Network Safeworking Rules and Procedures

Similar documents
Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures. Glossary

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Train Order System ANSY 502. Applicability. Publication Requirement. Document Status NSW SMS. External Only October 2015.

METROPOLITAN RAILWAY NETWORK TRACK OCCUPATION PROTOCOL

Using a Local Possession Authority

Transitions Between Signalling Systems

ADDENDUM TO THE CODE OF PRACTICE (VOLUME 3) FOR THE AUSTRALIAN RAIL NETWORK

Uncontrolled When Printed Document to be withdrawn as of 03/12/2011 To be superseded by GERT8000-RBBL Iss 21 published on 03/09/2011

Trackside Safety Curriculum. For Queensland Rail Rail Industry Workers

This is an uncontrolled copy. Before use, make sure that this is the current version by visiting NWT 304

Australian Network Rules and Procedures Development

Issue Rule Book Briefing Leaflet

ON TRACK SAFETY MANUAL

Directive 96/48/EC - Interoperability of the trans- European high speed rail system

Manual block working

Possession Controller

Requirements for Passenger Train Dispatch

Lookout Working ANWT 310. Applicability. Publication Requirement. Document Status NSW SMS. External Only October 2015.

DESIGN OF ROAD OVERBRIDGES

Eurobitume UK. Site Inspection for Delivery of Bitumen

LYTTELTON PORT OF CHRISTCHURCH TRAFFIC RULES AND MANAGEMENT

Golden Rule #5: Lifting & Mechanical Handling

LYTTELTON PORT OF CHRISTCHURCH TRAFFIC RULES AND MANAGEMENT

SAFETY FACT SHEETS. Working in or near Traffic Safety Non Negotiable. G-HS-ST Working in or near Traffic. G-HS-FS Version:1

Module T3 ERTMS. Possession of an ERTMS running line for engineering work where lineside signals are not provided. GE/RT8000/T3 ERTMS Rule Book

Response to a Bridge Strike over the Railway

Basic Track Awareness

Performance Measures for Track and Civil Infrastructure

STANDARD OPERATIONAL PROCEDURES

Management of Safety Related Control, Command and Signalling System Failures

ROADWAY WORKER PROTECTION

Defective On-Train Equipment. Defective On-Train Equipment. Railway Group Standard. GO/RT3437 Issue. Eight Date December 2015

Section F FIRES AND INCIDENTS INVOLVING DANGEROUS GOODS. Contents

Terminal Tracks - Managing the Risk

Wayleave Application for Non-Queensland Rail Service

Document Compilation and Approval

NZQA registered unit standard version 2 Page 1 of 7. Title Pilot an overweight load and an overdimension load as a Class 1 certified pilot

Uncontrolled When Printed Document comes into force 04/12/2010. GSM-R (IVRS) Radio system. Handbook. RS/520 Issue 1

Perspectives and challenges in operationalizing the

SECOND PERSON / DRIVER ASSISTANT PROGRAM

1 AIM 2 4 REASON FOR INCLUSION 2 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM AND PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

RAIL SAFETY COMPLIANCE CODE. Data loggers

The following is Queen's Printer for Ontario, Occupational Health and Safety Act - R.R.O. 1990, Reg. 851

Rail Accident Investigation Branch

Positioning and Labelling of Lineside Telephones

Centre for Rail Skills. National Occupational Standards. for the. Maintenance and Repair of. Traction and Rolling Stock

Infrastructure Based Train Detection Interface Requirements

FATAL AND SEVERE RISKS CONTROLS STANDARD. August 2018

Plant within the Rail Corridor

Notifying accidents and incidents

IDENTIFICATION AND MANAGEMENT OF HAZARDS

PRO Traffic Management

DRIVER CODE OF CONDUCT FOR TRUCK AND HEAVY VEHICLE OPERATORS PERFORMING WORK FOR OR ASSOCIATED WITH CDM LOGISTICS

PROCEDURES FOR YARD ACCESS AUTHORITIES

Iron Ore Company of Canada Health, Safety & Environment

GENERAL GUIDE FOR WORKPLACE TRAFFIC MANAGEMENT

SAFETY FACT SHEETS. Working with and around High Risk Plant Safety Non Negotiable. G-HS-ST Working with and around High Risk Plant

