Appendix B Highway 407 Interchange Review - Cochrane Street Area

Similar documents
DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

Interchange Improvements at the Queen Elizabeth Way and Glendale Avenue

A three-stage process was implemented in order to develop and evaluate the project concepts and provide recommendations for the project.

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

Consideration of a Diverging Diamond Interchange in Saskatchewan. Paul H. A. Steel, Project Manager, M. Eng., P.Eng., Tetra Tech EBA Inc.

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables

I-35/80 Operations Study: Douglas Avenue to NW 86 th Street FOR

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

Conclusions & Lessons Learned

MEMORANDUM: INITIAL CONCEPTS SUMMARY

INTERACTIVE HIGHWAY SAFETY DESIGN MODEL (IHSDM)

INTERCHANGE MODIFICATION REPORT

APPENDIX A TIER 1 ANALYSIS

Environmental Consequences and Mitigation

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

Military Highway Interchange

Exit 73 I-29 Interchange Modification Justification Study

Traffic Impact Studies

500 Interchange Design

CHAPTER 8: I-71 ACCESS IMPROVEMNETS

Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015

500 Interchange Design

Community Advisory Committee Meeting No. 2. June 22, 2006

Environmental Assessment for a New Landfill Footprint at the West Carleton Environmental Centre

Beltline Interchange Range of Alternatives Screening Summary Memo

Interchange Workshop Report (August 2004)

I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT

LOCATION AND DESIGN DIVISION

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016

GRE PID 80468

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project

Appendix F: Noise Report

Stage One Reference Design Enhancements. Date: 2 October Cabinet-in-Confidence

IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives Task 7.5

Bowen Road and Queen Elizabeth Way Interchange

LOCATION AND DESIGN DIVISION

EXECUTIVE SUMMARY. The IP developed the following purpose and need statement for the Part B I-71 Access Improvement Study.

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018

Conceptual Design Report

Interchange Design. Nick Hoernke, Bill Roth and Eric Sorensen

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee

INTERCHANGE SAFETY. Steve Allen. Houston Daugherty. Director, Strategic Transportation Investments Division (TDOT)

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA

DDI s Can Move More Than Cars. Alex Ariniello. Presentation for the ITE Western District Annual Meeting. July, 2016 in Albuquerque, New Mexico

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange

Highway 22X & Highway 791 Functional Planning Study

PUBLIC INFORMATION MEETING TUESDAY MARCH 9, 2010

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80)

I-95 Corridor Study Phase II Highway Element

Diverging Diamond Interchanges in Michigan

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting.

DEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI)

Functional Planning Study Highway 15:06 From Range Road 220 to Highway 830

DRAFT HARVIE ROAD/BIG BAY POINT ROAD/HIGHWAY 400 CLASS ENVIRONMENTAL ASSESSMENT STUDY E N V I R O N M E N T A L ST U D Y R E P O R T

Informational Brochure. Proposed Interchange. Interstate Route 295 (I-295) AT Greenville Avenue (State Route 5) Town of Johnston, Rhode Island

Route 7 Connector Ramp MODIF IE D I N T ER C H A N G E M OD IFICATIO N R E PO RT TRA N S F O R M I : I N S ID E THE BE LTWAY

NCHRP 3-88 Guidelines for Ramp and Interchange Spacing

Traffic Analysis. Appendix I

FINAL REPORT GUIDELINES FOR PRELIMINARY SELECTION OF THE OPTIMUM INTERCHANGE TYPE FOR A SPECIFIC LOCATION

PEER REVIEW FOR TRANSPORTATION ASSESSMENT ZONING APPLICATION REVIEW

I-10 CORRIDOR IMPROVEMENTS STAGE 0 FEASIBILITY STUDY STATE PROJECT NUMBER H FEDERAL AID PROJECT NUMBER H004100

I-65/I-70 North Split Project

NCHRP Report 687 Guidelines for Ramp and Interchange Spacing

407 TRANSITWAY - KENNEDY ROAD TO BROCK ROAD MINISTRY OF TRANSPORTATION - CENTRAL REGION

Vicinity Map. Interstate 605 (I-605) and State Route 91 (SR-91) in Los Angeles County

