(d on Determination 2017-1) @ 8.65% of the 13% of the Total Burdened for Work over 8 Other = = hours, Saturday for Work on ASBESTOS WORKER, HEAT & FROST INSULATOR (JOURNEY LEVEL) Mechanic 08/22/16 07/02/17 $38.37 $2.89 $8.64 $8.01 $0.64 $0.00 $58.55 $3.57 $5.36 $67.48 $90.82 $114.16 Hazardous Material Handler Mechanic 08/22/16 07/02/17 $18.38 $0.00 $4.54 $6.06 $0.22 $0.00 $29.20 $1.59 $2.39 $33.18 $44.36 $55.54 APPRENTICE (Asbestos Worker, Heat & Frost Insulator) Level 1 08/22/16 07/02/17 $15.64 $0.00 $7.59 $0.00 $0.64 $0.00 $23.87 $1.35 $2.03 $27.26 $36.77 $46.28 Level 2 08/22/16 07/02/17 $19.84 $0.00 $7.59 $0.00 $0.64 $0.00 $28.07 $1.72 $2.58 $32.37 $44.43 $56.50 Level 3 08/22/16 07/02/17 $23.57 $0.00 $8.31 $6.51 $0.64 $0.00 $39.03 $2.04 $3.06 $44.13 $58.47 $72.81 Level 4 08/22/16 07/02/17 $31.94 $0.00 $8.47 $6.51 $0.64 $0.00 $47.56 $2.76 $4.15 $54.48 $73.90 $93.33 ASBESTOS & LEAD ABATEMENT - LABORER (JOURNEY LEVEL) Asbestos and Lead Abatement Worker 02/22/17 12/31/17 $31.88 $4.45 $7.00 $6.50 $0.75 $0.39 $50.97 $3.14 $4.72 $58.84 $78.23 $97.62 BRICKLAYER & STONEMASON (JOURNEY LEVEL) Brick Layer, Stone Mason, Cement Blocklayer, Pointer, Caulker & 08/22/16 04/30/17 $39.01 $0.00 $7.75 $7.15 $0.85 $0.40 $55.16 $3.37 $5.07 $63.61 $87.33 $111.06 APPRENTICE (Bricklayer, Stonemason) Level 1 08/22/16 04/30/17 $13.65 $0.00 $7.75 $7.15 $0.29 $0.00 $28.84 $1.18 $1.77 $31.80 $40.10 $48.40 Level 2 08/22/16 04/30/17 $15.60 $0.00 $7.75 $7.15 $0.31 $0.00 $30.81 $1.35 $2.03 $34.19 $43.68 $53.16 Level 3 08/22/16 04/30/17 $19.51 $0.00 $7.75 $7.15 $0.35 $0.00 $34.76 $1.69 $2.54 $38.98 $50.85 $62.72 Level 4 08/22/16 04/30/17 $23.41 $0.00 $7.75 $7.15 $0.39 $0.00 $38.70 $2.02 $3.04 $43.77 $58.01 $72.25 Level 5 08/22/16 04/30/17 $27.31 $0.00 $7.75 $7.15 $0.43 $0.00 $42.64 $2.36 $3.55 $48.55 $65.16 $81.78 Level 6 08/22/16 04/30/17 $31.21 $0.00 $7.75 $7.15 $0.47 $0.00 $46.58 $2.70 $4.06 $53.34 $72.32 $91.30 Level 7 08/22/16 04/30/17 $35.11 $0.00 $7.75 $7.15 $0.51 $0.00 $50.52 $3.04 $4.56 $58.12 $79.48 $100.83 BRICKLAYER: MASON FINISHER (JOURNEY LEVEL) Mason Finisher 08/22/16 04/30/17 $27.31 $0.00 $7.75 $7.15 $0.73 $0.40 $43.34 $2.36 $3.55 $49.25 $65.86 $82.48 APPRENTICE (Mason Finisher) Level 1 08/22/16 04/30/16 $13.66 $0.00 $4.85 $1.00 $0.20 $0.00 $19.71 $1.18 $1.78 $22.67 $30.98 $39.28 Level 2 08/22/16 04/30/16 $16.39 $0.00 $4.85 $1.00 $0.22 $0.00 $22.46 $1.42 $2.13 $26.01 $35.98 $45.95 Level 3 08/22/16 04/30/16 $19.12 $0.00 $4.85 $1.00 $0.25 $0.00 $25.22 $1.65 $2.49 $29.36 $40.99 $52.62 Level 4 08/22/16 04/30/16 $21.85 $0.00 $4.85 $1.00 $0.28 $0.00 $27.98 $1.89 $2.84 $32.71 $46.00 $59.29 BRICK TENDER (JOURNEY LEVEL) Brick Tender 08/22/16 06/30/17 $30.52 $4.10 $7.06 $6.75 $0.65 $0.47 $49.55 $2.99 $4.50 $57.05 $75.61 $94.17 APPRENTICE (Bricktender) Level 1 08/22/16 06/30/17 $15.26 $2.87 $4.94 $1.35 $0.65 $0.47 $25.54 $1.57 $2.36 $29.47 $38.75 $48.03 Level 2 08/22/16 06/30/17 $16.79 $2.87 $4.94 $1.35 $0.65 $0.47 $27.07 $1.70 $2.56 $31.33 $41.54 $51.75 Level 3 08/22/16 06/30/17 $18.31 $2.87 $4.94 $1.35 $0.65 $0.47 $28.59 $1.83 $2.75 $33.18 $44.31 $55.45 Level 4 08/22/16 06/30/17 $21.36 $2.87 $4.94 $1.35 $0.65 $0.47 $31.64 $2.10 $3.15 $36.89 $49.88 $62.87 Level 5 08/22/16 06/30/17 $24.42 $2.87 $4.94 $1.35 $0.65 $0.47 $34.70 $2.36 $3.55 $40.61 $55.46 $70.32 Level 6 08/22/16 06/30/17 $25.94 $2.87 $4.94 $1.35 $0.65 $0.47 $36.22 $2.49 $3.75 $42.46 $58.24 $74.01 CARPENTER (JOURNEY LEVEL) Carpenter, Cabinet Installer, Insulation Installer, Hardwood Floor Worker & Acoustical Installer 02/22/17 06/30/17 $40.40 $4.95 $6.85 $4.66 $0.57 $0.39 $57.82 $3.92 $5.90 $67.64 $92.21 $116.78 Scaffold Builder 02/22/17 06/30/17 $31.60 $4.95 $6.85 $4.66 $0.57 $0.39 $49.02 $3.16 $4.75 $56.93 $76.15 $95.37 Millwright 02/22/17 06/30/17 $40.90 $4.95 $6.85 $4.66 $0.57 $0.59 $58.52 $3.97 $5.96 $68.45 $93.32 $118.20 APPRENTICE (Carpenter, Hardwood Floor Layer, Acoustical & Insulation Installer) Level 1 09/06/16 06/30/17 $16.16 $3.95 $6.85 $0.00 $0.57 $0.39 $27.92 $1.74 $2.61 $32.27 $42.10 $51.93 Level 2 09/06/16 06/30/17 $20.20 $3.95 $6.85 $0.00 $0.57 $0.39 $31.96 $2.09 $3.14 $37.19 $49.48 $61.76 Level 3 09/06/16 06/30/17 $24.24 $4.95 $6.85 $0.00 $0.57 $0.39 $37.00 $2.52 $3.79 $43.32 $58.06 $72.81 Level 4 09/06/16 06/30/17 $26.26 $4.95 $6.85 $4.66 $0.57 $0.39 $43.68 $2.70 $4.06 $50.44 $66.41 $82.38 Level 5 09/06/16 06/30/17 $28.28 $4.95 $6.85 $4.66 $0.57 $0.39 $45.70 $2.87 $4.32 $52.89 $70.10 $87.30 Level 6 09/06/16 06/30/17 $30.30 $4.95 $6.85 $4.66 $0.57 $0.39 $47.72 $3.05 $4.58 $55.35 $73.78 $92.21 Level 7 09/06/16 06/30/17 $32.32 $4.95 $6.85 $4.66 $0.57 $0.39 $49.74 $3.22 $4.85 $57.81 $77.47 $97.13 Level 8 09/06/16 06/30/17 $36.36 $4.95 $6.85 $4.66 $0.57 $0.39 $53.78 $3.57 $5.37 $62.72 $84.84 $106.96 APPRENTICE (Millwright) Level 1 02/22/17 06/30/17 $20.45 $3.95 $6.85 $0.00 $0.57 $0.59 $32.41 $2.11 $3.17 $37.69 $50.13 $62.57 Level 2 02/22/17 06/30/17 $22.50 $3.95 $6.85 $0.00 $0.57 $0.59 $34.46 $2.29 $3.44 $40.19 $53.87 $67.56 Level 3 02/22/17 06/30/17 $24.54 $4.95 $6.85 $0.00 $0.57 $0.59 $37.50 $2.55 $3.83 $43.88 $58.81 $73.74 Level 4 02/22/17 06/30/17 $26.59 $4.95 $6.85 $4.66 $0.57 $0.59 $44.21 $2.73 $4.10 $51.04 $67.21 $83.39 Level 5 02/22/17 06/30/17 $28.63 $4.95 $6.85 $4.66 $0.57 $0.59 $46.25 $2.90 $4.37 $53.52 $70.93 $88.35 Level 6 02/22/17 06/30/17 $30.68 $4.95 $6.85 $4.66 $0.57 $0.59 $48.30 $3.08 $4.63 $56.01 $74.68 $93.34 Level 7 02/22/17 06/30/17 $32.72 $4.95 $6.85 $4.66 $0.57 $0.59 $50.34 $3.26 $4.90 $58.50 $78.40 $98.30 Level 8 02/22/17 06/30/17 $34.77 $4.95 $6.85 $4.66 $0.57 $0.59 $52.39 $3.44 $5.16 $60.99 $82.14 $103.29 https://www.dir.ca.gov/public-works/prevailing-.html 4/20/2017 Page 1 of 9
