THE STRATA UNIT May 25, 2008

Similar documents
The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits

Residential Building Plans

Permit Posting and Inspection Procedures

INSULATION SUCCESS WITH 2012 IECC DELAWARE. for Builders & Trades. Recommended Practices for Optimized Energy Savings

Fundamentals of Building Construction: Materials and Methods

FIELD COPY ATTACHMENT

Success with 2012 NC Energy Conservation Code in North Carolina: Tech Tips for Builders. insulation

APPLICATION FOR FINISHED BASEMENT PERMIT

Residential Building Inspections

BELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY

BELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY

Pulaski County, Virginia

Building Construction Occupations

Success with Louisiana Energy Code. Techtips for Builders/Trades & Code Officials INSULATION

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No

INSULATION. Success with 2015 IECC Northeast & Mid-Atlantic. Techtips for Builders & Trades

U.S. EDITION RESIDENTIAL CONSTRUCTION DETAILS SAMPLE. A visual guide to construction detailing. Emma Walshaw

PLANNING FOUNDATION FRAMING

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

The Inspection Process. Waxhaw N.C.

Module number 3 provides an on-line, self-paced training seminar on chapter 4, foundations and chapter 5, floors from the residential code of ohio.

Kitchen Remodel Estimator. Contact Info: Project Summary: Design. Demo

Feature Zone IECC 2009 IECC

$308,900. Caleb Crescent Collection The Algonquin Model 1113 Sq. Ft. Elevation A. Updated: September 28, Elevation B

A Summary of the Basic Duties of Maintenance, Repair and Replacement for CARRIAGE PARK CONDOMINIUM ASSOCIATION

CODE COMPLIANCE GUIDELINE GENERAL BUILDING

TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION

ACCESSORY BUILDING. Building Permit Requirements: (must be completed before submitting application)

Building Systems and Design Elements included in SliDeRulE

THE CONSTRUCTION SUPERVISOR

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

2003 International Residential Building Code

REO Client Safety Hazard Requirements

General Requirements for Mobile Homes

Property Condition Assessment. Summary Report

Building Construction Occupations

1 AND 2 FAMILY DWELLING REQUIREMENTS

Chapter 14 - Air Sealing

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

CITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS

FOUR CORNERS CUSTOM BUILDERS, LLC

City of Westerville Guide to Commercial Inspections

NAAHB Workgroup Index General Ledger Account

Success with 2009 IECC in Georgia: Tech Tips for Builders. Insulation. Copyright 2014 Advanced Energy. All Rights Reserved

Alabama Home Inspections

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

Success with 2009 IECC: Tech Tips for Builders. Insulation. Copyright 2014 Advanced Energy. All Rights Reserved

Appalachian Log Structures Construction Cost Estimating Guide

Typical Finished Basement Details

Inspection Report. Prepared for: Yossi Berg. Property Address: 4925 Diggers Way Sugar Hill, GA. Date: July 20, 2011

CHECKLIST Inspecting a Garage

The Fleming Update. Getting Your 2016 Repair & Maintenance House in Order. First Quarter Aaron Wolf, President. Articles Inside.

One and Two Family Additions

RCT Webinar-Updated 03/18/12

PRE-ACCEPTANCE INSPECTION CHECKLIST

TOWN OF FRANCESTOWN BUILDING/CODE ENFORCEMENT 27 MAIN STREET P.O. BOX 5 FRANCESTOWN, NEW HAMPSHIRE Building Permit Application Guide

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

Estimated Cost Ranges for Completing Residential Flood Protection Projects

Davis Frame Co., Inc. Construction Budget Considerations

Walnut Creek Mutual Seventy

RENTAL INSPECTION CHECKLIST. Helpful Definitions: Egress: the free and unobstructed access to the exterior of a habitable space.

