OPERATING POLICY MANUAL

ENERGY CONTROL PROGRAM (LOCKOUT/TAGOUT)

CRAVEN COMMUNITY COLLEGE. Control of Hazardous Energy. (Lockout/Tagout) Completed by: Eddie Foster. Completed Date: January 2, 2018

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROCEDURES (Revised 8/05)

LOCKOUT/TAGOUT POLICY

Lockout/Tagout Program (Control of Hazardous Energy)

Title: Lockout/Tagout Policy. University Division/Department: Environmental Health & Safety Effective Date : May, 1996 Revised: July, 2017

An annual review of all local Lock Out Tag Out procedures must be accomplished.

Richland County School District One. Lockout & Tagout Program (29 CFR PART )

Delaware State University

Lockout Tagout Program

TABLE OF CONTENTS 1.0 SUMMARY SCOPE REGULATIONS AND POLICIES DEFINITIONS RESPONSIBILITIES... 2

ESSENTIAL SAFETY RESOURCES

Title: Lockout / Tagout Effective Date: 11/28/2014 Control Number: THG_0008 Revision Number: 1 Date: 10/8/2015 Annual Review Completed: 5/13/2015

The Control of Hazardous Energy (Lockout/Tagout)

2200 LOCK-OUT TAG-OUT PROGRAM. Document History. Version Date Comments

James E. Thompson, Inc. dba JTS Construction

Sample Lockout Procedure Use with Lockout/Tagout (Control of Hazardous Energy)

LOCKOUT / TAGOUT PROGRAM

Effective Date Revision Date Page October 1, 2014 June 2015 Page 1 of 13

FCX Department of Occupational Health and Safety Policy

LOCKOUT TAGOUT SAFETY PROGRAM

The Control of Hazardous Energy (Lockout/Tagout) California State University Chico

MISSOURI UNIVERSITY OF SCIENCE & TECHNOLOGY

COMMONWEALTH SCAFFOLD Quality Scaffolding Across New England

LOCKOUT TAGOUT STILL CRAZY AFTER ALL THESE YEARS?

Millersville University Finance and Administration Division Management Directive

An Example Of An Effective Lockout-Tagout Procedure

Lockout / Tagout Policy

The City of Redlands Lockout/ Tagout (LOTO) Program Rev. March 2017

Lockout/Tagout Program

No. GA Page 1 of 5 Effective Date: 03/04/16

Lockout/Tagout Procedures

LOCKOUT/TAGOUT PROGRAM29 CFR

CITY AND COUNTY OF DENVER CR&CF RISK UNIT Lockout/Tagout/Verify Standard

Lockout/Tagout Program

Control of Hazardous Energy (Lockout/Tagout) Program. The Department of Environmental Health and Safety

Lockout Myths & Misconceptions. Chad Ignatowski. Office: (616) Cell: (616)

CALIFORNIA STATE UNIVERSITY, LOS ANGELES LOCKOUT / TAGOUT PROGRAM

Dutchess Community College. Control of Hazardous Energy. Lockout Tagout Program

UNCG Lockout/Tagout Program

New Mexico Institute of Mining & Technology. Lockout/Tagout Policy

Model Safety Program

Lockout Tagout Program

FACT SHEET Standard: Lockout - Tagout

RISK CONTROL SOLUTIONS

Lock Out Tag Out (LOTO) Safety Procedure

Procedure. Procedure

Training Calendar. Monthly Poster Theme Make copies and post them wherever you will get the most impact. In This Issue: April 2018 SAFETY THEME

THE UNIVERSITY OF SOUTHERN MAINE. Lockout/Tagout Policy

CSEA Energy Control (Lockout/Tagout) Program Evaluation Form

Control of Hazardous Energy Lockout/Tagout A GUIDE TO EVALUATION OF EXPOSURES AND PROGRAM DEVELOPMENT

LOCKOUT / TAGOUT PURPOSE SCOPE DEFINITIONS. Applicable OSHA Standards: 29 CFR

Technical Safety Office. Hazardous Energy Control (Lockout/Tagout) Program An Environmental Health & Safety Document

Lockout Tagout.

Lockout Tagout Program

Control of Hazardous Energy (Lockout/Tagout Requirements and Procedures): OSHA Standard

D. Bleed: To release or dissipate residual energy in a machine, equipment, pipe, line, or duct so that all energy is reduced to a zero energy state.

