External Proxy Bus for Northport/Norwalk Cable

Similar documents
Why VRD Flows Should be Allowed on Controllable Parts of An Interface Even If MP Transactions Have Not Yet Been Accommodated

Linden VFT Scheduled Line Market Integration Update Initial Tariff Review

ISO New England Available Transfer Capability. Implementation Document. Version 1.0

ISO-NE and NYISO Inter-Regional Interchange Scheduling (IRIS)

ISO-NE and NYISO Inter-Regional Interchange Scheduling (IRIS)

Securing 100+kV Transmission Facilities in the Market Model Market Design Complete Presentation

RTC will make binding unit commitment and de-commitment decisions for the periods

5.1 Transmission Congestion Charge Calculation Calculation by Office of the Interconnection.

Locational Based Marginal Pricing

NYISO / PJM - Focused Study Reliability Analysis. Northeast Coordinated System Plan IPSAC09 November 06, 2009

MOD-001-1a Available Transfer Capability Implementation Document

ConOp. Internal NYISO Controllable Lines. Concept of Operation. Scott Harvey, LECG. Document Locator:

Update on Northeast Seams Issues. February 20, 2008 NYISO Business Issues Committee Meeting

Exhibit No.5 ATC/TTC CALCULATIONS AND METHODOLOGY STATEMENTS FROM ISO-NE AND PJM

RTO Overview and Day 2 Markets. EAI Technical Conference May 26, 2011

Con Ed/PSEG Wheel Replacement Proposal A joint white paper from the New York Independent System Operator and PJM Interconnection

Broader Regional Markets Report

PJM PROMOD Overview. August 1, PJM

Internal NYISO HVDC Controllable Line Scheduling. Concept of Operation. LECG Staff

the Real-Time Market will be based on the system marginal costs produced by the Real-Time

Broader Regional Markets Report

Broader Regional Markets Report

the Real-Time Market will be based on the system marginal costs produced by the Real-Time

Page 1 of 1. NPCC Methodology and Guidelines for Forecasting TTC and ATC

Coordination with PJM

Broader Regional Markets Report

Implementation of New Capacity Zone in Class Year Deliverability Studies

Industry Perspectives on FERC Standard Market Design

Less than 20 MW Constraint Reliability Margin Values

Dispatch Signal & Locational Marginal Pricing (LMP)

2015 ISO/RTO Metrics Report. Summary. November 2015

PJM Fixed Transmission Rights (FTRs)

Wes Yeomans Vice President Operations Management Committee May 31, 2017 COPYRIGHT NYISO ALL RIGHTS RESERVED

Interchange Transactions

Wholesale Electricity Markets. New England Independent System Operator. Commissioner Mark Vannoy Maine Public Utilities Commission

Mothball Outages in Capacity Markets

Congestion and Marginal Losses

Status: Functional Requirement Specification completed on March 15 th. Development is in progress and a September deployment is planned.

New York Independent System Operator, Inc. NYISO Tariffs. OATT Schedules

Lake Erie Loop Flow Modifications

2003 Program Plan. Open Scheduling System (OSS) Decision Support System (DSS) Market Structures Working Group March 10, 2003

UTC Activity Pre and Post 162 FERC 61,139: January 1, 2017 through March 8, 2018

Broader Regional Markets Report

Broader Regional Markets Report

Broader Regional Markets Report

California Independent System Operator Corporation Fifth Replacement Tariff

California Independent System Operator Corporation Fifth Replacement Tariff

U. S. SPOT MARKET REGULATION

EIPC Interconnection-wide Webinar and Stakeholder Discussion. November 17, 2015

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Congestion and Marginal Losses

Broader Regional Markets Report

Locational Export Capacity Proposal

Congestion and Marginal Losses

2005 Major Projects. Project Description. Status and Milestone Deliverables

PJM/NYISO Wheel Replacement

ASSESSING THE SHORT-RUN BENEFITS FROM A COMBINED NORTHEAST MARKET

NEW YORK INDEPENDENT SYSTEM OPERATOR

JCM Drill Down Report -- Draft. March 21, 2014

CUSTOMER GUIDE TO PJM BILLING

Analysis of the Broader Regional Markets Initiatives

MARKET EFFICIENCY STUDY PROCESS AND PROJECT EVALUATION TRAINING

Review of Interconnection Assistance Reliability Benefits. May 12, NPCC CP-5 Working Group