COPYRIGHTED MATERIAL. Contents. 1 Making Buildings 3. 3 Wood Foundations and. Preface to the Sixth Edition xi. Sitework 31

SECTION 6. Residential Warranty Corporation 10 Year, Limited Structural Warranty. Year One

Décor Design Construction llc

Chapter 4: Insulation

All Pro Home Inspection. Home Report South Your Town

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012

RESIDENTIAL BUILDING PLAN REQUIREMENTS

Cheshire, CT. By: A.M. Napolitano, LLC. Project Manager: Carolyne Sakonchick Ext. 323

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

PREPARING RESIDENTIAL PROPERTY FORTHE HOUSING HABITABILITY INSPECTION

Columbia County Health Care Center Added Amenities

New Home Warranty Handbook

ORDER OF AN EXECUTIVE OFFICER UNFIT FOR HUMAN HABITATION ORDER TO VACATE INACTIVE

What this Family Room Specification Package can be used for:

Standard practice for installing cellulose building insulation

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project

Framing Methods Structural Components

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

Residential Building Permits


BVSC BVSC. Midwest Technical Inspections Survey Worksheet. Account / Account Code: Insured: Policy #: Building Data - Section 1

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

RESIDENTIAL GARAGE AND DRIVEWAY

CHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS A. ITEMS FROM PREVIOUS SITE INSPECTIONS-INCOMPLETE OR ON HOLD

TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up

43. CONSERVATORY. Conservatory. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle

Proposal. Lexington, MA. Price Work Description

Building Architecture

3. Appliances - Free Standing x

Presented by The National Association of Certified Home Inspectors Chicago Chapter

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

Inspection Report. Prepared for: Gil Turiel. Property Address: 545 Briar Run Court Loganville, GA Date: July 17, 2011

B. RESIDENTIAL MASTER PLUMBER $ $ $

BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS

Seattle Public Schools Building Excellence IV Projects Under Construction

Transcription:

THE STRATA UNIT May 25, 2008 Over the years, we have been asked time and time again from our experience as a cost consultant and a project manager from both a restoration and renovation point of view What is my responsibility as a unit owner for the interior portion of my unit? Also, we have been constantly requested to split the responsibility of the cost of restoration after an insured loss between the strata corporation and the unit owner s policies. The way the Condominium Act is written coupled with the Strata Bylaws for each complex; it sometimes can become a murky and grey area with lots of ambiguous statements in both documents. So as a cost consultant, we have always taken the stand that the not only do we apply the two documents, we apply the principals of restoration and costing as well, thus we come out with a reasonable solution that is more common sense than anything else. So let s go inside a unit and start there. CEILINGS If there is another unit above or the unit owner does not have access to the attic, then it is a common separation and forms part of the strata complex. If the unit owner has access to the attic, then it becomes the unit owner s responsibility to maintain the insulation in that attic, and the roof section belongs to the strata complex.

The finish on the ceiling is the unit owners responsibility, but the framing portion, and the drywall belongs to the strata complex because under the Condominium Act, the strata council is responsible for the safety of the residences, and being part of the structure from both a safety point of view, a fire point as well. WALLS All exterior walls, bearing walls, and demising walls belong to the strata complex. Partition walls, provided that they are true partition walls meaning that the drywall on the ceiling flows continuous through above the top plate from one room into the next room, are the responsibility of the owner otherwise they become part of the complex. All finishes on all walls are the responsibility of the owner. Again the drywall is a fire issue as well as the framing being a safety issue. The entire true partition wall is the owner s responsibility. FLOORS The floor covering or finish is the owners, whereas the balance of the structure is the complexes. Even if the unit is on the ground floor and there is access to a crawl space basement because the foundation, footings, services, cleans outs, etc for the whole complex can be accessible from this point. It is the unit owner s responsibility to inform the council if they observe unusual activity going on in that space because council has limited access to the space. MILLWORK All built in, vanity, and kitchen cabinets are the owners, as well as the trim, and interior doors. EXTERIOR DOORS & WINDOWS They are the responsibility of the complex, while the maintenance of these components is the owners. By maintenance, we mean broken glass, weather-stripping, etc. PLUMBING This area seems to be the most confusing of all, so let s take a bathtub for example; the drain is the responsibility of the complex, while the water supply can be the owners, along with the fixture itself. The reasoning here is quite simple, as the water supply usually has shut off valves, the unit owner can control the flow from that point into the unit, whereas the drain has no shut off and runs into areas that the owner has no control over, therefore it becomes part of the complex. Maintenance of this item would be the owners. For example again, a toilet, the fixture and water supply is the owners, while the sewage pipe is the complex. Again the sewer pipe runs into areas that the owner can not access. However, should the toilet back up from abusive use or a plugged drain, it is the unit owners duty to address the issue unit a trades person can tell them that the cause is further into line and out of the owners jurisdiction, then the complex should take over. HEATING If the unit is self sufficient, then the owner has this responsibility, unless ducts and runs are in common areas that the owner cannot access, then again it becomes the strata s. If it is a common heating plant for the complex, then all of it becomes part of the complex. The only exception to this rule would be registers which can become the owners.