This approach involves the following suggested steps: Assemble the participants, hand out copies of the theme page, and pass around the signin

-Sample- Hazardous Energy Control Program

Brief Outline Code of Federal Regulation (29) The Control of Hazardous Energy (Lockout/Tagout)

Control of Hazardous Energy Program (Lockout/Tagout Program) June 13, 2017

COMPLETE AND EFFECTIVE LOCKOUT / TAGOUT PROGRAMS

Hazardous Energy Control / Lock out Tag out (LOTO)

Distribution Restriction Statement Approved for public release; distribution is unlimited.

HAZARDOUS ENERGY CONTROL PROGRAM

Control of Hazardous Energy Lockout/Tagout

LOCKOUT TAGOUT OTCO WATER WORKSHOP MARCH 5, 2014 COLUMBUS, OH

NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY NHMFL LOCKOUT/TAGOUT SAFETY PROCEDURE SP-1

UNCONTROLLED. Title: Energy Control and Lockout Compliance Work Instruction

UNCONTROLLED. Title: Energy Control and Lockout Compliance Work Instruction

Energy Control and Lockout Tagout

White Paper. May Ensuring Safety with a Lockout/Tagout Program Seven Steps to Compliance

Control of Hazardous Energy Sources

LOCKOUT/TAGOUT PROGRAM

Control of Hazardous Energy. How to comply with new shipyard safety regulations

LOCK OUT/ TAG OUT PROGRAM

Aircraft Lockout/Tagout (LOTO)

L OCKOUT T AGOUT. For Authorized Employees

Contents. Introduction... Equipment Survey: Identifying & Labeling the Energy Disconnecting Means... Methods of Locking Out Controls...

Control of. OSHA (Revised)

LOCK OUT - TAG OUT LO-TO

Contractor EHS Program Attachments

SECTION 2 SAFETY GOALS AND RESPONSIBILITIES P AGE 1

Mineral Products Association. Guide to Energy Isolation and LOTOTO. (Lock-out - Tag-out - Try-out)

NFPA 70E Compliance: A Systems Approach

PURPOSE OF THE PROCEDURE To minimize the incidence of employee injuries from machines and equipment as per OSHA

PROCESS OPERATIONS. Introduction to Operations. Diagrams for the Operating Unit. Revised 11/30/18 1

Course Description for Basic Lockout-Tagout

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

T08 - Maintaining Your Safety Plan

General Electrical Safety Awareness Course: E100

Machine Guarding and Maintenance

CAL/OSHA ELECTRICAL HIGH VOLTAGE

Tom Carpenter Crane Maintenance Technician

Implementing and Managing Electrical Safety Programs

Grace & Co. Conn Page 1 of 25

{CLIENT SITE} {CLIENT COMPANY}

Transcription:

Company Policy Lockout/Tagout is dedicated to the protection of its employees from occupational injuries and illnesses. is responsible for providing a safe working environment and the employees have and assume the responsibility of working safely. The objective of this program is to supplement the safety policy by providing specific standards regarding the lockout/tagout program, and to ensure that each employee is adequately trained and fully aware of safety procedures associated with the lockout/tagout program. Elimination of injuries and illnesses improves employee morale, improves customer service, improves product quality, and reduces workers compensation costs. The lockout/tagout program serves as a tool to increase employee protection and to reduce jobsite hazards. will conduct routine safety inspections of jobsites to ensure compliance with this program. has the authority to enforce the personal protective equipment (PPE) program in accordance to any and all safety rules and applicable OSHA regulations. Employees are required to comply with the guidelines set forth and to comply with the instruction of. In the event an unsafe condition arises in the absence of, employees shall alert the lead person on the jobsite immediately. Employees shall alert co-workers of any unsafe conditions that arise. Any employee who disobeys and/or disregards the guidelines set forth in this program, or the company s safety program, shall be subject to disciplinary action. Lockout/tagout procedure for Objectives To establish a means of positive control to prevent the accident starting or activating of machinery or systems while they are being repaired, cleaned and/or serviced. To establish a safe and positive means of shutting down machinery, equipment and systems. To prohibit unauthorized personnel or remote control systems from starting machinery or equipment while it is being serviced. To provide a secondary control system (tagout) when it is impossible to positively lockout the machinery or equipment. To establish responsibility for implementing and controlling lockout/tagout procedures. To ensure that only approved locks, standardized tags and fastening devices provided by the company will be utilized in the lockout/tagout procedures. LC-7126 (02-12) PAGE 1 of 14

