The right solutions. However, it is inevitable that with the introduction of any new construction system the question arises How does it compare?

Similar documents
THERMAL WALL SOLUTIONS

THERMAL WALL SOLUTIONS

Concrete Soffit Direct Fix

850 SOLID LIGHTWEIGHT READYBLOCK

The Thin-Joint Construction Cost Advantage The 12.4% cost saving building method *

Precision-made clay block walling system

Certificate No: EW182C

HIGH QUALITY, FAST CONSTRUCTION WITH THE FAMILIARITY OF TRADITIONAL BUILD

Certificate No: EW182B

Precision-made clay block walling system

Certificate No: EWW182

CHAPTER 3: Modern Methods of Construction (MMC)

Multi-layer Insulation Blanket for Walls

TECHNICAL GUIDANCE XXXX 2015 EXXON QUESTION ANSWER. page 1 of 9

A handbook of thermal bridging details incorporating Porotherm blocks

A Handbook of thermal bridging details incorporating aircrete blocks

Part E robustdetails. robustdetails. January 2018 Update Pack

Garage Conversion - Between and Under Joist Applications

HP Partial Fill. Robust, long-lasting protection

Multi-layer Insulation Blanket for Walls

Metal Web Floor System

Benefits of off site manufacture

0331 Brick and block construction

Definition of Wall. A continuous, vertical structure Thin relatively to its length and height

A Handbook of thermal bridging details incorporating aircrete blocks

GypWall TM ROBUST 4.4. GypWall ROBUST. Durable impact resistant partition system. Key facts. Sector Guide

robustdetails E-FC-7 Separating Floor Concrete Separating Floors Concrete E-FC-7


CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES. Chapter 10

Part E robustdetails. robustdetails. September 2015 Update Pack. Dear Colleague,

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES

safer, faster, smarter!

The extra strong, extra durable, sound resistant system that you can direct fix to

ROCKFLOOR. Thermal and acoustic stone wool insulation for ground and separating floors

Reinforced concrete double walls

Brick Veneer Walls. Insulation

CONCRETE BLOCKS Lignacite

DriLyner 5.2. DriLyner. Drywall masonry lining systems. Key facts. Sector Guide


CHAPTER 1: Tolerances

Multi-layer Insulation Blanket for Walls

Toplite _ aircrete blocks. from Tarmac Topblock

Garage Conversions. Technical Issues

Design Guide for the use of Hydraulic Lime Mortar in Masonry with Lightweight Steel Framing

Multi-layer Insulation Blanket for

Unit 8 Walls & Partition

EcoHome-Insulation.com. Aluminium Foil Bubble Insulation. General Purpose Insulation. Dry Lining. Cavity Wall. Insulation System.

GypLyner. GypLyner. Metal framed wall lining system. All our systems are covered by SpecSure when using genuine Gyproc and Isover products.

CONCRETE BLOCKS Lignacite

SOUND INSULATION TESTING IN DWELLINGS

Timber cladding for building refurbishment

SSS009: Substrate Specification Sheet 9 - Render Board

COSVR50 - SQA Unit Code DY9V 04 Repair and maintain masonry structures

BREEDON BLOCKS.

Aircrete blocks product guide

External Steel Stud and Top Hat Walls. Details SYSTEMS 176 NON-FIRE RATED SYSTEMS 176 FIRE RATED SYSTEMS 178 BRICK VENEER SYSTEMS 183 INSTALLATION 185

Taking the Devil out of the Detail?

Fire Resistant: Achieves FRL levels of 90/90/90 for load bearing walls.

CALL TO TALK TO THE SAS TEAM

Technical Guidance Note

Civil Engineering Construction Chapter 5

15 days 75% Compressive Strength 1 day 23N/mm² 28 days 44N/mm²

cornish concrete products Crosswall Construction low carbon fast track buildings

COSVR49 SQA Unit HN2H 04 Erect complex masonry structures

CI/SfB (41) x M2 June 2005 EPS

A4/8 PS AW2324D Issue 10 May Permishield

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR

An introduction to Part L U-values

Permicav XV TM NEXT GENERATION OF VAPOUR-PERMEABLE INSULATION FOR WALLS WITH CAVITIES

APPROVALS. Jabwall has been approved for this application since 1979, and was the first partial-fill insulation product to gain BBA approval.