(d on Determination 2017-1) CRAFT @ 8.65% of the 13% of the Total Burdened for Work over 8 for Work on Other = = hours, Saturday Level 9 02/22/17 06/30/17 $36.81 $4.95 $6.85 $4.66 $0.57 $0.59 $54.43 $3.61 $5.43 $63.47 $85.86 $108.25 Level 10 02/22/17 06/30/17 $38.86 $4.95 $6.85 $4.66 $0.57 $0.59 $56.48 $3.79 $5.70 $65.96 $89.60 $113.24 APPRENTICE (Scaffold Builder) Level 1 02/22/17 06/30/17 $12.64 $3.95 $6.85 $0.00 $0.57 $0.39 $24.40 $1.44 $2.16 $27.99 $35.68 $43.37 Level 2 02/22/17 06/30/17 $15.80 $3.95 $6.85 $0.00 $0.57 $0.39 $27.56 $1.71 $2.57 $31.84 $41.45 $51.06 Level 3 02/22/17 06/30/17 $18.96 $4.95 $6.85 $0.00 $0.57 $0.39 $31.72 $2.07 $3.11 $36.90 $48.43 $59.96 Level 4 02/22/17 06/30/17 $20.54 $4.95 $6.85 $4.66 $0.57 $0.39 $37.96 $2.20 $3.31 $43.48 $55.97 $68.47 Level 5 02/22/17 06/30/17 $22.12 $4.95 $6.85 $4.66 $0.57 $0.39 $39.54 $2.34 $3.52 $45.40 $58.86 $72.31 Level 6 02/22/17 06/30/17 $23.70 $4.95 $6.85 $4.66 $0.57 $0.39 $41.12 $2.48 $3.72 $47.32 $61.74 $76.15 Level 7 02/22/17 06/30/17 $25.28 $4.95 $6.85 $4.66 $0.57 $0.39 $42.70 $2.61 $3.93 $49.24 $64.62 $80.00 Level 8 02/22/17 06/30/17 $28.44 $4.95 $6.85 $4.66 $0.57 $0.39 $45.86 $2.89 $4.34 $53.09 $70.39 $87.69 CARPET, LINOLEUM & RESILIENT TILE LAYER (JOURNEY LEVEL) Resilient Tile Layer 08/22/16 04/30/17 $31.10 $2.05 $5.08 $6.30 $0.63 $0.28 $45.44 $2.87 $4.31 $52.62 $71.53 $90.45 Material Handler 08/22/16 04/30/17 $10.50 $0.55 $5.08 $2.28 $0.63 $0.18 $19.22 $0.96 $1.44 $21.61 $28.00 $34.39 APPRENTICE (Carpet, Linoleum & Resilient Flooring) Level 1 08/22/16 04/30/17 $14.00 $0.88 $0.00 $1.58 $0.63 $0.28 $17.37 $1.29 $1.93 $20.59 $29.11 $37.62 Level 2 02/22/16 04/30/17 $15.55 $1.22 $5.08 $2.10 $0.63 $0.28 $24.86 $1.45 $2.18 $28.49 $37.95 $47.41 Level 3 02/22/16 04/30/17 $17.11 $1.36 $5.08 $2.33 $0.63 $0.28 $26.79 $1.60 $2.40 $30.79 $41.20 $51.60 Level 4 02/22/16 04/30/17 $18.66 $1.48 $5.08 $2.55 $0.63 $0.28 $28.68 $1.74 $2.62 $33.04 $44.39 $55.74 Level 5 02/22/16 04/30/17 $20.22 $1.72 $5.08 $3.00 $0.63 $0.28 $30.93 $1.90 $2.85 $35.68 $47.98 $60.28 Level 6 02/22/16 04/30/17 $21.77 $1.96 $5.08 $3.45 $0.63 $0.28 $33.17 $2.05 $3.08 $38.31 $51.55 $64.79 Level 7 02/22/16 04/30/17 $24.88 $2.20 $5.08 $3.90 $0.63 $0.28 $36.97 $2.34 $3.52 $42.83 $57.97 $73.10 Level 8 02/22/16 04/30/17 $27.99 $2.38 $5.08 $4.35 $0.63 $0.28 $40.71 $2.63 $3.95 $47.29 $64.31 $81.33 CEMENT MASON (JOURNEY LEVEL) Cement Mason, Curb & Gutter Machine Operator, Screed Operator, 08/22/16 06/30/17 $33.30 $6.68 $7.77 $8.24 $0.64 $0.27 $56.90 $3.46 $5.20 $65.56 $85.81 $106.07 Magnesite-terrazzo, Epoxy, Urethanes and Exotic Coatings 08/22/16 06/30/17 $33.42 $6.68 $7.77 $8.24 $0.64 $0.27 $57.02 $3.47 $5.21 $65.70 $86.03 $106.36 Floating and Troweling Machine Operator 08/22/16 06/30/17 $33.55 $6.68 $7.77 $8.24 $0.64 $0.27 $57.15 $3.48 $5.23 $65.86 $86.27 $106.67 APPRENTICE (Cement Mason) Level 1 08/22/16 06/30/17 $13.32 $2.18 $7.77 $0.00 $0.64 $0.27 $24.18 $1.34 $2.02 $27.54 $35.64 $43.74 Level 2 08/22/16 06/30/17 $14.99 $2.18 $7.77 $0.00 $0.64 $0.27 $25.85 $1.49 $2.23 $29.57 $38.68 $47.80 Level 3 08/22/16 06/30/17 $16.65 $2.18 $7.77 $0.00 $0.64 $0.27 $27.51 $1.63 $2.45 $31.59 $41.71 $51.84 Level 4 08/22/16 06/30/17 $18.32 $6.68 $7.77 $0.00 $0.64 $0.27 $33.68 $2.16 $3.25 $39.09 $50.24 $61.38 Level 5 08/22/16 06/30/17 $19.98 $6.68 $7.77 $8.24 $0.64 $0.27 $43.58 $2.31 $3.47 $49.35 $61.50 $73.66 Level 6 08/22/16 06/30/17 $23.31 $6.68 $7.77 $8.24 $0.64 $0.27 $46.91 $2.59 $3.90 $53.40 $67.58 $81.76 Level 7 08/22/16 06/30/17 $26.64 $6.68 $7.77 $8.24 $0.64 $0.27 $50.24 $2.88 $4.33 $57.45 $73.66 $89.86 Level 8 08/22/16 06/30/17 $29.97 $6.68 $7.77 $8.24 $0.64 $0.27 $53.57 $3.17 $4.76 $61.50 $79.73 $97.96 CRANES, PILE DRIVER & HOIST EQUIPMENT - OPERATING ENGINEER Group 3 - A-Frame or Winch Truck Operator 08/22/16 06/30/17 $44.27 $3.45 $11.45 $9.65 $0.95 $0.39 $70.16 $4.13 $6.20 $80.49 $107.42 $134.35 Group 5 - Hydraulic Boom Truck 08/22/16 06/30/17 $44.63 $3.45 $11.45 $9.65 $0.95 $0.39 $70.52 $4.16 $6.25 $80.93 $108.08 $135.22 Group 6 - Bridge Crane/Creter Crane/Hoist Operator 08/22/16 06/30/17 $44.74 $3.45 $11.45 $9.65 $0.95 $0.39 $70.63 $4.17 $6.26 $81.06 $108.28 $135.49 Group 7 - Pedestal Crane/Shovel/Dragline/Clamshell Operator (over 5 cu. yds.) Group 8 - Crane Operator (up to 25 tons) Group 9 - Crane Operator (over 25 tons) Group 10 - Crane Operator (over 50 tons) Group 11 - Crane Operator (over 100 tons) Group 12 - Crane Operator (over 200 tons) Group 13 - Crane Operator (over 300 tons) 08/22/16 06/30/17 $44.86 $3.45 $11.45 $9.65 $0.95 $0.39 $70.75 $4.18 $6.28 $81.21 $108.50 $135.78 08/22/16 06/30/17 $45.03 $3.45 $11.45 $9.65 $0.95 $0.39 $70.92 $4.19 $6.30 $81.42 $108.81 $136.19 08/22/16 06/30/17 $45.20 $3.45 $11.45 $9.65 $0.95 $0.39 $71.09 $4.21 $6.32 $81.62 $109.12 $136.61 08/22/16 06/30/17 $46.20 $3.45 $11.45 $9.65 $0.95 $0.39 $72.09 $4.29 $6.45 $82.84 $110.94 $139.04 08/22/16 06/30/17 $47.20 $3.45 $11.45 $9.65 $0.95 $0.39 $73.09 $4.38 $6.58 $84.06 $112.77 $141.47 08/22/16 06/30/17 $48.20 $3.45 $11.45 $9.65 $0.95 $0.39 $74.09 $4.47 $6.71 $85.27 $114.59 $143.91 08/22/16 06/30/17 $49.20 $3.45 $11.45 $9.65 $0.95 $0.39 $75.09 $4.55 $6.84 $86.49 $116.41 $146.34 APPRENTICE (Pile Driver - Carpenter) Level 1 08/22/15 06/30/16 $16.21 $3.95 $6.85 $0.00 $0.57 $0.39 $27.97 $1.74 $2.62 $32.33 $42.19 $52.05 Level 2 08/22/15 06/30/16 $20.27 $3.95 $6.85 $0.00 $0.57 $0.39 $32.03 $2.10 $3.15 $37.27 $49.60 $61.93 Level 3 08/22/15 06/30/16 $24.32 $4.95 $6.85 $0.00 $0.57 $0.39 $37.08 $2.53 $3.81 $43.42 $58.21 $73.00 Level 4 08/22/15 06/30/16 $26.34 $4.95 $6.85 $4.66 $0.57 $0.39 $43.76 $2.71 $4.07 $50.53 $66.56 $82.58 Level 5 08/22/15 06/30/16 $28.37 $4.95 $6.85 $4.66 $0.57 $0.39 $45.79 $2.88 $4.33 $53.00 $70.26 $87.52 Level 6 08/22/15 06/30/16 $30.40 $4.95 $6.85 $4.66 $0.57 $0.39 $47.82 $3.06 $4.60 $55.47 $73.96 $92.45 Level 7 08/22/15 06/30/16 $32.42 $4.95 $6.85 $4.66 $0.57 $0.39 $49.84 $3.23 $4.86 $57.93 $77.65 $97.37 Level 8 08/22/15 06/30/16 $36.48 $4.95 $6.85 $4.66 $0.57 $0.39 $53.90 $3.58 $5.39 $62.87 $85.06 $107.25 https://www.dir.ca.gov/public-works/prevailing-.html 4/20/2017 Page 2 of 9
