Zack Hicks, Kyle Reisz, Patricia Myers, Ramakrishna Billakanti

Similar documents
SECTION 5. Existing Conditions TRANSPORTATION NETWORK TRANSPORTATION

CHAPTER 7 PHYSICAL INVENTORY OF THE CITY

SITING YORETOWN S NEW LANDFILL INFORMATIONAL SHEET

WOO-SR Feasibility Study (PID 90541) Feasibility Study Report April 22, 2011

RECREATIONAL FARM FOR SALE acres in Sangamon County, Illinois

Review Zone Application for D&R Canal Commission Decision

DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA

Chapter Six Future Transportation and Land Use

3.12 LAND USE AND PLANNING

Hillsborough County Future Land Use 160

ADDITION OF VIABLE AGRICULTURAL LANDS

PLANNING COMMISSION WORKSESSION: MARCH 20, 2011

If you have any questions about the request for proposal, please contact me by at

Chapter 6 Transit 2025 Sketch Plan ---Long Range Plan Project Elements

Rezoning Petition Final Staff Analysis July 16, 2018

APPENDICES. Table 46: Quantified Objectives (October 2013 to October 2021) New Construction Rehabilitation Conservation/Preservation

BACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE

CITY OF SUSANVILLE PLANNING DIVISION PROJECT & ENVIRONMENTAL QUESTIONNAIRE

The Little Canada Comprehensive Plan consists of the following sections:

Article 7. COMMERCIAL AND MIXED USE ZONES

SECTION 3 NATURAL RESOURCES

WQMP AMENDMENT REVIEW CHECKLIST

Notwithstanding article VII of this chapter, the following conditional uses may be permitted in the planned mixed use development (PMUD) zone:

WRIGHT CODE parking and/or storage shall be permitted in the buffer area.

5 ALTERNATIVES TO THE PROPOSED PROJECT

SECTION 3.322: NESKOWIN LOW DENSITY RESIDENTIAL ZONE (NeskR-1)

State Route 8 Bridge Replacement Project

10384 Navarre Road SW Navarre, Ohio 44662

SANTA BARBARA COUNTY ZONING ADMINISTRATOR STAFF REPORT October 21, 2011

CHAPTER 8: INTERGOVERNMENTAL COOPERATION

12 Evaluation of Alternatives

STAFF REPORT. Planning Commission. Anjanette Simon, Associate Planner

3.8 LAND USE AND PLANNING

COMPREHENSIVE PLAN Executive Summary C ITY OF ENNIS, TEXAS

Municipal Class EA Process

ARTICLE 9 INDUSTRIAL

Environmental and Development Services Department Planning Division San Pablo Avenue, El Cerrito, CA (510) FAX: (510)

XI. Thornton Planning Area

Downtown Cuyahoga Falls Circulation & Economic Transformation Project 2016 TIGER GRANT

NOBLESVILLE PLAN COMMISSION STAFF REPORT DECEMBER 16, 2013

Town of Bristol Town Administrator 1 South Street P.O. Box 249 Bristol, VT (802) x22

Once known as warehousing and distribution, the process

Stantec LAKEW OD RANCH STEWARDSHIP DISTRICT MASTER ENGINEER'S REPORT FOR NORTHEAST SECTOR AT LAKEWOOD RANCH INFRASTRUCTURE IMPROVEMENTS

3 PROJECT DESCRIPTION

Project Plan for TAX INCREMENTAL FINANCE DISTRICT #41 (UNIVERSITY-WHITNEY) City of Madison

Project Plan for TAX INCREMENTAL FINANCE DISTRICT #41 (UNIVERSITY-WHITNEY) City of Madison

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

Appendix A SUMMARY OF EXISTING ZONING DISTRICTS FOR THE CIVIL DIVISIONS ADJACENT TO THE VILLAGE OF HARTLAND AND WITHIN THE STUDY AREA: 1998

CHAPTER 6 SANITARY SEWER SUB-ELEMENT

Fairfield Corporate Commons

Town of Hartford. Comprehensive Planning Visioning Workshop. Results. November 17, 2006

17. WATER SUPPLY. TABLE 17.1 Average Daily Potable Water Demand

Centerpoint of the Southwest

2 COMMUNITY P. average number of days with any measurable precipitation is 112. On average, there are 205 sunny days per year

SEPA Modification Application

New York State Department of Environmental Conservation August Receive Site Fact Sheets by . See "For More Information" to Learn How.

