SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

Similar documents
SPACE TYPE: ENHANCED OFFICE

SPACE TYPE: COURTROOM

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

PHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No C

Budget Estimate Basic Tenant Improvement

Sewer, Water, Gas, Electric and Cable

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Whitley Shower Locker Toilet Facilities

OFFICE Space STANDARD SPECS Page 1

A. All tackboards shall be mechanically fastened to walls; gluing shall not be allowed.

SANDTOWN CROSSING PROFESSIONAL OFFICE PARK Atlanta, GA

Carter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications

Appendix J - Custom Uniformat for EDU Migration

PUBLIC RESTROOMS, DESIGN INTENT Los Angeles World Airports

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

SANDTOWN CROSSING PROFESSIONAL OFFICE PARK Atlanta, GA

MODULAR BUILDING SPECIFICATIONS

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

G Garza+McLain NOT FOR CONSTRUCTION SITE PLAN - EXISTING SCALE: 1" = 50'-0" SHEET NOTES GENERAL NOTES KIPP JOURNEY MODULAR CAMPUS

Gerald Desmond Bridge Replacement

TENANT CRITERIA MANUAL INSERT PHOTO HERE

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

VOLUME 4 DIVISION SPECIFICATIONS

Thurgood Marshall Recreation Center Summary

ADDENDUM 2 - JULY 14, 2015

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION

Asset Overview Report By Asset Name

K.B. Polk Recreation Center Summary

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

Facility Condition Assessment: Final Report. University of Delaware Newark Main Campus McKinly Lab Newark, DE 19716

CHAPTER 6 INTERIOR CONSTRUCTION

Harry Stone Recreation Center Summary

Total Building Area: 1964 Construction 30,140 square feet 1976 Construction 36,787 square feet 66,927 square feet

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

TABLE OF CONTENTS Public Safety Building

Tenant Fit-Out for PLCB / Waynesboro Mall

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205

Timberglen Recreation Center Summary

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

Building Systems and Design Elements included in SliDeRulE

Division 00 Procurement and Contracting Requirements

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS

STUART-HOBSON MIDDLE SCHOOL

Pulaski County, Virginia

AGILITAS Property Development

Residential Outline Specifications

GENERAL PROVISIONS

RECAPP Facility Evaluation Report

GENERAL PROVISIONS

EVENT 29: November 15, 2017 THE DO-DOs AND DON Ts OF TOILET ROOM DESIGN

By YR Communities.

Delta Gamma Sorority Renovation Budget Scope 3/7/2018

10155 Toilet Compartments

Lake Highlands North Recreation Center Summary

BUILDING/FACILITY ACCESSIBILITY CHECKLIST. Lessee. Lessor

Melhart Music Center Modular Music Practice Rooms - E3 Ready Specifications Section 13034

FRV AE SOLAR PROJECT, WEBBERVILLE, TX SPECIFICATION FOR THE TURNKEY, DESIGN AND BUILD OF THE OPERATIONS & MAINTENANCE (O&M) BUILDINGS

ACCESSIBLE REST ROOM Code Requirements

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards

CHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC

Technical Data Sheet Signature 842

CHANGE ROOM & SPORTING AMENITIES

2 Main Building BLDG-959A Building Purpose Building Area Bus Terminal 14,890 SF Inspection Date August 18, 2016 Inspection Conditions Facility Conditi

A/E Design Deliverable Checklist

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com

pershing+ desperes uichomes.com 6005 and 6007 Pershing Avenue pershing+desperes call or

Delco Activity Center Site Summary

Boyle. contemporary new homes with great curb appeal. boyle call or 3br/2.5bth, 1905sf

SHELL & CORE: COURTHOUSE

DIVISION 1 - GENERAL CONDITIONS TOTAL:

Columbia County Health Care Center Added Amenities

RECAPP Facility Evaluation Report

General Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

TECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE

New Beautifully Designed Office Condominium Complex. Heading

Accessible Toilet and Bathing Rooms

ALL DIMENSIONS FROM FINISHED FACE OF PARTITION TO FINISHED FACE OF PARTITION UNLESS OTHERWISE NOTED.