(d on Determination 2017-1) @ 8.65% of the 13% of the Total Burdened for Work over 8 Other = = hours, Saturday for Work on DREDGER - OPERATING ENGINEER (JOURNEY LEVEL) Chief Engineer 08/22/16 07/31/17 $48.40 $3.75 $11.45 $9.65 $0.95 $0.15 $74.35 $4.51 $6.78 $85.64 $115.08 $144.52 Leverman 08/22/16 07/31/17 $51.40 $3.75 $11.45 $9.65 $0.95 $0.15 $77.35 $4.77 $7.17 $89.29 $120.55 $151.82 Watch Engineer 08/22/16 07/31/17 $45.32 $3.75 $11.45 $9.65 $0.95 $0.15 $71.27 $4.24 $6.38 $81.89 $109.46 $137.03 Winchman (Stern Winch on Dredge) 08/22/16 07/31/17 $44.77 $3.75 $11.45 $9.65 $0.95 $0.15 $70.72 $96.67 $6.31 $173.70 $200.93 $228.16 Dozer Operator 08/22/16 07/31/17 $45.43 $3.75 $11.45 $9.65 $0.95 $0.15 $71.38 $4.25 $6.39 $82.03 $109.66 $137.29 Hydrographic Surveyor 08/22/16 07/31/17 $46.86 $3.75 $11.45 $9.65 $0.95 $0.15 $72.81 $4.38 $6.58 $83.77 $112.27 $140.77 Welder 08/22/16 07/31/17 $46.82 $3.75 $11.45 $9.65 $0.95 $0.15 $72.77 $4.37 $6.57 $83.72 $112.20 $140.67 DRIVER (ON/OFF- HAULING TO/FROM CONSTRUCTION SITE) Ready Mix Driver 02/22/16 6/30/2016* $23.60 $0.45 $6.00 $3.44 $0.00 $0.00 $33.49 $2.08 $3.13 $38.70 $53.05 $67.41 DRIVER (ON/OFF- HAULING TO/FROM CONSTRUCTION SITE) Dump truck 02/22/09 3/3/2010* $17.00 $0.33 $2.05 $0.09 $0.00 $0.00 $19.47 $1.50 $2.25 $23.22 $33.56 $43.90 DRYWALL INSTALLER/LATHER - CARPENTER (JOURNEY LEVEL) Drywall Installer/Lather 02/22/17 06/30/17 $40.40 $4.95 $6.85 $4.66 $0.57 $0.62 $58.05 $3.92 $5.90 $67.87 $92.44 $117.01 Stocker, Scrapper 02/22/17 06/30/17 $10.50 $3.95 $6.85 $0.00 $0.57 $0.00 $21.87 $1.25 $1.88 $25.00 $31.39 $37.77 Apprentice (Drywall Installer/Lather, Carpenter) Level 1 02/22/17 06/30/17 $16.16 $3.95 $6.85 $0.00 $0.57 $0.00 $27.53 $1.74 $2.61 $31.88 $41.71 $51.54 Level 2 02/22/17 06/30/17 $20.20 $3.95 $6.85 $0.00 $0.57 $0.00 $31.57 $2.09 $3.14 $36.80 $49.09 $61.37 Level 3 02/22/17 06/30/17 $24.24 $4.95 $6.85 $0.00 $0.57 $0.00 $36.61 $2.52 $3.79 $42.93 $57.67 $72.42 Level 4 02/22/17 06/30/17 $26.26 $4.95 $6.85 $4.66 $0.57 $0.62 $43.91 $2.70 $4.06 $50.67 $66.64 $82.61 Level 5 02/22/17 06/30/17 $28.28 $4.95 $6.85 $4.66 $0.57 $0.62 $45.93 $2.87 $4.32 $53.12 $70.33 $87.53 Level 6 02/22/17 06/30/17 $30.30 $4.95 $6.85 $4.66 $0.57 $0.62 $47.95 $3.05 $4.58 $55.58 $74.01 $92.44 Level 7 02/22/17 06/30/17 $32.32 $4.95 $6.85 $4.66 $0.57 $0.62 $49.97 $3.22 $4.85 $58.04 $77.70 $97.36 Level 8 02/22/17 06/30/17 $36.36 $4.95 $6.85 $4.66 $0.57 $0.62 $54.01 $3.57 $5.37 $62.95 $85.07 $107.19 DRYWALL FINISHER (JOURNEY LEVEL) Drywall Finisher 02/22/17 09/30/17 $37.18 $3.07 $8.05 $6.13 $0.67 $0.57 $55.67 $3.48 $5.23 $64.38 $87.00 $109.61 APPRENTICE (Drywall Finisher) Level 1 02/22/17 06/30/17 $16.18 $0.55 $8.05 $0.00 $0.67 $0.57 $26.02 $1.45 $2.17 $29.64 $39.48 $49.33 Level 2 02/22/17 06/30/17 $17.55 $1.05 $8.05 $1.56 $0.67 $0.57 $29.45 $1.61 $2.42 $33.48 $44.15 $54.83 Level 3 02/22/17 06/30/17 $19.40 $1.05 $8.05 $1.56 $0.67 $0.57 $31.30 $1.77 $2.66 $35.73 $47.53 $59.33 Level 4 02/22/17 06/30/17 $21.26 $1.05 $8.05 $2.56 $0.67 $0.57 $34.16 $1.93 $2.90 $38.99 $51.92 $64.85 Level 5 02/22/17 06/30/17 $24.14 $2.05 $8.05 $3.78 $0.67 $0.57 $39.26 $2.27 $3.40 $44.93 $59.61 $74.30 Level 6 02/22/17 06/30/17 $29.72 $2.05 $8.05 $3.78 $0.67 $0.57 $44.84 $2.75 $4.13 $51.72 $69.80 $87.87 ELECTRICIAN (JOURNEY LEVEL) Communication & Systems Installer** 02/22/17 12/31/17 $32.43 $0.00 $8.31 $4.37 $0.65 $0.25 $46.98 $2.81 $4.22 $54.00 $73.73 $93.46 Inside Wireman, Radio Monitor Technician** 02/22/17 12/31/17 $42.00 $0.00 $12.24 $14.27 $0.66 $0.45 $70.88 $3.63 $5.46 $79.97 $105.52 $131.07 Cable splicer-welder** 02/22/17 12/31/17 $44.10 $0.00 $12.24 $14.27 $0.66 $0.45 $73.04 $3.81 $5.73 $82.59 $109.41 $136.24 Tunnel Wireman** 02/22/17 12/31/17 $46.20 $0.00 $12.24 $14.27 $0.66 $0.45 $75.21 $4.00 $6.01 $85.21 $113.31 $141.41 Tunnel Cable Splicer** 02/22/17 12/31/17 $48.51 $0.00 $12.24 $14.27 $0.66 $0.45 $77.59 $4.20 $6.31 $88.09 $117.59 $147.10 APPRENTICE (Communication & Systems Installer) Level 1 02/22/17 12/31/17 $14.59 $0.00 $4.58 $0.44 $0.30 $0.16 $20.07 $1.26 $1.90 $23.23 $32.10 $40.98 Level 2 02/22/17 12/31/17 $16.22 $0.00 $4.58 $0.49 $0.30 $0.16 $21.75 $1.40 $2.11 $25.26 $35.13 $44.99 Level 3 02/22/17 12/31/17 $17.84 $0.00 $8.31 $2.94 $0.30 $0.16 $29.55 $1.54 $2.32 $33.41 $44.26 $55.11 Level 4 02/22/17 12/31/17 $19.46 $0.00 $8.31 $3.20 $0.30 $0.16 $31.43 $1.68 $2.53 $35.64 $47.48 $59.32 Level 5 02/22/17 12/31/17 $21.08 $0.00 $8.31 $3.47 $0.30 $0.16 $33.32 $1.82 $2.74 $37.88 $50.71 $63.53 Level 6 02/22/17 12/31/17 $25.94 $0.00 $8.31 $4.28 $0.30 $0.16 $38.99 $2.24 $3.37 $44.61 $60.38 $76.16 APPRENTICE (Electrician, Inside Wireman) Level 1 02/22/17 07/30/17 $16.80 $0.00 $11.24 $0.50 $0.71 $0.45 $29.70 $1.45 $2.18 $33.34 $43.56 $53.77 Level 2 02/22/17 07/30/17 $18.90 $0.00 $11.24 $0.57 $0.71 $0.45 $31.87 $1.63 $2.46 $35.96 $47.46 $58.95 Level 3 02/22/17 07/30/17 $21.00 $0.00 $12.24 $7.77 $0.71 $0.45 $42.17 $1.82 $2.73 $46.72 $59.49 $72.26 Level 4 02/22/17 07/30/17 $23.10 $0.00 $12.24 $8.54 $0.71 $0.45 $45.04 $2.00 $3.00 $50.04 $64.09 $78.14 Level 5 02/22/17 07/30/17 $25.20 $0.00 $12.24 $9.32 $0.71 $0.45 $47.92 $2.18 $3.28 $53.38 $68.70 $84.03 Level 6 02/22/17 07/30/17 $27.30 $0.00 $12.24 $10.10 $0.71 $0.45 $50.80 $2.36 $3.55 $56.71 $73.32 $89.92 Level 7 02/22/17 07/30/17 $29.40 $0.00 $12.24 $10.87 $0.71 $0.45 $53.67 $2.54 $3.82 $60.04 $77.92 $95.80 Level 8 02/22/17 07/30/17 $31.50 $0.00 $12.24 $11.65 $0.71 $0.45 $56.55 $2.72 $4.10 $63.37 $82.53 $101.69 Level 9 02/22/17 07/30/17 $33.60 $0.00 $12.24 $12.43 $0.71 $0.45 $59.43 $2.91 $4.37 $66.70 $87.14 $107.58 Level 10 02/22/17 07/30/17 $35.70 $0.00 $12.24 $13.20 $0.71 $0.45 $62.30 $3.09 $4.64 $70.03 $91.74 $113.46 https://www.dir.ca.gov/public-works/prevailing-.html 4/20/2017 Page 3 of 9
(d on Determination 2017-1) @ 8.65% of the 13% of the Total Burdened for Work over 8 Other = = hours, Saturday for Work on ELEVATOR CONSTRUCTOR (JOURNEY LEVEL) Mechanic 02/22/17 07/08/17 $52.21 $4.74 $15.275 $15.71 $0.60 $0.30 $88.835 $4.93 $7.40 $101.16 $132.92 $164.68 Helper 02/22/17 07/08/17 $36.55 $3.32 $15.275 $15.71 $0.60 $0.30 $71.755 $3.45 $5.18 $80.39 $102.62 $124.85 APPRENTICE (Elevator Constructor) Level 1 02/22/17 07/08/17 $26.11 $0.00 $0.000 $0.00 $0.00 $0.00 $26.105 $2.26 $3.39 $31.76 $47.64 $63.51 Level 2 02/22/17 07/08/17 $28.72 $2.60 $15.275 $15.71 $0.60 $0.30 $63.205 $2.71 $4.07 $69.99 $87.45 $104.92 Level 3 02/22/17 07/08/17 $33.94 $3.08 $15.275 $15.71 $0.60 $0.30 $68.905 $3.20 $4.81 $76.92 $97.56 $118.21 Level 4 02/22/17 07/08/17 $36.55 $3.31 $15.275 $15.71 $0.60 $0.30 $71.745 $3.45 $5.18 $80.37 $102.61 $124.84 Level 5 02/22/17 07/08/17 $41.77 $3.80 $15.275 $15.71 $0.60 $0.30 $77.455 $3.94 $5.92 $87.32 $112.73 $138.13 FENCE BUILDER - CARPENTER (JOURNEY LEVEL) Fence Builder 08/22/16 06/30/17 $36.34 $4.80 $6.85 $4.41 $0.57 $0.21 $53.18 $3.56 $5.35 $62.09 $84.19 $106.29 FIELD SURVEYOR (JOURNEY LEVEL) (10/1/15) Chief of Party 02/22/17 09/30/17 $46.71 $4.52 $11.45 $9.65 $1.05 $0.15 $73.53 $4.43 $6.66 $84.62 $113.03 $141.44 Instrumentman 02/22/17 09/30/17 $44.21 $4.35 $11.45 $9.65 $1.05 $0.15 $70.86 $4.20 $6.31 $81.37 $108.26 $135.15 Chainman/Rodman 02/22/17 09/30/17 $43.63 $4.30 $11.45 $9.65 $1.05 $0.15 $70.23 $4.15 $6.23 $80.61 $107.14 $133.68 APPRENTICE (Chainman/Rodman) Level 1 02/22/17 09/30/17 $18.32 $3.30 $11.45 $0.00 $1.05 $0.15 $34.27 $1.87 $2.81 $38.95 $50.09 $61.24 Level 2 02/22/17 09/30/17 $21.38 $3.30 $11.45 $0.00 $1.05 $0.15 $37.33 $2.13 $3.21 $42.67 $55.68 $68.68 Level 3 02/22/17 09/30/17 $24.43 $3.30 $11.45 $9.65 $1.05 $0.15 $50.03 $2.40 $3.60 $56.03 $70.89 $85.75 Level 4 02/22/17 09/30/17 $27.49 $3.30 $11.45 $9.65 $1.05 $0.15 $53.09 $2.66 $4.00 $59.76 $76.48 $93.20 Level 5 02/22/17 09/30/17 $30.10 $3.30 $11.45 $9.65 $1.05 $0.15 $55.70 $2.89 $4.34 $62.93 $81.24 $99.55 Level 6 02/22/17 09/30/17 $32.72 $3.30 $11.45 $9.65 $1.05 $0.15 $58.32 $3.12 $4.68 $66.12 $86.02 $105.92 Level 7 02/22/17 09/30/17 $34.90 $3.30 $11.45 $9.65 $1.05 $0.15 $60.50 $3.30 $4.97 $68.77 $90.00 $111.23 FIRE SAFETY AND MISCELLANEOUS SEALING Asbestos Worker - Fire Safety Technician Class I (0-2000 hrs) 08/22/16 06/30/17 $16.95 $0.90 $7.77 $0.00 $0.00 $0.05 $25.67 $1.54 $2.32 $29.53 $39.84 $50.15 Class II (2001-4000 hrs) 08/22/16 06/30/17 $21.58 $1.26 $7.77 $0.00 $0.00 $0.05 $30.66 $1.98 $2.97 $35.60 $48.73 $61.86 Class III (4001-6000 hrs) 08/22/16 06/30/17 $22.52 $1.33 $7.77 $8.01 $0.00 $0.05 $39.68 $2.06 $3.10 $44.84 $58.54 $72.24 Class IV (6001 or more hrs) 08/22/16 06/30/17 $26.15 $1.53 $7.77 $8.01 $0.00 $0.05 $43.51 $2.39 $3.60 $49.50 $65.41 $81.31 Plumber - Fire Safety Technician Class I (0-2000 hrs) 08/22/16 06/30/17 $17.38 $0.00 $7.45 $0.00 $0.10 $0.75 $25.68 $1.50 $2.26 $29.44 $40.01 $50.59 Class II (2001-4000 hrs) 08/22/16 06/30/17 $21.37 $1.00 $7.45 $0.00 $0.10 $0.75 $30.67 $1.94 $2.91 $35.51 $48.51 $61.51 Class III (4001-6000 hrs) 08/22/16 06/30/17 $23.91 $1.50 $7.45 $5.52 $0.10 $0.75 $39.23 $2.20 $3.30 $44.73 $59.27 $73.82 Class IV (6001 or more hrs) 08/22/16 06/30/17 $26.73 $2.50 $7.45 $5.52 $0.10 $0.75 $43.05 $2.53 $3.80 $49.38 $65.64 $81.90 GLAZIER (JOURNEY LEVEL) Glazier 08/22/16 05/31/17 $41.70 $0.00 $7.25 $13.11 $0.77 $0.53 $63.36 $3.61 $5.42 $72.39 $97.75 $123.12 APPRENTICE (Glazier) Level 1 08/22/16 05/31/17 $16.71 $0.00 $7.25 $4.13 $0.77 $0.53 $29.39 $1.45 $2.17 $33.01 $43.17 $53.34 Level 2 08/22/16 05/31/17 $18.79 $0.00 $7.25 $4.87 $0.77 $0.53 $32.21 $1.63 $2.44 $36.28 $47.71 $59.14 Level 3 08/22/16 05/31/17 $20.88 $0.00 $7.25 $5.52 $0.77 $0.53 $34.95 $1.81 $2.71 $39.47 $52.17 $64.87 Level 4 08/22/16 05/31/17 $25.04 $0.00 $7.25 $6.75 $0.77 $0.53 $40.34 $2.17 $3.26 $45.76 $60.99 $76.22 Level 5 08/22/16 05/31/17 $27.12 $0.00 $7.25 $7.64 $0.77 $0.53 $43.31 $2.35 $3.53 $49.18 $65.68 $82.17 Level 6 08/22/16 05/31/17 $31.29 $0.00 $7.25 $9.02 $0.77 $0.53 $48.86 $2.71 $4.07 $55.63 $74.67 $93.70 Level 7 08/22/16 05/31/17 $35.45 $0.00 $7.25 $10.42 $0.77 $0.53 $54.42 $3.07 $4.61 $62.09 $83.66 $105.22 Level 8 08/22/16 05/31/17 $37.54 $0.00 $7.25 $11.29 $0.77 $0.53 $57.38 $3.25 $4.88 $65.51 $88.34 $111.17 GUNITE WORKER - LABORER (JOURNEY LEVEL) Groundwire Man, Nozzleman, Rodman 08/22/16 07/01/17 $37.89 $4.14 $7.06 $9.30 $0.00 $0.15 $58.54 $3.64 $5.46 $67.64 $90.69 $113.73 Gunman 08/22/16 07/01/17 $36.94 $4.14 $7.06 $9.30 $0.00 $0.15 $57.59 $3.55 $5.34 $66.48 $88.95 $111.42 Reboundman 08/22/16 07/01/17 $33.40 $4.14 $7.06 $9.30 $0.00 $0.15 $54.05 $3.25 $4.88 $62.18 $82.49 $102.81 Entry Level Gunite Worker Step I (0-1000 hrs) 08/22/16 07/01/17 $26.20 $4.14 $3.25 $6.11 $0.00 $0.12 $39.82 $2.62 $3.94 $46.39 $62.32 $78.26 Step II (1001-2000 hrs) 08/22/16 07/01/17 $28.20 $4.14 $3.25 $6.11 $0.00 $0.12 $41.82 $2.80 $4.20 $48.82 $65.97 $83.13 HORIZONTAL DIRECTIONAL DRILLING - LABORER (JOURNEY LEVEL) Group I - Drilling Crew Laborer Group II - Vehicle Operator/Hauler Group III - Horizontal Directional Drill Operator Group IV - Electronic Tracking Locator 02/22/17 07/02/17 $33.65 $3.12 $7.06 $3.35 $0.40 $0.92 $48.50 $3.18 $4.78 $56.46 $76.93 $97.40 02/22/17 07/02/17 $33.82 $3.12 $7.06 $3.35 $0.40 $0.92 $48.67 $3.20 $4.80 $56.67 $77.24 $97.81 02/22/17 07/02/17 $35.67 $3.12 $7.06 $3.35 $0.40 $0.92 $50.52 $3.36 $5.04 $58.92 $80.61 $102.31 02/22/17 07/02/17 $37.67 $3.12 $7.06 $3.35 $0.40 $0.92 $52.52 $3.53 $5.30 $61.35 $84.26 $107.18 https://www.dir.ca.gov/public-works/prevailing-.html 4/20/2017 Page 4 of 9
(d on Determination 2017-1) @ 8.65% of the 13% of the Total Burdened for Work over 8 Other = = hours, Saturday for Work on APPRENTICE (Horizontal Directional Drilling - Laborer) Level 1 02/22/17 07/02/17 $17.67 $3.20 $4.94 $1.35 $0.69 $0.67 $28.52 $1.81 $2.71 $33.04 $43.79 $54.53 Level 2 02/22/17 07/02/17 $19.44 $3.20 $4.94 $1.35 $0.69 $0.67 $30.29 $1.96 $2.94 $35.19 $47.02 $58.84 Level 3 02/22/17 07/02/17 $21.20 $3.20 $4.94 $1.35 $0.69 $0.67 $32.05 $2.11 $3.17 $37.33 $50.23 $63.12 Level 4 02/22/17 07/02/17 $24.74 $3.20 $4.94 $1.35 $0.69 $0.67 $35.59 $2.42 $3.63 $41.64 $56.69 $71.74 Level 5 02/22/17 07/02/17 $28.27 $3.20 $4.94 $1.35 $0.69 $0.67 $39.12 $2.72 $4.09 $45.93 $63.13 $80.32 Level 6 08/22/16 07/02/17 $30.04 $3.20 $4.94 $1.35 $0.69 $0.67 $40.89 $2.88 $4.32 $48.09 $66.36 $84.63 IRON WORKER (JOURNEY LEVEL) Iron Worker - Ornamental, Reinforcing, Structural 02/22/17 06/30/17 $36.00 $4.00 $9.55 $13.32 $0.72 $2.865 $66.455 $3.46 $5.20 $75.12 $97.01 $118.91 Fence Erector 02/22/17 06/30/17 $29.58 $2.70 $7.38 $8.99 $0.51 $1.905 $51.065 $2.79 $4.20 $58.05 $76.05 $94.04 APPRENTICE (Iron Worker) Level 1 02/22/17 06/30/17 $18.00 $4.00 $5.50 $0.00 $0.72 $0.285 $28.505 $1.90 $2.86 $33.27 $44.22 $55.17 Level 2 02/22/17 06/30/17 $19.80 $4.00 $9.55 $0.00 $0.72 $0.655 $34.725 $2.06 $3.09 $39.88 $51.92 $63.96 Level 3 02/22/17 06/30/17 $21.60 $4.00 $9.55 $3.33 $0.72 $0.655 $39.855 $2.21 $3.33 $45.40 $58.54 $71.67 Level 4 02/22/17 06/30/17 $23.40 $4.00 $9.55 $3.33 $0.72 $1.765 $42.765 $2.37 $3.56 $48.70 $62.93 $77.16 Level 5 02/22/17 06/30/17 $27.00 $4.00 $9.55 $6.66 $0.72 $1.765 $49.695 $2.68 $4.03 $56.41 $72.83 $89.25 Level 6 02/22/17 06/30/17 $28.80 $4.00 $9.55 $6.66 $0.72 $1.765 $51.495 $2.84 $4.26 $58.60 $76.11 $93.63 Level 7 02/22/17 06/30/17 $32.40 $4.00 $9.55 $9.99 $0.72 $2.865 $59.525 $3.15 $4.73 $67.41 $87.11 $106.82 Level 8 02/22/17 06/30/17 $34.20 $4.00 $9.55 $9.99 $0.72 $2.865 $61.325 $3.30 $4.97 $69.60 $90.40 $111.20 APPRENTICE (Fence Erector) Level 1 08/22/16 12/31/16 $14.17 $2.62 $5.50 $0.00 $0.51 $0.205 $23.005 $1.45 $2.18 $26.64 $35.26 $43.88 Level 2 08/22/16 12/31/16 $15.58 $2.62 $7.25 $0.00 $0.51 $0.245 $26.205 $1.57 $2.37 $30.15 $39.62 $49.10 Level 3 