DESIGN REVIEW COMMITTEE AGENDA ITEM

ARTICLE II Zoning Districts and Allowable Land Uses

BASIS OF REVIEW SITE PLAN REVIEW

ENVIRONMENTAL FEATURES OF THE TOWN

Rules for providing public testimony

APPENDICES. Table 46: Quantified Objectives (October 2013 to October 2021) New Construction Rehabilitation Conservation/Preservation

Seasons Business Center New Construction!

9-LOT SUBDIVISION & PUD SKETCH PLAN

Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination

64E System Size Determinations.

Property Owner's Name: Telephone #: Mailing Address: System Address (if different): Directions to location of installation:

Include this form in your application submittal.

Marcellus Shale Follow-up Questions. Sue Mukherjee, Director Center for Workforce Information & Analysis Pennsylvania Department of Labor & Industry

PLANNING COMMISSION STAFF REPORT

If you have any questions, feel free to contact the office of the Planning Commission at

MINUTE ORDER. BONNER COUNTY PLANNING and ZONING COMMISSION PUBLIC HEARING MINUTES JANUARY 14, 2016

Seasons Business Center 2 New Construction!

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted:

SITE EVALUATION REQUEST FORM

System Address (if different): Directions to location of installation:

2.1 Summary of Existing and Future Population Estimates

VII. WATER SUPPLY AND SEWAGE TREATMENT

Cass County Soil Erosion & Sedimentation Control Program

2016 MAJOR GENERAL PLAN AMENDMENT

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

BASELINE DOCUMENTATION REPORT

Application Number: SP Project Name: Novo Nordisk Bright Sky Major Site Plan (acting as a Master Plan)

Chapter 9: Vision Plan. Chapter 9. Vision Plan. Lake Loveland. Image 179 Credit: City of Loveland

1. Applicant: City of Verona 2. Description of Proposal. 3. Existing Environment

STAFF REPORT. Permit Number: Tallman. Kitsap County Board of Commissioners; Kitsap County Planning Commission

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Rezoning Petition Final Staff Analysis June 18, 2018

Vision, Goals, Objectives, and Land Use Scenarios Welcome

TOWN OF SMYRNA Water Quality Buffer Zone Policy

11 Joint Development Regulatory Context and Methodology

Washington Boulevard and Kirkwood Road Special General Land Use Plan (GLUP) Study Plus. Agenda Item #43

Silverdale Water District 2018 Environmental Checklist

INDUSTRIAL SITES. Contact Us: A Summary of Industrial Land in the Township of Wellington North

Northern Tier. Pennsylvania s Marcellus Shale Formation. Population Demographics

Appendix A Stormwater Site Plan Report Short Form

LAND USE INTRODUCTION EXISTING CONDITIONS

14(h)EPA-06 City of Springfield 76 East High Street Springfield, Ohio Clark County Greening City Plaza

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY/DUPLEX BUILDING PERMIT / GRADING AND EXCAVATION PERMITTING INFORMATION PACKET

Construction Application for Permit (CAP) Instructions

Transcription:

Zack Hicks, Kyle Reisz, Patricia Myers, Ramakrishna Billakanti

Zoning Code E 1 36 R 2 45 R 3 32 Area in Acres Current zoning for the site is R2 Stow & R3 and E1. R-2 Residence District. Provide areas for single-family uses at a slightly higher density, a minimum lot size of 16,000 sq. ft., which conditionally permit clustered single-family, two-family and multiple-family. R-3 Residence District. Provide areas for single-family uses at a higher density, a minimum lot size of 12,000 sq. ft., which conditionally permit clustered single family, two-family and multiple-family dwellings, as well as boarding houses. Cuyahoga Falls Current zoning - E1 - Employment District - may need to request change to M1

Harrington Farm Site Future zoning changes by the city indicate their desire to develop the sight for Industrial use. Site: labeled G

Is there a need for Manufacturing in Summit County? % of Total Economy Manufacturing 9.1% Commercial 27.2% Economic Profile Summit County, Ohio Code Type of Industry Number of Industries Percent ages 3Manufacturing 2041 9.12% 4Retail Trade 6106 27.28% Real Estate, Information, Professional 5and Administrative Services 6348 28.36% 6Educational, Health, Social Assistance 3094 13.82% 7Arts, Entertainment, Food Industry 2646 11.82% 8Other Services, Maintenance 2146 9.59% Total 22381 100.00

Is there a need for Manufacturing in Stow? % of Total Economy Manufacturing Basic 5% Retail Trade Non-basic 27% Real Estate, Information, Professional - Non-basic 30% Educational, Health, Social Assistance - Non-basic 16% Arts, Entertainment, Food Industry Basic 12% Other Services, Maintenance - Non-basic 11% Code Type of Industry # of establishments % Type 3Manufacturing 63 5.37 Basic 4Retail Trade 312 26.58 Non Basic Real Estate, Information, Professional 5and Administrative Services 354 30.15 Non Basic 6Educational, Health, Social Assistance 184 15.67 Non Basic 7Arts, Entertainment, Food Industry 136 11.58 Basic 8Other Services, Maintenance 125 10.65 Non Basic

