Project Proposal For Establishment

Similar documents
Project Proposal For Establishment

Project Proposal For Establishment. Low cost preservation Unit(New)

ONION STORAGE STRUCTURES

3. INTEGRATED PACK-HOUSE

Expression of Interest (EOI)/ seeking proposals for setting up of Integrated Cold Chain, Value Addition and Preservation Infrastructure / facilities

D:\Website_Update\Design_Final\Guidelines_ \Ssguidelines\NHM\Ripening Chamber.Doc Page 1 of 6

7. REFER VANS (Refrigerated Transport):

5. AGRICULTURAL MARKETING

National Fisheries Development Board

Onion Storage Structures Under RKVY- Success Story

JAGGERY FROM SUGARCANE

7. REFER VANS (Refrigerated Transport):

Central Research Institute for Dryland Agriculture Hyderabad

Capt. Pawanexh Kohli

1. Background. 2. Objective

Project Proposal. Establishment of Seed Processing Infrastructure Facilities for Vegetable Crops

SMALL FARMERES AGRIBUSINESS CONSORTIUM (SFAC) VENTURE CAPITAL SCHEME FOR AGRIBUSINESS DEVELOPMENT

Numaligarh Refinery Limited (A Government of India Enterprise)

EMPANELMENT OF CONTRACTORS FOR CIVIL WORKS Metropolitan Oil & Gas Pvt. Ltd.

GINGER & GARLIC PROCESSING

The Director Department of Skill Development & Entrepreneurship Govt. Of Arunachal Pradesh Udyog Sadan, 'C' Sector Itanagar

About Farmer Producer organization (FPO) and Present Status. About SFAC:- About Farmer Producer Organization:-

Project Profile PULSE MILL

CHAPTER 11: PROSPECTS OF THE SMALL SCALE AGRO-PROCESSING INDUSTRY IN THE AHMEDNAGAR DISTRICT

PROJECT REPORT 5MT COOL CHAMBER

U.P. SMALL INDUSTRIES CORPORATION LTD. ( A State Govt. of U.P. Undertaking ) 110, Industrial Estate, Fazalganj, Kanpur

Small Farmers Welfare Fund

GPS INSTITUTE OF AGRICULTURAL MANAGEMENT- BENGALURU

National Urban Livelihoods Mission. Guidelines for Employment through Skills Training & Placement

IRCON INTERNATIONAL LIMITED (A Public Sector Undertaking under the Ministry of Railways)

Government of Karnataka

F. No. 10(25)/2016-PE-I Government of India Ministry of Heavy Industries and Public Enterprises Department of Heavy Industry VACANCY CIRCULAR

Minutes of the meeting held on to review the progress of implementation of NHM Scheme in Madhya Pradesh

PUNJAB AGRO FARMING. A Part of Himalaya Group of Companies PROFILE SINCE 2007

EXPRESSION OF INTEREST INVITED FOR. Annual Rate Contract of supply of Chemicals/ Glassware/Plastic wares/minor Equipments

EXPRESSION OF INTEREST (EOI) (No. F&H/EOI/Dec/2016)

The Vegetable Initiative For Urban Clusters

2.2 Availability of know-how and Compliances DFRL, Mysore, has successfully developed the technical know-how. Compliance with PFA Act is mandatory.

Maximizing the benefit by revival, mordenisation and rejuvenation of water harvesting sturcture (check Dam) in Dahod District of Gujarat

ELIGIBILITY CRITERIA

Ministry of Environment & Forests (C.P. Division) Revised Guidelines for the Centrally Sponsored Scheme of Common Effluent Treatment Plants (CETPs)

HMNEH CDB CIH NHB NHM NBM. All schemes for horticulture subsumed

PROJECT REPORT 2 MT COOL CHAMBER

Centre for Academic Social Responsibility (ASR)

Government of Karnataka (Department of Horticulture)

APPLICATION FOR VENDOR REGISTRATION Read the instructions and conditions at the end of this application format before preparing to fill-in the form.