Areas of responsibility will be responsible for implementing the lockout/tagout program. is responsible to enforce the program and ensure compliance with the procedures in their department. is responsible for monitoring the compliance of this procedure and will conduct the annual inspection and certification of the authorized employees. Authorized employees (those contained in Attachment A-1) are responsible to follow established lockout/ tagout procedures. Affected employees (all other employees in the facility) are responsible for ensuring they do not attempt to restart or re-energize machines or equipment which are locked out or tagged out. Procedures Preparation for lockout /tagout Employees who are required to utilize the lockout/tagout procedure (see Attachment A-1) must be knowledgeable of the different energy sources and the proper sequence of shutting off or disconnecting energy means. The four types of energy sources are: 1. Electrical (most common form) 2. Hydraulic or pneumatic 3. Fluids and gases 4. Mechanical More than one energy source can be utilized on some equipment and the proper procedure must be followed in order to identify energy sources and lockout/tagout accordingly. See Attachment D for specific procedure format. Electrical Shutoff power at machine and disconnect. Disconnecting means must be locked or tagged Press start button to see that correct systems are locked out. All controls must be returned to their safest position. Points to remember: a. If a machine or piece of equipment contains capacitors, they must be drained of stored energy. b. Possible disconnecting means include the power cord, power panels (look for primary and secondary voltage), breakers, the operator s station, motor circuit, relays, limit switches, and electrical interlocks. LC-7126 (02-12) PAGE 2 of 14

Note: 1. Some equipment may have a motor isolating shutoff and a control isolating shutoff. 2. If unplugging the power cord disconnects the electrical energy, the cord must be kept under the control of the authorized employee or the plug end of the cord must be locked out or tagged out. Hydraulic/pneumatic Shutoff all energy sources (pumps and compressors). If the pumps and compressors supply energy to more than one piece of equipment, lockout or tagout the valve supplying energy to this piece of equipment. Stored pressure from hydraulic/pneumatic lines shall be drained/bled when release of stored energy could cause injury to employees. Make sure controls are returned to their safest position (off, stop, standby, inch, jog, etc.). Fluids and gases Identify the type of fluid or gas. Close valves to prevent flow, lockout/tagout. Determine the isolating device, close, and lockout or tagout. Drain and bleed lines to zero energy state. Note: Some systems may have electrically controlled valves; if so, they must be shutoff, locked or tagged out. Check for zero energy state at the equipment. Mechanical energy (Gravity activation or stored in springs, etc.) Block out or use die ram safety chain. Lockout or tagout safety device. Shutoff, lockout or tagout electrical system. Check for zero energy state. Return controls to safest position. Release from lockout/tagout Inspection: Make certain the work is completed and inventory tools and equipment used. Clean up: Remove all towels, rags, work-aids, etc. Replace guards: Replace all guards possible. Sometimes a particular guard may have to be left off until the start sequence is over due to possible adjustments. However, all other guards should be put back into place. Check controls: All controls should be in their safest position. The work area shall be checked to ensure that all employees have been safely positioned or removed and notified that the lockout/tagout devices are being removed. Remove locks/tags: Remove only your lock or tag. LC-7126 (02-12) PAGE 3 of 14

Procedure involving more than one person When servicing and/or maintenance is performed by more than one person, each authorized employee shall place his own lock or tag on the energy-isolating source. This shall be done by utilizing a multiple lock scissors clamp if the equipment is capable of being locked out. If the equipment cannot be locked out, then each authorized employee must place his tag on the equipment. Procedure for the removal of an authorized employee s lockout/tagout by the company Verification by employer that the authorized employee who applied the device is not in the facility. Make reasonable effort to advise the employee that his device has been removed (this can be done when he returns to the facility). Ensure that the authorized employee has this knowledge before he resumes work at the facility. Procedures for shift or personnel changes Each facility must develop their own written procedures based on their need and capabilities. However, your procedure must specify how you will ensure the continuity of lockout or tagout protection during that time (reference 1910.147(e)(4)). Procedures for outside personnel/contractors Outside personnel/contractors shall be advised that the company has and enforces the use of lockout/tagout procedures. They will be informed of the use of locks and tags and notified about the prohibition relating to attempts to restart or re-energize machines or equipment that are locked out or tagged out. The company will obtain information from the outside personnel/contractor about their lockout/tagout procedures and advise affected employees of this information. The outside personnel/contractor will be required to sign a certification form (see Attachment C). If the outside personnel/contractor has previously signed a certification that is on file, there is no need to have them sign a new certification. Training and communication Each authorized employee who will be utilizing the lockout/tagout procedure will be trained in the recognition of applicable hazardous energy sources, type and magnitude of energy available in the work place, and the methods and means necessary for energy isolation and control. Each affected employee (all employees other than authorized employees utilizing the lockout/tagout procedure) shall be instructed in the purpose and use of the lockout/tagout procedure and the prohibition relating to attempts to restart or re-energize machines or equipment which are locked out or tagged out. Training will be certified using Attachment A-2 (Authorized Personnel) or A-3 (Affected Personnel). The certification will be retained in the employee s personnel file. LC-7126 (02-12) PAGE 4 of 14