What type of manufacturing would make sense? -Because 1/3 of stow s industry is polymer based, it might make sense to take advantage of this already established base - Stow has a relatively low % of medical industry, yet is located between the renowned Cleveland Clinic and the growing Akron medical corridor it might make sense to take advantage of this location to produce medical supplies Industry by type - Stow Polymers, Plastics & Chemicals 44 33.3% Metals, Machining 36 27.3% Instruments & Controls 19 14.4% Medical 13 9.8% Other 20 15.2% Total Industrial Companies 132 100%

Population Cohort Male Female Under 5 years 18,417 17,585 5 to 9 years 19,890 19,360 10 to 14 years 19,702 18,709 15 to 19 years 18,311 17,398 20 to 24 years 15,259 15,750 25 to 29 years 16,837 17,586 30 to 34 years 18,872 19,372 35 to 39 years 20,934 22,036 40 to 44 years 21,993 23,183 45 to 49 years 20,183 21,044 50 to 54 years 17,811 18,596 55 to 59 years 12,433 13,568 60 to 64 years 10,005 11,493 65 to 69 years 8,840 10,613 70 to 74 years 8,783 11,358 75 to 79 years 6,884 11,358 80 to 84 years 3,930 6,990 144,392 males of working age 151,135 females of working age 295,527 working age persons in Stow 85 to 89 years 1,724 4,048

% of total Population # of population Attainment Both Sexes Male Female H.S. or less 36.1% 42.9% 49.1% Some college credit, less than 1 year 1 or more years of college, no degree Associate degree Bachelors Degree Masters Degree Professional Degree Doctorate Degree 7.2 6.8 7.5 14.5 14.7 14.4 5.3 4.7 5.8 16.7 17.9 15.7 5.6 5.8 4.5 1.9 2.6 1.2 0.9 1.4 0.5 Attainmen t Both Sexes Male Female H.S. or less 173,581 78,314 95,267 Some college credit, less than 1 year 1 or more years of college, no degree Associate degree Bachelors Degree Masters Degree Professiona l Degree Doctorate Degree 26,045 11,542 14,503 52,763 24,998 27,765 19,160 7,974 11,186 60,675 30,469 30,206 20,230 9,815 10,415 6,808 4,453 2,355 3,383 2,465 918 In October of 2009 Summit County had an unemployment rate of 9.8% 57.8% have no college degree 252,389 have no college degree

Population Cohort at 5 year Interval for the year 2000 Population Cohort Male Female 0-4 1169 944 5-9 1249 1179 10-14 1354 1125 15-19 1149 957 20-24 743 839 25-29 1033 1051 30-34 1150 1209 35-39 1204 1412 40-44 1522 1542 45-49 1293 1315 50-54 1119 1086 55-59 786 948 60-64 495 468 65-69 463 557 70-74 454 506 75-79 312 428 80-84 154 385 85+ 110 429 Source: 2000 Census 8,850 males of working age 9,402 females of working age 18,252 working age persons in Stow

% of Total Population # of Total Population Attainment Both Sexes Male Female Attainment Both Sexes Male Female H.S. or less 35.8% 34.4% 37.1% H.S. or less 7,656 3,463 4,193 Some college credit, less than 1 year 6.4 5.3 7.3 Some college credit, less than 1 year 1,363 537 826 1 or more years of college, no degree 15.1 14.9 15.3 1 or more years of college, no degree 3,241 1,503 1,738 Associate degree 6.6 6.1 7.1 Associate degree 1,422 612 810 Bachelors Degree 23.8 24.7 23 Bachelors Degree 5,097 2,489 2,608 Masters Degree 8.8 9.3 8.4 Masters Degree 1,885 934 951 Professional Degree 2.2 3.4 1.1 Professional Degree 473 345 128 Doctorate Degree 1.4 2.1 0.7 Doctorate Degree 294 212 82 57.3% have no college degree 12,260 have no college degree

Top: To the northwest of the site, in Cuyahoga Falls. The intersection is Wyoga Lake and Remington Roads. Bottom left: A house immediately to the south of the site, located on the Cuyahoga Falls side of the Stow-Cuyahoga Falls border. Bottom right: To the southwest of the site, also in Cuyahoga Falls. The road is also Wyoga Lake Road. Notice how the power lines are operated by Cuyahoga Falls Municipal Power and not FirstEnergy.

