Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Similar documents
City of Tacoma Tacoma Public Utilities Tacoma Power. REQUEST FOR BIDS PG F Alder Lake Park Sewage Treatment Expansion

Table of Contents for Guide Specifications

DOCUMENT ADDENDA AND MODIFICATIONS

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority

ITEM 706 PIPE SLOPE DRAIN

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

YES, we received Addendum No. 1

SOUTH GRANVILLE WATER AND SEWER AUTHORITY GENERAL DESCRIPTION OF COST ITEMS AND BID ITEMS FOR H STREET BY-PASS WATERLINE CONTRACT NO.

SECTION UNCLASSIFIED EXCAVATION AND GRADING

DRAFT TECHNICAL SPECIFICATIONS FOR

IM 0291(108)0 UNION COUNTY INDEX OF SHEETS. Index of Sheets. Estimate of Quantities. Table of Fence Quantities. Details for Right-of-Way Fence

SECTION PAYMENT PROCEDURES

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

ADDENDUM NO. 1. DATE ISSUED: June 1, 2018

SECTION MEASUREMENT AND PAYMENT

SECTION GENERAL EXCAVATION

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT

SECTION A1 EXCAVATION AND BACKFILL GENERAL

DIVISION 4100 SITEWORK

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST

ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB # RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN

SANBORN COUNTY

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION MEASUREMENT AND PAYMENT

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000

SECTION 1500 REMOVALS

Whatcom County Bid ADDENDUM NO. 2 West Badger Road / Bertrand Creek Bridge #50 Replacement CRP Federal Aid BRS-2037(107)

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

DOCUMENT ADDENDUM No. 2

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

a. Unless otherwise specified, all lengths shall be horizontal distances.

SECTION EROSION AND SEDIMENTATION CONTROL

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

LOWER MILL DIRT HAUL AND PLACEMENT PROJECT

000I-291 UNION COUNTY INDEX OF SHEETS

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

ADDENDUM NO. 1 FOR ROADWAY RECONSTRUCTION RFP # June 7, 2016

Lump Sum L.S. (15") EA

STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PLANS FOR PROPOSED

Ministry of Forests, Lands and Natural Resource Operations

ADDENDUM NO. 1. BVCAP Laurel Hill Residential Site Improvements Pawtucket, RI. March 18, 2016 PREPARED BY:

Job Order Sewer Repair Services

Project # Brown County PCN i40h Replace Section Line Road Culvert

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

CITY OF ELKO BID TABULATION FOR Sports Complex

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Final Estimates Level 2


Replace BID SCHEDULE with attached revised BID SCHEDULE.

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

ADDENDUM #1 BL Construction of Club Drive Park: Phase II

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of

SPECIAL SPECIFICATION. Water and Sewer System and Appurtenances

Forsyth County Procurement

SECTION EROSION CONTROLS

SPECIAL SPECIFICATION 3504 Septic Tank System

CITY OF TACOMA Department of Public Utilities Tacoma Power

902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL

SPECIAL PROVISIONS. SECTION B Scope of Work. P21106 Over/Under CMP Pipe Replacement

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED?????

TECHNICAL SPECIFICATION

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018

QUESTIONS AND ANSWERS THROUGH 10:00 PM DECEMBER 15, 2015

SECTION TRENCHING & BACKFILLING

CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER

SECTION MEASUREMENT AND PAYMENT

UPPER REPUBLICAN NRD ROCK CREEK Drop Structure #1 DUNDY COUNTY, nebraska

BASE BID FORM FY 2015

CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION TREE & PLANTING PROTECTION

Invitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $

CONTRACT NO. : MTK11/2017 REHABILITATION OF MSAULI ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

TABULATION OF TOTAL QUANTITIES - CR 44H (BUCKHORN ROAD) (1 OF 2)

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

ADDENDUM NO. 1. Description of BID 7664: Fossil Creek Trail Underpass at Trilby Road

Base Course Design and Construction

SECTION MEASUREMENT AND PAYMENT

10:00 AM, Wednesday, April 8, 2015

SECTION EARTHWORK. B. Removal of subsoil and excavating all classes of material encountered.