The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits

VILLAGE OF MARATHON CITY MARATHON COUNTY WISCONSIN

CampusMaker ModPod. Mobile Modular s. The Flexible Solution for Sustainable Learning Spaces

DESIGN DESCRIPTIONS MANUAL

Construction Standards PAGE

DALLAS-FORT WORTH INTERNATIONAL AIRPORT

Facilities Management Services & Funding Guide Centrally Funded and Recharge Services

Beckley-Saner Recreation Center Summary

Mills Elementary School Site Summary

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

Division 09 FINISHES TABLE OF CONTENTS

PROJECT MANUAL FOR: HUMPHREYS CO. SHERRILL BUILDING RENOVATIONS: NEW URGENT CARE CLINIC & EXTENSION SERVICE OFFICE

1. Unified Facilities Criteria - Design: General Building Requirements (UFC ).

Estimate Form for Bathroom Design and Installation

Building Program Example. Eric Anderson

Feb : MM PSYCH PML

Transcription:

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) Construction Criteria The unit costs for the Physical Fitness Center (Exercise Room) space type are based on the construction quality and design features in the following table. This information has been generally organized under Uniformat headings. Items marked with a have a space-related cost impact on the building shell and core. Shell Superstructure Floor Construction Exercise and weight rooms, storage rooms 150 LB/SF live load Increased structural steel provided to reduce vibration transmission Interior Construction Partitions Suite Perimeter and Public Corridor Showers 4 CMU with grouted cores Structural slab-to-slab Structural slab-to-slab 4 CMU with grouted cores with outside face of 2 metal furring and 1 layer ½ GWB Acoustical insulation in furring channels 45 STC Cement board over vapor barrier on metal studs at 24 OC Doors Main Suite Entrance, Perimeter Exits Locker Rooms Fitness Instruction Solid core 1¾ hardwood veneer doors in 3-0 (w) by 7-0 (h) Hardware to be latch sets with levers Solid core 1¾ hardwood veneer doors 3-0 (w) by 7-0 (h) Frame and threshold sound gasketing Hardware to be locksets with levers Key locks Automatic closers Solid core 1¾ hardwood veneer doors 3-0 (w) by 7-0 (h) Doorframes will be a minimum 14 gauge metal frame construction Automatic closers Solid core 1¾ hardwood veneer double doors in 6-0 (w) by 7-0 (h) Hardware to be latch sets with levers Automatic closer Push plate Physical Fitness (Exercise Room) 12-1

Specialties Toilet Accessories Stainless steel ceiling hung partitions Toilet paper holder Feminine napkin disposal (female toilets only) Feminine napkin dispenser (female toilets only) Paper towel dispenser combination waste receptacle Soap dispenser Mirror with stainless steel edging ADAAG compliant grab bar Shower soap holder in shower area Towel hooks in shower a area Signage Suite Entrance Room Signage System Window Treatment Room identification signage to be plastic letters mounted beside the door with Braille raised message module Signage for life safety and public convenience (toilets) within the functional areas of the tenant will be included in the unit costs and will be modular vinyl lettering on plastic laminate signage frame system with ADAAG compliant tactile Braille vinyl signage modules Signage requirements within the tenant demised space related to their function will be provided by tenant Horizontal 1 louver blinds Anti-static painted aluminum louvers Concealed valance free head Interior Finishes Walls Locker Room Showers, Toilets Low VOC semi-gloss paint with vinyl cove base Type II vinyl wall covering with vinyl cove base Ceramic tile with ceramic tile cove base Floors Toilet, Showers 6-0 broadloom carpet 32 oz per square yard level loop Yarn dyed color with pattern Fourth generation nylon yarn Bonded construction with cushioned back Ceramic tile Shower to have pan substrate Ceiling Toilet, Showers Suspended 24 by 24 acoustical tile ceiling included as part of the building shell and core provisions Painted plaster ceiling 12-2 Physical Fitness (Exercise Room)