Top: Through the trees are the newly-built Wyndham Ridge Apartments to the north of the site. To the east and northeast of the site are wetlands which are not included in this analysis, as they lie outside the property. Bottom: To the southeast of the site is a partiallyobscured home, likely on Homewood Avenue.

Top: Mud Brook from the structurallyunstable former railroad bridge. Bottom right: A field is somewhat plowed, leading up to the former railroad tracks. Bottom left: A trail runs through the hilly, fieldcovered landscape.

Left: The aforementioned railroad bridge, which won t serve much use to any proposed development in the area. Right: Water lines on the Cuyahoga Falls side of the property.

Slope Proximity to major roads Proximity to Freeways Sewer connection feasibility Needed sewer line length On-site effluent sewage disposal Municipal water connection feasibility Needed municipal water line length Wetlands Floodplains Soil: suitability Soil: weight carrying capacity Soil: impervious surface suitability Traffic Impact Economic impact Weight and Grade assigned for Residential, Commercial and Industrial development

RsB = Rittman silt loam: SEVERE limitations for onsite sewage effluent disposal due to slow permeability, moderate limitations for homes of 3 stories or less and streets and parking lots due to a seasonally high water table. RsC2 = Rittman silt loam: SEVERE limitations for onsite sewage effluent disposal due to slow permeability, moderate limitations for homes of 3 stories or less due to seasonally high water table and slope, and severe limitation for streets and parking lots due to slope. BgB = Bogart loam: moderate limitations for onsite sewage effluent disposal, homes of 3 stories or less, and streets and parking lots due to a seasonally high water table. WaB = Wadsworth silt loam: SEVERE limitations for onsite sewage effluent disposal and homes of 3 stories or less due to slow permeability and a seasonally high water table, and moderate limitation for streets and parking lots due to seasonally high water table and slope. CnC = Chili loam: moderate limitations for onsite sewage effluent disposal and homes of 3 stories or less due to slope, and SEVERE limitations for streets and parking lots due to slope. *RsD2 = Rittman silt loam *FcA = Fitchville silt loam *Le = Lobdell silt loam *Ln = Lorain silty clay loam *Cg = Carlisle Muck *= not recommended for development of any type due to severe limitations as well as proximity to floodplain boundary.

Sewer Costs Cost per foot $125-200 Manhole - $3,ooo (needed every 300ft) Waterline Costs Cost per Foot - $150 Hookup - $2,200 (per house/building) Waterlines on site Sewer lines on site

Harrington Farm site is within 30 minutes of N. Canton and well into southeast Cleveland

Harrington Farm site is within 5 minutes of Route 8 and within 15 minutes of downtown Akron and I-77

The 39 acres of the parcel that is zoned as R-3 will allow up to 3.3 dwellings per acre. The 10 acres zoned R-2 will allow 2.5 dwellings per acre. The entire 49 acre parcel will allow for 153 residential units to be developed. 153 new will result in 1,450 additional trips which must be accommodated by the local road network

A commercial development will allow 23% of the 49 acres to be developed, resulting in a development of 11.27 acres, which is 490,000 square feet. The average shopping center in the US has 56,000 square feet of retail floor space. A commercial center of 100,000 square feet could allow a greater diversity of commercial development and was used for this analysis. A 100,000 Sq ft commercial development will result in 6,700 additional trips which must be accommodated by the local road network.

The proposed zoning in Stow will allow for 40% of the 49 acres to be developed for industrial use, resulting in 19.6 acres. The current zoning in Cuyahoga Falls will allow for 50% of the 28 acres to be developed, resulting in 14 additional acres. Total developable land is 34.6 acres. Our proposal is for a 400,000 sq ft industrial development. This does not include space for warehouses and truck parking. This size development will result in 2,700 additional trips which must be accommodated by the local road network

Residential: 3.3 moderately suitable Commercial: 3.1 moderately suitable Industrial: 3.5 Most suitable of tested development types 1-1.79: Least suitable 1.8-2.59: Less suitable 2.6-3.39: Moderately suitable 3.4-4.19: More suitable 4.2-5: Most suitable

-Will augment the low (5%) basic economy of Stow -Will add only moderate increase in traffic to local road network -Is ideally located for easy freeway access (within 5 min of Route 8) -Is within a 30 minute drive of both Cleveland and the northern edge of Canton -Has potential to augment and benefit from other regional industries -Has already been established as a good use for the site by both Stow and Cuyahoga Falls -Will require little with regards cost site grading, sewer and water connections -Area provides a working age population to support a manufacturing facility -Was the highest rated use in our ranking system