SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

Similar documents
SECTION PAVING AND SURFACING

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION ASPHALT PAVING AND SURFACING

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section

Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel

SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG):

SPECIAL SPECIFICATION 3289 High Friction Surface Treatment

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SECTION 503 TEMPORARY PAVEMENT RESTORATION

SECTION 18 - EARTHWORK TABLE OF CONTENTS

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

5-02 BITUMINOUS SURFACE TREATMENT

St. Tammany Parish Government Department of Procurement P. O. Box 628 Covington, LA Phone: (985) Fax: (985)

SECTION FLEXIBLE PAVING

TECHNICAL SPECIFICATION

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING

TECHNICAL SPECIFICATION

SECTION 315 ASPHALT CONCRETE PAVEMENT. Materials shall be furnished by the Contractor in accordance with Section 200.

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES. Part 1 - General Work Included Related Requirements...

SECTION GENERAL EXCAVATION

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

Department of Building and Zoning Approaches and Sidewalks for ONE AND TWO FAMILY CONSTRUCTION

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 3 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

SPECIAL PROVISIONS - SP2005BOOK Page 237 JUNE 30, 2006 Last Revision 4/16/08

SECTION CONCRETE PAVING

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION 18 - EARTHWORK TABLE OF CONTENTS

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS.

ASPHALTIC CONCRETE PAVING SECTION

SECTION 14 EMBANKMENT

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.

CITY OF FARGO SPECIFICATIONS ASPHALT LEVELING COURSE

STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN

BASE CONSTRUCTION MATERIALS A Aggregate

CATEGORY 500 PAVING HIGH FRICTION SURFACE TREATMENT

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

SPECIFICATIONS FOR SAND SEAL

610 - DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

CHAPTER 11 - RESTORATION OF SURFACE IMPROVEMENTS

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING

PERMEABLE INTERLOCKING PAVERS

Item 247 Flexible Base

Item 247 Flexible Base

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS

SECTION 3200 CONCRETE CURB AND GUTTER

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

1. Payment for concrete sidewalks is on square foot basis. a. Limits for measurement for trench excavation as follows:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans.

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction

REQUEST FOR PROPOSAL Asphalt & Concrete Repair

IGGA Guide Specification: Conventional Diamond Grinding of City Streets Introduction

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

CONSTRUCTION BULLETIN

ITEM 223 LIME-FLY ASH STABILIZED SUBGRADE Description. Mix and compact water, lime and fly ash (LFA), and subgrade in the roadway.

610 - DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT

CITY OF SAN ANGELO ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

S-1 (2356) BITUMINOUS SEAL COAT REVISED 9/26/07 SP Mn/DOT 2356 is deleted and replaced by the following:

SECTION 20 INDEX PAVING FABRIC 1. SCOPE OF WORK MATERIAL REQUIREMENTS CONSTRUCTION AND INSTALLATION REQUIREMENTS...

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE

Special Provision No. 103F31 December 2014

Special Provision No. 103F31 January 2014

SPECIFICATIONS FOR BONDED WEARING COURSE

SURFACINGS AND PAVEMENTS SECTION 37: BITUMINOUS SEALS 37-1 SEAL COATS

APPENDIX A MEASUREMENT AND PAYMENT

GENERAL NOTES ROADWAY CONSTRUCTION RD0001-1A ISSUED:2017 REVISED: --

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas.

081 S-292 & 081 N

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

CITY OF ANN ARBOR, MICHIGAN Public Services Area/Project Management Unit 301 E. Huron Street P.O. Box 8647, Ann Arbor, Michigan 48107

SPECIFICATIONS FOR NEW WORK CHIP SEAL

CITY OF FARGO SPECIFICATIONS SEAL COATS

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

CITY OF WILSON. Public Services Engineering. Backfilling, Compaction, & Patching Policy on Existing Pavements

Section 505. CHIP SEALS

Section 7 Roadway GENERAL REQUIREMENTS I. TYPICAL SECTION...7-1

RHODE ISLAND DEPARTMENT OF PUBLIC SERVICES

DIVISION 4100 SITEWORK

Special Provision No. 103F31 June This Special Provision covers all surface smoothness requirements for hot mix asphalt construction.

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

KU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT

SAND SEAL SPECIFICATIONS. The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority.

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

Plan Preparation Guide. Chapter 2. Typical Sections - Pavement Design

Reinforced Soil Slopes (RSS)

Transcription:

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3 26-5 PAVEMENT REINFORCING FABRIC... 26.3 26-6 MEASUREMENT... 26.3 26-7 PAYMENT... 26.4