Procedures for periodic inspection A periodic inspection (at least annually) will be conducted of each authorized employee under the lockout/ tagout procedure. This inspection shall be performed by the, provided they are not the ones utilizing the energy control procedure being inspected. The inspection will include a review between and each authorized employee. It will include a review of that employee s responsibilities under the energy control (lockout/ tagout) procedure. The inspection will also consist of a physical inspection of the authorized employee while performing work under the procedures. shall certify, in writing, that the inspection has been performed. The written certification (see Attachment B) shall be retained in the individual s personnel file. LC-7126 (02-12) PAGE 5 of 14

Attachment A-1 List of Authorized Personnel for Lockout/Tagout Procedures Names Job Title LC-7126 (02-12) PAGE 6 of 14

Certification of Training (Authorized Personnel) Attachment A-2 I certify that I received training as an authorized employee under Company Name lockout/tagout program. I further certify that I understand the procedures and will abide by those procedures. Authorized Employee Signature: Date: LC-7126 (02-12) PAGE 7 of 14

Certification of Training (Affected Personnel) Attachment A-3 I certify that I received training as an affected employee under Company Name lockout/tagout program. I further certify and understand that I am prohibited from attempting to restart or re-energize machines or equipment that are locked out or tagged out. Authorized Employee Signature: Date: LC-7126 (02-12) PAGE 8 of 14

Attachment B Lockout/Tagout Inspection Certification I certify that was inspected on this date utilizing lockout/tagout procedures. The inspection was performed while working on: Authorized Employee Signature: Date: Inspector Signature: Date: LC-7126 (02-12) PAGE 9 of 14

Outside Personnel/Contractor Certification Attachment C I certify that Company Name and Outside Personnel/Contractor have informed each other of our respective lockout/tagout procedures. Name (Printed): Signature: Date: Outside Personnel Contractor Name (Printed): Signature: Date: LC-7126 (02-12) PAGE 10 of 15

Attachment D Equipment specific procedure for: Date: Machine Identification General description: Manufacturer: Model number: Serial number: Note: If there is more than one piece of the same equipment, list all serial numbers. Location of equipment: Operator Controls The type of controls available to the operator needs to be determined. This should help identify energy sources and lockout capacity for the equipment. List types of operator controls: LC-7126 (02-12) PAGE 11 of 14

Energy sources The energy sources present on this equipment are: (electrical, steam, hydraulic, pneumatic, natural gas, stored energy, etc.) Energy source Location Lockable Type lock or block Yes No needed Shutdown procedures Please list the steps (in order) necessary to shutdown and de-energize the equipment. Be specific. For stored energy, be specific about how the energy will be dissipated or restrained. Procedure: Lock type and location: De-energized state to be verified? How? Notify all affected employees when this procedure is in application. LC-7126 (02-12) PAGE 12 of 14

Start-up procedures Please list the steps (in order) necessary to reactivate (energize) the equipment. Be specific. Procedure: Energy source activated: Notify all affected employees when this procedure is in application. Procedures for operations and service/maintenance List those operations where the procedures above do not apply. [Reference 29CFR 1910.147 (a)(2)] Alternate measures that provide effective protection must be developed for these operations. Job safety analysis is one method of determining appropriate measures. Operation name: LC-7126 (02-12) PAGE 13 of 15

Affected and authorized employees List each person affected by this procedure and those authorized to use this procedure. Name Affected Employees Job Title Approved by: Date: The information contained in this service bulletin was obtained from reliable sources. However, United Fire Group accepts no legal responsibility for the correctness or completeness of this information. LC-7126 (02-12) PAGE 14 of 15