PJM M2M Market Flow Proposal. October 2014

PSE&G/ConEd Wheel Modeling

Proposed ICAP Manual Revisions Regarding Deliverability Requirements for Capacity Imports from PJM

Business Practices for. Schedule 21-ES. (Modifications Issued on August 11, 2016)

LMP Implementation in New England

Broader Regional Markets

Glossary of Terms Used in Reliability Standards. Preliminary Draft Version 0 Reliability Standards September 1, 2004

Entergy Nuclear Indian Point 2, LLC First Substitute Sheet No. 1 FERC Electric Tariff, Original Volume No. 1 superseding Original Sheet No.

ATTACHMENT C. Methodology to Assess Available Transfer Capability

Carbon Charge Proposal Evaluation PREPARED BY: PREPARED FOR: DATE:

Intertie Capacity Value for Alberta

131 FERC 61,181 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER CONDITIONALLY ACCEPTING JOINT OPERATING AGREEMENT

EIPC Roll-Up Powerflow Model

Billing System Corrections (Baseline)

Congestion and Marginal Losses

Market Simulation Structured Scenarios. Energy Imbalance Market Implementation Arizona Public Service and Puget Sound Energy

Impact of Convergence Bidding on Interties. Draft Final Proposal

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Appendix 1 PRELIMINARY DELIVERABILITY BASELINE ANALYSIS STUDY REPORT

Dave LaPlante Vice President, Markets Development September 18, 2002

Single Schedule Market Pricing Issues

JCM Drill Down Report. February 19, 2015

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Wide-Area Trans-Regional Northeast Reliability Assessment

Interchange Transactions

PJM Business Practices for Hudson Transmission Service

FINAL REPORT PHASE IV MARKET TRIALS

FERC Docket EL Fast-Start Resources

Energy Imbalance Market Year 1 Enhancements. Issue Paper and Straw Proposal

2.1.1 Market Power Mitigation & Reliability Requirements Determination Market Power Mitigation & Reliability Requirements Determination

Price Validation of Energy and Ancillary Markets

ISO Net Surplus Collection & Allocation in Wholesale Power Markets under LMP

PJM Business Practices for Neptune Transmission Service

NPTEL

Joint and Common Market ITEM 4 PSEUDO TIES

Operational Aspects of PJM/NYISO Wheel Replacement Protocol

Joint and Common Market PSEUDO TIE UPDATE AUGUST 22, 2017

Transcription:

Market Structure Working Group June 2003 External Proxy Bus for Northport/Norwalk Cable Navigant Consulting, Inc. www.lipower.org

Context The issue of when it is appropriate to have multiple external nodes and when it is appropriate to have a single external node between two ISOs was discussed at the last meeting. The potential for negative impacts of having multiple external nodes on an interface comprised of free-floating interties was distinguished from the positive potential impacts of having multiple external nodes on an interface with controllable lines if the system operators maintain a separate tie line schedule on the controllable line. This presentation looks at the treatment of the PAR-controlled Northport/Norwalk Tie (1385) in this context, and reflects a similar presentation made to the New England markets committee last month. 1

Introduction Historically, the Northport-Norwalk cable (1385 Tie) had been operated as a separate tie supporting economic and reliability transactions. With implementation of NE-SMD, NYISO and ISO-NE: (1) model the 1385 Tie as part of a single external NY/NE interface node and (2) set flows over the 1385 Tie to zero, not allowing any economic interchange of energy over the 1385 Tie. Proposal: Establish a separate external node for the 1385 Tie Develop operational rules that remove the zero flow limitation. 2

Present Treatment of 1385 Tie 1385 Tie is modeled as part of total NY/NE interface node. ISO-NE does not post a separate ATC for the 1385 Tie and does not list 1385 Tie as a separate point of delivery. Flows over 1385 Tie set to zero based on contingency analysis rule. ISOs maintains that energy flows over the 1385 Tie can severely constrain the capability of the entire NY/NE AC interface when the flow on the 1385 Tie is in the same direction as the flow on the entire NY/NE AC interface, reducing it by a factor of about three to 1. ISOs only allows schedules over the 1385 Tie under emergency circumstances 3

