Catch Basin Inserts: Method to Determine CB Inserts Act as Full Capture Devices

Similar documents
DIVISION 5 STORM DRAINAGE CRITERIA

RETENTION BASIN EXAMPLE

Appendix E.2 Preliminary Hydrology Report

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

Introduction to Storm Sewer Design

CUYAHOGA COUNTY ENGINEER

BMP #: Water Quality Inserts

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL

3.2 INFILTRATION TRENCH

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL

Water Resources Management Plan

ENGN.4010 ENGINEERING CAPSTONE DESIGN Watershed Analysis. CiA

November 21, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

PERKFILTER. Design Guide

Water Resources Management Plan Appendix B

CITY UTILITIES DESIGN STANDARDS MANUAL

December 6, Nate Hatleback Project Manager City of Thornton 9500 Civic Center Drive Thornton, CO 80229

PART V - STORM DRAIN DESIGN CRITERIA

PART V - STORM DRAIN DESIGN CRITERIA

TOWN OF PARKER, COUNTY OF DOUGLAS, STATE OF COLORADO N.T.S.

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

TECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance

Design Example Handouts. DURANGO DETENTION WORKBOOK LUNCH AND LEARN CITY OF DURANGO Meeting Date: February 7, 2017

HY-12 User Manual. Aquaveo. Contents

UNPARALLELED PERFORMANCE

Extended Detention Basin Design

Stormwater Local Design Manual For Houston County, Georgia

Warner Robins Stormwater Local Design Manual

Chapter 8. Inlets. 8.0 Introduction. 8.1 General

MODEL Stormwater Local Design Manual. City of Centerville

APPENDIX G HYDRAULIC GRADE LINE

PRELIMINARY DRAINAGE REPORT FOR THE EDI MASTER PLAN

100-yr Design Runoff (cfs) Basin ID 103b A a B B C Totals

Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS

Hydrologic Study Report for Single Lot Detention Basin Analysis

The site slopes generally from the southwest to northeast at approximately 3.7 percent.

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

January 20, Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO (303)

12 DRAINAGE General Administrative Requirements Standards

TECHNICAL MEMORANDUM. SUBJECT: Water quality orifice sizing equation for EURV and WQCV detention basins

APPENDIX F RATIONAL METHOD

PART 3 STORM WATER TECHNICAL MANUAL

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

PRELIMINARY DRAINAGE STUDY

Submittal Requirements. Post Construction Verification Document Plan Requirements

HYDROLOGY STUDY LA MIRADA BOULEVARD La Mirada, California

sewers ANd storm drains Storm Drain Under Construction, 1916

APPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary

TECHNICAL GUIDANCE DOCUMENT APPENDICES

ATTACHMENT 4 Section Project Status Quarterly Report - Dec 31, 2015 Measure V - Clean Beaches and Ocean Parcel Tax

Astra Engineering LLC

Appendix G Preliminary Hydrology Study

3.11 Sand Filter Basin

Siphonic Roof Drainage & Design Process. Presentation by

DRAINAGE BASICS Common Terminology & Reference Tools Drainage Components Determine Existing Conditions Calculate Development Requirements

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

TYPE "A" CATCH BASIN

OPERATION & MAINTENANCE

CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)

CORBIN AND NORDHOFF IV. ENVIRONMENTAL IMPACT ANALYSIS ENV EIR F. HYDROLOGY

PRIVATE STORM DRAINAGE FACILITIES REQUIREMENTS

Block and gravel filters can be used where velocities are higher. Reduces the amount of sediment leaving the site.

Drainage Analysis. Appendix E

PRELIMINARY HYDROLOGY STUDY

BOARD OF COUNTY COMMISSIONERS ALLEN COUNTY, OHIO 301 N. Main Street, Lima, OH 45801

Rational Method Hydrological Calculations with Excel COURSE CONTENT

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

GENERAL REQUIREMENTS - DRAINAGE

Treatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation

2. DEFINITIONS. American Association of State Highway and Transportation Officials.

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

FINAL DRAINAGE REPORT FALLBROOK FILING NO. 3 Thornton, CO

Stormwater Sediment Sampling Project Report Project ID: SUNTREE_SED_001

Hydrodynamic Separation Product Calculator

PROPOSED THREE-STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 19 R-PLAN ROCKINGHAM AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT

STAINLESS PRODUCTS TRUSTED SOLUTIONS FLOOR DRAINS TRENCH DRAINS CLEANOUTS P-TRAPS HUB DRAINS FLOOR SINKS FLOOR TROUGHS CUSTOM SOLUTIONS