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

Calibration of a Micro-Simulation Model in a Large Urban Network

Transportation Connectivity, Accessibility and Economic Opportunity Study

I-65/I-70 North Split Project. Alternatives Screening Report CAC Meeting October 9, 2018

South Dakota Department of Transportation. Interchange Modification Justification Report. Interstate 90 Exit 44 (Bethlehem Road - Piedmont)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Placerville, a Unique Historical Past Forging into a Golden Future

Woodburn Interchange Project Transportation Technical Report

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

Rapid City, SD HDR Project No RE: Replacement of Existing I-190 Twin Bridges at I-190/Silver Street Interchange, Rapid City, SD

Chapter GRADE SEPARATIONS & INTERCHANGES

SITE AREA AERIAL PHOTO

Operational Analysis of Dulles Toll Road Ramps to Tysons. Board Transportation Committee Meeting September 17, 2013

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report

FRASER RIVER CROSSING PLANNING AND EVALUATION STUDY

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

CLA /10.54, PID Project Description:

St. Francis Drive through the City of Santa Fe Corridor Study

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

Chapter 4: Transportation and Circulation

EFFECTIVE MANAGEMENT OF A PUBLIC- PRIVATE INFRASTRUCTURE PARTNERSHIP: A CASE STUDY

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

I-95 Corridor Study Phase II Highway Element

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

Alternatives Evaluation Methodology

South Dakota Interstate Corridor Study. Phase I Summary Report

LOCATION HYDRAULIC REPORT

Kris Haynes, C.Tech Project Manager - Ottawa Monarch Corporation. cc Steno jcd

04 ALA /6.7. Vicinity Map

Transcription:

Appendix B Highway 407 Interchange Review - Cochrane Street Area

AECOM 300 ater Street hitby, ON, Canada L1N 9J2 www.aecom.com Memorandum To Michael May, P.Eng., Town of hitby Page 1 CC Subject Greg Hardy, P.Eng., Town of hitby From Brenda Jamieson, P.Eng. / Heather Nottbeck, P.Eng. Date May 24, 2016 Project Number 60494833 1. Introduction AECOM was retained by the Town of hitby to undertake conceptual design for potential interchange configurations at Highway 407 and Cochrane Street and Highway 407 and Ashburn Road in the Town of hitby. The approved Highway 407 East plan documented in the 407 East Report includes the following key elements: Construction of the Highway 407 Mainline from Brock Road to Highway 35/115; Construction of two north-south links Highway 412 and Highway 418 that will connect Highway 407 to Highway 401; and Protection for a dedicated transit way and support facilities. The first phase of work (see Exhibit 1) includes a six lane east-west freeway from Brock Road to Highway 412, a four lane east-west freeway from Highway 412 to Harmony Road and a four lane northsouth freeway from Highway 401 to Highway 407. Four arterial road interchanges are planned in the Brooklin area, specifically full interchanges at Lake Ridge Road, Baldwin Street (Hwy 7/12), and Thickson Road, and a partial interchange (to and from the south) on Highway 412 at Highway 7. A full interchange accommodates moves in all directions while a partial interchange only accommodate moves to and from the corridor in one direction. Though not shown in Exhibit 1, the 407 East Report stated: A future interchange at Cochrane Street is not precluded and would be subject to approval of an independent and review and approval by MTO. A conceptual plan of the Town of hitby s proposed interchange at Cochrane Street was included in the Report and is illustrated in Exhibit 2. Cochrane Street is situated approximately 2 km east of Highway 412 and 2 km west of Baldwin Street. Ashburn Road is situated approximately 3 km east of Highway 412 and 1 km west of Baldwin Street. Highway 7 crosses over the Highway 407 corridor midway between Cochrane Street and Ashburn Road. MEMO-2016-05-24-Highway 407 Interchange Review.Docx

