EARLY START PERMITS. Site cleaning, including removal of any existing asphalt, and/or concrete slab, Excavation work under the building footprint,

Similar documents
STORAGE RACKS PLAN REVIEW LIST (2011 LABC)

Commercial Building Permit Applications. Commercial Permit Applications

Note #2: Refer to Commercial Permitting Handbook 2016 Denver Building and Fire Code for asbestos regulations.

STRUCTURAL OBSERVATION

Mandatory Wood Frame Soft-story Retrofit Program PERMITTING AND INSPECTION PROCESS GUIDELINES

New Commercial Construction Permit

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

Commercial Remodel Permit

HALIFAX REGIONAL MUNICIPALITY BY-LAW NUMBER B-201 RESPECTING THE BUILDING CODE

UNIFORM CONSTRUCTION CODE (UCC) BUILDING PERMIT APPLICATION RESIDENTIAL NEW CONSTRUCTION AND/OR IMPROVEMENTS

UCC CONSTRUCTION PERMIT APPLICATION INSTRUCTIONS

UNIFORM CONSTRUCTION CODE (UCC) BUILDING PERMIT APPLICATION RESIDENTIAL NEW CONSTRUCTION AND/OR IMPROVEMENTS

Fill out all sections or mark with N/A (not applicable)

Frequently Asked Questions. Rebuilding After the 2017 Redwood Complex Fire

BUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE

Municipal Services Agency Building Inspection General Information: (916)

Form CITY OF SILVER BAY BUILDING PERMIT APPLICATION INFORMATION SHEET

Village of Orland Hills COMMERCIAL Building Permit Application S. 94th Avenue, Orland Hills, IL

COMMERCIAL OR RESIDENTIAL NEW BUILDINGS, REMODELS AND ADDITIONS

Commercial Solar Photovoltaic System Permit

Plains Township Building Permit Application

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

CITY OF TROY, MISSOURI Building Permit Application. Type of Permit: Residential Commercial. Company: Contact person: Address # Street Name:

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

Westtown Township Building Permit Application Instructions Notes:

DEMOLITION OF BUILDINGS

TOWN OF ROTTERDAM BUILDING DEPARTMENT RESIDENTIAL ACCESSORY BUILDINGS AND STRUCTURE PERMIT APPLICATION Ext 395

*FOR RESIDENTIAL PROJECTS, CALL JACK CARNS AT *FOR COMMERCIAL PROJECTS, CALL BRIAN WRUBLE AT

PLEASE READ AND SIGN RESIDENTIAL ENERGY CODE AND EROSION CONTROL!

Project Address Applicant: (Please Print) Plan review Engineer: Phone: Date

Fill out all sections or mark with N/A (not applicable)

Appendix 2: Term Sheet. SECTION 37 TERM SHEET FOR CITY SPACE AT THE CONDOMINIUM TO BE CONSTRUCTED AT 200 DUNDAS STREET EAST (the "Project")

Baseline Hillside Ordinance Correction Sheet (Ordinance No. 184,802 Effective 3/17/17)

GRAY WATER SYSTEMS FOR RESIDENTIAL BUILDINGS

WOOD FRAME SOFT-STORY RETROFIT PROGRAM

The following information is required when submitting a building permit application:

PERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS

DEMOLITION OF BUILDINGS

Solar Photovoltaic System Permit

STANDARD PLAN BULLETIN SP-2 (Structural)

City of Roanoke. Commercial Permit Submittal Guidelines

62 POTOMAC STREET WEST ROXBURY, MA 02132

NON-RESIDENTIAL BUILDING & ZONING PACKAGE

7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit

Application for Certificate of Occupancy Procedure for Existing Commercial & Residential 4 (+) Family Buildings

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

Los Angeles Planning and Zoning. The following regulations shall apply to the RE Residential Estate Zone:

Town of Grantham, NH Building Permit Application Procedures

HOME OWNERS GUIDE PERMIT & INSPECTIONS FOR OWNER OCCUPIED SINGLE FAMILY DWELLINGS

1. Complete Building Permit Application forms on page 2. Include septic system design approval from the Washington County Health Department.

