A Systems Approach to Accelerating Testing, a Case Study. NDIA 8th Annual Systems Engineering Conference October 24-27, 2005

Similar documents
Campus Solutions 9.2 Upgrade Functional Testing Kickoff. panthersoft.fiu.edu

Woking. q business confidence report

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Traffic Department Anchorage: Performance. Value. Results.

State Agency Energy Savings Program

Innovation in Outbound Logistics. Gurgaon, 10 Nov 2016

CILT Certified Procurement Professional. Contents are subject to change. For the latest updates visit

Program Executive Office for Combat Support & Combat Service Support ~ NDIA 2007 Tactical Wheeled Vehicle (TWV) Conference ~

IMPLEMENTATION BEST PRACTICES

COLONEL DOUGLAS EVANS

HR/Payroll Modernization Overview. January 2015

Company: Rockwell Collins Industry: Aerospace & Defense Category: Technology

Certified Purchasing Professional. Contents are subject to change. For the latest updates visit

Wind Update. Renewable Energy Integration Lessons Learned. March 28, 2012

Traffic Division Public Works Department Anchorage: Performance. Value. Results.

QUOTE-TO-CA$H CERTIFICATION. Module 3, Part 3 Revenue Management

Electric Forward Market Report

Teamcenter Page 1. Siemens PLM Software Siemens Product Lifecycle Management Software Inc. All rights reserved

COURSE LISTING. Courses Listed. with Customer Relationship Management (CRM) SAP CRM. 15 December 2017 (12:23 GMT)

University of Michigan Eco-Driving Index (EDI) Latest data: August 2017

Groundwater Discharge Permit Application ~ Part A Business Information

Strategic Account Management: Roles and Best Practices. Contents are subject to change. For the latest updates visit

TL 9000 Quality Management System. Measurements Handbook. BRR Examples

Fiducia TG Reliability Life Cycle Management (RLCM)

Inspirage Value Propositions Denis SENPERE VP, Inspirage Europe

COURSE LISTING. Courses Listed. Training for Applications with Integration in SAP Business One. 27 November 2017 (07:09 GMT) Advanced

Best Value Basics II. Isaac Kashiwagi Kashiwagi Solution Model Inc.

edart Roadmap As of February 21 st, 2018

Update on Root Zone Management

edart Roadmap As of November 13 th, PJM 2017

Media Planning and Strategy

Sustaining Our Buildings & Grounds

CI User Engagement Activities and Schedule Nov Apr 2013

MODULAR CONSTRUCTION SYSTEM

Army National Guard Equipping Brief for NGAUS Industry Day 2012

COURSE LISTING. Courses Listed. with SAP Ariba SAP Ariba Procurement. 4 February 2018 (03:51 GMT)

Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories. Omar Maguiña Rivero

I-95 Corridor Coalition Vehicle Probe Project Scope and Methodology

Strategic Account Management. Contents are subject to change. For the latest updates visit

Workday Network. Patti Rowe Julie Vlier Jane Zbyszynski

Next Generation Enterprise Network- Recompete (NGEN-R) End User Hardware (EUHW)

Street Maintenance Section Maintenance and Operations Division Public Works Department Anchorage: Performance. Value. Results.

COURSE LISTING. Courses Listed. with Quality Management SAP ERP. 15 February 2018 (23:55 GMT) SAP01 - SAP SAP01E - SAP Overview

Raynet Software Lifecycle

Procurement Planning and Bid Management. Contents are subject to change. For the latest updates visit

The ASC 606 clock is ticking It may be time for brute force

ICAS (Enterprise Remote Monitoring)

Revised SMIS+ implementation plan. 4 th August 2015 SMIS+ Team

COURSE LISTING. Courses Listed. with Logistics Execution & Warehouse Management SAP ERP. 23 January 2018 (16:50 GMT)

Raynet Software Lifecycle

Invitation for Expression of Interest IT SERVICES

Minnesota District Freight Plans - Work Plan

Michigan Integrated Food and Farming Systems 2005 Marketing & Communications Plan

MATERIALS AND SUPPLIES INVENTORY

Merrill Field Lead Monitoring Report

OIT DIGITAL CHAT F E B R U A R Y 1 0,

Epicor Selection and Implementation

CILT Certificate in Stock Management, Forecasting and Demand Planning. Contents are subject to change. For the latest updates visit

The Certified Business Analyst Professional. Contents are subject to change. For the latest updates visit

Yield Accounting Management

City of San Clemente Water Usage Report

Wal-Mart Stores, Inc. (NYSE: WMT) Bill Simon Executive Vice President & Chief Executive Officer Walmart U.S.

