ASSEMBLY AND OPERATING MANUAL LTW EG CORNER - MANHOLE

Similar documents
ASSEMBLY AND OPERATING MANUAL LTW SLIDE RAIL SYSTEM - Type PV

ASSEMBLY AND OPERATING MANUAL LTW SLIDE RAIL SYSTEM - Type FP

ASSEMBLY AND OPERATING MANUAL LTW SHORING BOXES VB 100

manufacturer: 6%+7LHIEDXWHFKQLN*PE+ Ferdinand-Porsche-Str. 8 D HEINSBERG

CORNER SLIDE RAIL OPEN PIT INSTALLATION INSTRUCTIONS

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August

SHORING SYSTEMS FROM SHORING PROFESSIONALS

RAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017

Edge Support Trench Lining System

TRITEC light Steel Panel Formwork

KS - Assembly and operating manual Trench box

Summary. Mini KKP - Assembly and operating manuel Pile guide box. Montage. Implementation. Accessories. Technical data

Conergy SolarFamulus II

ALISPLY. Scaffold Plank. Aligner. Plate Washer ½ x 6 x 6

PERI PD 8 The cost-effective shoring for slab tables and high loads

HELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION

Rolling Towers. Layher Rolling Towers Uni Wide. Safety Structure Instructions for Assembly and Use. Mobile working platforms to DIN EN 1004:

MGF TECHNICAL FILE MGF 305 UC BRACE. Description. Product Notes Issue 4

INSTALLATION GUIDE Sika SolarMount 1 Exposition East West

KEEP FOR FUTURE REFERENCE MRT FORKLIFT ADAPTER READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

ifix INSTALLATION MANUAL PV flat roof installation system Version

Alisply-M Walls (Handset)

h Installation Manual

MAXIMO MXH Heated Formwork The cost-effective solution for concreting operations at low temperatures. Product brochure

Mounting systems for solar technology

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions

Rapid Clamp EUROBUYSERVICES EBS

MGF TECHNICAL FILE MGF 203 UC BRACE. Description. Product Notes.

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

Alisply Circular Headquarters - Spain Alsina USA - Chicago Alsina USA - Miami

Installation Instructions

BY DAYTON SUPERIOR. FormRight FORMING SYSTEM

Formwork Direct International. Tel: Heavy Duty Panel System

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

KEEP FOR FUTURE REFERENCE FORKLIFT ADAPTER FOR MRTA6 AND MRTA8 LIFTERS READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

On-roof system Tau Installation manual

MGF TECHNICAL FILE MGF 400 SERIES STRUT. Description. Product Notes.

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

MevaFlex Assembly and Operating Instructions

Universal Elevator Mount Owners Manual

MGF TECHNICAL FILE WALERS AND STRUTS. Description. Product Notes.

Steel Forming System BROCHURE. A durable, all-steel forming system that is ideal for pier caps and self-spanning applications.

EN 1065 ULTRADECK SLAB SYSTEM

PERI UP Easy * The lightweight and fast frame scaffold for safe working on facades

July Climbing Scaffold with retractable formwork Instructions for erection and use

3.1. FOLDABLE WORKING PLATFORMS. and accessories

Radiant Solar Tripod Planning and Installation Guide V1.2 With Australia AS/NZS1170.2

Instruction Guide. FreeSpan SR. English

Rolling Towers. Layher Uni Light Tower Instructions for Assembly and Use. Mobile working platforms according to DIN EN 1004:

Tabulated Data Hydraulic Vertical Shores

Althon slot channels Althon

A EN ROUND STORAGE SILO. Ø480cm, Ø560cm, Ø640cm, Ø720cm ASSEMBLY AND USER MANUAL. ARSKAMETALLI LTD

NEVI Light modular formwork

EASY ROOF FLAT PV FIXING SYSTEM FOR FLAT ROOF

INSTRUCTIONmanual. BoSS COMPACT SIDE CANTILEVER TOWER SCAFFOLD 3T Method - Through the Trap Door

TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS. Combisafe International AB

Bravo Platform Unpacking Guide

Safety Ladders: Made of Aluminium

Edge-of-Dock Leveler 'BA' - 'BX' Series. Owner s Manual and Installation Instructions

MANUAL. portrait set-up. landscape set-up. ClickFit Evo mounting system for sloping roofs with roof tiles for solar panels

Span 400 Series Instruction Manual

ALUPROP Aluminium prop

Modular Scaffolding MEKA 48

STRAIL level crossing systems & STRAILastic track damping systems

New Zealand s Excavation Safety Specialists.