PROMOTION OF DRY LAND MANGO CULTIVATION FOR INCOME SECURITY

APPENDIX 14-I-A APPLICATION FOR SETTING UP EOU UNITS IN SPECIAL ECONOMIC ZONE

Tender Notice. Type Of Bag size (kg) TERMS AND CONDITION FOR SUPPLY OF CLOTH BAGS IN TENDER

GENERAL INFORMATION AND INSTRUCTIONS FOR PREPARING CONSULTANT S PREQUALIFICATION STATEMENT

Implementation Guidelines

Subsidy Scheme for GlobalGAP Certification for growers of Alphonso Mango, Kesar Mango, Banana, Pomegranate, Orange Fruit for the Year

Expert Committee Report UGC Sponsored Minor Research Project

QUALITY COUNCIL OF INDIA. INDIA Good Agriculture Practices (INDGAP) Certification Scheme. Certification Criteria

Plastics Processing Machinery (PPM) Overview

Ministry of Food Processing Industries. National Mission on Food Processing (NMFP)

i) Evidence in support of registration of the Orgnisation under the Registration of Societies Act, 1860;

A STUDY ON TURMERIC GROWERS SATISFACTION TOWARDS PRODUCTION OF TURMERIC IN ERODE DISTRICT

PROJECT FOR A MODEL COPRA UNIT

FINANCIAL AND ECONOMIC ANALYSIS

F. No. 202/3/2009-BM Government of India Ministry of New and Renewable Energy (Biomass Division)

Facilities & Infrastructure Management Department

TOMATO SAUCE, KETCHUP AND PUREE

Agribusiness and Agro- Industries: Investment Programme Priorities. Doyle Baker Rural Infrastructure and Agro-Industries Division FAO

AGRICULTURE DEPARTMENT

Impact of national food security mission-pulses on legumes production performance in Punjab, India

DPR ON COLD STORE HAVING CAPACITY OF 5000 MT

Guidelines for Strengthening of the National Agriculture Extension System (NAES)

BURN STANDARD COMPANY LIMITED 22B, Raja Santosh Road, Alipore, Kolkata [ A Government of India Undertaking under Ministry of Railways ]

The objectives of the scheme are

Research on Post Harvest Technology of Importance Crop of Saurashtra

The African Smallholder Farmer s Perspective. Silas D. Hungwe President, Zimbabwe Farmers Union

Proposed additional financing to the Kingdom of Cambodia for the Tonle Sap Poverty Reduction and Smallholder Development Project

1 TOMATO PUREE, SAUCE AND KETCHUP. 1.1 Introduction

Construction of Drain In Vikas Nagar From Hari Mandir to Village Nagal Kheri Estimated Cost

POLICY FOR FOOD PROCESSING INDUSTRY

TENDER DOCUMENT FOR PREPARATION DETAILED PROJECT REPORT (DPR) FOR SETTING UP OF A CASHEW PROCESSING PLANT

TD 603. Water Resources Milind Sohoni sohoni/ Analysis Framework for the 2009 Maharashtra MWRRA Tarrif Document

KIOCL LIMITED (A Govt. of India Enterprise) Block II, Koramangala, Sarjapur Road, Bengaluru

Jawaharlal Nehru Institute of Banking & Finance (JNIBF) Gachibowli,Hyderabad Pre-Qualification of Interior Contractors

Community Managed Micro Irrigation Scheme

OIL PALM DEVELOPMENT PROGRAMME IN MIZORAM (Why Oil Palm in Mizoram)

Guidance Notes for imports of organic products according to Article 19 Regulation (EC) No. 1235/2008 from third countries into the European Union

From community seed banks to community seed enterprises. G. V. Ramanjaneyulu, G. Rajshekar and K. Radha Rani

Session - II. Livelihood Linkages of Trade in Agricultural Products. A Presentation By

Indian Institute of Entrepreneurship An ISO 9001:2008 Certified Organisation Lalmati, N.H. Bypass No. 37 Guwahati 29

A STUDY OF GOVERNMENT SUBSIDIES, ANALYSIS OF AWARENESS & UTILIZATION OF SUBSIDIES BY THE FARMERS IN WESTERN MAHARASHTRA

Providing better market linkage to Orange Grower in Jhalawar, Rajasthan

CANTONMENT BOARD AMBALA

PRE FEASIBILITY REPORT

RPL/F-2110/ 17/07/2017 EXPRESSION OF INTEREST INVITED FOR ENGAGMENT OF INTERNAL AUDITORS IN RPL

Numaligarh Refinery Limited

Agarbatti(IncenseStick)Manufacturing

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

A STUDY OF SMALL SCALE INDUSTRIES: MARKETING STRATEGIES

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

Control Points Checklist for Internal Audit

KARNATAKA COUNCIL FOR TECHNOLOGICAL UPGRADATION (A

RESULTS- STUDY OF COLD STORAGES

FACT SHEET. The State Government has now submitted a proposal for renewal of diversion of forest land. The facts of the case are as below:

Transcription:

100 Project Proposal For Establishment of Low Cost Onion Storage Installed Capacity/annum 25 MT Promoters Share Term Loan Unsecured Loan 1.00 Lac Name of the Bank Proposed Subsidy Total Project Cost 0.50 Lac 1.00 Lac By M/s Submitted to SHM Govt. of Uttar Pradesh

101 SUBMISSION OF PROPOSALS (PHM) ONION STORAGE Unit BY PRIVATE SECTOR UNDER NHM 1. Name of the Project M/S Onion Storage (On farm handling storage etc.) by Mr. 2. Type of Activity On farm handling & storage,sorting, grading, packing Preservation of onion. 3. Objectives To provide services of Storage of onion 4. Location of the Project with address a) General Area Kh. No. Vill. Teh. Distt. b) Category of beneficiary 5. Constitution Public Limited Company/Private Limited Company/ Registered Society Association/Federation Producer Company/ Proprietorship Firm Partnership concern/ Individual person/ Self help group(shg) 6. Management Private 7. Brief background of promoter The Company/firm/association/SHG is promoted by Directors namely Shri and shri. All the directors of the company are agriculturists and have good experience. 8. Cost of Project (Rs. In Lacs) a) Land (If purchased new along with documentary proof) b) Building c) Plant & Machinery d) Contingencies e) Misc. Fixed Assets f) Working Capital margin g) Pre operative Exp. h) Other Current Assets & Securities Total (Rs. in lacs) Own land 1.00 for construction of shed 0.25 0.05 1.30 lacs

102 9. Means of Finance (Rs. In Lacs) a) Promoter Share b) Bank Term Loan c) Subsidy d) Quasi Equity e) Unsecured Loan 1.00 0.00 0.50 0.30 Total Rs. 1.30 10. Details of Cost of Plant & Machinery /equipment supported by quotation. 11. Details of Building construction and the cost duly certified. 12. Area of operation with special reference to Districts to be covered. 13. Availability of raw material, name of the cluster and District along with the major crops. 14. Backward Linkage with farmers with reference to either providing services or purchase of raw material. 15. Forward Linkages Analysis of domestic and export markets, tie up made for sale of Produce and branding aspect. 16. No. of farmers/ orchardist to be benefited. The details of estimate of working shed as per NHRDF standards Block Tehsil District Abundant quantity of onions available in the district as well as in surrounding area. Total area in district is...(ha) & Total production in district is...000 MT. The promoter also itself engaged in production of onions Due to the shortages of good quality onion in off season. The promotor will earn handsome price from this facilities. Approx. 10 farmers to be benefited.

103 17. SWOT Analysis. Strength There is a abundant availability of raw materials. The onion storage unit is situated in onion production belt and having good network of growers. Vast domestic market Weakness Low availability of adequate infrastructural facilities Inefficient supply chain due to a large number of intermediaries Seasonality of raw material Opportunity Large crop and material base offering a vast potential for agro processing activities Rising income levels and changing consumption patterns Opening of global markets Availability of capital subsidy from NHM to start a business opportunity in local areas. Threat High inventory carrying cost High packaging cost Natural Calamity. 18. Financial Analysis IRR, NPW, cost benefit Ratio, Break even point, DER, DSER, Projected balance sheet etc. The proposed unit has a local market demand oriented basis. the unit shall be run very successfully by converting fresh ungraded onion to graded, value added produce which is directly ready to consume products. The unit has great advantage for more profitability. there is an ample scope to enhance their profitability within stipulated course of time. 19. Insurance of the fixed NA assets. 20. Certificate from NA Pollution Control Department. 21. Name of the sponsoring bank along with the details of Technoeconomical appraisal reports, copy of sanction letter and Detailed Project Report (DPR) as submitted to bank. 22. Certificate regarding Non availing of subsidy from any other Central/State Govt. Department 23. Social benefits with The proposal has been self appraised by the beneficiary on the basis of local requirements. DETAILS OF THE PROPOSED PROJECT Building The construction /arrangement of shed as per NHRDF standards As desired by SHM in the affidavit format.