How FPL's Customer Service business unit changed its safety culture and significantly reduced injuries

HUMAN CAPITAL MANAGEMENT TOWN HALL

COURSE LISTING. Courses Listed. 30 January 2018 (11:31 GMT) TM100 - SAP Transportation Management. SAP Transportation Management

USAF CAD/PAD Program Overview CAD/PAD Industrial Summit

Επιχειρησιακή Συνέχεια και Εφοδιαστική Αλυσίδα, 14 Οκτωβρίου Moving ahead in a changing environment

LEVERAGING YOUR SUPPLY CHAIN: Chemical Management. Verne Shortell October 12, 2010

Monitoring validated processes by using SPC

POWERFUL END TO END PLM IN THE PTC CLOUD

DATE: JANUARY 24, 2018 HERITAGE VALLEY POLICY ADVISORY COMMITTEE (HVTAC) HEATHER MILLER, TRANSIT PLANNER KEY PERFORMANCE INDICATORS (KPI) REPORT

COURSE LISTING. Courses Listed. with SAP ERP. 18 January 2018 (11:06 GMT)

National Institute of Technology Calicut Department of Mechanical Engineering PRODUCTION PLANNING (AGGREGATE PLANNING)

HOUSE OF REPRESENTATIVES KNOTT COMMITTEE ROOM 116 NOVEMBER 28, 2018

Ariba Project Outcomes October 2017 Update. Presented by Procurement Department October 2017

SUPPLY CHAIN EXCELLENCE IN WIDEX. June 2016

Large Quantity to Small Quantity Generator

Results of California s Renewable Energy Program and Agricultural Biomass to Energy Program (SB704)

Systems Engineering and Logistics: Gunners Restraint

Transportation Worker Identification Credential (TWIC) Program Briefing

LOGISTICS February 8-11, 2009 Gaylord Texan Dallas, Texas. Title Sponsor :

COURSE LISTING. Courses Listed. 12 January 2018 (08:11 GMT) SAPFIN - Overview of SAP Financials

FIVE BENEFITS TO USING REMOTE MONITORING WITH YOUR OVERHEAD CRANES

The Texas Experience: Implications of 8,000+ MW Wind Generation Resources In ERCOT. David Campbell CEO, Luminant 2009 Summer Seminar August 3, 2009

Sunrise Project South I-205 Corridor Improvement Project

SUPPLY CHAIN CENTER ACUTE CARE PHARMACY

Accessibility and the MBTA Path to Integration and Inclusion

Changes since 14 Jan 99 are in BOLD font.; changes since 4 Mar 99 are in BOLD ITALIC font. (5 Mar 99)

THE VALUE OF DISCRETE-EVENT SIMULATION IN COMPUTER-AIDED PROCESS OPERATIONS

Outstanding Audit Recommendations Follow Up Audit Report

FTP/SIS Steering Committee Work Plan and PPI Update

COURSE LISTING. Courses Listed. with Portfolio & Project Management SAP ERP. 13 March 2018 (10:01 GMT) SAP01 - SAP SAP01E - SAP Overview

A how-to session featuring a behind-the-scenes look at how Best-in-Show winner, HCSS, decides when to outsource and when to create from within

SYNCHRONY CONNECT. Making an Impact with Direct Marketing Test and Learn Strategies that Maximize ROI

Barnaby Electronics Ltd - Feasibility Report

PMDS (Performance Management & Development System) DIT Explanatory Handbook

Brand Plan Sample Template. Akademia Marketingu Farmaceutycznego

Scott Pasternak. Senior Project Manager, Burns & McDonnell

LTG (Ret) Charles S. Mahan, Jr. VP, Homeland Security and Defense, SAP Public Services, Inc.

