organization to be able to achieve business strategies. The strategies should be planned, organized and realized according to needs. The above-mentioned statement speaks volumes about having to practically use in the management of production systems, the theory of reliability and risk in terms of realizing process tasks, i.e. implementation of reliability engineering and risk. Managers at all the management

62 Jadwiga Bizon-Górecka levels in all their managerial activities face the risk-related problems. Manager s responsibility concerns not only the responsibility for the successes of an organisation (related mainly to the productivity of resources) but it also relates to products, workforce rights, as well as employment planning, health and safety security and pollution matters. The above account substantiates the system approach to risk management, which has been depicted by the author in her earlier work (Bizon- Górecka, 2002). International Organisation for Standardisation (ISO) were also preparing the framework of risk management normalisation, which will focus on organisation s security (ISO 31000:2009). The problems of risk in the process perspective are included in Table 1. Table 1. Risk factors in the processes of the manufacturing enterprise No. Process Aims of processes Risk factors I. 1 I. 2 I. 3 policy and strategy finances and results the organizational structure I. PROCESS ES OF MANAGEMENT Ensuring coherence of the Policy of Risk with the policy of the enterprise. Ensuring the unity of planned strategic tasks and aims of processes. Ensuring financial liquidity and plus financial results of the enterprise. Ensuring the adequacy of the organizational structure and operational tasks and requirements of the legal environment of the enterprise. - Volatility of the political and economic environment, - Assessment of success factors (adequacy of the SWOT analysis), - Predilection of the management staff to take risk, - Knowledge and engagement of employees - Fiscal changes, - Changes to banking regulations, - Punctuality of paying invoices by clients, - Stability of the market, - Investment decisions of the management, - Knowledge and engagement of employees - Volatility of legal relationships, - Resistance to change, - Organizational culture, - Knowledge and engagement of employees.

Process management of the company as a standard of the holistic view of risk 63 No. Process Aims of processes Risk factors the system of - Qualifications of managers, I. 4 risk management (mainteagement staff, - Decisions made by the man- Maintenance of the system of risk management. nance and development - Databases, of the - Computer science system system) II.1 II.2 III.1. III.2. Internal audits Corrective and preventive action Marketing Designing and development of products II. IMPROVEMENT PROCESSES Ensuring the effectiveness of the functioning of the system of risk management through current monitoring processes and indications about increasing the quality of their functioning. Aim is to correct the faults of processes, and prevent them with the use of the results of internal audits. III. PROCESSES OF CREATING ADDED VALUE Recognition of the needs of the construction market and behavior of clients (needs, requirements, satisfaction) and the market of suppliers of raw materials and materials and services. Additional aim is to build a good image of the enterprise. Ensuring the application of modern solutions of goods and services, being in the scope of the enterprise operation. - Engagement and capabilities of auditors. - Databases, - System of internal communication, - Elasticity of processes, - Employees qualifications - Volatility of demand, - Market potential, - Competitive position, - Impact of promotools, - Marketers qualifications. - Assessment of the possibilities of fulfilling clients requirements, - Employees qualifications, - Technical possibilities, - Elasticity of production lines, - Assessment of the impact of products on the natural environment, - Availability of modern technologies, - Financial means.

64 Jadwiga Bizon-Górecka No. Process Aims of processes Risk factors III.3 III.4 III.5 III.6 Production planning Logistics Manufacturing of goods Service of clients Ensuring that the process of planning production should proceed in controlled conditions so as to fully achieve the compliance of goods/services with the set requirements between clients and suppliers (internal and external ones). ensure purchases, supplies and transport of raw materials, materials and services of features meeting the requirements of respective processes. realize manufacturing processes in a safe way for employees and their environment, and also to guarantee the required quality of products. create added value for - Databases including normative indispensible work resources (workload, materials, equipment), - Employees qualifications, - Precision in specifying client s requirements. - Assessment of material needs (quantitative and qualitative), - Relationships with contractors, - Change of the prices of materials, - Change of supply terms and conditions, - Punctuality of supplies, - Stock, - System of the quality control of materials, - Compliance with technical and environmental norms by suppliers, - Breakdowns of machines and appliances, - Conditions of storage of raw materials and goods. - Guarantee of material production factors, - Possibility of the recruitment of employees, - Engagement of employees in work, - Qualifications and experience of employees, - Breakdowns of technological machines and appliances, - Safety of people safety and hygiene of work (lighting, noise, vibrations, temperature, chemical factors, stress), - Environmental pollution. - Procedures about signing an

Process management of the company as a standard of the holistic view of risk 65 No. Process Aims of processes Risk factors clients through ensuring high-quality service in all phases of the contact with external clients. agreement, - Communication and relationships with the client during production of goods or providing services, - Punctuality of supplies, - Aftersales service, - Qualifications and engagement of employees. IV.1 IV.2 IV.3 IV.4 technical infrastructure human resources Oversight over the work environment and natural environment internal communication computer science system Source: own elaboration IV. SUPPORT PROCESSES ensure the proper functioning of the technical infrastructure in order to fulfill the quality requirements of processes. ensure the proper adjustment of the number and qualifications of employees to the fulfillment of set tasks. ensure the required work environment for employees to enable the proper execution of production works (safety and hygiene of work). Aim of the process is also to minimize dangers for the natural environment and enhance independence. streamline of the management of internal communication to ensure unambiguity of the requirements of internal and external clients. - Technical progress, - Thefts, - Environmental pollution. - Numerical selection of employees, - Qualifications and engagement of employees, - Job market, - System of internal communication. - Exposure of employees to the process, - Update of cards of vocational risk, - Pollution of the natural environment, - Volatility of environmental requirements, - National policy about the environment. - Organizational culture, - Stability of staff.