Jensen Deflective Separator (JDS) Stormwater Treatment Unit

SPRI RD-1 Performance Standard for Retrofit Drains

Preliminary Drainage Analysis

Section 600 Runoff Table of Contents

GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887

Appendix I OFFICE OF THE MORGAN COUNTY SURVEYOR STORMWATER DESIGN MANUAL 7/1/2008

Appendix L. Drainage Report

TRENCH FORMER. ABT, INC., 259 Murdock Road, Troutman NC 28166, (800)

Sump Pumps Office procedures for the Drainage & Grading section

EXTENDED DETENTION BASIN EXAMPLE

SECTION 4 STORM DRAINAGE

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

Temporary Slope Protection Method for Shallow or Surficial Failures

STORMWATER MANAGEMENT REPORT FOR. Chick-Fil-A S Ferdon Blvd, Crestview FL. February 10 th, 2017

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview

Appendix F. Flow Duration Basin Design Guidance

Chapter 15 Catch Basin Inserts

Chapter 11 Drainage Improvements

WMS 8.4 Tutorial Storm Drain Modeling Storm Drain: Hydrographic Design Learn how to run sub-basin hydrographs through a storm drain network

Section 403. DRAINAGE STRUCTURES

WMS 9.1 Tutorial Storm Drain Modeling Storm Drain: Hydrographic Design Learn how to run sub-basin hydrographs through a storm drain network

Transcription:

WATERSHED PROTECTION DIVISION DEPARTMENT OF PUBLIC WORKS BUREAU OF SANITATION CITY OF LOS ANGELES Catch Basin Inserts: Method to Determine CB Inserts Act as Full Capture Devices

Catch Basin Inserts: Method to Determine CB Inserts Act as Full Capture Devices Background The intent of this paper is to present a method to determine if the existing configurations of the City of Los Angeles catch basin (CB) inserts with 5 millimeter openings meet the definition of a full capture device as defined in the Trash Total Maximum Daily Loads (TMDLs) documents. The City has explored several configurations of catch basin inserts in order to select one that met the regulatory requirements and had minimal impact on its existing storm drain system. Figure 1 below shows the evolution of CB inserts that the City investigated during the past 4 years. a) hanging basket b) horizontal c) vertical Figure 1. Evolution of catch basin inserts in the City of Los Angeles 1-1

As can be seen, the City has examined three distinct configurations of inserts. The hanging basket type insert was examined in pilot installations with discouraging results. The demise of the basket insert is its limited capacity for trash capture and the associated tedious maintenance requirements. The City did not proceed with extensive installations of this insert but opted to proceed with that of the horizontal and vertical insert that are described below. The approach described herein will apply to both the horizontal and vertical inserts. The horizontal insert (See Figure ) was considered because it addressed the City s concern for increasing trash capture and improving maintenance. The inserts are manufactured from hot dipped galvanized steel or 316-stainless steel sheets with 5 millimeter (0.197 inch) diameter circular openings. Inserts installed in curb opening catch basins encompass the entire width and approximately 85% of the entire length of the basin. An overflow is provided to alleviate hydraulic conditions from major rain events to ensure public safety. Figure depicts typical insert installation in curb opening catch basins. Those installed in grated inlets fit the entire opening. The City has installed several hundred of these inserts in the high trash areas. The vertical insert is the last in the evolution of inserts that the City is deploying in the high trash areas. The inserts are manufactured from 304- stainless steel, gauge 14, screen sheets with 5 millimeter (0.197 inch) diameter circular openings. These inserts only have a vertical component and are installed just outside the outlet pipe of the catch basin. See Figure 3 for typical insert installation. The insert extends vertically to approximately -inches to 3-inches below the bottom lip of the curb opening. This insert has an overflow to alleviate hydraulic conditions from major rain events to ensure public safety. The absence of a horizontal screen allows for increase trash capture volume and lessens the frequency of inserts maintenance. The City has installed several thousands of these inserts in the high trash areas. 1-

maintenance hole cover gutter curb face storm runoff insert bypass 5mm screen insert outlet pipe Profile sidewalk maintenance hole 5mm screen insert outlet pipe gutter storm runoff Plan Figure. Typical City of Los Angeles horizontal insert installation 1-3

maintenance hole cover gutter curb face storm runoff insert bypass 5mm screen insert outlet pipe Profile sidewalk maintenance hole 5mm screen insert outlet pipe gutter storm runoff Plan Figure 3. Typical City of Los Angeles vertical insert installation 1-4