NEPOOL Standard for Designation of Nodes Section 2.7(e) to Market Rule 1 provides that: [a]s appropriate and after consulting with Participants, the ISO will establish and re-configure External Nodes taking into consideration appropriate factors which may include: tie line operational matters, FTR modeling and auction assumptions, market power issues associated with external contractual arrangements, impacts on Locational Marginal Prices and inter-regional trading impacts. Table 2.2 note (c) of the NEPOOL Market Operations Manual states that Phase Angle Regulation of intertie capability: shall be operated by NYISO and ISO-NE to provide local area reliability and to maximize inter-iso transfers as appropriate. 4

Concerns with Present Treatment Setting 1385 Tie flow to zero does not maximize the volume or value of inter-iso transfers when flows over the 1385 Tie do not constrain economic interchange upstate. And maximizing the total inter-control area energy flows may not maximize the value of those transfers. Contrary to the ISOs contingency concern, the vast majority of the time, 1385 Tie flow (even if scheduled at the maximum capability of the cable) do not limit economic interchange upstate. 5

Impacts of 1385 Tie Capability on Economic Transactions To or From Upstate New York During most hours even full flow on 1385 Tie does not limit volume of economic upstate transactions. Requiring a zero schedule on 1385 flow in these hours reduces total economic transfers between ISO-NE and NYISO. During the June 2002 through February 2003 period full flow on 1385 would have limited the amount of economic upstate transactions that were scheduled, less than 6.3 percent of the time. During most hours where a full flow on 1385 would limit the amount of economic transactions scheduled upstate, a less than 200 MW schedule on 1385 would not limit these transaction. 6

Questions About 1385 Tie As a Separate External Node Won t PJM-type phantom arbitrage opportunities arise with more than one external node between NY and NE? The PJM Phantom Arbitrage occurred where the NYISO modeled PJM as a single external proxy bus and PJM modeled two external proxy busses in NY. Under certain conditions, market participants were able to submit a balanced schedule in PJM, pay no congestion in New York and collect congestion in PJM, creating a risk-less arbitrage. Other opportunities could have occurred if the location of marginal generation did not match the external proxy bus on interfaces with multiple free-floating lines. Common external node for 1385 Tie between ISO-NE and NYISO (i.e. both ISO-NE and NYISO establish a separate external node/proxy bus for the 1385 Tie) will eliminate phantom arbitrage potential. Having a separate proxy bus and maintaining a tie line schedule on 1385 would help the ISO correctly reflect the relative flows over 1385 and rest of interface, eliminating gaming potential for those submitting balanced schedules on 1385 and upstate interfaces. 7

Questions About 1385 Tie As a Separate External Node Won t inadvertent flows on the 1385 Tie increase if a non-zero schedule is used? Historically, inadvertent flow occurred mainly when PAR control angle limits were reached. LIPA $6 Million investment in new PAR increases control angle to +-50 degrees, reduces inadvertent flow. The PAR deadband of +-15MW applies to any setting including 0 MW. ISO has existing procedures for inadvertent flows, as well as procedures for DAM and real time energy deviations, which can be applied to separate external node for the 1385 Tie. 8

Questions About 1385 Tie As a Separate External Node Doesn t the NYISO OATT prohibit transactions over the 1385 Tie by anybody other than LIPA? Third parties canand have used the 1385 Tie for transactions. 1385 Tie is subject to the NEPOOL and NYISO open access tariffs. NYISO OATT provides that third party use of transmission facilities subject to clearance under IRS private use rules. Procedures for scheduling service over 1385 Tie, consistent with NYISO OATT Section 5.2D, are posted on the NYISO OASIS. 9

Proposed Treatment Separate Proxy Bus at 1385 Tie and Posting and Release of Unused Capability Create a separate proxy bus in both NYISO and ISO-NE representations at center of 1385 Tie with ISO-NE and NYISO to post ATC of 1385 Tie. Define rules for when ATC would be greater than zero (When TTC less scheduled transactions was positive). Improve operating definition of when 1385 Tie flows would bind (or perhaps increase) economic transactions upstate. Optimal solution would be to select schedules considering economics of transactions within both ISOs. 10

Next Steps 1385 Tie owners meeting with ISO-NE and NYISO to discuss present treatment of the 1385 Tie in ISO-NE and NYISO. LIPA will discuss and propose options for interim and long-term treatment in subsequent MSWG meetings early this summer. 11