STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 836 SEEDING AND EROSION CONTROL WITH TURF REINFORCING MAT January 18, 2013

Similar documents
ROLLED EROSION CONTROL PRODUCTS (RECP)

SECTION 806 WATER COURSE AND SLOPE EROSION PROTECTION

EC-04 ROLLED EROSION CONTROL PRODUCTS (RECP)

Curlex Enforcer EROSION CONTROL BLANKET SPECIFICATION

TriNet Coconut EROSION CONTROL BLANKET SPECIFICATION

TriNet Coconut EROSION CONTROL BLANKET SPECIFICATION

Recyclex TRM TURF REINFORCEMENT MAT SPECIFICATION

Specifications for the Selection and Application of Erosion Control Blanket on Slopes or Channels

AEC Premier Straw Double Net Quick Mow EROSION CONTROL BLANKET SPECIFICATION

SECTION EROSION CONTROL MATTINGS AND COMPONENTS

Curlex High Velocity EROSION CONTROL BLANKET SPECIFICATION

Curlex II EROSION CONTROL BLANKET SPECIFICATION

Flexamat Tied Concrete Block Mats

Flexamat Erosion Control Mat

EC-7 GEOTEXTILES AND MATS. Objectives. Potential Alternatives

Geosynthetic Materials for Separation and Stabilization

Section Specification for Geogrid Base Reinforcement of Flexible Pavement Structures

P R E M I E R M A N U F A C T U R E R O F E R O S I O N C O N T R O L P R O D U C T S

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 863 REINFORCED SOIL SLOPES. October 19, 2012

Table 1: Minimum Perimeter Control Performance Requirements. Physical Property* Test Method Required Value

Section Soil Erosion Protection Tender No. [ ] Page 1

Reinforced Soil Slopes (RSS)

Erosion Control Blankets

Drop-In Specification Standard Flexamat Erosion Control System (English Units)

CITY OF URBANA CLASS 2 EROSION CONTROL PERMIT STANDARD DETAILS

SECTION EROSION AND SEDIMENTATION CONTROLS

User Guide. Overview. March product innovation. NTPEP test reports contain data collected according to laboratory testing protocols

Section (1997 Section 02795) PERMEABLE, FLEXIBLE and PLANTABLE CONCRETE EROSION CONTROL SYSTEM

MATERIAL SPECIFICATION Manufactured Ditch Checks

TESTING AND SPECIFYING EROSION CONTROL PRODUCTS

SECTION 10 - SEEDING Related requirements specified in other Sections of the Specifications. A. Section 7 - General Construction Standards

INSTRUCTIONAL BULLETIN NO

Large-Scale Channel Erosion Testing (ASTM D 6460) (Modified procedure used for vegetated channel tests)

METROPOLITAN UTILITIES DISTRICT No Page: 1 of 10

ARMORMAX ENGINEERED EARTH ARMORING SOLUTIONS

SECTION 603 SEEDING I. GENERAL 1.1 DESCRIPTION OF WORK

INSTALLATION OF LANDLOK ON SLOPES

IN T R A / M IN T R A M

Catch Drains Part 4: Geotextile-lined

Quality Control, Quality Assurance and Performance Testing of ECPs. Erosion. Erosion Control

Section 1I-3 - Bioswales

SECTION 903 EROSION CONTROL

CITY OF FARGO SPECIFICATIONS GEOTEXTILES AND GEOGRIDS

EROSION AND SEDIMENT CONTROL

INLET STRUCTURE FILTERS

Geogrid Soil Reinforcement

Section 216. Seeding, Fertilizer, Sodding

SECTION TRENCHING, BACKFILL AND COMPACTION

Vegetated Large-Scale Channel Erosion Testing (ASTM D 6460) (Modified procedure used for vegetated channel tests)

INLET STRUCTURE FILTERS

FIBER REINFORCED MATRIX (FRM)

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

Large-Scale Channel Erosion Testing (ASTM D 6460, modified) ErosionTech s ETPP-10, Double Net Synthetic Fiber Mat, over Loam

Turf Reinforcement Mats

APPENDIX H. Stabilization Measure Fact Sheets

SC-07 STORM DRAIN INLET PROTECTION

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition


Alternative BMPs for Erosion Prevention & Sediment Control

The Manitoba Water Services Board SECTION Standard Construction Specifications CONSTRUCTION OF WATERWAYS September 2013 Page 1 of 9

902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL

STANDARD SPECIFICATIONS FOR CONSTRUCTING UTILITY FACILITIES DIVISION III - CONSTRUCTION SPECIFICATIONS SECTION 11

STANDARD SPECIFICATIONS FOR CONSTRUCTING UTILITY FACILITIES DIVISION III - CONSTRUCTION SPECIFICATIONS

This silt fence system is composed of geotextile filter fabric and steel posts.