SECTION 26 COLD PLANE ASPHALT CONCRETE PAVEMENT 26-1 GENERAL Existing asphalt concrete pavement shall be cold planed at the locations shown or specified in the Contract and in accordance with these Specifications, unless directed otherwise by the Cold planing machines shall have a cutter head not less than thirty inches (30 ) in width and shall be operated so as not to produce fumes or smoke. The cold planing machine shall be capable of planing the pavement without requiring the use of a heating device to soften the pavement during or prior to the planing operation. The depth, width and shape of the cut shall be as shown or specified in the Contract or as directed by the The final cut shall result in a uniform surface conforming to the details shown or specified in the Contract. The outside lines of the planed area shall be neat and uniform. The Contractor shall remove existing asphalt concrete from the top of the gutter pan and from the face of gutter lip as directed by the The Contractor shall not damage the surfacing to remain in place or the gutter lips during the planing operation. The Contractor shall replace damaged gutter lips with spalls in excess of one inch (1 ) deep by five inches (5 ) long at the Contractor s expense. Streets being planed shall be swept with a mechanical type pickup machine throughout the course of planing operations and shall be left clean of all planing debris at the end of each Working Day. Planing debris shall not be spilled into drain inlets and rail tracks, and the Contractor shall clean up any spillage immediately. All vegetation shall be removed from the gutter lip and other street areas to be resurfaced. The planed material shall remain the property of the Contractor, unless otherwise specified in the Special Provisions. If specified, the Contractor shall transport the material to the Agency s stockpile location, located at the County yard at the intersection of Roseville Road and Watt Avenue. The Contractor shall coordinate deliveries of the material to the County s stockpile location through the The Contractor shall notify the Agency a minimum of two (2) Working Days prior to the proposed transport and delivery of material to the County s stockpile location. At the option of the Contractor, planed material may be used as fill material within the balance of the project and shall be considered as included in the price paid for Imported Borrow. 26-2 PAVEMENT KEYCUTTING Pavement keycutting shall consist of cold planing asphalt concrete pavement adjacent to the lip of gutters and across street intersections, as shown on the Plans. Cold planing for pavement keycutting shall be to a minimum depth of one and one-half inches (1-1/2 ) adjacent to the gutter lip and shall be tapered to the existing pavement grade over a distance of approximately twelve feet (12 ) from the gutter lip, as shown or specified in the Contract or as otherwise directed by the At cross-streets within the limits of the Work, pavement keycutting shall continue in a straight line from curb line to curb line parallel to the direction of work. Elevation differences between the pavement keycutting and cross-streets shall be lessened with temporary asphalt concrete tapers. The slope of the temporary asphalt concrete tapers shall not be greater than one inch (1 ) vertical in twelve inches (12 ) horizontal. Asphalt concrete for tapers shall be commercial quality and may be spread and compacted by any method that will produce a 26.1

smooth riding surface. Temporary asphalt concrete tapers and all loose material from the underlying surface shall be completely removed before placing the permanent surfacing. At the beginning and ending limits of the planing work, a planed pavement conform shall be constructed as specified in Section 26-4, Planed Pavement Conforms, in this Section of these Specifications. 26-3 PAVEMENT PLANING Pavement planing shall consist of cold planing a continuous width of asphalt concrete pavement, to the limits shown or specified in the Contract. The depth of planing below gutter lips shall equal the specified thickness of asphalt concrete overlay as shown or specified in the Contract. The depth of planing at the street centerline shall equal the specified thickness of asphalt concrete to be placed on the street, and shall slope smoothly from the lip of gutter to the street centerline. Planed widths of pavement shall be continuous except for special treatment at traffic signal detector loops and at manhole rims as shown or specified in the Contract or as directed by the In areas where full width planing is not possible because of traffic signal detector loops, separation shall be maintained from traffic signal detector saw cuts and loops. Pavement planing shall be to within one foot (1 ) horizontally of manhole rim on all sides, unless width of grinding falls below five feet (5 ) wide. The planing may be omitted in the areas where a less than five-foot (5 ) width can be obtained. At cross streets with traffic signals, the planing shall be carried around the corner to the center crosswalk and limit line of the adjacent intersection, unless otherwise directed by the At cross streets without traffic signals, the planing shall be carried around the corner to the mid-point of the curb radius of the adjacent side street, unless otherwise directed by the At the end of each Working Day there shall not be any elevation difference between planed and unplaned pavement in the traveled vehicle lanes. Any differences that parallel the centerline of the street shall be sloped by either temporary asphalt concrete tapers or additional planing to produce a bevel within the planed pavement. The slope of either the temporary asphalt concrete tapers or the bevel shall not be greater than one inch (1 ) vertical in twelve inches (12 ) horizontal. When temporary asphalt concrete tapers are used, asphalt concrete for tapers shall be commercial quality and may be spread and compacted by any method that will produce a smooth riding surface. Temporary asphalt concrete tapers and all loose material from the underlying surface shall be completely removed before placing the permanent surfacing. Elevation differences between planed pavement and lips of gutters are not required to be sloped. Elevation differences perpendicular to the centerline of the street or elevation differences between the planed street and cross-streets shall be lessened with temporary asphalt concrete tapers, as specified above. Temporary asphalt concrete tapers and all loose material from the underlying surface shall be completely removed before placing the permanent surfacing. At the limits of the planing work, a planed pavement conform shall be constructed as specified in Section 26-4, Planed Pavement Conforms, in this Section of these Specifications, or as directed by Contractor shall provide a means for temporary lane delineation, including centerline (yellow) and lane lines (white), between the time of planing operations and roadway paving, as specified in Section 6-13, Public Safety and Traffic Control, of these Specifications. 26.2