Method The following assertions are made: 1. Catch basins in the City of Los Angeles have been designed to intercept runoff from a ten-year storm. (Source: City of Los Angeles, Bureau of Engineering, Storm Drain Design Manual, Part G, Section G, June 1969).. Catch basin outlet pipes have been designed to be a minimum of 18 inches. (Source: City of Los Angeles, Bureau of Engineering, Storm Drain Design Manual, Part G, Section G353, June 1969). The following steps are taken to determine if the inserts with 5 millimeter are full capture devices, i.e., will treat flows from a 1-year, 1-hour storm. 1. Determine the gross area of the CB insert installed within the catch basin, both horizontal and vertical sections.. Determine the percentage (%) open area of the CB insert. Percentage was provided by the manufacturer. 3. Determine the net area of the CB insert. This is done by multiplying the gross area by the percentage of the open area. 4. Determine an effective pipe diameter based on the net area of the CB insert. This is done by using the area of a circle equation and solving for the diameter. 5. Interpretation of effective pipe diameter: a. Greater than 18 inches would indicate that the CB insert can treat more flow than existing CB outlet pipe, thus it will pass flow from a ten-year storm. b. Less than 18 inches would indicate the CB insert is unable to pass more flow than existing CB outlet pipe, thus it will not pass flow from a ten-year storm. i. Proceed in calculating the 1-year, 1-hour storm flow for the CB of concern using the Rational Method and using the rain intensity as determined by the County of Los Angeles intensity isohyetal map for Los Angeles County. ii. Determine an effective pipe diameter that would transport the 1-year, 1-hour flow determined above. iii. Compare effective pipe diameter with actual outlet diameter. If actual outlet diameter is smaller than effective pipe diameter, insert is a full capture device. 1-5

Example Horizontal Insert The example below is presented to illustrate the sequence of the method proposed. Problem: Determine if the horizontal insert acts as a full capture device. Given: 1. CB insert dimensions horizontal section is 3.5 feet by 3.6 feet vertical section is 1.5 feet by 3.5 feet. Tributary area of CB is 10 feet by 150 feet (0.41 acres) 3. Rainfall intensity is 0.5 in/hr 4. Percent open area of insert is equal to fifty percent (50%) 5. Street slope is 0.00 ft/ft Solution: 1. Determine Gross Area: horizontal section = 3.5 ft 3.67 ft 1.85 ft vertical section = 1.5 ft 3.67 ft 5.5 ft Total Gross Area = 1.85 ft 5.5 ft 18.35 ft. Percent open area of insert: Open area = 50% 3. Determine Net Area of Insert: Net Area = 18.35 ft 50% Net Area = 9.18 ft 4. Determine Effective Pipe Diameter (d new ): Area of Circle = d 4 d new = 4 area d new = 4 9.18 ft d new = 3.4 ft 1 1 5. Interpretation of Effective Pipe Diameter: The effective pipe diameter resulted in 3.4 ft. This diameter is greater than 18 inches, thus CB insert can pass/treat more flow than the existing outlet pipe which is designed for a 10-1-6

year storm, so at this point we can stop and conclude that this insert is a full capture device. 1-7

Example Vertical Insert The example below is presented to illustrate the sequence of the method proposed. Problem: Determine if the vertical insert acts as a full capture device. Given: 1. CB insert dimensions vertical section is 1.5 feet by 3.5 feet 6. Tributary area of CB is 10 feet by 150 feet (0.41 acres) 7. Rainfall intensity is 0.5 in/hr 8. Percent open area is equal to fifty percent (50%) 9. Street slope equals 0.00 ft/ft Solution: 1. Determine Gross Area: vertical section = 1.5 ft 3.67 ft 5.5 ft Total Gross Area = 5.5 ft. Percent open area of insert: Open area = 50% 3. Determine Net Area of Insert: Net Area = 5.5 ft 50% Net Area =.75 ft 4. Determine Effective Pipe Diameter (d new ): Area of Circle = d 4 d new = 4 area d new = 4.75 ft d new = 1.87 ft 1 1 5. Interpretation of Effective Pipe Diameter: The effective pipe diameter resulted as 1.87 ft. This diameter is greater than 18 inches, thus CB insert can pass more flow than the existing outlet pipe which we assume was designed for a 10-year storm, so at this point we can stop and say that this insert indeed is a full capture device. 1-8

Discussion The above approach provides a method that can be easily applied to the inserts currently being used by the City to demonstrate their use as full capture devices. The initial calculations, allow us to see if placement of the catch basin (CB) insert would hinder the existing conditions of the CB. In the example above, the dimensions given are for a shallow basin found in the City s storm drain system and thus the insert installed would have the smallest opened surface area that could be expected. One would expect the open area of the inserts to increase for larger CBs with longer curb openings (varying from 7 ft to 48 ft long) and depth varying from 4 ft to 1 ft. The example illustrates that even inserts with minimal opened surface area that could be expected in shallow CBs are adequate to handle the 10-year flow that the CB is designed to intercept, but as well can easily accommodate the 1-year, 1-hour rain intensity. 1-9