66 Jadwiga Bizon-Górecka The realization of all the processes in the enterprise consumes resources. The process picture of the functioning of the enterprise can indicate the centers of costs in connection with sources of their origination. Sales of products (goods and services), as a source of revenue, should be monitored in such a way as to be able to identify their centres. To guarantee the constant improvement and development of is an important element of the process approach. This idea can be treated as a paradigm of management regarding any areas of the management of the organization, in which important considerations of the improvement of its functioning (Myszewski 2004). The constant improvement of processes is also inscribed into quality management, according to ISO standard. In Figure 1 the idea of constant improvement of all the areas of the organization is shown. Fig. 1. Scheme for constant improvement of all the areas of the enterprise Constant improvement of the system of risk management Interested parties Requirements Management responsibility human resources Realization goods Measurements, analysis and improvement of Satisfaction Interested parties Input data Source: elaborated on the basis of norm ISO 9001:2015. Output data The improvement of processes consists in a constant analysis of their course and assessment of compliance with set aims, and also correction of all kinds of deviations in order to realize their set provisions. In order to take such action, one uses all the sources available, e.g. sources of information, internal audits, corrective and preventive action, management overviews, clients complaints etc. Such information enable to take deci-

Process management of the company as a standard of the holistic view of risk 67 sions about how to improve the process and achieve higher targets. If, as a result of improvement, there are new parameters of the process, the cycle of development returns to the stage of the analysis of the process. It is connected with the fact that changes were made, that is why one should confirm the stability of the process once again (its confirmation is the overriding aim of maintaining the process). After formulating the plan, one should assess compliance of its results with the planned ones. The moment the results are different to those of planned before, then the initial plan needs changing and implementing and checking once again, so the cycle of improvement begins from scratch. Conclusions Designing risk management should include the current state of the structure of the system of enterprise management. In connection with the popular management of organizations, according to ISO standards, risk management can be integrated with quality management, environment management and safety management. The process approach accompanies such a solution in the enterprise. The divisions of processes are an attempt at seeing the organization as a whole consisting of these processes. The map of processes should be consistent with the accepted aims of the organization as well as reflecting all the processes realized in the enterprise. The map makes it possible to visualize a set of tasks, assess the structure of each process and subprocess at its present stage and also at the desired stage. When properly made, the map enables to identify major links of the process and to specify time necessary to do successive tasks and to indicate poor links: faulty and redundant actions. The implementation of the process approach to the management of the organization requires such radical changes. Improvement and development through evolutionary changes should be inscribed into the reformed system of management. In conclusion may be appropriate following comments: Action about risk management must be compatible with action about management in the given organization. The process approach in management means to take into account a number of activities as processes with a clear aim, and also relationships occurring between processes. The approach can be indicated as a useful toll for the holistic consideration of problems connected with risk and implementation of total risk management in economic entities. The map of processes enables to illustrate the geography of risks, both original and consecutive ones.

68 Jadwiga Bizon-Górecka One should indicate at this point the correlation of processes at all organizational levels and resulting phenomenon of risk interference, occurring in different areas and at different levels in the given organization. Model of the process approach to risk management in the organization emphasizes the necessity of considering original risk occurring usually in the course of realizing respective processes, as well as risks of consecutive character resulting from relationships between specific processes. Mapping risk, in the sense of specifying geographies of risk in the organization, makes it possible to react quickly to materialized risk. The map of risk thus understood can be built on the basis of the map of processes. Risk analysis of individual processes increases the economic and environmental efficiency of the enterprise and therefore contributes to sustainable development. References [1] Bizon-Górecka J. (2007), Modelowanie struktury systemu zarzdzania ryzykiem przedsibiorstwie ujcie holistyczne, TNOiK, Bydgoszcz. [2] Bizon-Górecka J. (2002), Systemowe zarzdzanie ryzykiem jako panaceum na ryzyko zarzdzania organizacj, Przegld Organizacji Nr 9/2002, ss. 33-35. [3] Brilman J. (2002), Nowoczesne koncepcje i metody zarzdzania, PWE, Warszawa. [4] Czekaj J., Dresler Z. (1995), Podstawy zarzdzania finansami firmy, PWN, Warszawa. [5] Grajewski P., Nogalski B. (2004), Podejcie procesowe jako filozofia ograniczania ryzyka i zwikszania bezpieczestwa funkcjonowania organizacji, [in:] Strategie zarzdzania ryzykiem w przedsibiorstwie ryzyko a bezpieczestwo organizacji, red. J. Bizon- Górecka, TNOiK, Bydgoszcz, ss. 41-46. [6] ISO 31000:2009, Risk management Principles and guidelines, International Organization for Standardization. [7] ISO 9001:2015, Quality management systems Requirements, International Organization for Standardization. [8] Myszewski J. (2004), Paradygmat doskonalenia systemu Shewarta- Deminga, Organizacja i Kierowanie, Nr 1/2004.