Page 2 Memorandum, May 24, 2016 Exhibit 1: Highway 407 East Phase 1 Exhibit 2: Conceptual 407 East / Cochrane Street Interchange Design in 407 East Report

Page 3 Memorandum, May 24, 2016 This memorandum provides a brief overview of the key design principles and guidelines that were considered in the development of the conceptual design alternatives for the Cochrane Street and Ashburn Road interchange locations and the identification of key advantages and disadvantages for each alternative design from a design, transportation operations and land use perspective. This memorandum also identifies additional work which is expected to be required by the Ministry of Transportation for their review and approval of an additional interchange on the Highway 407 Mainline between Highway 412 and Baldwin Street. 2. Design Principles and Guidelines The applicable design principles and guidelines for interchange locations and configurations are set out in the Geometric Design Standards Manual for Ontario Highways (GDSOH) and the Highway Access Management Guidelines. 2.1 SYSTEM CONSIDERATIONS An interchange is one element of a freeway system. Freeway design elements and interchange design influence the operation of each other and as such it is essential to treat a length of freeway and its associated interchanges as a single system to ensure proper balance of features and consistent operational quality and performance. Key system considerations include: Interchange location and spacing: Interchanges should be located at major arterial roads in proximity to major development areas. Interchange spacing in urban areas generally ranges from 2 km to 3 km. Coordination of interchanges: Consistency of interchange features in urban areas promotes driver understanding and smooth flowing operation. Right side exits in advance of underpass structures are preferable from a driver expectation and safety perspective. Lane balance and basic lanes: Proper lane balance and maintenance of basic lanes promotes safe operations and accommodates variations in traffic patterns. eaving: hen a freeway entrance is followed by an exit, traffic entering the freeway and that exiting the freeway cross and are in conflict. The conflict between entering and exiting traffic tends to interrupt the operation of through traffic, creates turbulence in the traffic flow and has the effect of reducing capacity and safety performance. This length of roadway is referred to as a weaving section. The weaving length is measured from a point where the adjacent edges of pavement at the merge (on-ramp) are 0.5 m apart to a point where the adjacent edges of pavement at the diverge (off-ramp) are 3.75 m apart as described in Section F.4.5 of the GDSOH. In accordance with the GDSOH, to maintain safe efficient operation between entrance and exit ramps, minimum weaving lengths of 600 m and 800 m should be provided between arterial interchanges and an arterial interchange and a freeway interchange respectively. Shorter weaving lengths may be imposed due to other constraints and will operate with varying qualities of service depending on local conditions such as traffic volumes, sight distance and alignment features. Arterial road interchange locations are typically sited based on the following factors: Interchange spacing guidelines set out in the GDSOH: minimum 2 km spacing between arterial road interchanges through urban areas, providing for a minimum weaving length of 600m;

Page 4 Memorandum, May 24, 2016 minimum 3 km spacing between an arterial road interchange and a freeway to freeway interchange, providing for a minimum weavingg length of 800m; Connections to major arterial roadways is preferable; Existing and planned development in proximity to the interchange location; and Traffic forecasting work. As noted previously, shorter weaving lengths and hence a tighter interchange spacing may be accepted by the Ministry if the traffic operations analysis demonstrates acceptable traffic operations can be achieved. 2.2 INTERCHANGEE DESIGN The selection and design of an interchange is influenced by site specific engineering, environmental, topographical and operational considerations. The preferred interchange configuration is the Parclo A4 design as it has the best capacity, operational and safety characteristics relative to other available interchange configurations as shown in Exhibit 3. here significant environmental, geometric or property constraints, alternativee interchange configurations can be considered. Exhibit 3: Comparison of Interchange Configuration Characteristics Interchange Configuration Parclo A4 Parclo A2 Parclo B2 Parclo AB Diamond (1) Characteristic / Selection Consideration Capacity Highest /High /High Delay on Cross Road Low Low Low /High Traffic Progression on Cross Road Best Pedestrian and Bicycle Accommodation on Cross Easy Difficult Difficult Difficult Easy Road Relative Construction Cost High Low Right-of-ay High /High /High /High /Low Note: (1) Partial diamond is a variation of the diamond interchange configuration.