Light steel frame walls

REFLECTIVE TECHNOLOGY CONSTRUCTION MEMBRANES

9/24/2015. Aalto! / ENG + ARC. Asuinrakennusten rakenneratkaisut. Requirements : Sound insulation requirements : Thermal insulation requirements :

ENERGYSAVER. Blown cavity wall insulation


Construction Technology Revision Guide

cornish concrete products Structural precast

CI/Sfb 2- Rj7 - Eighth Issue May 2011

v 2.2 February 2018 country stone in stodck availabl walling

PENTABLOCK Technical Information 190mm Series

CI/SfB. October 2003

TECHNICAL INFORMATION SHEET NUMBER 1a

Floors Walls Roofs. Jabfill Premium. APPLICATION: Full-fill Cavity Wall Insulation PRODUCTS: Vencel Resil Limited

Multi-layer Insulation Blanket for Walls

A4/8 PS AW2002 Issue 6 Sept Permishield

Form Block V I C / S A

APPLICATION: Floor insulation precast suspended concrete floor. Products: Jabfloor Premium 70 and 100

Design Guide for the use of Hydraulic Lime Mortar. EcoRight Ltd Unit 2 Paddock Road Caversham Reading Berkshire RG4 5BY Tel:

Floors Walls Roofs. Jabfloor Premium board Jablite Premium board Jabfloor board Jablite board. APPLICATION: Basements PRODUCTS: Vencel Resil Limited

MortarNet (updated to include Insect Barrier) Master Specification

Certificate No: EWW555

EZWall TM REAL BRICK CLADDING SYSTEM. E uroform Products Ltd. Solutions for the building industry

FIBOLITE MAKING LITE OF PART E REGULATIONSNS

wall underlay Product BRANZ APPRAISAL No. 695 (2010) Scope Thermakraft Industries (NZ) Ltd PO Box Botany Manukau 2163 Auckland

A4/6 PS AW1551 Issue 4 Nov Permishield

Terraced Masonry Test Houses in Bradford

C08. S04. P02 P08 Tiling

EXTERIOR WALLS. exterior wall systems, cladding w/ masonry. chapters SUBJECT

Passivhaus Documentation

Curved partition and wall lining system

Transcription:

Value assessment.

The right solutions. We Believe We believe that Porotherm offers both short and long term value to all involved in the building process - from bricklayer to client and everyone in between. However, it is inevitable that with the introduction of any new construction system the question arises How does it compare? In terms of cost? Other construction methods? Productivity on site? Here we endeavour to provide some guidance on areas of the construction process where the Porotherm System provides the user with benefits that need to be considered when endeavouring to produce a realistic comparison - for both Hard and Soft costs and hence value. 2

Hard costs Porotherm speed/cost comparator This is an extract from the interactive version available online at www.wienerberger.co.uk POROTHERM AIRCRETE LIGHTWEIGHT CONCRETE DENSE CONCRETE CUSTOMER OPTION COSTS PLEASE SELECT BLOCK PTH 140 140mm 7N 140mm 7N 140mm 7N Midi 140mm Block Details Strength N/mm 2 10 7 7 7 Weight Kg 7.9 10 19.6 17. Length (mm) 00 440 440 290 Height (mm) 224 215 215 215 Width (mm) 140 140 140 140 Lambda Value 0.28 0.19 0.47 1.28 No. per m 2 15 10 10 15 Delivered Cost /m 2 Laying Rate per Day - m 2 /man (indicative).00 11.00 9.00 7.00 Laying Cost /m 2 (indicative) Mortar Cost /m 2 1.8 1.8 1.50 Power/Water allowance for mixing Bed Joint Mortar/m 2 0.0 Laying Cost /m 2 Period to construct 1000m 2 - in days 10 0 7 48 The premier question is usually how much does it cost and how long does it take to build? This model has been developed to allow potential users of Porotherm to gauge the base cost of construction in Porotherm to construction in other masonry blocks together with the relevant production rates. This is a live model allowing you to use not only the indicative costs and production rates entered, but also your own figures if you wish. With wall costs roughly equal and with significantly faster build potential, the programme advantages of the virtually dry Porotherm System can be substantial.