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

James & Nanci Dobbins (PLN030106)

Inspection Procedure Handout

Phoenix Building Construction Code Updated Amendments to the Administrative Provisions

CITY OF LOS ANGELES DEPARTMENT OF CITY PLANNING ZONING INFORMATION (ZI) FILE. Effective Date: September 2, 2014

Town of Fredonia. 25 N Main St. * PO Box 217 Fredonia AZ Fax: * Office

Building Plan Review - Department of Planning and Development

Incorporated Village of Lawrence

ADMINISTRATIVE BULLETIN. TITLE : Procedures for Implementation of SFBC Chapter 34B

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements

Building Department Permit Application. Part I: General Information

Sump Pump Upgrade and Down Spout Disconnect Subsidy Program

Proud of its Heritage, Preparing for its Future

DECK INFORMATION SHEET

1 DiPronio Drive, Waterloo, New York Office (315) Fax (315) Cover Page Building Permit Application STOP!

Supplemental Plan Check List for Unreinforced Masonry (URM) Retrofit

ADMINISTRATIVE BULLETIN. TITLE : Local Equivalency for Exiting Through a Garage Area for Type V, Group R Buildings

RESIDENTIAL BUILDING PERMIT INSTRUCTIONS Town of Liberty 120 North Main Street Liberty, New York 12754

Application for Building Permit Addition or Exterior Renovation City of Webster Groves Department of Planning and Development 314/

Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2014 LABC)

Plan Check No. Checked by: An Appointment Is Required for Verification

DEMOLITION BY USE OF EXPLOSIVES

Civic Address (Street No. & Name):

New York State Fire and Building Codes William LaCount Code Enforcement Official

*FOR RESIDENTIAL PROJECTS, CALL JACK CARNS AT *FOR COMMERCIAL PROJECTS, CALL BRIAN WRUBLE AT

Development Services Department. Building Division Handout San Pablo, CA Ph: (510)

ZONING ADMINISTRATOR AGENDA

Commercial Submittal Packet

BUILDING PERMIT APPLICATION

Chapter UNIFORM CODES FOR CONSTRUCTION BUILDING CODE

TOWN OF EASTCHESTER BUILDING & PLANNING DEPARTMENT BUILDING PERMIT APPLICATION PACKAGE

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

TOWN OF EASTCHESTER BUILDING & PLANNING DEPARTMENT BUILDING PERMIT APPLICATION PACKAGE

Submission, Review and Approval of Construction Documents Submission and Review of a Completed Application for Permit

Residential Building Permits

COMMERCIAL PLAN SUBMITTAL GUIDELINES JAN 2018

An Applicants Guide to Residential Building Permits City of Galt Building Department

Application for a Permit to Construct or Demolish This form is authorized under section 8(1.1) of the Building Code Act

Change of Coordinating Registered Professional (CRP) or Registered Professional (RP)

WOODFORD COUNTY BUILDING & ZONING DEPARTMENT FLOODPLAIN DEVELOPMENT PERMIT APPLICATION FORM OWNERS NAME & ADDRESS: PHONE #:

RESIDENTIAL BUILDING PERMIT APPLICATION ( MINIMUM Building Requirements-Page 6)

BUILDING PERMIT SUBMISSION CHECKLIST NEW MULTIPLE-FAMILY RESIDENCE NEW COMMERCIAL BUILDING

JACKSON COUNTY PERMITTING & CODE ENFORCEMENT New Residential, New Commercial Application

MINIMUM REQUIREMENTS FOR CONSTRUCTION PLANS, GRADING AND/OR DRAINAGE PLANS, LOW IMPACT DEVELOPMENT PLANS, AND WATER EFFICIENT LANDSCAPE PLANS

ONSITE WASTEWATER TREATMENT SYSTEM (OWTS)

Scale Drawing This drawing will need to show the full lot and location of the proposed

City of Hunters Creek Village #1 HUNTERS CREEK PLACE HUNTERS CREEK VILLAGE, TEXAS (713) phone (713) fax

BOROUGH OF SEWICKLEY HEIGHTS BUILDING PERMIT APPLICATION

RECONSTRUCTION AND REPLACEMENT OF EARTHQUAKE DAMAGED MASONRY CHIMNEYS

CITY OF GLEN COVE Building Department

Transcription:

INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC 91.106.4 Effective: 01-01-2017 DOCUMENT NO.: P/BC 2017-097 Revised: Previously Issued As: P/BC 2014-097 EARLY START PERMITS Los Angeles Municipal Code Section (LAMC) 91.106.4 stipulates that the Department of Building and Safety (LADBS) will issue a permit upon receipt of the total fees when the information on the application and plans is in conformance with the code. However, requests for early start permits are frequently made even though the necessary information required demonstrating a project s compliance with the code has not been provided. These Early Start Permits may include site preparation and foundation work, demolition of interior non-structural partitions, mechanical or electrical work. LADBS recognizes that, in some cases, there is a need to issue Early Start Permits to allow certain construction activities to begin prior to the approval of the final plans. This information bulletin stipulates the LADBS policy in issuing these Early Start Permits. If you wish to obtain one of the Early Start Permit types described in this Bulletin, you should notify the LADBS staff as soon as possible. I. POLICY ON SITE PREPARATION AND FOUNDATION PERMIT Also known as Foundation Only Permit, this type of permit (LAMC 91.106.1.1) can be issued for either non-residential or residential buildings, except for projects subject to the Hillside Ordinance (LAMC 12.21A17) and Baseline Hillside Ordinance (LAMC 12.21C10). Work authorized under the Foundation Only Permit can include all work at or below grade, such as: Site cleaning, including removal of any existing asphalt, and/or concrete slab, Excavation work under the building footprint, Note: Unless specifically exempt by LAMC 91.106.1.2, a grading permit will be required for grading work outside the building footprint, and for any grading work under or outside the building footprint when the project is located in the designated Hillside Grading area. Note: Foundation, basement walls, interior walls and columns below grade, slab on grade, and structural slab at or below grade level. Plans shall clearly describe the scope of work covered by the Foundation Only Permit and any structural plans that include other work not included with the foundation-only permit, must be removed from the set of plans that will be approved. Page 1 of 5

A Foundation Only Permit can be issued when all of the following requirements have been met: 1. Sufficient plans are submitted for plan check to demonstrate the project s compliance with both the zoning and building code requirements in regard to use, parking, building height, floor area, density, passageways, setbacks, type of construction, fire and life safety issues, disabled access, number of stories and any required land-use entitlements. 2. Adequate construction details and structural calculations are provided to demonstrate that the work covered by the Foundation Only Permit complies with the code requirements. 3. Foundation design is in compliance with any required soils/geology reports and such reports have been approved by the Grading Section. 4. Foundation plans are reviewed and signed and stamped by the geotechnical engineer and geologist who prepared the soils/geology report when such a report is required. 5. All applicable clearances from all departments or governmental agencies have been obtained, and all required affidavits have been recorded with the County Recorder s Office. All clearances will be required on both the Foundation Only Permit and the subsequent super-structure building permit prior to the issuance of the foundation-only permit. 6. Plan check fee based on the construction valuation for the entire project shall be paid at the time plans are submitted. Permit fee with a valuation equal to 25% of the total project construction valuation shall be paid at the time the Foundation Only Permit is issued. Other fees (e.g. school district, Arts Development, dwelling unit tax, etc.) are paid in conjunction with the final permit. 7. A Request for Modification has been administratively approved to allow the issuance of a foundation only permit provided the owner, architect and engineer responsible for the structural design, sign and submit a written Assumption of Risk statement stating that they understand that the foundation-only permit is issued based on incomplete plans and that they understand that the plans are neither checked nor approved for construction of the complete structure. 8. Further, the owner, architect and engineer must state that they assume all risk and responsibility for the construction of the work included in the foundation-only permit; and that they will strictly adhere to all code requirements and make any changes to the construction included as part of the foundation-only permit that may be needed, if conditions are different from originally assumed; and indemnify the City from all liabilities that may result. See attached samples of the Request for Modification and Assumption of Risk statement The signed Assumption of Risk statement must be made part of the first sheet of the foundationonly plans. 9. A copy of the approved plans and a copy of the administrative approval and attachments must be kept by the plan check chief in the office where the plans are approved, until the permit for the super-structure is issued. 10. The first sheet of the plans must clearly state the work included by the early start permit. 11. Upon approval, the front portion of every sheet of the foundation-only plans must be stamped with the following stamp: Page 2 of 5