Page 5 Memorandum, May 24, 2016 Ramp geometry, including the alignment, profile and cross section, is influenced by a number of design considerations such as traffic volume and traffic mix, geometric and operational characteristics of the crossing road and adjacent through roads, interchange configuration, terrain, traffic control devices and driver expectation. The geometric requirements for interchange ramps are set out in the GDSOH, including applicable design speeds for ramp elements and entrance / exit terminal designs to and from the freeway and the crossing road to satisfy operational and safety performance requirements. The spacing between ramp terminal intersections along the crossing road and adjacent intersections is also an important design consideration with respect to the performance and operation of the ramp terminal intersections. A minimum spacing of 300 m is desirable in accordance with the Highway Access Management Guidelines. A tighter spacing may be accepted by the Ministry if the traffic operations analysis demonstrates acceptable traffic operations can be achieved. 3. Conceptual Design Alternatives Conceptual interchange design alternatives were generated for the Cochrane Street and Ashburn Road locations in accordance with the design principles and guidelines set out in Section 2 utilizing the Highway 407 East issued for construction drawings and base mapping provided by the Town of hitby. 3.1 COCHRANE STREET INTERCHANGE DESIGN ALTERNATIS Given existing site conditions and the design principles and guidelines set out in Section 2, three alternatives were developed for the Cochrane Street/Highway 407 Interchange as follows and shown in Appendix A: Alternative 1 consisting of a Parclo A2 configuration on the north side of Highway 407 (i.e. for the westerly oriented ramps) and a Diamond configuration on the south side of Highway 407 (i.e. for the easterly oriented ramps) which protects for a future eastbound inner loop ramp. This alternative exceeds the minimum weaving distance of 800 m to the Highway 412 interchange ramps and 600 m to the Baldwin Street interchange ramps and provides a separation of 201 m between the south ramp terminal intersection and the Cochrane Street / Highway 7 intersection which is less than the desired minimum spacing of 300 m. Alternative 2 consisting of a Parclo A2 configuration on the north side of Highway 407 (i.e. for the westerly oriented ramps) and a tightened Diamond configuration on the south side of Highway 407 (i.e. for the easterly oriented ramps) which does not protect for a future eastbound inner loop ramp. This alternative exceeds the minimum weaving distance of 800 m to the Highway 412 interchange ramps and 600 m to the Baldwin Street interchange ramps and provides a separation of 215 m between the south ramp terminal intersection and the Cochrane Street / Highway 7 intersection which is less than the desired minimum spacing of 300 m. Alternative 3 consisting of a Parclo A4 configuration on both the north side and the south side of Highway 407. However, due to the proximity of the Highway 412 freeway ramps to the west, the available weaving distance in the westbound direction between the Cochrane Street southbound on-ramp and the westbound exit ramp to Highway 412 southbound would be in the order of 435 m which is well short of the minimum required distance of 800 m. This alternative exceeds the minimum weaving distances to the other adjacent interchange ramps and provides a separation of 201 m between the south ramp terminal intersection and the Cochrane Street / Highway 7 intersection.