TRAPEZOIDAL SHEET METAL RAIL LIFT/VARIO for trapezoidal sheet metal roofs

Heavy-Duty Braces Triplex Assembly and Operating Instructions

INSTALLING A POUR-IN-PLACE DOCK LEVELER (EH & RR)

Span 400 Instruction Manual

MOUNTING SYSTEM FOR PITCHED ROOF WITH TILES. mounting system for pitched roof with tiles for solar panels in landscape setup. Rev

LADDERSPAN AGR. BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE

24 Portable Saw Mill OWNER S MANUAL

Rack-in-a-BoxTM INSTALLATION MANUAL

Alisply Walls. Product brochure

Noetop is a versatile, robust integrated formwork panel system. The basic panels incorporate the strongbacks and

Miller Collective Safety at Height Solutions EPIC ULTRA Barrier System EPIC Post-N-Barrier System EPIC Basic Barrier System

20 Portable Saw Mill OWNER S MANUAL

Z5054 Ci60/Ci90 Flying adapter Mounting instructions

Delta Level 1000 Hinged Lip Pit Mounted & Suspended Frame Dock Leveller

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

Trench lining systems: STEEL

LEWIS Miniscaff Folding Tower Assembly Guide

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2)

Note. Floor beams can also be made from wooden beams put through the holes in the longitudinal beam and boards nailed to it.

INSTRUCTIONS FOR ASSEMBLING NEBS FLOODED RACKS

ON-ROOF ATTACHMENT FLAT COLLECTOR HELIOSTAR

Adjustable Suspension Hanger Technical Datasheet

Mounting systems for solar technology

CORNER ELEMENTS CENTRE SUPPORT ACCESSORY BAG PROJECTION SCREEN BAG. 4 pieces- basic frame 52x52 cm (fig.: including SET UP SUPPORT,optional)

SECURE. UNIVERSAL. MOUNTING. Tilt Kit Installation Manual

Span 500. Elite Instruction Manual. DESIGNATION SPAN 500 Double Width EN /12 XXXD SPAN 500 Single Width EN /8 XXXD

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use

Instruction Manual. DESIGNATION SPAN 500 Double Width EN /12 XXXD SPAN 500 Single Width EN /8 XXXD

WINSAFE Corp. OPERATING INSTRUCTIONS SUPERMOD MODULAR PLATFORMS CUSTOM LARGE AREA PLATFORMS SUPER DECK MODULAR PLATFORMS BOILERMOD MODULAR PLATFORMS

Mounting systems for solar technology

Modular Scaffold MEKA 48

GROUND MOUNT INSTALLATION MANUAL

Z5394 Rigging manual 1.2 en

The frame elements, accessories and additional elements are maintenance-free!

Transcription:

Manufacturer: LTW Tiefbauvertriebs GmbH Holter Weg 11 D 41836 Hückelhoven-Brachelen Phone: +49 (0) 24 62 / 2009 0 Fax: +49 (0) 24 62 / 2009 15 e-mail: info@ltw-verbau.de homepage: http:\ \ www.ltw-shoring.com LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 19.09.2016 page 1