Typical build 11.52am 11.59am Background 12.10pm During the Autumn of 2008 and Spring of 2009 an extensive review of cost of construction using Porotherm was undertaken and found to be similar to that for an equivalent wall constructed from Aircrete or Medium Dense blocks. Typical laying performance figures, and costs were sourced from a number of contractors, and over a period of time, verified with others to provide basic constructed wall costs against which to compare Porotherm. Conservative laying speeds for Porotherm were utilised, with rates which ensured that the bricklayers maintained or exceeded their comparable daily wages even when laying for only 6 hours per day, leaving 2 hours for setting out, mixing and the like. 12.18pm Laying speeds achieved have since been shown by experience to be significantly better than those initially utilised - although it is important that the logistics of loading out and safe access are given due consideration to maximise the benefits. 12.27pm The conclusion of this exercise clearly showed that the cost of constructing with Porotherm was usually equal, and often more, economical than traditional concrete block work even without taking into consideration the significance of the potential for additional benefits which the system brings - soft costs. 12.2pm Start: 11.52am End: 12.2pm Two men 40 minutes to lay 10 blocks = 8m 2 Laying Speed = 6m 2 per man per hour 4

Soft Costs - Hidden of the Porotherm System With conditions varying around the country and contractors allocating costs differently within their cost build ups, the following notes are designed to provide guidance in respect of those areas where soft costs should be considered to obtain a realistic overall comparison. Production Porotherm has a typical construction speed which exceeds that of traditional concrete block work. Typically five times quicker - dependant upon the type of blockwork with which Porotherm is compared. Porotherm s 1mm joint not only prevents settlement during construction with the associated expression of mortar from traditional mm or 10mm joints, but also prevents floating and minimises instability during construction. The majority of strength is gained within 2 hours, full strength is gained in around 24 hours. However due to the nature of both the Bed Joint Mortar and the 1mm joint, initial set is gained within 0 minutes, providing a remarkably rigid structure very quickly, allowing construction to proceed without the risk of float or settlement. Therefore, the usual restrictions on lift height do not apply. Providing adequate returns or intermediate/buttress walls are present to provide stability, then storey height in a day is a practical proposition. Reduced programme periods leading to potential for reduced preliminary costs. Watertight shell achieved in a reduced period leading to potential for parallel working, both inside the building and on the external facade. Reduced drying time means the construction is ready for following trades sooner and there is less moisture in the building. Negligible expressed mortar ensures very clean construction, which means no mortar contamination in the cavities and a clean workplace at the end of construction requiring minimal clearing up. Allows full inspection during installation of insulation to ensure all batts/sheets fully abut with no air gaps, maximising thermal efficiency. Weather The 1mm joint allows Porotherm to be constructed in conditions when inclement weather would render it impractical to construct traditional blockwork. The normal rules of cold weather working still apply e.g. min. + C on a rising thermometer etc. With relatively minimal temporary protection, (e.g. a timber batten on the head of the wall at the end of shift) Porotherm will take up little water and due to it s pore structure releases that moisture easily, drying out quickly. Reduced period to watertight shell reduces the period for which the project is susceptible to inclement weather reducing risk of programme delays. The best possible weather conditions can be utilised for construction of the external leaf, bringing further benefits from improved quality and cleanliness. Reduced risk of wind damage due to swift initial set. 5

Bed Joint Mortar Small quantities mixed locally to the point of use. No requirement for establishing silo s whilst the silo itself is often provided free of charge there is an associated cost of both installation and removal of the base, together with water and power supplies. Reduced forklift requirement which also reduces pedestrian/plant interface or hook time requirement on multi-storey projects, the latter in particular often an issue where concrete pours cause friction/delays with the smooth supply of mortar to bricklayers. The use of Porotherm may result in avoiding the need to hire in additional pumping or lifting plant to maintain production on all fronts. Reduced wastage - small amounts mixed at any one time reduces wastage at the shift end or when the weather deteriorates. Reduced site water usage around 95% less than required for traditional mortar. Minimal Bed Joint Mortar usage, particularly when applied by roller, means a very clean work area, no mortar droppings to clear up or dispose of and no spots to clear and dispose of at the shift end. Health and Safety The unit weight of the blocks, together with smooth corners/surfaces reduces the risks of muscular strain, cuts and abrasions which inevitably carry a hidden cost to any project in production lost. Reduced interface with cement minimises risk of dermatological problems for bricklayers. Build Quality Exacting height tolerances for the blocks encourages improved accuracy in construction. Reduced water utilised in construction reduces moisture available for take up by first and second fix items, increasing stability and reducing potential for shrinkage. Stability of the Porotherm blocks leads to reduced thermal movement or cracking. Client / End User Reduced construction programme leads to reduced interest costs and/or earlier release of capital. Earlier use of development and/or income stream. A better quality building. 6