The Thinking Approach LEAN CONCEPTS , IL Holdings, LLC All rights reserved 1

Transcription:

NDIA 8th Annual Systems Engineering Conference October 24-27, 2005 1

The Low Signature Armored Cab (LSAC), Stewart & Stevenson Tactical Vehicle Systems (TVS) Co-Presenters: Douglas Chojecki, Chief Engineer R&D Nathan Byman. Manager ILS Regis Luther, VP Engineering 2

A Systems Approach to Introduction U.S. Army pre-oif strategy for Tactical Wheeled Vehicles (TWV) did not require armoring Battlefield experience in OIF quickly showed TWV required protection; ambush small arms, IED, RPG 3

Introduction, continued Demand for Armor on TWV resulted in need for accelerated development, including system-level testing Normal U.S. Army development test for cab would require 6-12 months of effort, production to follow LSAC tested within 3 months Qualification testing run in parallel with first production 4

The Real world The customer knows what they want Requirements are derived considering all affected by the system; users, logistics, manufacturing, finances... Requirements are stable, or with the rare exception: revised in a controlled change environment Schedules are well planned, fixed and met Designs successfully anticipate all failure modes and complete documentation is available for procurement, manufacturing and field support The end product is verified to meet all requirements 5

The Original Requirements TVS IRAD effort used existing vehicle requirements C130 transportability was maintained Coupon testing of ballistic solutions validated LSAC could be built to withstand objective threat levels Meeting other standard FMTV requirements with LSAC allowed maximum commonality 6

The original project milestones Oct. 2002 Jan. 2003 Apr. 2003 Jul. 2003 Aug. 2003 Project approval/requirements analysis Design start Ballistic solution chosen 1 st prototype cab complete TVS test of prototype 7

A Systems Approach to August 2003, Project is on schedule! Success! 8

Realizing an opportunity Shortly after successful completion of the 2-man LSAC concept cab, U.S. Army is shown concept Interest quickly accelerates Results in requirements redefinition for the armored cab 9

Scope and schedule change dramatically Project changes from build and demonstrate a prototype to: Build and test multiple prototypes document for installation/support & test in a much shorter time frame Requirements change significantly 10

The new project milestones Sep. 2003 Apr. 2004 May 2004 Jun. 2004 Nov. 2004 Dec. 2004 U.S. Army begins discussions 1 st Prototype of 3-man cab Government testing begins Safety Release Contract for initial production cabs Delivery of initial cabs 11

Re-engineering the product U.S. Army ballistic requirements are specified classified 3-man cab defined in place of TVS IRAD developed 2-man cab Man-lift changes glass configuration Supplemental armor requirements added 12

Accelerated testing: durability, safety, performance LSAC required safety release 3k mile durability test scheduled at Government Test site Performance testing scheduled at Government Test site Testing scheduled to be accomplished May- June 2004 13

Documentation; Configuration Management 3-D modeling developed for design Model revisions controlled via database Initial new parts built from models Technical data package (drawings) finalized during initial build Change approval streamlined Change approval became more limited during production to concentrate on must have, not like to s 14

Logistics & Supportability Logistics/maintainability involved during design phase to ensure supportable design Commonality of parts, LSAC versus standard cab used to maximum advantage Work instructions for field retrofit developed on 1 st LSAC cab(s) 15

Production Ramp-up to 300 cabs/month achieved in 4 months Close coordination with design engineering and manufacturing during tooling and process definition Manufacturing changes to TDP processed with highest priority 16

Fielding Established installation teams and sites through existing support network, And additional site(s) Design concept of replaceable cab versus addon-armor made installations quicker Data from initial fielding, gathered through established networks, enhanced testing and required/suggested were implemented expeditiously 17

A Systems Approach to Evaluation of the Project - The Systems Engineering Process This figure is from Bahill and Gissing (1998) 18

How the LSAC requirements were established and changed Discussions with and evaluation by U.S. Army resulted in current cab 3-man capability being retained Internal volume of cab was also required to be minimally changed, Resulting increase in axle loading during transport approved as acceptable 19

LSAC Alternatives investigations Major alternatives already considered or developed Add on Armor to existing cab 2-man vs. 3-man cab 20

Integration of LSAC Maintained standard production cab interfaces to maximum extent Development by OEM with full access to TDP, manufacturing and vehicles assets expedited design Most ILS development of technical documentation achieved during design & prototype build 21

System Fielding Design concept of replaceable cab simplified installation Teams led by trained personnel Cabs shipped to theatre and installed on deployed vehicles Direct communication between installation teams and factory 22

Assessing the performance The key to achieving success was to get the product designed and qualified ASAP Testing for safety release was accomplished in less than 2 months Normally this would require at least 6 months Controlling change through production and test phases is critical. Changes must be minimized! 23

Conclusions Buy-in from all levels required to get the project accomplished in the expedited time-frame Priority must be established to achieve success Excellent communications and working relations required 24