08/22/16 12/31/16 $17.00 $2.62 $7.25 $2.25 $0.51 $0.245 $29.875 $1.70 $2.55 $34.12 $44.46 $54.80 Level 4 08/22/16 12/31/16 $18.42 $2.62 $7.25 $2.25 $0.51 $0.885 $31.935 $1.82 $2.74 $36.49 $47.69 $58.90 Level 5 08/22/16 12/31/16 $21.25 $2.62 $7.25 $4.50 $0.51 $0.885 $37.015 $2.06 $3.10 $42.18 $55.11 $68.03 Level 6 08/22/16 12/31/16 $22.66 $2.62 $7.25 $4.50 $0.51 $0.885 $38.425 $2.19 $3.29 $43.90 $57.68 $71.46 Level 7 08/22/16 12/31/16 $25.50 $2.62 $7.25 $6.74 $0.51 $1.515 $44.135 $2.43 $3.66 $50.22 $65.73 $81.24 Level 8 08/22/16 12/31/16 $26.91 $2.62 $7.25 $6.74 $0.51 $1.515 $45.545 $2.55 $3.84 $51.94 $68.31 $84.67 LABORER Group 1 - Boring Machine Helper, Concrete Curer (water curing), Demolition Laborer, Flagman, Pipeline Laborer, Post Hole Digger, etc. 02/22/17 07/02/17 $32.34 $4.57 $7.06 $6.75 $0.69 $0.67 $52.08 $3.19 $4.80 $60.07 $79.74 $99.41 Group 2 - Asphalt Shovler, Cement Dumper, Fine Grader, Stonepaver, Underground Laborer, etc. 02/22/17 07/02/17 $32.89 $4.57 $7.06 $6.75 $0.69 $0.67 $52.63 $3.24 $4.87 $60.74 $80.75 $100.75 Group 3 - Asphalt Installation, Compactor, Concrete Cutter, Driller, Jackhammer, Fence Erector, Power Post Hole Digger, Trenching Machine, etc. 02/22/17 07/02/17 $33.44 $4.57 $7.06 $6.75 $0.69 $0.67 $53.18 $3.29 $4.94 $61.41 $81.75 $102.09 Group 4 - Worker Exposed to Raw Sewage, Asphalt Raker, Asphalt Dumpman & Spreader, Concrete Saw Cutter, Concrete Viborator Operator, Pipelayer, Prefab Manhole Installer, Sandblaster, etc. 02/22/17 07/02/17 $34.99 $4.57 $7.06 $6.75 $0.69 $0.67 $54.73 $3.42 $5.14 $63.29 $84.58 $105.86 Group 5 - Driller, Toxic Waste Removal, Welding 02/22/17 07/02/17 $35.34 $4.57 $7.06 $6.75 $0.69 $0.67 $55.08 $3.45 $5.19 $63.72 $85.22 $106.71 APPRENTICE (Laborer) Level 1 02/22/17 07/02/17 $17.67 $3.20 $4.94 $1.35 $0.69 $0.67 $28.52 $1.81 $2.71 $33.04 $43.79 $54.53 Level 2 02/22/17 07/02/17 $19.44 $3.20 $4.94 $1.35 $0.69 $0.67 $30.29 $1.96 $2.94 $35.19 $47.02 $58.84 Level 3 02/22/17 07/02/17 $21.20 $3.20 $4.94 $1.35 $0.69 $0.67 $32.05 $2.11 $3.17 $37.33 $50.23 $63.12 Level 4 02/22/17 07/02/17 $24.74 $3.20 $4.94 $1.35 $0.69 $0.67 $35.59 $2.42 $3.63 $41.64 $56.69 $71.74 Level 5 02/22/17 07/02/17 $28.27 $3.20 $4.94 $1.35 $0.69 $0.67 $39.12 $2.72 $4.09 $45.93 $63.13 $80.32 Level 6 02/22/17 07/02/17 $30.04 $3.20 $4.94 $1.35 $0.69 $0.67 $40.89 $2.88 $4.32 $48.09 $66.36 $84.63 LANDSCAPE/IRRIGATION LABORER/TENDER Landscape/Irrigation Laborer 02/22/17 07/31/17 $30.53 $4.57 $7.06 $6.75 $0.69 $0.54 $50.14 $3.04 $4.56 $57.74 $76.31 $94.88 Landscape Hydro Seeder 02/22/17 07/31/17 $31.63 $4.57 $7.06 $6.75 $0.69 $0.54 $51.24 $3.13 $4.71 $59.08 $78.32 $97.56 Landscape Irrigation Tender 02/22/17 07/31/17 $14.21 $1.27 $2.25 $0.00 $0.00 $0.21 $17.94 $1.34 $2.01 $21.29 $29.93 $38.58 APPRENTICE (Landscape/Irrigation Fitter) Level 1 02/22/17 06/30/17 $14.17 $1.30 $8.16 $0.38 $0.94 $0.90 $25.85 $1.34 $2.01 $29.20 $37.82 $46.44 Level 2 02/22/17 06/30/17 $17.00 $1.53 $8.16 $0.38 $1.01 $0.90 $28.98 $1.60 $2.41 $32.99 $43.33 $53.67 Level 3 02/22/17 06/30/17 $19.84 $1.76 $8.16 $7.07 $1.02 $0.90 $38.75 $1.87 $2.81 $43.43 $55.49 $67.56 Level 4 02/22/17 06/30/17 $22.67 $2.00 $8.16 $7.07 $1.07 $0.90 $41.87 $2.13 $3.21 $47.21 $61.00 $74.79 Level 5 02/22/17 06/30/17 $25.51 $2.24 $8.16 $7.89 $1.10 $0.90 $45.80 $2.40 $3.61 $51.81 $67.32 $82.84 LANDSCAPE MAINTENANCE LABORER Landscape Maintenance Laborer 02/22/17 03/31/2017* $10.50 $0.115 $0.89 $0.00 $0.00 $0.14 $11.645 $0.92 $1.38 $13.94 $20.33 $26.72 https://www.dir.ca.gov/public-works/prevailing-.html 4/20/2017 Page 5 of 9
(d on Determination 2017-1) @ 8.65% of the 13% of the Total Burdened for Work over 8 Other = = hours, Saturday for Work on LANDSCAPE OPERATING ENGINEER Backhoe Operator, Forklifts, Roller Operator, Earthmoving Equipment Skiploader Operator, Trencher-31 hp and up 02/22/17 10/31/17 $34.96 $3.45 $11.45 $9.65 $0.95 $0.15 $60.61 $3.32 $4.99 $68.93 $90.19 $111.45 APPRENTICE (Landscape - Operating Engineer) Level 1 02/22/17 10/31/17 $20.98 $3.45 $11.45 $9.65 $0.95 $0.15 $46.63 $2.11 $3.18 $51.92 $64.68 $77.44 Level 2 02/22/17 10/31/17 $22.72 $3.45 $11.45 $9.65 $0.95 $0.15 $48.37 $2.26 $3.40 $54.04 $67.86 $81.67 Level 3 02/22/17 10/31/17 $24.47 $3.45 $11.45 $9.65 $0.95 $0.15 $50.12 $2.42 $3.63 $56.16 $71.05 $85.93 Level 4 02/22/17 10/31/17 $26.22 $3.45 $11.45 $9.65 $0.95 $0.15 $51.87 $2.57 $3.86 $58.29 $74.24 $90.19 Level 5 02/22/17 10/31/17 $27.97 $3.45 $11.45 $9.65 $0.95 $0.15 $53.62 $2.72 $4.08 $60.42 $77.44 $94.45 Level 6 02/22/17 10/31/17 $31.46 $3.45 $11.45 $9.65 $0.95 $0.15 $57.11 $3.02 $4.54 $64.67 $83.80 $102.94 METAL ROOFING SYSTEM INSTALLER (JOURNEY LEVEL) Metal Roofing System Installer 08/22/16 06/30/17 $41.86 $0.00 $9.87 $16.21 $0.82 $0.65 $69.41 $3.62 $5.44 $78.47 $103.93 $129.40 MODULAR FURNITURE INSTALLER - CARPENTER Installer 02/22/13 6/30/13* $17.00 $1.85 $4.70 $1.86 $0.00 $0.00 $25.41 $1.63 $2.45 $29.49 $39.83 $50.17 Lead Installer 02/22/13 6/30/13* $19.00 $1.85 $4.70 $1.86 $0.00 $0.00 $27.41 $1.80 $2.71 $31.92 $43.48 $55.04 APPRENTICE (Modular Furniture Installer - Carpenter) Level 1 08/22/13 9/30/13* $12.41 $1.85 $4.70 $0.00 $0.00 $0.00 $18.96 $1.23 $1.85 $22.05 $29.60 $37.14 Level 2 08/22/13 9/30/13* $12.92 $1.85 $4.70 $0.00 $0.00 $0.00 $19.47 $1.28 $1.92 $22.67 $30.53 $38.38 Level 3 08/22/13 9/30/13* $13.60 $1.85 $4.70 $0.00 $0.00 $0.00 $20.15 $1.34 $2.01 $23.49 $31.77 $40.04 Level 4 08/22/13 9/30/13* $14.28 $1.85 $4.70 $0.00 $0.00 $0.00 $20.83 $1.40 $2.10 $24.32 $33.01 $41.69 Level 5 08/22/13 9/30/13* $14.79 $1.85 $4.70 $1.86 $0.00 $0.00 $23.20 $1.44 $2.16 $26.80 $35.80 $44.79 Level 6 08/22/13 9/30/13* $15.64 $1.85 $4.70 $1.86 $0.00 $0.00 $24.05 $1.51 $2.27 $27.84 $37.35 $46.86 OPERATING ENGINEER Group 1 - Forklift (under 5 tons), Generator/Pump Operator, etc. Group 2 - Forklift (over 5 tons), Skiploader (up to 3/4 cu yd) Group 3 - Bobcat or similar type Group 4 - Backhoe/Boring Machine/Concrete Pump/Drilling Machine (small auger-max 30 ft)/excavator (under 21K lbs.)