ELECTRICAL All fixtures, receptacles, switches, plates, are the unit owners. If each unit has its own service, this too becomes the owners. If the wiring runs into common areas, the wiring becomes the complex. Again the principle of continuous run without junction applies. FIRE PROTECTION All fire protection equipment such as smoke detectors, carbon monoxide detectors, central alarms, etc. should be the responsibility of the complex because they do not only concern the unit owner but all of the other owners throughout the complex. Now as we mentioned in the beginning this is using basic common sense as we see it and applying principles from the condominium act, construction, and restoration. We have been very successful in the past in resolving situations regarding who is responsible, and if you find yourself in this situation, we would advise that you retain a cost consultant. For more information about us, please visit our website at www.integralconsultants.ca FOUNDATIONS June 1, 2008 A building needs a foundation to support its considerable weight, provide a flat and level base for frame construction that separates wood based materials fro contact with the round and or concrete that would otherwise cause rot and allow termite infestation. Depending upon when and where the building is built, the foundation may be of stone, brick, preservative treated lumber, concrete block or poured concrete. The most common material of these is concrete. Most buildings have a raised, perimeter foundation that supports floors and load bearing walls. Some are build on a flat concrete slab that doubles as the foundation for support, and the ground floor that becomes part of the finished occupancy. Other buildings are built on concrete pillars or

wood pilings, or a portion thereof, although this method is being phased out in favor of the foundation wall. These concrete pillars can also support load bearing walls within the building structure. These pillars rest upon a footing and support mid span beams that form part of the framing of the building. Alternatively concrete blocks with steel reinforced rods inserted into the center of them are used in place of solid concrete construction. These blocks which are hollow in the middle are placed on a bed of mortar to solidify rigidity and grouted inserted in the cavity to hold the steel rods in place. Today, interior supporting pillars have either concrete blocks or steel adjustable poles to support the framing structure. The most common foundation walls are poured reinforced concrete or filled reinforced concrete blocks, although pre poured foundation wall slabs are becoming more popular and may become a method of the future. These newer aged poured concrete walls have insulated permanent formwork put in place with a network of reinforcing rods in between for better insulation value for not only full basements but crawl spaces as well. The exterior of these walls have a membrane with a puck designed waterproofing sheets attached for a watertight wall. This includes the pre formed wall slabs as well. Concrete Block Pillars Concrete Block Foundation Wall

Poured Concrete Full Foundation Poured Concrete Crawl Space Slab of Grade Poured Concrete Foundation Panels Permanent Insulated Formwork Foundation Waterproofing Foundations can and do crack, sink, and fail. This is because of poor soil conditions, faulty workmanship, over construction of the building, under construction of the footings and placement of the building in proximity to hillsides, roadways, and waterways. Building Code changes all over North America have introduced these last two products in the last few years and the beginning of Code Green is just around the corner.

These two products are part of a greener building code. For more information concerning these products call Mainland Concrete Lifters Inc. toll free at 1 800 231 3132. Please visit our sponsors. www.integralconsultants.ca www.mainlandlifters.com Without them, this newsletter would not be possible. THIS NEWSLETTER IS DESIGNED TO INFORM ADJUSTERS, BROKERS, UNDERWRITERS, AND CONSUMERS OF RISKS REGARDING REAL PROPERTY WHETHER IT IS SIMPLY EXISTING CONDITIONS OF A PROPERTY OR ACTUAL LOSS OF PROPERTY. THIS PUBLICATION IS DISTRIBUTED BY SUBSCRIPTION OR APPOINTMENT ONLY TO OVER 3,000 SUBSCRIBERS