26-4 PLANED PAVEMENT CONFORMS Planed pavement conforms shall be constructed at the limits of the Work as shown or specified in the Contract and as directed by the Except on residential streets or where otherwise shown or specified in the Contract, where the beginning or ending limit is a cross street, a fifty-foot (50 ) planed conform extending to the round corner of the cross street shall be constructed to the dimensions and depths of cut shown or specified in the Contract. On residential streets, an eighteen-foot (18 ) planed pavement conform shall be constructed. The slope of the temporary asphalt concrete tapers at the limits shall not be greater than one inch (1 ) vertical to thirty-six inches (36 ) horizontal. Where the beginning or ending limit is not at a cross street, or where a cross street or other such feature that is not to be resurfaced causes a discontinuity in the Work, a planed pavement conform shall be constructed. The conform shall span the full width of the street for a distance of fifty feet (50 ) back from the limit line or feature causing the discontinuity in the work. At bridge decks the conform shall span the full width of the street for a distance of fifty feet (50 ). The depth of cut shall be one and one-half inches (1-1/2 ) at the limit of work and shall be progressively decreased to zero (0 ) over the conform length. Planed pavement conforms shall also be constructed at freeway entrance and exit ramps and at right and left long-radius turn lanes which diverge from or converge onto the street to be resurfaced. These conforms shall span the full width of the ramp or turn lane for a distance of eighteen feet (18 ) and shall be constructed where shown on the Plans or directed by the 26-5 PAVEMENT REINFORCING FABRIC Pavement reinforcing fabric shall be installed in conformance with the provisions in Sections 39-4.03 and 88-1.02 of the State Standard Specifications, the manufacturer's recommendations, and the Contract. Pavement fabric shall be used in pavement overlay areas where shown or specified in the Contract and shall extend at least two feet (2') beyond any joints between the new pavement section and the overlay section. When installed, the fabric shall be a minimum of twenty-four inches (24 ) away from the lip of gutter and from the edge of pavement. After thoroughly cleaning the surface to receive fabric, all cracks greater than one-quarter inch (1/4 ) in width shall be filled with a hot asphaltic crack filler and allowed to cure. Crack filler shall not extend above the existing pavement surface. Crack filler material shall be paid for under the unit price bid per pound for crack filler, and no additional payment will be made. If a leveling course is used, crack sealing is not required. Type A three-eighths inch (3/8 ) maximum gradation leveling course material shall be placed prior to pavement reinforcing fabric. Leveling course material shall be placed as shown on the Plans and paid for under the unit price bid per ton for asphalt concrete, and no additional payment will be made. Pavement fabric binder shall be AR4000. The minimum asphalt binder temperature shall be 290 degrees F, with a distributor tank temperature not to exceed 324 degrees F. The asphalt binder shall be placed at a rate of one-quarter gallon (0.25 gal.) per square yard, or as directed by the If mechanical laydown equipment is used, it must be capable of handling full rolls of fabric and be capable of laying the fabric smoothly without excessive wrinkles and/or folds. 26-6 MEASUREMENT Cold planing asphalt concrete for pavement keycutting will be measured by the linear foot for the pavement keycutting width shown or specified in the Contract. The quantity to be paid for will be the actual length of pavement cold planed, irrespective of the number of passes required to obtain the specified depth. 26.3

Cold planing asphalt concrete for pavement planing of continuous widths of asphalt concrete pavement will be measured by the square yard. The quantity to be paid for will be the actual area of pavement cold planed, irrespective of the number of passes required to obtain the specified depth. Planed pavement conforms will be measured by the square yard. The quantity to be paid for will be the actual area of pavement conforms planed, irrespective of the number of passes required to obtain the specified depth. Quantities of pavement reinforcing fabric, including binder, will be measured by the area of roadway covered with pavement fabric, not the area or quantity of fabric installed. Placement of pavement fabric beyond the limits shown or specified in the Contract, without written direction from the Agency, shall not be allowed and no payment will be made. 26-7 PAYMENT The price paid per linear foot for pavement keycutting for the width shown on the Plans includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in pavement keycutting, complete in place, including disposal or transport of planed material, as shown or specified in the Contract, specified in these Specifications, and directed by the The price paid per square foot for pavement planing includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in pavement planing, complete in place, including disposal or transport of planed material, as shown or specified in the Contract, specified in these Specifications, and directed by the The price paid per square foot for planed pavement conforms includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in planed pavement conforms, complete in place, including disposal or transport, and processing for fill of planed material, as shown or specified in the Contract, specified in these Specifications, and directed by the Full compensation for furnishing asphalt concrete for temporary tapers and for constructing, maintaining, removing, and disposing of the tapers is included in the prices paid for the various items of work involved in cold planning asphalt concrete pavement, and no additional compensation will be paid. Full compensation for furnishing and applying the pavement reinforcing fabric, the AR4000 binder, and for furnishing and spreading sand to cover exposed binder material, as necessary, or as directed by Agency, and all preparation activities, including, but not limited to, street cleaning and crack sealing, is incidental and included in the unit price paid for reinforcing fabric and no additional compensation will be paid. 26.4