TEMPORARY AIR AND WATER POLLUTION, SOIL EROSION, AND SILTATION CONTROL South Terminal C Phase 1 (WS110) Item P-156

CITY AND COUNTY OF DENVER

EXISTING CONDITIONS. Town of Bedford, NH Sand Volleyball Courts Existing Conditions Sheet 2 of 5 GENERAL NOTES

DESIGN & CONSTRUCTION GUIDELINES

Maine Turnpike Authority

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project

SECTION TRENCHING

Transcription:

Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of measure may be used as a guide for preparing bid proposal forms as part of the project specifications manual. Mobilization Per WSDOT 1-09.7 Trench Excavation Temporary Erosion and Sedimentation Control (TESC) for all trench excavation and safety provisions not included in any other unit price items. for the construction of a temporary construction entrance, installation of temporary orange PVC fencing, installation of straw wattles, installation of a construction staging area, and installation of catch basin inlet protection as shown on the drawings and as specified in the Payment also includes the removal of all of these TESC measures after the construction of the new trail is complete and the restoration of the existing trail and construction staging area to its pre-construction condition. Upon acceptance of the Contractor s Erosion and Sediment Control Plan (CESCP) and TESC personnel list with certification cards, 25 percent. After NTP and before Substantial Completion, 50 percent will be prorated and paid monthly for compliance with CESCP. Non-compliance will result in withholding of payment for the month of non-compliance. At final payment, 25 percent for a clean site.

Page 2 of 6 Construction Access Road for all construction access roads required for the duration of the project. Includes restoring construction access road areas to original conditions at the project s completion. After initial installation, 50% will be paid After site is restored, the remaining 50% will be paid Surveying Site Protection Traffic Control Landscape Restoration Superstructure Removal and Disposal necessary to survey critical areas, clearing limits, layout, cut and fill and all other surveying necessary to provide compliance with the contract drawings. All surveying shall be completed by a professional land surveyor licensed and registered in the State of Washington. to protect all trees and park facilities such as benches, walkways and tables within the contractor staging area or near construction activities per City of Bellingham Parks standards. supervision, temporary signage, tools, equipment, supplies, and incidentals necessary to furnish and install all pedestrian and vehicular traffic control items required for the duration of the project. Remove all traffic control items at the project s completion. to remove all construction related materials and restore construction site and surrounding areas to original conditions. Payment at initial restoration: 75% Payment after restoration seeding establishment meeting contract specifications: 25% Full compensation for labor, materials, tools, equipment and incidentals necessary to remove existing superstructure, including stringers, decking, railings and appurtenances as required to construct improvements as shown in the drawings and written in the

Page 3 of 6 Demolition, Clearing & Grubbing for all clearing & grubbing activities as defined in these Clearing and grubbing includes the removal of all trees less than 10 inches in diameter and their associated stumps and root wads to a depth as indicated in these Payment also includes the felling and removal of trees over 10 inches in diameter including their root wads where shown on the Drawings. Payment also includes the hauling and disposing of off-site. Grading, Excavation, and Embankment to excavate trail to subgrade elevation as shown on the Drawings and haul excavated material to the construction staging area for stockpiling. Also includes all labor and equipment to excavate trail to a recommended stripping depth of approximately [enter depth here, which shall be determined on a project by project basis, typically 12 inches] inches below existing ground surface throughout as recommended in the geotechnical report for this project (and deeper in those areas where grades dictate and to and haul and dispose of excavated material to an off-site location. Includes all labor and equipment to excavate soil as determined by the project geotechnical engineer to be unsuitable material for trail subgrade to a depth as determined by the geotechnical engineer and to and haul and dispose of excavated material to an off-site location. Also includes all labor, equipment, and materials to place and compact native soil from on-site as embankment fill as required by the Drawings and as specified in these Cubic Yard In Place Fine Grading Crushed Limestone Top Course to prepare site to an elevation as shown on the drawings and as specified in these for complete installation of crushed limestone top course trail surfacing based on approved truck tickets and as shown on the Drawings and as specified in these