This silt fence system is composed of geotextile filter fabric and steel posts.

Large-Scale Channel Erosion Testing (ASTM D 6460) (Modified procedure used for vegetated channel tests)

EROSION AND SEDIMENT CONTROL

Sediment Retention Fiber Roll (SRFR) General Usage and Installation Guidelines

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 834 CONDUIT RENEWAL USING RESIN BASED LINER. April 16, 2010

Channel FlexTM P-BD Series

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

PAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS.

SECTION EROSION CONTROLS

The Next Generation of Storm Water Treatment Technology

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

The Next Generation of Storm Water Treatment Technology

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

HYDRAULIC EROSION CONTROL PRODUCTS

ITEM 706 PIPE SLOPE DRAIN

DIVISION II SEEDING SECTION 02933

Your Guide to Natural Erosion Control and Revegetation Solutions. BioNet. Natural Solutions for Natural Problems.

SECTION 70 SEEDING. This work consists of preparing a seedbed and furnishing and planting seed on disturbed areas within limits of the work.

SECTION EROSION CONTROL DEVICES

SECTION. 1. Specifications for the Engineered Turf component of the HydroTurf Z System. - HydroTurf Z References and Definitions

City of Thomasville Water, Sewer & Natural Gas Specifications

Curlex Bloc An American Made Alternative to Coir Logs SPECIFICATION

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems

There are seven seed mix options available to the designer; these are:

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

SECTION SUBDRAINAGE

PART 1 - GENERAL 1.01 General Provisions A. The Conditions of the Contract and all Sections of Division 1 are hereby made a part of this Section.

COUNTY of KANE PURCHASING DEPARTMENT KANE COUNTY GOVERNMENT CENTER

B804 - SEEDING AND COVER - OPSS 804

Building. Anchorplex. Retaining Wall Systems

Best Management Practice (BMP) Guidance Manual

CW 3615 RIPRAP TABLE OF CONTENTS

STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS

SECTION 18 - EARTHWORK TABLE OF CONTENTS

Transcription:

836.01 Description 836.02 Materials 836.03 Construction 836.04 Maintenance 836.05 Method of Measurement 836.06 Basis of Payment STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 836 SEEDING AND EROSION CONTROL WITH TURF REINFORCING MAT January 18, 2013 836.01 Description. This work consists of furnishing, placing and maintaining seeding and erosion control with turf reinforcing mat on areas shown on the plans. 836.02 Materials. For mat Type 1, Type 2, and Type 3 furnish a flexible mat of, non-biodegradable polymer monofilament yarns bonded together to form a stable threedimensional web. Straw, coconut fiber, or other biodegradable materials may be intertwined with mat Type 1. Furnished mats conforming to the following: A. Permeable. B. The non-biodegradable component is resistant to chemical, environmental and ultraviolet degradation. The following Minimum Average Roll Values (MARV) for physical properties are derived from quality control testing performed by a GAI-LAP accredited laboratory: Property Test Method Type 1 Type 2 Type 3 Ground Cover Factor (2) (percent, minimum) ECTC 40 50 60 Mass per Unit Area(2) (oz/yd 2 [g/m 2 ] minimum) ASTM D 6566 8[270] 10[340] 14[475] Thickness (mils. [mm], ASTM D 6525, minimum) at 2 kpa 120 [3.05] 500 [12.7] 500 [12.7] Tensile Strength(1) 145 X 110 165 X 123 210 X 60 ASTM D 5035 (lb/ft [kn/m], minimum) [2.1 X 1.6] [2.4 X 1.8] [3.0 X 2.3] Ultraviolet Resistance (percent, minimum) ASTM D 4355, 500 hours total exposure 80 80 80