Timber Frame - Porotherm Construction Comparison How Porotherm performs against timber frame is a frequent question and the following Comparison Table provides guidance on how the principle elements compare. Structure Inner leaf Element Timber Frame Construction Timber frame panel 89mm or 140mm stud plus OSB and external membrane Porotherm Porotherm Construction COMPARISON Timber frame porotherm Wall ties Timber frame ties Thin joint ties = = Holding down straps As required by Structural Engineer Not required Cavity closure around openings Required Required = = Fire stop barriers to cavities (typically mineral wool in polythene sock) Required at all floor and eaves levels and party walls Only if partial fill Outer leaf Constructed after principal structure Constructed after principal structure = = Outer leaf (If brickwork) Typically at a premium cost as no blockwork No premium Insulation and Thermal Performance Insulation 90mm or 140mm batts between Porotherm has an insulation value so cavity studs less insulation required U value performance of walls Little benefit from timber elements and OSB from performance of inner leaf board with 90mm glass fibre 0.0 and FR with 100mm glass fibre 0.0 u value Bubble foil, brick outer u value 0.0. Bubble foil is a relatively expensive option < 0.27 Internal Finishes Inner finish Vapour membrane. The nuisance of ensuring intact prior to plasterboarding is probably more relevant than the actual cost Not required Parge coat Not required Advisory if not wet plastered Plasterboard Nailed or drywall screws Dabbed = = Settlement Allowance needed at all windows and No requirement potentially at storeys when multi-storey Post completion shrinkage Potential for shrinkage cracks etc. Minimal - extremely stable material Construction Considerations Construction cost Modern Masonry Alliance typically advise 15% more expensive than equivalent masonry construction Fire risk during construction Specific measures required and/possibly additional insurance None Weather Potential for rain damage to timber Porotherm less vulnerable and dries out quickly Scaffold Generally erected prior to commencement Erected in parallel to ground floor in readiness for installation of first floor Design Considerations Flexibility for design changes Intermediate floor - multi-storey Staircases Lengthy lead in time for panel design and manufacture to accommodate changes Deep floorzone, to achieve sound and fire requirements (circa 500mm overall depth) May require additional fire protection to timber flights in multi-storey y y = = Incorporated with ease Concrete widespan, beam and block or insitu can be used. (circa 00mm overall depth) Concrete stairs can be utilised 7

Wienerberger as well as its directors, officers, employees, agents and representatives disclaim any responsibility, express or implied, for the accuracy or completeness of the information contained in this brochure or its suitability for a certain purpose. This brochure does not constitute a complete description of all articles manufactured and distributed by Wienerberger and cannot contain all relevant information for their use. All products, components, methods etc. described herein are subject to continuous technical development and may therefore be modified by Wienerberger without further notice. Such modification may cause the information herein to become partially or entirely inapplicable. This brochure cannot and does not substitute the client s own necessary assessment and evaluation of the items described herein as well as the involvement of professional advice as to planning and construction. This also applies to technical norms applicable to a certain project, which should be reviewed by qualified consulting engineers and/or architects. In particular, any amendment of the relevant UK legislation (e.g. in the field of construction law and/or technical norms) may cause the information contained herein to become partially or entirely inapplicable in conjunction with the articles, components or methods described. Wienerberger is not obliged to update any such information. If and to the extent the brochure contains statements in relation to third party products, such statements are based on Wienerberger s own experience made under certain circumstances. Such statements may prove correct or incorrect under different circumstances. Wienerberger shall not be liable for the correctness and completeness of the information, conclusions and predictions contained in such statements. Any liability of Wienerberger in connection with the products and methods described in this brochure is valid only if and to the extent agreed upon in writing between Wienerberger and the client, e.g. in the form of a definitive written purchase agreement. If the client chooses to use or process articles or components displayed herein in a way differing from the methods recommended herein, the client has to obtain Wienerberger s written approval in order to preserve liability claims, if any. Wienerberger Ltd Wienerberger House Brooks Drive Cheadle Royal Business Park Cheadle, Cheshire SK8 SA 0161 491 8200 Customer Service Centre T 0845 0 2524 F 0844 555 5770 office@wienerberger.co.uk www.brick.co.uk Printed on elementally chlorine free paper using vegetable inks.