Page 4 of 6 Crushed Surfacing Base Course for complete installation of crushed surfacing base course based on approved truck tickets and as shown on the Drawings and as specified in these Rip Rap Abutment Fill Abutment Steel Piles Abutment Concrete Pile Caps Fiber Reinforced Plastic (FRP) Deck Precast Concrete Deck Slabs Metal Fabrications As-Built Drawings necessary to construct the riprap protection, except excavation, and based on approved truck tickets. When it is necessary to dump and sort individual loads, payment will be made only for that portion accepted by the Owner s Representative. necessary to furnish and install geotextile fabric, structural fill, pea gravel, and other fill for abutment slopes as shown in the drawings and written in the necessary to furnish and install steel pipe piles as shown on the drawings and written in the necessary to furnish and install reinforced concrete abutment pile caps as shown on the drawings and written in the necessary to furnish and install fiber reinforced plastic (FRP) deck panels as shown on the drawings and written in the necessary to furnish and install precast concrete deck slabs complete as specified and shown on Drawings and not provided in other unit price items. necessary to furnish and install all other miscellaneous steel not included in other unit prices. necessary to furnish as-built drawings of the project meeting the requirements of the specifications, reviewed and approved by Owner. Each

Page 5 of 6 Permeable Ballast necessary to furnish and complete installation of permeable ballast based on approved truck tickets and as shown on the Drawings and as specified in these Import, Place, and Compact Select Borrow Non-woven Geotextile Sign Post for Dog Waste Station: Force Account Mulch Plant Selection Including Plant Establishment Trees, 2 Gal for compacting of select borrow fill material to elevations as shown on the Drawings and based on approved truck tickets. to provide and install non-woven geotextile fabric as shown on the Drawings and as specified in the for the fabrication and installation of sign post, post base, graphics, sign, and hardware as specified in the Drawings for a dog waste station. This item includes monies for repairing unknown existing public/private facilities that are disturbed during construction and for other miscellaneous changes as approved by the Owner. The estimated amount provided as shown on the Bid Form is an allowance for work outside the Contract Requirements to be paid in accordance with the provisions of the Supplementary Conditions and only with prior approval of the City of Bellingham Parks and Recreation. to complete stockpile, haul and install imported wood chip mulch to the depth indicated on the plans along the trail, within the entire planting areas, in wetland creation areas, and to cover restored contractor's access into the site as indicated on the plans. This item also includes all compensation to the contractor for any optional chipping of any on site felled trees. to complete, provide, install, guarantee and maintain container trees as detailed and described on the plans and in the specifications, complete in place. Payment shall be per WSDOT 8-02.5 Square Yard Each EST CY EA

Page 6 of 6 Plant Selection Including Plant Establishment Shrubs, 1 Gal EA Shall include all labor, equipment Includes full compensation for all materials, labor, supervision, tools, equipment, supplies, and incidentals to complete, provide, install, guarantee and maintain container shrubs as detailed and described on the plans and in the specifications, complete in place. Payment shall be per WSDOT 8-02.5 Plant Maintenance and Guarantee Way Finding Post and Foundation Fence [use this section if plant maintenance and guarantee is paid for separate from plant selection] Work shall be completed in accordance with WSDOT Standard Specification 8-02.1. Watering of all planted material shall occur a minimum of once a week for the duration of the 2yr plant maintenance period. Weeding of the entire planted area shall occur a minimum of once a month for the duration of the 2yr plant maintenance period. Payment shall be per lump sum on a monthly basis at a partial payment equal to a percentage complete of the unit Contract price. to complete, provide, and install specified way finding post and post footing, complete in place. Payment shall be per each, installed. to complete, provide, and install specified fence, complete in place. Payment shall be per LF, installed. EA LF END OF SECTION