Plumbing Toilet Shower Drinking Fountains Service from central hot water heater for fitness center Porcelain sink wall-mounted Cold and hot water supply Lever faucet Porcelain floor mounted flush-valve water closet Floor drain Adjustable shower head with hot and cold water supply Drain Wall mounted fountain with chiller in each exercise and weight room and locker room HVAC Air Distribution System Air Handling Unit Air Supply Exhaust Air Thermostat Controls AHUs provided as part of the building shell and core provisions; assume that the Tenant Improvements for this space type requires a 20% increase in cooling capacity above the building shell and core Provide AHU for exercise areas Fitness center to have negative air pressure relative to other areas of the building Separate zones for each exercise area and lockers Separate return air Ducted ceiling supply with ducted ceiling return air system; no transfer ducts Sound baffles at all acoustically rated partitions: exercise and weight rooms and tenant demising partitions Toilets and showers provide direct 100% exhaust operated by time clock or BAS Setback thermostat even in areas of 24 hour operation with override by building shell and core BAS Fire Protection Fire Suppression Fire and Smoke Detection Fire Alarms Sprinkler system is part of the building shell and core provisions; assume that Tenant Improvement for this space type requires relocation of 10% sprinkler heads Fire and smoke dampers to be provided in rated walls One smoke and heat detection device in each occupiable space One fire alarm pull station by each egress point Audible and visible (strobe) alarm in each occupiable space Physical Fitness (Exercise Room) 12-3

Electrical Electrical Outlets Aerobics Equipment One duplex electrical outlet on each wall and wall mounted duplex outlets every 50-0 OC One wall mounted duplex outlet every 6-0 with dedicated line every two outlets One recessed wall duplex outlet for clock Lighting Exercise Station Rooms, Aerobic Machine Rooms, Free-Weight Rooms, and Fitness Instruction Rooms Shower lighting provided as part of the building standard shell and core provisions with a minimum of one 24 (w) by 48 (l) recessed parabolic fluorescent fixture with two T-8 lamps and electronic ballasts per room and additional fixtures per every 80 SF (or T-5 equivalent) Independent switch control for each area with 3 way switches at each entrance Fluorescent 24 (w) by 48 (l) recessed ceiling fixtures with protective acrylic lens located every 80 SF Independent switch control for each area with 3 way switches at each entrance Vapor proof light fixture with compact fluorescent lamp Telephone and Communication Outlets Entrance Conduit and pathways for services from the core to the tenant demised space provided as part of the building shell and core provisions; conduit and boxes within the tenant suite are part of the Tenant Improvement unit costs Conduit and telephone outlet boxes provided as part of the Tenant Improvement unit costs; telephone systems and data LAN systems equipment provided by tenant Conduit and boxes for one telephone line in each space provided as part of the Conduit and boxes for one ceiling mounted PA speaker for every 1,000 SF provided as part of the Tenant Improvement unit costs; equipment and wiring provided by tenant Conduit and boxes for one cable television outlet mounted at 7-0 above the floor provided as part of Tenant Improvement unit costs; equipment and wiring provided by tenant Conduit and boxes for high fidelity sound system for broadcast of exercise music provided as part of the Tenant Improvement unit costs; equipment and wiring provided by tenant Conduit and boxes for one wall mounted telephone line provided as part of Conduit and boxes for one LAN connection provided as part of the Tenant Improvement unit costs; equipment and wiring provided by tenant Conduit and boxes for one ceiling mounted PA speaker provided as part of the 12-4 Physical Fitness (Exercise Room)

Multimedia System Conduit and power connections for sound and video systems provided as part of the Tenant Improvement unit costs; electronics, wiring, and speaker and monitors provided by tenant Equipment Exercise Equipment Lockers Mounting and power connections provided as part of the Tenant Improvement unit costs; exercise equipment provided by tenant Single tier 1-0 (w) by 1-0 (d) by 6-0 (h) metal lockers with sloped tops, painted finish with latch Integral hardwood bench seat Lockers set on one course of CMU Physical Fitness (Exercise Room) 12-5