Page 6 Memorandum, May 24, 2016 Consideration was also given to providing a Parclo B interchange configuration on the south side of Highway 407 for the easterly oriented ramps. However, this configuration would result in a spacing of less than 150 m between the south ramp terminal intersection and the Highway 7/Cochrane Street intersection which was not considered feasible. Furthermore, a Parclo B interchange configuration does not offer the same operational and safety performance as the proposed diamond configuration. The potential for modifications to the Highway 412 interchange easterly oriented ramps was also considered to increase the separation distance to the Cochrane Street interchange. However, given the complexity of the Highway 412 interchange, minor refinements to the easterly oriented ramps are not feasible to increase the separation distance. Key advantages and disadvantages of the Cochrane Street interchange design alternatives are identified in Exhibit 4. Exhibit 4: Key Advantages and Disadvantages of Cochrane Street Interchange Design Alternatives Alternative Advantages Disadvantages Cochrane Street Alt 1 (Recommended for Future Review) Cochrane Street Alt 2 (Recommended for Future Review) Achieves minimum spacing to Baldwin Street interchange (2 km) Standard interchange configuration and geometry; protects for future eastbound inner loop ramp Accommodates all moves Exceeds minimum weaving lengths (1) Parallel lane exit provided on Cochrane Street to westbound onramp which should result in improved traffic operations on Cochrane Street Achieves minimum spacing to Baldwin Street interchange (2 km) Standard interchange configuration and geometry Accommodates all moves Exceeds minimum weaving lengths (1) Direct taper exit provided on Cochrane Street to westbound onramp which should result in acceptable traffic operations on Cochrane Street Spacing of 2 km to Hwy 412 interchange is less than typical minimum requirement of 3 km Provides intersection spacing of 201 m on Cochrane Street between south ramp terminal intersection and Hwy 7 intersection vs desired minimum of 300m Approach grades on Cochrane Street in vicinity of Hwy 407 crossing are approx. 6%; profile adjustments will be required to achieve maximum 3% grade required for ramp terminal intersections Requires widening of watercourse structures east and west of Cochrane Street (M37 and M39) Moderate footprint requirement relative to other alternatives (approx. 12 ha) Moderate cost relative to other alternatives Spacing of 2 km to Hwy 412 interchange is less than typical minimum requirement of 3 km Precludes addition of eastbound inner loop ramp Provides intersection spacing of 215 m on Cochrane Street between south ramp terminal intersection and Hwy 7 intersection vs desired minimum of 300m Approach grades on Cochrane Street in vicinity of Hwy 407 crossing are approx. 6%; profile adjustments will be required to achieve maximum 3% grade required

Page 7 Memorandum, May 24, 2016 Alternative Advantages Disadvantages for ramp terminal intersections Requires widening of watercourse structures east and west of Cochrane Street (M37 and M39) Moderate footprint requirement relative to other alternatives (approx. 12 ha) Lowest cost relative to other alternatives Cochrane Street Alt 3 (Not Recommended for Future Review) Achieves minimum spacing to Baldwin Street interchange (2 km) Standard interchange configuration and geometry Accommodates all moves Exceeds minimum weaving lengths to Baldwin Street ramps and the Hwy 412 EB on-ramp (1) Direct taper exit provided on Cochrane Street to westbound onramp which should result in acceptable traffic operations on Cochrane Street Spacing of 2 km to Hwy 412 interchange is less than typical minimum requirement of 3 km Does not achieve minimum weaving length to the Hwy 412 B off-ramp (435 m vs 800 m) Provides intersection spacing of 201 m on Cochrane Street between south ramp terminal intersection and Hwy 7 intersection vs desired minimum of 300m Approach grades on Cochrane Street in vicinity of Hwy 407 crossing are approx. 6%; profile adjustments will be required to achieve maximum 3% grade required for ramp terminal intersections Requires widening of watercourse structures east and west of Cochrane Street (M37 and M39) Largest footprint requirement relative to other alternatives (approx. 14 ha) Highest cost relative to other alternatives Notes: 1. Traffic analysis required to confirm operational performance of weaving sections acceptable. 3.2 ASHBURN ROAD INTERCHANGE DESIGN ALTERNATIS Given existing site conditions and the design principles and guidelines set out in Section 2, one alternative was developed for the Ashburn Road/Highway 407 Interchange as follows and shown in Appendix A: Alternative 1 consisting of a Partial Diamond configuration accommodating movements to and from the west. The entrance to Highway 407 westbound is via a direct on-ramp from Highway 7 westbound, just west of Ashburn Road. The second entrance to the highway for northbound traffic on Ashburn Road is via a loop ramp situated south of Highway 7. The eastbound diamond off ramp tees into Ashburn Road. Consideration was given to the provision of a Parclo A4 configuration on both the north side and the south side of Highway 407. However, given the close proximity of the Baldwin Street interchange to the east and Highway 7 to the north, a Parclo A4 configuration is not feasible at this location. The entrance and exit ramps between Ashburn Road and Baldwin Street would overlap. The separation between the north ramp terminal intersection and the Highway 7 / Ashburn Road intersection would be in the order of 100 m.