General Instructions Intended Use For soil replacement on contaminated sites For installation of garbage container in city center areas Flush positioning of the next section/module Compatible with standard slide rail system The continuous conversion of the modules is covering an entire area, without mixing contaminated excavation and backfill soil. For this reason, this type of system can only be used as EG corner. Depending on local differences, different corner slide rails can be used. In combination with base and top panels a trench depths of ~ 4,00m can be achieved. Slide Rail Systems are being installed using the lowering and cut method ( dig and push ). The following regulations and rules have to be followed in their valid version: Regulations of the BG-Fachausschuss Tiefbau (technical committee civil and underground engineering) DIN 4124 Baugruben & Gräben (excavation pits and trenches) DIN EN 13331 Teil 1 & 2 Grabenverbaugeräte (part 1 and 2 construction equipment) Regeln für Sicherheit und Gesundheit bei der Arbeit (rules for safety and health during work) Unfallverhütungsvorschriften/Arbeitsschutzvorschrifte n (regulations for the prevention of accidents and safety at work rules) Please follow the instructions making use of our Slide rail systems. Lifting & Transportation The shoring may only be attached at the corresponding eyes and openings and/or lifting accessories. Lifting chains must be chosen to suit the weight being handled. To prevent the accidental detachment of the load use only load hooks with safety catches. The allowed tensile forces have to be kept in any cases. Transportation has to be carried out next to soil and unneeded oscillations have to be avoided. It is prohibited to stand within the pivoting range of the excavator or crane and beneath suspended loads. When handling and removing the shoring, watch out for overhead contact lines (power cables). A load operator must stand to the front of the excavator and be in eye contact with the machine operator. Measures to reduce hazards The safety of persons on site must be enhanced with the aid of signs, cones, warning tapes and/or safety staff specially deployed on site for this purpose. Neighbouring traffic flow has to be made possible by means of safety staff if needed. Personnel must wear protective clothing (helmet/safety shoes/gloves). The risk of instability as a consequence of wind loads when setting up or using the shoring must be considered. The shoring must be lowered onto level and firm ground. Where the ground is sloping or uneven, the shoring should be set up, if possible, at right angles to the slope. Maintenance & Repair Before use, all shoring components must be checked for their correct function. Faulty or deformed parts must be replaced in any case. Minor repairs can be carried out by the user, after consultation with LTW. There is no warranty on incorrectly performed repairs and the use of non-original parts. According to intenseness of use, the components should be painted with anticorrosion paint every two years. LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 19.09.2016 page 2

System view EG corner EG corner 3-sided EG corner 4-sided LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 19.09.2016 page 3

Technical Characteristics Plates VS 60 Plate length Plate height Plate thickness Working width Limit state design load Plate weight L H t Pl b C e d G PL [ m ] [ m ] [ mm ] [ m ] [ kn / m² ] [ kg ] 2,00 2,50 3,00 1,32 1,56 1,32 1,56 1,32 1,56 60 ~2,21 77,9 60 ~2,71 50,1 60 ~3,13 36,8 365 215 250 445 260 300 510 295 345 Plates VS 100 2,00 100 ~2,13 171,6 510 335 370 2,50 100 ~2,63 110,4 605 400 440 3,00 100 ~3,05 81,1 690 450 500 3,50 100 ~3,63 56,6 805 525 580 Plates VS 120 4,00 120 ~4,09 71,0 1170 745 835 4,50 120 ~4,59 56,2 1305 830 930 5,00 120 ~5,09 72,1 1635 1020 1150 LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 19.09.2016 page 4

Corner slide rails EG CORNER KT Rail length Rail thickness Limit state design Weight moment t Tr M d G Tr [ m ] [ mm ] [ knm ] [ kg ] 2,50 175 3,00 200 183 113 3,50 230 4,00 255 EG CORNER KT 3-sided Rail length Rail thickness Limit state design Weight moment t Tr M d G Tr [ m ] [ mm ] [ knm ] [ kg ] 2,50 275 3,00 320 250 197 3,50 365 4,00 410 EG CORNER KT 4-sided Rail length Rail thickness Limit state design Weight moment t Tr M d G Tr [ m ] [ mm ] [ knm ] [ kg ] 2,50 370 3,00 430 350 358 3,50 490 4,00 555 LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 19.09.2016 page 5