Requirements for the Weekly Operating Notice, Periodical Operating Notice and Sectional Appendix

Interface between Station Platforms, Track and Trains

ERA TSI OPE Working document

Level 1 Award in Health and Safety in a Construction Environment

Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice)

NZQA registered unit standard 1768 version 5 Page 1 of 6. Title Pilot an overweight load and an overdimension load as a Class 2 certified pilot

Ensure your own actions reduce risks to health and safety

Infrastructure Based Train Detection Systems

Roadway Worker Protection (RWP) 49 CFR Part 214 Subpart C and Railroad Communications

Worksite Safety Update Promoting safety in road construction

Guidelines for Scaffolding near Service Lines. Version 1 March 2014

Rail Safety Management Procedure General Engineering and Operational Systems Railway Track Signals - Detonators

DIVISION 9 TRAM TECHNICAL

Lone Working Policy and Procedure. Contents

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock

WI Revision 14 Safety

GLASGOW AIRPORT RAIL LINK BILL NETWORK RAIL OBJECTION. 1. Introduction

WELCOME. from CENTRAL TRAINING SERVICES LIMITED.

Effective Date: 10-January Table of Contents

BNSF OPERATIONS TESTING REFERENCE GUIDE Remote Operations Testing /Audit Supplement April 01, 2008

Section 1 OBC FADS /13 Access to Parking Areas

Contractor Safety Rules: Issued to all North American Subsidiaries of Genesee & Wyoming Inc. Effective April 1, 2002 Revised Dec.

Safely designing High Speed Two

Operate a front end loader/backhoe

PTA THIRD PARTY RAIL ACCESS TRAIN MANAGEMENT GUIDELINES Rev1.00

SOUTHERN AFRICAN RAILWAYS ASSOCIATION

TRANSPORTATION AND TRAFFIC MANAGEMENT PLAN

PRO Traffic Management

LONDON UNDERGROUND LIMITED ASSOCIATED SOCIETY OF LOCOMOTIVE ENGINEERS AND FIREMEN NATIONAL UNION OF RAIL, MARITIME AND TRANSPORT WORKERS

REQUEST FOR PUBLIC SUBMISSIONS

Train Driver Apprenticeship Standard Typical Job Titles Occupational Profile Knowledge and Understanding Skills

Operate a dozer (wheeled and tracked)

MetroLink Operations 700 South Ewing Street Saint Louis, Missouri

Transcription:

Network Safeworking Rules and Procedures Responsibilities of Rail Traffic Crews Rule Number: 2027 Version 1.0, 31 March 2016

Responsibilities of Rail Traffic Crews Rule Number: 2027 Document Control Identification Document title Number Version Date 2027 Responsibilities of Rail Traffic Crews Document History 1.0 31 March 2016 Publication version Effective date Page(s) affected 2027 Responsibilities of Rail Traffic Crews Authorisation 4 May 2016 Reasons for and extent of change(s) Adam Sidebottom Rail Safety Manager Brookfield Rail 31 March 2016 DISTRIBUTION AND CHANGE: Brookfield Rail maintains the master for this document and publishes the current version of the Brookfield Rail website. Any changes to the content of this publication require the version number to be updated. Changes to this publication must be approved according to the procedure for developing Brookfield Rail products. To view the latest version of this document visit www.brookfieldrail.com 2027 Responsibilities of Rail Traffic Crews, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED

Table of Contents Glossary of this Rule... 4 1. Purpose... 7 2. General... 7 3. Responsibilities... 7 3.1 Vigilance... 8 3.2 Cross Checks... 9 3.3 Display of Authority... 9 4. Rail Traffic Crew Changeover... 9 4.1 Relieving Rail Traffic Crew... 9 4.2 Rail Traffic Crew Being Relieved... 10 5. Examination of Other Rail Traffic... 10 5.1 Roll-by Inspection... 10 5.2 Advising of the Examination... 10 6. Reporting and Managing of Faults and Unsafe Conditions... 11 7. Overdue Occupancies... 11 7.1 Stopped Rail Traffic... 11 7.2 Inspecting Stopped Rail Traffic... 11 7.3 Disabled Rail Traffic... 11 8. Confirming Rail Traffic Complete... 12 9. References... 12 10. Effective Date... 12 2027 Responsibilities of Rail Traffic Crews, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 3 of 12

Glossary of this Rule Access Provider Adjacent Authority Block Station Civil Infrastructure Competent Worker Complete Crossing Location/Station Disabled Drivers Information System (DIS) An organisation that provides and manages a Rail Network and safe method of entry to that network for Access Users. Near to, close to, parallel to. Formal name for a written Authority (e.g. Local Possession Authority, Alternative Proceed Authority). A station at either end of a block section at which equipment is provided to control the movement of rail traffic. The track, track formation and drainage, and fixed structures beside, over or under the track. The term includes supports for overhead electric traction equipment and supports for signalling and telecommunications equipment, but not the equipment itself. A worker certified as competent to carry out a relevant task. Rail traffic where the consist has not parted. May consist of single or double ended portion of track, to hold rail traffic, connected to a main line that is used to permit other rail traffic to cross or pass. Unable to travel due to a defect. A system that can provide Rail Traffic Crews with: Train Consist Temporary Speed Restrictions Permanent Speed Restrictions Standard Timetable Train Notices Instructions Track Warnings Vehicle Restrictions Electrical Infrastructure End-of-Train Marker End-of-Train Monitor may include: Equipment and systems for supplying and distributing electricity Wires, cables, electrical equipment, electrical switch rooms, signalling and substations. A device, including tail lights, fitted to the trailing end of the last vehicle of a rail traffic consist to indicate the end of the consist. A device secured to the coupler of the last vehicle which communicates via radio link to the locomotive and provides real time end-of-train air pressure and other related information (e.g. rail traffic separation alarm). 2027 Responsibilities of Rail Traffic Crews, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 4 of 12

In-Effect Infrastructure Level Crossings Limit Of Authority Location Network Network Controller Network Safeworking Rules and Procedures Normal Speed Operator s Representative Permanent Speed Restriction Points Protection Rail Traffic Rail Traffic Crew Road Rail Vehicle Roll-by Inspection Route Activate, become current, in force. See civil infrastructure; electrical infrastructure; signalling infrastructure and telecommunications infrastructure. A location where the railway line and a road or pedestrian walkway cross paths on the same level (at grade). The limit may be defined by a sign, a signal capable of displaying a STOP indication, or a specific kilometrage point on a line. It defines the location to which rail traffic may travel under a Proceed Authority or the limits of a work on track authority. A place in the Network with a designated name, identification number, or signalling reference. A combination of track and other associated infrastructure controlled by Brookfield Rail. A Competent Worker who authorises and issues Occupancy Authorities, and works points, signals and other signalling equipment to manage routes for safe and efficient transit of rail traffic in the Network. The master set of Brookfield Rail rules and procedures that define how Access Users operate safely on the Brookfield Rail Network. A speed that does not exceed the speed limit currently in effect for the section of line and type of rail traffic. A person authorised by an above rail or below rail Operator to act on their behalf. A speed restriction (not temporary) imposed on the Network due to characteristics of the infrastructure. A track component consisting of paired pieces of tapered rail (blades) that can be moved and set to allow tracks to diverge or converge. The means used to prevent rail traffic from entering a worksite or other portion of track, or to prevent road or pedestrian traffic entering a level crossing. Trains and track vehicle or vehicles travelling on the Network. Competent Workers responsible for the operation of the Motive Power Unit. A road vehicle fitted with additional rail gear that enables the vehicle to be driven on rail. A visual inspection of passing rail traffic to identify equipment, loading security or other defects or failure. The rail traffic path from one limit of authority to the next in the direction of travel. 2027 Responsibilities of Rail Traffic Crews, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 5 of 12