EARLY START PERMIT This is only a partial permit that was requested by the building owner. The owner and/or architect signed an assumption of risk assuming all associated risks in order to allow the start of the construction project. The issuance of this permit does not convey any vested rights to a condition not in conformance with the Codes. A subsequent permit is required for the remaining work before the project is complete. The work included in this permit is described on the first page of these plans. II. POLICY ON INTERIOR NON-STRUCTURAL DEMOLITION PERMIT An Interior Non-Structural Demolition Permit may be issued for any building prior to the issuance of a tenant improvement permit. If building is a Historical Monument, it is essential that the proper agency approves the early start work separately. The work covered by the Early Start Permit includes the removal of interior non load bearing partitions, ceilings, plumbing, electrical, and mechanical systems, but not including fire sprinklers or other fire safety systems. An Interior Non-Structural Removal Permit may be issued when the following requirements have been met: 1. Plans shall clearly show the scope of demolition work. In addition, the plans shall demonstrate that the integrity of the structural and fire and life safety system will not be compromised by the demolition work. 2. An administrative approval has been obtained allowing disabled access upgrades to be postponed until the actual tenant improvement work is done. 3. Payment of plan check and permit fees based on the valuation of the demolition work shall be made. 4. Comply with conditions 7, 8, 9 and 10 of Section I, in reference to the non-structural demolition permit, except that the Assumption of Risk agreement may be signed by either the architect of record or the owner. The interior non-structural demolition permit must show the existing and the proposed use to be the same. If the ultimate use or occupancy of the building is different from its current use or occupancy, the issuance of an Interior Non-Structural Demolition Permit does not establish any vested rights to the new use or occupancy. If a new use is proposed, the building shall conform to all the code regulations at the time of the final building permit issuance. Page 3 of 5

III. POLICY ON ELECTRICAL CONDUIT ONLY PERMIT A Conduit Only Permit may be issued to allow installation of empty conduits, junction boxes, and pull boxes excluding conductors, prior to approval of the electrical plans to accommodate fast track construction schedules. Only one inspection will be allowed for Conduit Only Permit. A supplemental permit is required for each additional inspection requested by the applicant. A Conduit Only Permit may be issued at the Express Permit Counter when the following requirements are met: The electrical plans are submitted to plan check for review and plan check fees are paid. Plans shall clearly show the sizes, locations, types and sizes of conduits and boxes. The plans shall indicate that the sizes of the conduits and boxes are sufficient for the anticipated number of conductors. An administrative approval is to be obtained from the Electrical Plan Check engineer reviewing the plans to allow conduit only installation while plan check review is in progress. A blank modification form may be obtained from LADBS website: www.ladbs.org. Permit for inspection prior to plan check approval must have the following wording in the PCIS work description: Permit to install conduit only and related appurtenances excluding conductors per approved modification. IV. POLICY ON PLUMBING/MECHANICAL PERMIT PRIOR TO THE APPROVAL OF PLANS A Plumbing and/or Mechanical Permit may be issued at the Express Permit Counter for certain portions of the work when the following requirements are met: Plans for the plumbing and/or mechanical system have been submitted to the Mechanical Plan Check Section. An administrative approval has been obtained from the Plumbing/Mechanical Inspection Section allowing inspection prior to plan check approval. See www.ladbs.org for blank form. Plumbing/Mechanical Permits for inspections prior to plan check approval must have the following wording in the PCIS work description: Permit for inspection prior to plan check approval per approved modification. This permit is for a one time inspection only. This permit will entitle the contractor one initial inspection and one re-inspection, should a correction notice be issued. All subsequent inspections will require a separate permit. When the plans are approved, a permit for all the work (including work already inspected) must be obtained. Page 4 of 5

ASSUMPTION OF RISK AGREEMENT FOR AN EARLY START PERMIT JOB ADDRESS PERMIT No. - - The undersigned owner, architect, and engineer responsible for the structural design, understand that the early start permit is issued based on incomplete plans and understand that the plans are neither checked nor approved for construction of the complete structure. Further, the undersigned assume all risk and responsibility due to the construction of the work included in the early start permit, and will strictly adhere to all code requirements and make any changes to the construction approved as part of the early start permit that may be needed if conditions are different from those originally assumed. We understand that no vested rights are conveyed by this permit in the event that a conflict with any code or regulation is later identified upon checking the complete plans. Moreover, we indemnify and hold the City harmless from any and all liability, loss or expenditure of any kind or nature which may be sustained as a result of the construction or as to the loads presumed to be carried on the structure. Before a permit is issued for the construction of any structure on the new foundation, the entire structure must be made to conform in every manner with all applicable codes and regulations. Owner s Name & Title Signature Date Architect s Name Signature (with building owner s consent) Date Engineer s Name Signature (with building owner s consent) Date All three signatures are required for a foundation-only permit. Only one of the signatures is required for an interior non-structural demolition permit. Page 5 of 5