(1) Machine Direction X Cross Direction (2) Light Penetration Test, The biodegradable portion for mat type1 is include in the test. Mat type 1 is not required to have a biodegradable portion. Perform testing for physical properties at frequencies exceeding ASTM D 4354, Procedure B, with a lot defined as the lesser of the manufacturer s planned production quantity and one calendar day s production. Furnish mats meeting the following permissible design values when tested at an independent hydraulics testing facility for a minimum of 0.5 hours on an unvegetated erodible soil bed of sand or firm loam. Property Type 1 Type 2 Type 3 Velocity Resistance (fps[m/sec],minimum) 5 [1.5] 8.5 [2.6] 12 [3.6] Shear Stress Resistance (lb/ft 2 2 [.100] 3 [.144] 5 [.240] [kn/m 2 ], minimum) Soil Loss (in. [mm]) 1 [25] 1 [25] 1 [25] Furnish mats meeting the following permissible design values when tested at an independent hydraulics testing facility for a minimum of 0.5 hours on a vegetated, erodible soil bed of sand or firm loam. Property Type 1 Type 2 Type 3 Velocity Resistance (fps[m/sec],minimum) 8 [2.5] 13 [4] 18 [5.5] Shear Stress Resistance (lb/ft 2 3 [.140] 5 [.240] 8 [.380] [kn/m 2 ], minimum) Soil Loss (in. [mm]) 1 [25] 1 [25] 1 [25] Ship and store the mats such that they are protect from direct sunlight, dirt, dust, moisture and other debris. Furnish pins or staples conforming to 671.02. The Contractor may use 18 inch [450 mm] pins, ¼ inch [4.5 mm] diameter, with attached 1½ inch [38 mm] washers in lieu of 12 inch (300mm) wire staples as fasteners. Drive pins only until the attached washer is flush with the ground surface. Furnish material according to the Departments Qualified Products List (QPL). Supply recommended installation procedures with each roll of mat delivered to the job site.

Furnish seed conforming to 659. 836.03 Construction. Prior to placement of the mat, prepare the seed area, lime, fertilize, and seed according to Item 659, with the following exceptions: A. Remove all rock, clods and foreign material 1½ inch [38 mm] or greater in size from the surface to be covered. B. Do not apply mulch prior to placement of the mat. Place the mat according to 671.03.A, with the following exceptions and additions: 2. Begin installation at the downstream terminal end trench 12 inches [300 mm] deep by 6 inches [150 mm] wide. Place mat in bottom of trench with roll of material on downstream side of the trench. After pinning mat securely in bottom of trench, backfill the trench and compact firmly. Roll mat across backfill and upstream. 4. Construct upstream termination by rolling mat through the terminal end trench, 12 inches [300 mm] by 6 inches [150 mm], being sure to allow sufficient amount of mat to cover backfilled trench. After pinning mat in bottom of trench, backfill the trench and compact firmly. Roll remaining mat back downstream across backfill and pin in place. 7. In addition construct top of channel bank termination by rolling mat through a top anchor trench, 12 inches [300 mm] by 6 inches [150 mm], being sure to allow sufficient amount of mat to cover the backfilled trench. After pinning mat in bottom of trench, backfill the trench and compact firmly. 9. For mat Types 1, 2, and 3, after installation of the mat, re-seed the mats with the mixture and at the rate specified in 659 or on the plans. Install the required soil fill by raking and smoothing fine topsoil into the turf reinforcing mat in accordance with the Manufacturer s recommendation. Do not leave excessive soil above the matting. Apply mulch to mat type 1 after placement. Apply mulch to mat types 2 and 3 after soil filling if required or after placement. 836.04 Maintenance. Maintain the area covered by seeding and erosion control with turf reinforcing mat according to 671.04. 836.05 Method of Measurement. The Department will measure the mat by the number of square yards [square meters] of surface area completed and accepted.

836.06 Basis of Payment. The Department will pay for preparing the area, liming, fertilizing, seeding, and mulching under Item 659. The Department will pay for furnishing and installing the mat, soil filling and re-seeding the required soil filled areas under Seeding and Erosion Control with Turf Reinforcing Mat. The Department will pay for accepted quantities at the contract prices as follows: Item Unit Description 836 Square yard [square meter] 836 Square yard [square meter] Seeding and erosion control with turf reinforcing mat, Type. Seeding and erosion control with turf reinforcing mat, Type, without soil-filling.

Designer Note: This supplemental specification will be used in ditch design for velocity protection. SS 836 may be used when the ditch slope is less than 10 percent and maximum velocities exceed those allowed for Seed, Sod, or Ditch Erosion Protection as shown in Table 1102-1 of the Location and Design Manual. For ditch velocities shown in Section 1102.3.2.A of the manual, the materials specified in SS 836 provide viable alternatives to Rock Channel Protection.