Safe Place Secure Signalling and Communications Infrastructure Systems of Safeworking Temporary Speed Restriction (TSR) Track Track Workers Train Travel A Safe Place is: where there is at least three metres clearance from the nearest Running Line; on a Platform behind the safety lines; within a purpose-built refuge or shelter; where a structure or physical barrier has been erected to provide a position of safety; or immediately in front of stationary and Secured Rail Traffic. To safeguard against accidental or unauthorised access or movement. Signalling equipment and telecommunications equipment used as part of the safeworking and operating systems of the Network. An integrated system of operating procedures and engineered systems used in the Network, for safe operation of rail traffic, and protection of people and property. An imposed reduction of the normal speed for a portion of track. The combination of rails, rail connectors, sleepers, ballast, points and crossings. Competent rail safety workers whose primary duties are associated with work on or around infrastructure in the Rail Corridor. A locomotive or self-propelled vehicle, alone or coupled to one or more vehicles. Rail Traffic. Planned or purposeful movement from one location to another. 2027 Responsibilities of Rail Traffic Crews, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 6 of 12

1. Purpose The purpose of this Rule is to provide instruction detailing the responsibilities of Rail Traffic Crews on the Network. 2. General Rail Traffic Crews must be competent: for the Rail Traffic they operate in the Network; in the Systems of Safeworking relevant to their area of operation; and for the Route over which they Travel. 3. Responsibilities Rail Traffic Crews must: ensure that the Drivers Information System (DIS) documentation is obtained prior to departing the originating Depot and is retained for the duration of the journey; make sure their Rail Traffic can be operated safely before they enter and during Travel in the Network; ensure their Rail Traffic carries sufficient Safeworking and Authority forms applicable to the line being Travelled, before entering the Network; tell the Network Controller if a defect is detected on their Rail Traffic; tell the Network Controller if an Infrastructure defect is detected; co-operate with Competent Workers in the performance of their duties; tell the Network Controller about breaches to the Network Safeworking Rules and Procedures; and promptly report delays to the Network Controller. 2027 Responsibilities of Rail Traffic Crews, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 7 of 12

3.1 Vigilance Rail Traffic Crews must: observe the Track in the direction of Travel; observe other Rail Traffic; frequently observe to the rear to ensure that the Rail Traffic is following in a safe and proper manner; not engage in any activity that distracts their attention, or the attention of others; be prepared to stop or reduce Rail Traffic speed if required; advise the operator of any Road Rail Vehicle known to be following when it is necessary to stop or reduce speed; not exceed speed limits; reduce Rail Traffic speed if it is considered that the conditions prevent safe operation at Normal Speed; stop, if braking equipment is not considered to be operating as expected; pay particular attention when: Authorities are being received; reporting their position; visibility is impaired for any reason; and approaching: a Block Station; a Crossing Location; signals, indicators and signs; Track Workers; and Level Crossings. 2027 Responsibilities of Rail Traffic Crews, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 8 of 12

3.2 Cross Checks Each Rail Traffic Crew member must be aware of and agree to the current Limit of Authority. The Rail Traffic Crew must confirm with each other the meaning of: signals; Points settings; Permanent Speed Restriction signs; and Temporary Speed Restriction (TSR) signs. 3.3 Display of Authority Where the Authority is carried on the Rail Traffic, it must be displayed in conspicuous view of the crew member at the controls of the Rail Traffic. 4. Rail Traffic Crew Changeover Rail Traffic Crews must tell a relieving Rail Traffic Crew about any conditions that could affect the operation of the Rail Traffic. 4.1 Relieving Rail Traffic Crew The relieving Rail Traffic Crew must check the status of the Authority In-Effect and, if the Authority is a token or written Authority, make sure that it is: understood; correctly recorded, if written; and clearly displayed. The relieving Rail Traffic Crew must tell the Network Controller about: the change of Rail Traffic Crew; any change to communications arrangements; the Limits of the Authority currently In-Effect; and any special instructions. If the Limits of Authority or special instructions reported by the Rail Traffic Crew are incorrect, the Network Controller must issue a new Authority or provide updated instructions as required. 2027 Responsibilities of Rail Traffic Crews, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 9 of 12

