HIGH SCHOOL #2 Severance, CO MANAGEMENT PLAN November,

Similar documents
WESTERN ENGINEERING CONSULTANTS, Inc LLC

WESTERN ENGINEERING CONSULTANTS, Inc LLC

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES

Indigo Community Development District. Public Facilities Report

DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

Woodlake General Plan Draft Environmental Impact Report

Area Drainage Master Planning. Erik Nilssen, Douglas County Engineer April 12, 2017

Aperio Property Consultants, llc 4032 Defoe Street Strasburg, CO Phone (303) Contact: Aaron Thompson

CHAPTER 3. Grading Standards

NATIONAL FISH AND WILDLIFE FOUNDATION (NFWF) PHASE II

Yorkton Rona Commercial and Industrial development. Concept Plan and Serviceability Report

11. Public Utilities. Key Terminology: OVERVIEW STORMWATER MANAGEMENT WATERSHED MANAGEMENT ORGANIZATIONS AND COMMISSIONS. Inventory and Analysis

MOBILE SOUTH BUSINESS PARK SUBDIVISION, UNIT ONE, RESUBDIVISION OF LOTS 2, 3 & 4 OF THE RESUBDIVISION OF LOTS 4 & 12

Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:

To: Interested Parties From: March Joint Powers Authority Meridian Parkway, Suite 140 Riverside, CA 92518

APPLICATION PROCESSING. CHECK WITH STAFF - Development Services Staff will explain the requirements and procedures to you.

Project: Developer/Designer: Reviewer:

Glossary. September 11,

HAROLD L. MOSELEY SUBDIVISION, RESUBDIVISION OF LOT 2

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Roaring Fork Valley Regional Planning Commission

CHURCHILL DOWNS SUBDIVISION, 2 ND UNIT, RESUBDIVISION OF LOTS

DR DRAINAGEWAY THORNTON VALLEY SUBDIVISION OVERALL DEVELOPMENT PLAN & CONCEPTUAL SITE PLAN SWC OF COLO BLVD & THORNTON PKWY THORNTON, CO

SEPA Modification Application

V. DRAINAGE IMPROVEMENTS

Figure 9: US Geological Survey 7.5 minute topographic survey map of project area

Index. Composition and Order of Plan Set. Utility Plan... 5

SAMPLE DRAINAGE STATEMENT

Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587

3.12 LAND USE AND PLANNING

CITY OF FIREBAUGH Environmental Questionnaire

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - STORM DRAINAGE SYSTEM. M - Page 25 of 37. Proposed CIP

NOTICE OF PREPARATION DRAFT ENVIRONMENTAL IMPACT REPORT

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

STAFF REPORT FOR PLANNING COMMISSION MEETING OF MARCH 28, 2018 FILE NO: SUP AGENDA ITEM: E.2

Capital Facilities Element

Carpinteria Valley Water District Carpinteria Advanced Purification Project

5.1 SUMMARY OF PROJECT FACILITIES AND SERVICES

Charter Township of Garfield Grand Traverse County

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

CHAPTER 9, INTERGOVERNMENTAL COOPERATION ELEMENT

III. INVENTORY OF EXISTING FACILITIES

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below.

DRAFT ENVIRONMENTAL IMPACT STATEMENT

April 12, 2006 Planning Commission Meeting. Landfill Energy Systems

Notice of Preparation for the Copeland Creek Stormwater Detention Basin (CIP Project )

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: September 7, 2017

FINDINGS OF FACT And CONCLUSIONS

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

APPENDIX A: NOTICE OF PREPARATION AND COMMENTS RECEIVED

PUBLIC FACILITIES REPORT

Engineer s Report Infrastructure Improvements

HEADQUARTERS WEST LTD. FARM, RANCH, AGRIBUSINESS REAL ESTATE SALES & SERVICES

Town Board of Trustees December 10, 2013

STAFF REPORT # CONDITIONAL USE PLANNING COMMISSION MEETING DATE: May 16, 2013

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

3 PROJECT DESCRIPTION

Riverview Drive Sanitary Sewer and Water Main Extension Project CITY OF ANN ARBOR FILE NO

ARTICLE 700 LARGE SCALE DEVELOPMENTS

Sutter County Community Services

EXECUTIVE SUMMARY - REVISED

ELDERBERRY CUSA EXPANSION SUMMARY INFORMATION

NOTICE OF DECISION. LD , TP and ADJ , ADJ , SDM (Hall Boulevard 15-Lot Preliminary Subdivision).