/trenching Machine (up to 6 ft.) Operator, etc. Group 6 - Concrete Placer/Hydraulic Casing Oscillator (45 ft max depth), Rubber-Tired Earthmoving Equipment (up to 25 yd struck)/skiploader (over 3/4/yds.) Operator, Welder, etc. Group 8 - Asphalt/Concrete Spreading/Asphalt Paving Machine/ Asphalt-Rubber Distributor/Backhoe (Over 3/4 yds)/compactor (Self Propelled)/Grouting Machine/Loader/Pumpcrete Gun/Skiploader (1 1/2 yd to 6 1/2 yd)/tractor Compressor Drill Combination/Tractor/Trenching Machine Operator/Gradechecker Group 10 - Backhoe (over 5 cy)/drilling Machine Bucket or Auger Type (105 ft max depth)/pre-stressed Wrapping Machine/Rubber- Tired Earthmoving Equipment (over 50 cy struck)/tractor Loader (over 6 1/2 cy)/drilling Machine Operator/Welder - Certified Group 12 - Backhoe Operator (over 7 cy)/rubber-tired Earthmoving Equipment (over 50 yd struck)/auto Grader/Auto Slip Form/Drilling Machine Operator (175 ft. max depth) Group 13 - Rubber-Tired Earthmoving Equipment Operator (single engine, up to and including 25 yds. struck) Group 14 - Canal Liner/Canal Trimmer/Remote-control Earthmoving Equipment/Wheel Excavator Operator (over 750 cu. yds.) Group 15 - Rubber-Tired Earthmoving Equipment (see description) Group 16 - Rubber-Tired Earthmoving Equipment (see description) Group 17 - Rubber-Tired Earthmoving Equipment (see description) Group 18 - Rubber-Tired Earthmoving Equipment (see description) Group 19 - Rubber-Tired Earthmoving Equipment (see description) Group 20 - Rubber-Tired Earthmoving Equipment (see description) Group 21 - Rubber-Tired Earthmoving Equipment (see description) Group 22 - Rubber-Tired Earthmoving Equipment (see description) Group 23 - Rubber-Tired Earthmoving Equipment (see description) Group 24 - Rubber-Tired Earthmoving Equipment (see description) 08/22/16 06/30/17 $41.85 $3.45 $11.45 $9.65 $0.95 $0.39 $67.74 $3.92 $5.89 $77.55 $103.00 $128.46 08/22/16 06/30/17 $42.63 $3.45 $11.45 $9.65 $0.95 $0.39 $68.52 $3.99 $5.99 $78.50 $104.43 $130.36 08/22/16 06/30/17 $42.92 $3.45 $11.45 $9.65 $0.95 $0.39 $68.81 $4.01 $6.03 $78.85 $104.96 $131.06 08/22/16 06/30/17 $44.41 $3.45 $11.45 $9.65 $0.95 $0.39 $70.30 $4.14 $6.22 $80.66 $107.67 $134.69 08/22/16 06/30/17 $44.63 $3.45 $11.45 $9.65 $0.95 $0.39 $70.52 $4.16 $6.25 $80.93 $108.08 $135.22 08/22/16 06/30/17 $44.74 $3.45 $11.45 $9.65 $0.95 $0.39 $70.63 $4.17 $6.26 $81.06 $108.28 $135.49 08/22/16 06/30/17 $44.86 $3.45 $11.45 $9.65 $0.95 $0.39 $70.75 $4.18 $6.28 $81.21 $108.50 $135.78 08/22/16 06/30/17 $45.03 $3.45 $11.45 $9.65 $0.95 $0.39 $70.92 $4.19 $6.30 $81.42 $108.81 $136.19 08/22/16 06/30/17 $45.13 $3.45 $11.45 $9.65 $0.95 $0.39 $71.02 $4.20 $6.32 $81.54 $108.99 $136.44 08/22/16 06/30/17 $45.16 $3.45 $11.45 $9.65 $0.95 $0.39 $71.05 $4.20 $6.32 $81.57 $109.04 $136.51 08/22/16 06/30/17 $45.24 $3.45 $11.45 $9.65 $0.95 $0.39 $71.13 $4.21 $6.33 $81.67 $109.19 $136.71 08/22/16 06/30/17 $45.36 $3.45 $11.45 $9.65 $0.95 $0.39 $71.25 $4.22 $6.35 $81.82 $109.41 $137.00 08/22/16 06/30/17 $45.53 $3.45 $11.45 $9.65 $0.95 $0.39 $71.42 $4.24 $6.37 $82.02 $109.72 $137.41 08/22/16 06/30/17 $45.63 $3.45 $11.45 $9.65 $0.95 $0.39 $71.52 $4.25 $6.38 $82.15 $109.90 $137.65 08/22/16 06/30/17 $45.74 $3.45 $11.45 $9.65 $0.95 $0.39 $71.63 $4.25 $6.39 $82.28 $110.10 $137.92 08/22/16 06/30/17 $45.86 $3.45 $11.45 $9.65 $0.95 $0.39 $71.75 $4.27 $6.41 $82.43 $110.32 $138.21 08/22/16 06/30/17 $46.03 $3.45 $11.45 $9.65 $0.95 $0.39 $71.92 $4.28 $6.43 $82.63 $110.63 $138.63 08/22/16 06/30/17 $46.13 $3.45 $11.45 $9.65 $0.95 $0.39 $72.02 $4.29 $6.45 $82.75 $110.81 $138.87 08/22/16 06/30/17 $46.24 $3.45 $11.45 $9.65 $0.95 $0.39 $72.13 $4.30 $6.46 $82.89 $111.01 $139.14 08/22/16 06/30/17 $46.36 $3.45 $11.45 $9.65 $0.95 $0.39 $72.25 $4.31 $6.48 $83.03 $111.23 $139.43 https://www.dir.ca.gov/public-works/prevailing-.html 4/20/2017 Page 6 of 9
(d on Determination 2017-1) @ 8.65% of the 13% of the Total Burdened for Work over 8 Other = = hours, Saturday for Work on Group 25 - Concrete Pump Operator 08/22/16 06/30/17 $46.53 $3.45 $11.45 $9.65 $0.95 $0.39 $72.42 $4.32 $6.50 $83.24 $111.54 $139.84 APPRENTICE (Operating Engineer) Level 1 08/22/16 06/30/17 $26.78 $3.45 $11.45 $0.00 $0.95 $0.39 $43.02 $2.61 $3.93 $49.56 $65.85 $82.14 Level 2 08/22/16 06/30/17 $29.01 $3.45 $11.45 $0.00 $0.95 $0.39 $45.25 $2.81 $4.22 $52.28 $69.92 $87.57 Level 3 08/22/16 06/30/17 $31.24 $3.45 $11.45 $9.65 $0.95 $0.39 $57.13 $3.00 $4.51 $64.64 $83.64 $102.64 Level 4 08/22/16 06/30/17 $33.47 $3.45 $11.45 $9.65 $0.95 $0.39 $59.36 $3.19 $4.80 $67.35 $87.71 $108.07 Level 5 08/22/16 06/30/17 $35.70 $3.45 $11.45 $9.65 $0.95 $0.39 $61.59 $3.39 $5.09 $70.07 $91.78 $113.50 Level 6 08/22/16 06/30/17 $40.17 $3.45 $11.45 $9.65 $0.95 $0.39 $66.06 $3.77 $5.67 $75.50 $99.94 $124.37 PAINTER (JOURNEY LEVEL) Painter, Lead Abatement 08/22/16 06/30/17 $31.12 $1.55 $8.05 $3.04 $0.60 $0.91 $45.27 $2.83 $4.25 $52.34 $71.27 $90.20 Industrial Painter 08/22/16 06/30/17 $32.52 $1.55 $8.05 $3.04 $0.70 $0.91 $46.77 $2.95 $4.43 $54.15 $73.93 $93.71 APPRENTICE (Painter) Level 1 08/22/16 06/30/17 $13.38 $0.52 $6.10 $0.14 $0.60 $0.91 $21.650 $1.20 $1.81 $24.66 $32.80 $40.94 Level 2 08/22/16 06/30/17 $14.00 $0.53 $6.40 $0.14 $0.60 $0.91 $22.580 $1.26 $1.89 $25.73 $34.24 $42.76 Level 3 08/22/16 06/30/17 $14.75 $0.74 $7.32 $0.68 $0.60 $0.91 $25.000 $1.34 $2.01 $28.35 $37.33 $46.30 Level 4 08/22/16 06/30/17 $16.15 $0.76 $8.05 $1.28 $0.60 $0.91 $27.750 $1.46 $2.20 $31.41 $41.23 $51.06 Level 5 08/22/16 06/30/17 $17.54 $1.33 $8.05 $1.34 $0.60 $0.91 $29.770 $1.63 $2.45 $33.86 $44.52 $55.19 Level 6 08/22/16 06/30/17 $18.94 $1.35 $8.05 $2.05 $0.60 $0.91 $31.900 $1.76 $2.64 $36.29 $47.81 $59.33 Level 7 08/22/16 06/30/17 $20.35 $1.38 $8.05 $2.52 $0.84 $0.91 $34.050 $1.88 $2.82 $38.75 $51.13 $63.51 Level 8 08/22/16 06/30/17 $21.73 $1.40 $8.05 $2.52 $1.55 $0.91 $36.160 $2.00 $3.01 $41.17 $54.38 $67.60 APPRENTICE (Industrial Painter) Level 1 08/22/16 06/30/17 $13.98 $0.52 $6.10 $0.14 $0.79 $0.82 $22.35 $1.25 $1.89 $25.49 $33.99 $42.50 Level 2 08/22/16 06/30/17 $14.63 $0.53 $6.40 $0.14 $0.79 $0.82 $23.31 $1.31 $1.97 $26.59 $35.49 $44.39 Level 3 08/22/16 06/30/17 $15.42 $0.74 $7.32 $0.68 $0.79 $0.82 $25.77 $1.40 $2.10 $29.27 $38.65 $48.03 Level 4 08/22/16 06/30/17 $16.89 $0.76 $8.05 $1.28 $0.79 $0.82 $28.59 $1.53 $2.29 $32.41 $42.68 $52.96 Level 5 08/22/16 06/30/17 $18.34 $1.33 $8.05 $1.34 $0.79 $0.82 $30.67 $1.70 $2.56 $34.93 $46.08 $57.24 Level 6 08/22/16 06/30/17 $19.80 $1.35 $8.05 $2.05 $0.79 $0.82 $32.86 $1.83 $2.75 $37.44 $49.48 $61.53 Level 7 08/22/16 06/30/17 $21.26 $1.38 $8.05 $2.52 $1.03 $0.82 $35.06 $1.96 $2.94 $39.96 $52.89 $65.82 Level 8 08/22/16 06/30/17 $22.72 $1.40 $8.05 $2.52 $1.74 $0.82 $37.25 $2.09 $3.14 $42.47 $56.29 $70.11 PARKING AND HIGHWAY IMPROVEMENT (STRIPING, SLURRY AND SEAL COAT - LABORER) Group 1 - Protective Coating, Pavement Sealing, Installation of Carstops, Traffic Control Person, Asphalt Repair 08/22/16 07/02/17 $34.86 $4.81 $7.06 $3.95 $1.21 $0.56 $52.45 $3.43 $5.16 $61.04 $82.24 $103.45 Group 2 - Traffic Surface Abrasive Blaster, Traffic Control Person/Certified, Repairing and Filling of Cracks and Surface Cleaning on Streets, Slurry Seal Squeegeeman (Finisher) 08/22/16 07/02/17 $36.16 $4.81 $7.06 $3.95 $1.21 $0.56 $53.75 $3.54 $5.33 $62.62 $84.61 $106.61 Group 3 - Traffic Delineating Device Applicator, Traffic Protective System Installer, Pavement Marking Applicator, Slurry Seal Applicator 08/22/16 07/02/17 $38.17 $4.81 $7.06 $3.95 $1.21 $0.56 $55.76 $3.72 $5.59 $65.07 $88.28 $111.50 Group 4 - Traffic Stripping Applicator, Slurry Seal Mixer Operator 08/22/16 07/02/17 $39.91 $4.81 $7.06 $3.95 $1.21 $0.56 $57.50 $3.87 $5.81 $67.18 $91.46 $115.73 APPRENTICE (Parking & Highway Improvement/Striper - Laborer) Level 1 08/22/16 07/03/17 $22.35 $2.41 $4.94 $1.19 $0.55 $0.00 $31.44 $2.14 $3.22 $36.80 $50.39 $63.99 Level 2 08/22/16 07/03/17 $26.17 $2.41 $4.94 $1.19 $0.55 $0.00 $35.26 $2.47 $3.72 $41.45 $57.37 $73.28 Level 3 08/22/16 07/03/17 $28.63 $3.37 $5.65 $1.58 $1.21 $0.44 $40.88 $2.77 $4.16 $47.81 $65.22 $82.64 Level 4 08/22/16 07/03/17 $30.54 $3.37 $5.65 $1.58 $1.21 $0.44 $42.79 $2.93 $4.41 $50.13 $68.71 $87.28 PLASTERER (JOURNEY LEVEL) Plasterer 08/22/16 08/02/17 $34.41 $5.58 $9.13 $4.21 $0.63 $0.99 $54.95 $3.46 $5.20 $63.61 $84.54 $105.47 Plaster Tender 08/22/16 08/02/17 $34.15 $5.05 $7.06 $6.15 $1.02 $1.02 $54.45 $3.39 $5.10 $62.94 $83.71 $104.48 Plaster clean-up Laborer 08/22/16 08/02/17 $31.60 $5.05 $7.06 $6.15 $1.02 $1.02 $51.90 $3.17 $4.76 $59.83 $79.06 $98.28 APPRENTICE (Plasterer) Level 1 08/22/16 08/01/17 $15.48 $4.34 $9.13 $0.00 $0.00 $0.00 $28.95 $1.71 $2.58 $33.24 $42.66 $52.07 Level 2 08/22/16 08/01/17 $17.21 $4.45 $9.13 $4.21 $0.63 $0.99 $36.62 $1.87 $2.82 $41.31 $51.78 $62.25 Level 3 08/22/16 08/01/17 $20.65 $4.65 $9.13 $4.21 $0.63 $0.99 $40.26 $2.19 $3.29 $45.74 $58.30 $70.86 Level 4 08/22/16 08/01/17 $24.09 $4.85 $9.13 $4.21 $0.63 $0.99 $43.90 $2.50 $3.76 $50.17 $64.82 $79.47 Level 5 08/22/16 08/01/17 $27.53 $5.05 $9.13 $4.21 $0.63 $0.99 $47.54 $2.82 $4.24 $54.59 $71.34 $88.08 Level 6 08/22/16 08/01/17 $30.97 $5.26 $9.13 $4.21 $0.63 $0.99 $51.19 $3.13 $4.71 $59.03 $77.87 $96.71 https://www.dir.ca.gov/public-works/prevailing-.html 4/20/2017 Page 7 of 9
(d on Determination 2017-1) @ 8.65% of the 13% of the Total Burdened for Work over 8 Other = = hours, Saturday for Work on APPRENTICE (Plaster Tender) Level 1 08/22/16 08/01/17 $15.37 $5.05 $4.24 $1.23 $1.02 $0.12 $27.03 $1.77 $2.65 $31.45 $40.80 $50.15 Level 2 08/22/15 08/01/17 $17.08 $5.05 $4.95 $2.46 $1.02 $0.12 $30.68 $1.91 $2.88 $35.47 $45.86 $56.25 Level 3 08/22/16 08/01/17 $20.49 $5.05 $5.65 $3.69 $1.02 $0.12 $36.02 $2.21 $3.32 $41.55 $54.01 $66.48 Level 4 08/22/15 08/01/17 $23.91 $5.05 $6.36 $4.92 $1.02 $0.12 $41.38 $2.51 $3.76 $47.65 $62.19 $76.74 Level 5 08/22/15 08/01/17 $27.32 $5.05 $6.36 $5.23 $1.02 $0.12 $45.10 $2.80 $4.21 $52.11 $68.73 $85.34 Level 6 08/22/15 08/01/17 $30.74 $5.05 $6.36 $5.54 $1.02 $0.12 $48.83 $3.10 $4.65 $56.58 $75.28 $93.97 PLUMBER (JOURNEY LEVEL) Plumber, Industrial and General Pipefitter 02/22/17 06/30/17 $44.16 $3.03 $8.16 $11.40 $1.85 $1.10 $69.70 $4.08 $6.13 $79.92 $106.78 $133.64 Sewer and Storm Drain Pipelayer 02/22/17 06/30/17 $33.87 $1.00 $8.05 $8.55 $1.58 $1.10 $54.15 $3.02 $4.53 $61.70 $82.30 $102.90 Sewer and Storm Drain Pipe Tradesman 02/22/17 06/30/17 $17.41 $0.00 $8.05 $0.38 $1.01 $0.95 $27.80 $1.51 $2.26 $31.57 $42.16 $52.75 Landscape/Irrigation Fitter 08/22/16 06/30/17 $28.34 $2.49 $8.16 $11.40 $1.24 $0.90 $52.53 $2.67 $4.01 $59.20 $76.44 $93.68 Landscape/Irrigation Tradesman 08/22/16 06/30/17 $14.11 $0.00 $2.00 $0.88 $0.10 $0.85 $17.94 $1.22 $1.83 $20.99 $29.58 $38.16 Fire Sprinkler Fitter 02/22/17 8/31/2017* $39.66 $0.00 $9.17 $14.45 $1.35 $0.55 $65.18 $3.43 $5.16 $73.77 $97.89 $122.01 APPRENTICE (Plumber, Pipefitter, Steamfitter) Level 1 02/22/17 06/30/17 $19.87 $1.54 $0.00 $0.38 $1.03 $0.98 $23.80 $1.85 $2.78 $28.44 $40.52 $52.61 Level 2 02/22/17 06/30/17 $22.08 $1.84 $8.16 $0.38 $1.10 $1.04 $34.60 $2.07 $3.11 $39.78 $53.21 $66.64 Level 3 02/22/17 06/30/17 $26.50 $2.14 $8.16 $5.53 $1.11 $1.04 $44.48 $2.48 $3.72 $50.68 $66.80 $82.92 Level 4 02/22/17 06/30/17 $30.91 $2.43 $8.16 $5.91 $1.16 $1.04 $49.61 $2.88 $4.33 $56.83 $75.63 $94.43 Level 5 02/22/17 06/30/17 $35.33 $2.73 $8.16 $6.34 $1.19 $1.04 $54.79 $3.29 $4.95 $63.03 $84.52 $106.01 ROOFER (JOURNEY LEVEL) Roofer 08/22/16 07/31/17* $36.12 $0.00 $7.81 $7.04 $0.50 $0.57 $52.04 $3.12 $4.70 $59.86 $81.83 $103.80 Pitch Work 08/22/16 07/31/17 $37.87 $0.00 $7.81 $7.04 $0.50 $0.57 $53.79 $3.28 $4.92 $61.99 $85.02 $108.06 APPRENTICE (Roofer) Level 1 08/22/16 07/31/17 $19.94 $0.00 $7.81 $3.94 $0.50 $0.57 $32.76 $1.72 $2.59 $37.08 $49.21 $61.33 Level 2 08/22/16 07/31/17 $21.55 $0.00 $7.81 $3.94 $0.50 $0.57 $34.37 $1.86 $2.80 $39.04 $52.14 $65.25 Level 3 08/22/16 07/31/17 $23.17 $0.00 $7.81 $3.94 $0.50 $0.57 $35.99 $2.00 $3.01 $41.01 $55.10 $69.19 Level 4 08/22/16 07/31/17 $24.79 $0.00 $7.81 $3.94 $0.50 $0.57 $37.61 $2.14 $3.22 $42.98 $58.06 $73.13 Level 5 08/22/16 07/31/17 $26.41 $0.00 $7.81 $3.94 $0.50 $0.57 $39.23 $2.28 $3.43 $44.95 $61.01 $77.08 Level 6 08/22/16 07/31/17 $29.65 $0.00 $7.81 $4.19 $0.50 $0.57 $42.72 $2.56 $3.85 $49.14 $67.17 $85.21 Level 7 08/22/16 07/31/17 $32.88 $0.00 $7.81 $4.19 $0.50 $0.57 $45.95 $2.84 $4.27 $53.07 $73.07 $93.07 SHEET METAL WORKER (JOURNEY LEVEL) Sheet Metal Worker 08/22/16 06/30/17 $41.86 $0.00 $9.87 $16.21 $0.82 $0.65 $69.41 $3.62 $5.44 $78.47 $103.93 $129.40 APPRENTICE (Sheet metal Worker) Level 1 08/22/16 06/30/17 $14.26 $0.00 $5.72 $2.03 $1.67 $0.35 $24.03 $1.23 $1.85 $27.12 $35.79 $44.46 Level 2 08/22/16 06/30/17 $15.85 $0.00 $5.72 $2.15 $1.67 $0.35 $25.74 $1.37 $2.06 $29.17 $38.81 $48.45 Level 3 08/22/16 06/30/17 $17.43 $0.00 $5.72 $2.26 $1.67 $0.35 $27.43 $1.51 $2.27 $31.20 $41.81 $52.41 Level 4 08/22/16 06/30/17 $19.01 $0.00 $5.72 $2.37 $1.67 $0.35 $29.12 $1.64 $2.47 $33.24 $44.80 $56.36 Level 5 08/22/16 06/30/17 $20.60 $0.00 $5.72 $2.49 $1.67 $0.35 $30.83 $1.78 $2.68 $35.29 $47.82 $60.35 08/22/16 06/30/17 $22.18 $0.00 $5.72 $2.60 $1.67 $0.35 $32.52 $1.92 $2.88 $37.32 $50.81 $64.30 Level 7 08/22/16 06/30/17 $23.77 $0.00 $5.72 $2.72 $1.67 $0.35 $34.23 $2.06 $3.09 $39.38 $53.83 $68.29 Level 8 08/22/16 06/30/17 $25.35 $0.00 $5.72 $2.83 $1.67 $0.35 $35.92 $2.19 $3.30 $41.41 $56.83 $72.25 Level 9 08/22/16 06/30/17 $26.94 $0.00 $5.72 $2.95 $1.67 $0.35 $37.63 $2.33 $3.50 $43.46 $59.85 $76.24 Level 10 08/22/16 06/30/17 $28.52 $0.00 $5.72 $3.06 $1.67 $0.35 $39.32 $2.47 $3.71 $45.49 $62.84 $80.19 TEAMSTERS (WORK ON SITE ONLY) Group 2 - Truck Mounted Power Broom 02/22/17 06/30/17 $29.24 $2.90 $16.87 $5.00 $1.62 $0.45 $56.08 $2.78 $4.18 $63.04 $80.82 $98.61 Group 3 - Dump Truck (under 16 yds.) 02/22/17 06/30/17 $29.37 $2.90 $16.87 $5.00 $1.62 $0.45 $56.21 $2.79 $4.20 $63.20 $81.06 $98.93 Group 6 - Dump Truck (16-25 yds) 02/22/17 06/30/17 $29.62 $2.90 $16.87 $5.00 $1.62 $0.45 $56.46 $2.81 $4.23 $63.50 $81.52 $99.53 Group 8 - Dump Truck (25-49 yds) 02/22/17 06/30/17 $30.12 $2.90 $16.87 $5.00 $1.62 $0.45 $56.96 $2.86 $4.29 $64.11 $82.43 $100.75 TERRAZZO FINISHER (JOURNEY LEVEL) Terrazzo Finisher 02/22/17 08/31/17 $28.53 $0.00 $8.36 $3.40 $0.51 $0.12 $40.92 $2.47 $3.71 $47.10 $64.45 $81.80 APPRENTICE (Terrazo Finisher) Level 1 02/22/17 08/31/17 $14.27 $0.00 $3.23 $0.00 $0.51 $0.12 $18.13 $1.23 $1.86 $21.22 $29.90 $38.58 Level 2 02/22/17 08/31/17 $17.12 $0.00 $6.96 $3.40 $0.51 $0.12 $28.11 $1.48 $2.23 $31.82 $42.23 $52.64 Level 3 02/22/17 08/31/17 $21.40 $0.00 $8.36 $3.40 $0.51 $0.12 $33.79 $1.85 $2.78 $38.42 $51.44 $64.46 Level 4 02/22/17 08/31/17 $22.82 $0.00 $8.36 $3.40 $0.51 $0.12 $35.21 $1.97 $2.97 $40.15 $54.03 $67.91 TERRAZZO WORKER (JOURNEY LEVEL) Terrazzo Worker 02/22/17 08/31/17 $35.57 $0.00 $9.15 $3.40 $0.59 $0.12 $48.83 $3.08 $4.62 $56.53 $78.17 $99.80 TILE FINISHER (JOURNEY LEVEL) https://www.dir.ca.gov/public-works/prevailing-.html 4/20/2017 Page 8 of 9
(d on Determination 2017-1) CRAFT @ 8.65% of the 13% of the Total Burdened for Work over 8 for Work on Other = = hours, Saturday Tile Finisher 08/22/15 05/31/16 $24.53 $0.00 $8.43 $1.89 $0.76 $0.28 $35.89 $2.12 $3.19 $41.20 $56.12 $71.04 APPRENTICE (Tile Finisher) Level 1 08/22/16 05/31/17 $14.47 $0.00 $4.24 $0.00 $0.76 $0.05 $19.52 $1.25 $1.88 $22.65 $31.45 $40.26 Level 2 08/22/16 05/31/17 $17.66 $0.00 $6.38 $0.00 $0.76 $0.05 $24.85 $1.53 $2.30 $28.67 $39.42 $50.16 Level 3 08/22/16 05/31/17 $20.85 $0.00 $7.58 $1.59 $0.76 $0.05 $30.83 $1.80 $2.71 $35.34 $48.03 $60.71 Level 4 08/22/16 05/31/17 $23.55 $0.00 $7.58 $1.59 $0.76 $0.05 $33.53 $2.04 $3.06 $38.63 $52.95 $67.28 TILE LAYER (JOURNEY LEVEL) Tile Layer 02/22/17 05/31/17 $35.89 $0.00 $9.25 $6.03 $0.96 $0.37 $52.50 $3.10 $4.67 $60.27 $82.10 $103.93 APPRENTICE (Tile Setter) Level 1 08/22/16 05/31/17 $16.15 $0.00 $9.25 $0.00 $0.96 $0.37 $26.73 $1.40 $2.10 $30.23 $40.05 $49.87 Level 2 08/22/16 05/31/17 $18.30 $0.00 $9.25 $0.00 $0.96 $0.37 $28.88 $1.58 $2.38 $32.84 $43.97 $55.10 Level 3 08/22/16 05/31/17 $20.82 $0.00 $9.25 $6.03 $0.96 $0.37 $37.43 $1.80 $2.71 $41.94 $54.60 $67.27 Level 4 08/22/16 05/31/17 $22.97 $0.00 $9.25 $6.03 $0.96 $0.37 $39.58 $1.99 $2.99 $44.55 $58.52 $72.50 Level 5 08/22/16 05/31/17 $25.12 $0.00 $9.25 $6.03 $0.96 $0.37 $41.73 $2.17 $3.27 $47.17 $62.45 $77.73 Level 6 08/22/16 05/31/17 $27.28 $0.00 $9.25 $6.03 $0.96 $0.37 $43.89 $2.36 $3.55 $49.80 $66.39 $82.98 Level 7 08/22/16 05/31/17 $31.58 $0.00 $9.25 $6.03 $0.96 $0.37 $48.19 $2.73 $4.11 $55.03 $74.24 $93.44 Level 8 08/22/16 05/31/17 $33.74 $0.00 $9.25 $6.03 $0.96 $0.37 $50.35 $2.92 $4.39 $57.65 $78.18 $98.70 TREE TRIMMER (LINE CLEARANCE) Tree Trimmer Step 1 02/22/17 12/30/17 $14.75 $0.68 $3.51 $0.44 $0.00 $0.00 $19.38 $1.33 $2.01 $22.72 $31.69 $40.66 Step 2 02/22/17 12/30/17 $15.70 $0.72 $3.51 $0.47 $0.00 $0.00 $20.40 $1.42 $2.13 $23.95 $33.50 $43.05 Step 3 02/22/17 12/30/17 $16.33 $0.75 $3.51 $0.48 $0.00 $0.00 $21.07 $1.48 $2.22 $24.77 $34.70 $44.63 Step 4 02/22/17 12/30/17 $17.06 $0.79 $3.51 $0.51 $0.00 $0.00 $21.87 $1.54 $2.32 $25.73 $36.11 $46.49 Tree Trimmer Trainee 02/22/17 12/30/17 $14.02 $0.65 $3.51 $0.42 $0.00 $0.00 $18.60 $1.27 $1.91 $21.78 $30.30 $38.83 Step 1 (0-6 Months) 08/22/16 12/31/16 $12.65 $0.58 $3.51 $0.37 $0.00 $0.00 $17.11 $1.14 $1.72 $19.97 $27.67 $35.36 Step 2 (7-18 Months) 08/22/16 12/31/16 $13.53 $0.62 $3.51 $0.40 $0.00 $0.00 $18.06 $1.22 $1.84 $21.12 $29.35 $37.58 Groundman 08/22/16 12/31/16 $12.18 $0.56 $3.51 $0.36 $0.00 $0.00 $16.61 $1.10 $1.66 $19.37 $26.78 $34.19 TUNNEL WORKER - LABORER (JOURNEY LEVEL) Group 3 - Micro-Tunneling, Micro-Tunneling Systems 08/22/16 07/02/17 $38.87 $4.57 $7.06 $6.75 $0.69 $0.67 $58.61 $3.76 $5.65 $68.01 $91.66 $115.30 TUNNEL - OPERATING ENGINEER (JOURNEY LEVEL) Group 6 - Grouting Machine Operator 08/22/16 06/30/17 $45.24 $3.45 $11.45 $9.65 $0.95 $0.39 $71.13 $4.21 $6.33 $81.67 $109.19 $136.71 Notes: 1. The Change Order Labor s are calculated using the most current published prevailing wage and fringe benefits determination, applicable to the Los Angeles County and the particular labor classification, from the State of California Director of Industrial Relations. To the Total (Column D), will be added Payroll Taxes at 8.65% (Column E), and Worker s Compensation & General Liability Insurance at 13% (Column F) of the base wages (Columns A+B), respectively. 2. The most commonly used labor classifications employed on Bureau of Engineering projects are listed in the table above. The change order rates for labor classifications not listed in the table will be calculated using the available prevailing wage wage and fringe benefit determinations from the State of California Industrial Relations. Payment to a craft of classification not shown on the prevailing wage rate determinations shall comply with the rate of the craft or classification most closely related to it. 3. Copies of the prevailing wage and fringe benefit determinations are available on the internet at http://www.dir.ca.gov/oprl/pwd/. * Effective until superseded by a new determination issued by the State of California Director of Industrial Relations. ** In addition, an amount equal to 3% of the base hourly rate is added to the total hourly rate and overtime hourly rates for the National Employees Benefit Board. https://www.dir.ca.gov/public-works/prevailing-.html 4/20/2017 Page 9 of 9