Page 8 Memorandum, May 24, 2016 Reconfiguration of the Baldwin Street interchange was also considered to assess the feasibility of broadening the range of interchange designs for the Ashburn Road location. However, even with the provision of a Parclo AB interchange configuration at Baldwin Street which situates all the ramps on the east side of Baldwin Street, it is not possible to achieve the minimum weaving lengths since Ashburn Road and Baldwin Street are situated less than 1 km apart. Furthermore, notwithstanding the significant cost and time involved to redesign and reconstruct the Baldwin Street interchange, a Parclo AB interchange configuration at Baldwin Street does not offer the same operational and safety performance as the currently constructed Parclo A4 interchange and may negatively impact on planned transitway infrastructure at Baldwin Street. Key advantages and disadvantages of the Ashburn Road interchange design alternative are identified in Exhibit 5. Exhibit 5: Key Advantages and Disadvantages of Ashburn Road Interchange Design Alternative Alternative Advantages Disadvantages Ashburn Road Alt 1 (Not Recommended for Future Review) Achieves minimum spacing to Hwy 412 interchange (3 km) Exceeds minimum weaving lengths to Hwy 412 ramps (1) Accommodates partial moves only (to and from the west) Non-standard interchange configuration with on-ramps provided from different arterial roads Spacing to Baldwin Street interchange is less than typical minimum 2 km requirement (i.e. 1 km); however weaving is not an issue as there are no easterly oriented ramps Approach grades on Ashburn Road in vicinity of Hwy 407 crossing are approx. 6%; profile adjustments will be required to achieve maximum 3% grade required for ramp terminal intersection Requires widening of watercourse structure and Highway 7 structure east of Cochrane Street and Ashburn Road structure Moderate footprint requirement relative to other alternatives (6 ha) Low cost relative to other alternatives Notes: 1. Traffic analysis required to confirm operational performance of weaving sections acceptable. 4. Next Steps On the basis of the conceptual review documented in this memorandum, an interchange at Cochrane Street is preferred as it better complies with MTO design principles and guidelines, subject to further review including traffic operations analysis. The following additional work is expected to be required to obtain MTO approval of an additional interchange on the Highway 407 Mainline between Highway 412 and Baldwin Street:

Page 9 Memorandum, May 24, 2016 Demonstrate the need for an additional interchange: On the basis of the transportation modelling and assessment work undertaken for the 407 East, it was determined that the proposed interchanges at Lake Ridge Road and Baldwin Street and the north-south crossings of the 407 East transportation corridor through this area have sufficient capacity to accommodate the projected 2031 traffic demands. The Town of hitby will need to demonstrate to the Ministry why an additional interchange is required to serve the planned development in the Brooklin area. Traffic operations analysis: Traffic operations analysis will be required to demonstrate that the introduction of an additional interchange on the Highway 407 mainline between Highway 412 and Baldwin Street will not negatively impact the capacity and operation of the Highway 407 mainline and the adjacent interchanges. Feasibility Study: It would be beneficial to conduct a feasibility study to confirm feasible interchange design alternatives from a capacity, operations and safety perspective taking into consideration potential land use and environmental impacts and obtain Ministry support for a new interchange prior to proceeding with a Class Environmental Assessment Study. Class Environmental Assessment Study: A Class Study will be required to obtain environmental clearance for a new interchange between Highway 412 and Baldwin Street. The study should examine, as a minimum, the need and justification for a new interchange and the impacts of the proposed changes on the footprint, capacity and operation of the Highway 407 mainline and the adjacent interchanges. The study should also include mitigation measures acceptable to the Ministry that would address any impacts to the Highway 407 mainline and adjacent interchanges. The technically preferred alternative and associated design will require MTO endorsement as part of the study process. As stated in the 407 East Report, the following key constraints will need to be addressed to MTO s satisfaction when reviewing future interchange proposals at Cochrane Street: The 4.9% grade of Cochrane Street is greater than the MTO maximum standard grade of 3.0% for ramp terminal intersections; The design speed of Cochrane Street would need to be reduced from 80 km /h to 55-60 km/h to satisfy turning sight distance criteria at the south ramp terminal; The intersection spacing of ramp terminals and Cochrane Street / Highway 7 (approximately 250 m) will be less than the minimum MTO standard of 300 m; The MTO standard for interchange spacing is 3-8 km between arterial and freeway interchanges. Cochrane Street is 2 km east of the est Durham Link Interchange (Highway 412). As noted in previous sections of this memorandum, tighter interchange and intersection spacing may be accepted by the Ministry if the traffic operations analysis demonstrates acceptable traffic operations can be achieved. ith the urbanization of the Cochrane Street area, interchange spacing in the 2 km to 3 km range would comply with typical MTO guidelines. Further, a reduced speed limit on Cochrane Street should be in keeping with the urbanizing condition for the area. Modifications to the Cochrane Street profile will be required to the north and south of the Highway 407 bridge to achieve an acceptable grade on Cochrane Street through the ramp terminal intersections.

Page 10 Memorandum, May 24, 2016 Appendix A Conceptual Interchange Design Alternatives

NO RT H Lane NG NG Cochra n m e Stree t Country M37 B 2 50 R R = 55 N/ AM S- P 13 0 -N/ P E-N/S S Ashbu RAMP M RA PO FU TE N RA TUR TIA M E L 55 P 13 0 250 RAMP N/S-E 400 201m Highwa y7 rn Roa d M37 EB Cochra ne Street Lane m Country 910 99 5 M39 B M39 EB Highw 0m 91 ay 7 G N 0m 74 G N

NO RT H Lane NG NG Cochra n m e Stree t Country M37 B 2 R 50 R = 55 N/ AM S- P 13 rn Roa d M37 EB 0 S E-N/S -N/ P Ashbu RAMP M RA 13 0 250 RAM P N/S -E 350 215m Highwa y7 Cochra ne Street Lane m Country 925 99 5 M39 B M39 EB Highw 0m 91 ay 7 G N 5m 74 G N

NO RT H Lane e Stree M37 B M37 EB 50 RAMP N/S- 2 50 R RA =55 S- MP 13 rn Roa d 10 0 RAMP M RA E-N/S -N/ P RA N MP -E 5 S Ashbu NG Cochra n NG 5 250 Highwa y7 13 0 RAMP N/S-E 400 201m Cochra ne Street Lane m Country 910 m t Country 435 M39 B M39 EB Highw 0m 91 ay 7 G N 0m 74 G N

NO RT H t E AV E e Stree 5k m NG Cochra n 1. 2 M37 B t Ashbu E AV EL EN GT H e Stree Highway 7 M39 B RA MP E- 65 0 M39 EB 54m Highw ay 250 RAMP RA M P 55 S -N/S 13 0 n Road BA RA LD MP IN - BN N/S A shb ur 1k m Cochra n 2.0 rn Roa d M37 EB BA RA LD MP IN N- BN S 7