1.0 INTRODUCTION. Executive Summary

# 14 ) ZN AMERICAN DIALYSIS CENTER OF NORTH LAS VEGAS M-2, GENERAL INDUSTRIAL DISTRICT TO M-1, BUSINESS PARK INDUSTRIAL DISTRICT PUBLIC HEARING

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands

Wheaton PRELIMINARY RECOMMENDATIONS

(1) The proposed commercial solar energy generation facility is either

Project Title: Major Site Review (SR16-06) for Ripon Gardens II Commercial

SECTION 5: OTHER CEQA STATUTORY CONSIDERATIONS

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements

Mendocino Forest Products Grading For Industrial Land Improvements

COLLIER COUNTY Growth Management Department

RUBONIA SUBDIVISION DRAINAGE AND ROADWAY IMPROVMENTS PREPARED BY: MANATEE COUNTY PUBLIC WORKS ENGINEERING SERVICES DIVISION

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

Jonathan Lange, Planner Community Development Department

NOBLESVILLE PLAN COMMISSION STAFF REPORT DECEMBER 16, 2013

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

JOINT PUBLIC NOTICE. January 16, Post Office Box Post Office Box 4313 New Orleans, Louisiana Baton Rouge, Louisiana

SUBJECT: LE SKY RANCH WASTEWATER RECLAMATION FACILITY LOCATION AND EXTENT MOLLY ORKILD-LARSON, SENIOR PLANNER JUNE 11, 2018

The following County planning and policy documents relate to or implement the Circulation, Infrastructure, and Services Element.

Stantec LAKEW OD RANCH STEWARDSHIP DISTRICT MASTER ENGINEER'S REPORT FOR NORTHEAST SECTOR AT LAKEWOOD RANCH INFRASTRUCTURE IMPROVEMENTS

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1

Headwaters Underground Water Conservation. District Hill Country Priority Groundwater Management Area

INFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN

APPENDIX C REQUEST FOR REVIEW, APPLICATION INFORMATION, AND PROJECT COMMENTS

Preliminary Drainage Analysis

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST

AREA STRUCTURE PLAN SW W4M CAMROSE COUNTY BYLAW ## JULY 2017(REVISED) PREPARED BY: AUSTROM CONSULTING &VICINIA PLANNING & ENGAGEMENT INC.

Municipal Stormwater Ordinances Summary Table

Zoning Permits 11-1 ZONING PERMITS

Planned Unit Development Overlay District. For. Lloyd Tract PUD

3 August 13, 2014 Public Hearing

Town of Huntsville Official Plan Section 9 Rural Area Page 104

Transcription:

HIGH SCHOOL #2 Severance, CO MANAGEMENT PLAN November, 18 2016 1

VICINITY MAP Site Data Land Use Statistics o Proposed Developed Site 55 acres 22.8% o Flood Plain 6 acres 2.4% o Open Space 100.6 acres 41.5% o Space to be Annexed 80.6 acres 33.3% o Total Site Area 242.2 acres 100% 2

CONCEPT CAMPUS PLAN 3

TOWN QUESTIONS What is the theme of the development? The theme of the development is to create a modern school High School campus covering 61+/- acres. The campus would include the High School building with supporting facilities designed to promote community use with the ability to support numerous before/after school functions; reflects a sense of longevity and quality through the application of building materials and incorporates security strategies to ensure student and faculty safety. What is the roadway network associated with this development? Hidden Valley Parkway will be extended from the east edge of Hidden Valley Farm Subdivision to Weld County Road 23. Roadways and access drives to the high school campus will be designed at strategic locations. Improvements to Weld County Road 23 will be designed per the Traffic Impact Study recommendations. What is the lot layout associated with this development? The only lot to be developed at this time will be the high school campus. All other parcels will be designated as Tracts, which will require separate review applications through the Town. How is connectivity within and outside the development achieved? For the high school campus development, connectivity will include extending Hidden Valley Parkway from the east side of Hidden Valley Farm Subdivision to Weld County Road 23. When the southern portion of the property develops, a roadway will connect to Weld County Road 70. What is the irrigation system, including sources of water? It is anticipated that non-potable water will be used to irrigate the school campus. How is potable water supplied to the project? Potable water will be obtained from North Weld County Water District. Is there adequate potable water obtainable for the project? It is anticipated that there is adequate potable water supplied by North Weld County Water District. 4

How is storm water being managed? Storm water for the high school project will be routed via swales, channels, and curb and gutter to the proposed detention pond. Attenuated flows will be released to the John Law Ditch. How will the development handle the sanitary sewer? Sanitary sewer from the high school site will utilize sewer mains to be extended from the Town s sewer collection system. How is off-street parking being addressed? The high school campus will have adequate parking lot facilities for students, faculty and afterschool activities. How is exterior lighting being addressed? Exterior lighting will consist of site lighting for both parking and security by use of light poles along with surface mounted building lighting. What is the potential impact on adjacent neighborhoods? A connectivity spine will run east/west feeding the High School circulation. Tailholt Subdivision east of County Road 23 will have an access point along with Hidden Valley Subdivision west of Great Western Trail will have an access point to the High School. If noise or smells are associated with the development, what are the plans for mitigation? Construction will take place only during normal working hours. All standard best management practices, including noise, dust and erosion control will be followed during the construction process. Subdivisions to the east and west will not have construction traffic need pass through the neighborhood. Are there existing or proposed mineral development/oil & Gas? The School District has an agreement with the company that leases the mineral rights that the existing wells will be plugged, and no new wells will be located on the school property. 5

What is the state of ownership of Oil & Gas minerals? The School District has an agreement with the company that leases the mineral rights that the existing wells will be plugged, and no new wells will be located on the school property. How are conflicts between the project and Oil & Gas development managed? No conflicts are anticipated on the school site. 6