Accessories Description Dimension specified use for Weight [kg] bolt 40 * 128 connection between Base and Extension Plates 1,4 locking clip [R] 6 locking clip for connecting bolt at plates 0,1 protection rail for VS 100 & 120 protection rail L = 1800 for Plate length 2,00m 151 protection rail L = 2300 for Plate length 2,50m 188 protection rail L = 2500 for Plate length 3,00m 203 protection rail L = 3300 for Plate length 3,50m 264 protection rail L = 3800 for Plate length 4,00m 304 protection rail L = 4300 for Plate length 4,50m 341 protection rail L = 4800 for Plate length 5,00m 378 Tensile Forces lifting eyes at the rail head R d = 226 kn lifting eyes at the plate head R d = 229 kn bottom eyes at the plate R d = 47 kn LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 19.09.2016 page 6

Installation Instruction Pre-Excavation of max. 1,25m and approx. 10cm wider than the pit will be. In principle the preexcavation complies with the type of soil and safety regulations. Connect the lifting hooks to the first Base Panel, place it into the pre-excavated trench, push in and secure it. Pick up the 1. Corner Slide Rail with an appropriate lifting device, raise it over the Base panel and insert the guidance over the side part (T-Section) of the Panel. Press the Slide Rail Frame carefully into the ground. At this stage the trench must not be entered! Mount the second plate in the free guidance of the Corner Slide Rail and align rectangular. The second Corner Slide Rail is now guided with the guidance over the side part (T-Section) of the already installed Panel. The further installation is effected as described before, until all four Plates had been installed. The fourth Corner Slide Rail is now guided over the two free side parts (T-Sections) of the plates. The perfect distances between the two free side parts should be ~9cm. Pre-excavate about another 50cm and push in Rails and Plates by turn. Fill the gap between the trench walls and the inserted shoring! To protect the shoring plates and ensure a long life cycle we recommend the use of protection rails. When the top of the externally guided plate has reached the top ground surface, the system will be extended by using a top plate. Connect the Base and Extension Panels with the Connecting Bolts 40*128mm and the [R] locking clips. The step-by-step installation has to be continued, until the trench has reached the desired trench depth. The top edge of the shoring must overtop the surrounding terrain by at least 5cm! LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 19.09.2016 page 7

Depending on the requirements, triangular corner slide rails or quadrangular corner slide rails can be used. In this case this shoring area serves as shuttering for the newly established sector. The Plates and Rails which have already been extracted will be continuously installed within the further construction progress. Re-Installation According to compacting possibilities bring in 0,50m filling material. Start lifting the inner plates by the filled height. Finally compact the backfill. Repeat this procedure as described until the shoring can be lifted out of the trench. You should only use the designated lifting eyes for lifting the shoring components. It is prohibited to stand within the pivoting range of the excavator or crane and beneath suspended loads. LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 19.09.2016 page 8

Clamping device - EG CORNER 3-sided 2 Bay Pit 2 Bay Pit with clamping device LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 19.09.2016 page 9

Technical parameters Clamping Device consisting of: Description Qty. Weight [ kg/pce.] Socket 2 19,5 End Plate 1 33,4 threaded rod 4 1,2 hex-nut 8 0,6 washer 8 0,1 complete kid 1 82 The clamping device engages behind the EG corner 3-sided and clamps the outside horizontal upper waler HEB 240. It creates a load-carrying connection which enables the forces that arise being discharged into the outer corner slide rails. Installation Instruction Installation of the Bay Pit as described before. The Shoring plates must reach the top ground surface. The central corner slide rail must be braced in the trench bottom, (bottom support), e.g. by means of a HEB waler or a Concrete Slab. The dimensioning of the waler acts in accordance with the statical requirements and the working width. Pre-assemble the sockets with the threaded rods, hexnuts and washers. Move the first socket over the EG corner 3-sided and put down on the top ground surface. Put the waler HEB 240 behind the Slide Rails on approx. 6cm thick wood pieces. Move the second preassembled socket over the EG corner 3-sided and put down on the top of the waler. Take the end plate and fix it to the threaded rods, and fasten the bolts securely with nuts and washer. Now the panels across the clamping device can be removed. LTW Tiefbauvertriebs GmbH * Holter Weg 11 * D-41836 Hückelhoven-Brachelen 19.09.2016 page 10