4.2 Rail Traffic Crew Being Relieved The Rail Traffic Crew being relieved must not depart until they have made sure that the relieving Rail Traffic Crew understands: the status of the Authority In-Effect; the status of signals and Points; the speed limits applicable for the Rail Traffic; the status of Track and TSRs in place; and any factors that could affect the safety of Rail Traffic. 5. Examination of Other Rail Traffic Rail Traffic Crews must check other Rail Traffic, as effectively as the circumstances allow, for: loading irregularities; Rail Traffic defects; dragging equipment; the presence and operation of an End-of-Train Marker; and any other irregularities. 5.1 Roll-by Inspection One member of the Rail Traffic Crew must be in a Safe Place, at ground level if possible, to conduct a Roll-by Inspection of other Rail Traffic. The relieved Rail Traffic Crew must carry out a Roll-by Inspection of the Rail Traffic as it departs the change-over Location, unless there will be a delay due to ongoing loading etc. 5.2 Advising of the Examination Rail Traffic Crews must inform each other after the examination and advise that the other Rail Traffic is Complete and whether or not there were any irregularities. Where an End-of-Train Marker is missing Rail Traffic Crews must act in accordance with Rule 4005 Rail Traffic Lights and Markers. 2027 Responsibilities of Rail Traffic Crews, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 10 of 12

6. Reporting and Managing of Faults and Unsafe Conditions If a defect or unsafe condition is detected, Rail Traffic Crews must tell: the affected Rail Traffic Crew; and the Network Controller. If a fault or failure requires attention by the Rail Traffic Crew, they must, if necessary, arrange for Protection from other Rail Traffic in accordance with Rule 4001 Protecting Disabled Rail Traffic. 7. Overdue Occupancies 7.1 Stopped Rail Traffic If a Rail Traffic stoppage is or will become extended, the Rail Traffic Crew must: tell the Network Controller the Location and the reason why the Rail Traffic is overdue; if necessary, Secure the Rail Traffic; and if necessary, provide Protection for the Rail Traffic in accordance with Rule 4001 Protecting Disabled Rail Traffic. 7.2 Inspecting Stopped Rail Traffic WARNING: Where there is a risk of being struck by Rail Traffic on Adjacent lines, the Rail Traffic Crew must arrange to implement safety measures in accordance with Procedure 9010.Protecting Work from Rail Traffic on Adjacent Lines. WARNING: Adjacent lines may be under the control of a different Network Controller or Access Provider. If it is necessary to inspect their Rail Traffic the Rail Traffic Crew must: make sure that they and the Rail Traffic are Protected against Rail Traffic on Adjacent lines; and tell the Network Controller the result of the inspection. 7.3 Disabled Rail Traffic If the Rail Traffic Crew reports overdue Rail Traffic as Disabled, the Network Controller must act in accordance with Rule 4009 Removing Disabled Rail Traffic. 2027 Responsibilities of Rail Traffic Crews, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 11 of 12

8. Confirming Rail Traffic Complete When it is necessary to determine that Rail Traffic is Complete, the following methods must be used by Rail Traffic Crews or other Competent Workers: a visual inspection has verified the presence of the End-of-Train Marker; where information is provided by an End of Train Monitoring system; no unaccounted brake reduction has occurred and no other sign on the brake gauge is evident which indicates the Train is not Complete; or it is determined that the correct vehicle is at the rear of the Rail Traffic. 9. References 4001 Protecting Disabled Rail Traffic 4005 Rail Traffic Lights and Markers 4009 Removing Disabled Rail Traffic 9010 Protecting Work from Rail Traffic on Adjacent Lines 10. Effective Date 4 May 2016 2027 Responsibilities of Rail Traffic Crews, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 12 of 12