104 special reference to employment generation. a) Direct employment b) Indirect employmnt Women/S.T/S.C. employment 24. Details of the sustainability of the project with special reference to its capacity to generate income since only one time grant is admissible. Yes, more than 03 Yes, approximately 05 Yes, approximately 05 Since the proposed unit has a moderate investment and there is an ample scope to enhance their profitability within stipulated course of time. The other benefits are as Large crop and material base offering a vast potential for agro processing activities Rising income levels and changing consumption patterns Favourable demographic profile and changing lifestyles Opening of global markets Availability of capital subsidy from NHM to start a business opportunity in local areas. 25. Implementation schedule Forwarding of Application submission 26. Amount of subsidy sought Site selection, minor civil work Completion of civil work and placement of orders for machinery Erection, installation and trial runs 15 days 15 days 30 days 15 days Rs.0.50 Lac. Financial assistance in the form of grant is available from the Ministry of Agriculture, NHM, Govt. of India, towards expenditure on capital investment for eligible projects. Recommended & Forwarded (By DHO/DDH/PRINCIPAL) Signature of candidate Address Phone & Mobile No.

105 MODEL PROJECT FOR ONION STORAGE STRUCTURE UP State produces 515% onion of the total production of the country. Out of the total onion production in the State, 1015% onion production is in Kharif season, 3040% production is in Late Kharif and 5060% production is in Rabi/Summer season. Generally onion produced in Kharif and Late Kharif season is not suitable for storage while onion produced in summer season can be stored upto 56 months and it can be brought in the market during rainy season i.e. from June to October. There are certain problems which arises during conventional storage of onion viz. loss in weight, sprouting and rotting of bulb. To overcome these losses onion must be stored in scientific manner and its prices. The onion storage as per this plan will minimize the storage losses and quality deterioration of the onion which will in turn help the farmers to fetch better prices for their produce. To encourage the farmers for setting up of scientific onion storage systems, To get benefit of the NHM scheme farmer should erect onion storage structure according to proposed plan only. The construction cost of the onion storage structure is assumed at Rs. 6000/ per MT for this scheme. As per the scheme, subsidy 50% of the construction cost maximum upto Rs.50000/ of 25 MT storage capacity. CONSTRUCTION OF ONION STORAGE STRUCTURE Modern onion storage structures have been so planned to aerate the onions from all sides. Following points to be followed during its construction. 1. It is necessary that lower base of onion storage structure should be raised from the ground level by 1.5' to 2.00' for that the foundation should be laid out according to soil type. Pillar height should be 1.5' to 2'. 2. Skeleton of structure should be rest on these pillars and it should be made up of iron angles/wooden material. Lower base can be made up of iron angles wooden battens. Its breadth should be a 5'. 3. Side wall should be made up to bamboo battens/iron angle with the support and help of iron angles. Its height should be 5'. Bamboo battens/iron angles should be so arranged that onions should not come out of it and also proper air circulation should be made which should be at 5' height. 4. Height of roof of onion storage structure should be 2' above onion stored. For roof iron/cement/manglore tiles should be used. Material of roof should be heat resistant. Also, according structural design roof should have sufficient slope. 5. To avoid droplets rain water and sunlight, sides of roof should be sufficiently projected outside and also same from direction of rain (southwest).

106 Do's and Don'ts able for onion storage structure 1. Site selected for onion storage structure should be well drained and should be easily accusable to good road. Ill drained and deep site should be avoided. 2. Onion storage structure should be naturally ventilated from lower and other sides. Circumstance for natural ventilation should be avoided or minimise. 3. There should not be tall civil work close to structure. Tall civil work should be 1.5 times height of onion storage structure away from onion storage structure. 4. The width of onion storage structure should be 610 cm. for natural air circulation. In high humid area width of storage structure should be less otherwise there should be provision of mechanism for air circulation. The width of onion storage structure should not be more. 5. The length of onion storage structure should be right angle to the direction of wind (East West). While constructing onion storage structure the length of structure should not be in the direction of wind. 6. Windward side of storage should have closing system during storm and heavy rain and opening facility when necessary. During storm and heavy rain windward side of storage should not be open. 7. The sides of the roof should be sufficiently forwarded to avoid rainwater and to resist heat. The sides should not be short. 8. There should be heat resistant material at the upper side of roof of onion storage structure. Do not use galvanised iron sheets for roof.

107 Onion storage structure of 25 M.T. Capacity Onion storage structure of 50 M.T.Capacity