WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

Similar documents
OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) Item Description Qty Unit Rate Total

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount

COUNTY GOVERNMENT OF SIAYA: PROPOSED ECD BLOCK

Description Unit Quantity Rate Kshs. Amount Kshs.

WORK BELOW LOWEST FLOOR FINISH BQ/1/4 230, FRAME BQ/2/8 441, UPPER FLOOR BQ/3/2 507, ROOF BQ/4/8 202,915.35

Estimate FOR THE SEPTIC TANK

Carried to collection

PROPOSED CONSTRUCTION OF TWIN ECD CLASSROOM AND THREE DOOR PIT LATRINE BILLS OF QUANTITIES PROPOSED TWIN ECD CLASSROOM FINANCIAL YEAR

BILLS OF QUANTITIES FOR CONSTRUCTION OF MODEL DISPENSARY BLOCK AT MGUNGANI / SALAITA

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL.

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI

PRICED BILL OF QUANTITIES

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

KANPUR SMART CITY LIMITED

TITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY

ITEM DESCRIPTION QTY UNIT RATE K.SHS PROPOSED KMTC CLASSROOMS AT NYAHURURU L HOSPITAL - - ELEMENT NO. 1 SUBSTRUCTURES. Oversite excavation -

PROPOSED ERECTION AND COMPLETION OF CEREAL STORE.

300 SM 285 SM 256 CM 70 CM 63 CM 210 SM 241 SM 3 CM

ITEM No. D E S C R I P T I O N UNIT QTY. 5-E343.2 In class III material m³ 1,260 - Max. Depth: m For disposal

TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA

BILL OF QUANTITIES. S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of

B Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1

Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2

CATCHMENT STRUCTURE 13M X 15M

Requirements for Measuring and Pricing of Structural Concrete

ITEM DESCRIPTION QTY UNIT RATE K.SHS PROPOSED SURGICAL THEATER - ELEMENT NO. 1 SUBSTRUCTURES. Oversite excavation -

Drainage, Road Drainage and Collection Pit A - EXCAVATION:

Construction of Shopping Complex at MNIT campus.

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15.

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

Scanned by CamScanner

SELF-ASSESSMENT EXERCISE FOR CHAPTER 24: PREPARATION OF BILLS OF QUANTITIES

APPLICABILITY TABLE. Council BSC CHRC GRC IRC LSC MRC RRC Applicable Yes Yes Yes Yes Yes Yes Yes

CHAPTER 16 - GANTRIES

EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS

PROPOSED EXTERNAL WORKS AT NKABUNE TECHNICAL TRAINING INSTITUTE BILL 1 DRIVEWAYS AND PARKINGS

Temecula Medical Center Temecula, CA

1 BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION.

FOR. RCC Structural Works for Construction of Infectious Block Building at Kendrapara, Odisha state VOLUME III PRICE BID/BILL OF QUANTITIES

PRE-CAST HOUSE CONSTRUCTION

QPM Ltd. Tender Document _1020

Return, fill in and ram well selected excavated materials to make up levels around wall foundations.

CHAPTER 8. Concrete Work

Building Construction

CIVIL WORKS Mahesh G. Nair

Method of Measurement for Road Works Series MM Structural Concrete

PROGRESSIVE REPORT FOR CABANA MEMORIAL BUILDING CLIENT: SISTERS OF IMMACULATE HEART OF MARY RAPARATRIX GOOGONYA CONTRACTOR:BUCONS (U) LIMITED

This precast prestressed concrete pedestrian

TITLE: ABLUTION BLOCK WITH BIODIGESTER. ITEM No. D E S C R I P T I O N UNIT QTY

Statement of Special Inspection Requirements

Seven Wonders of the Ancient World

SCHEDULE OF ITEMS & QUANTITIES FOR CIVIL WORKS OF PROPOSED GIRLS/ BOYS TOILET BLOCK

Slab on Grade. Introduction CHAPTER 10

R-Group Finland Oy. REA Lifting Inserts Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND

SECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

2002 Advanced Building Products, Inc., P.O. Box 98, Springvale, Maine TEL: ; FAX: ; WEBSITE:

ABSTRACT SHEET Name of Work : Main Building Proposed Construction of RSETI Building On Plot No. 7/1 & 9 At-Babupeth, Chandrapur

Concrete Slab-on-Ground

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI

Item Description Qty Unit Rate Total x 1500 mm with one fixed light and two hanging lights 18 No 9, ,000

D Bulk Excavate in black cotton soils depth exceeding 1.5 M but not exceeding 3.0m 2,488 CM 450 1,119,600.00

TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

2016 DESIGN AND DRAWING OF REINFORCED CONCRETE STRUCTURES

Sabah Shawkat Cabinet of Structural Engineering 2017

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS. A. Formwork complete with shoring, bracing and anchorage.

SECTION PRECAST CONCRETE COVER SYSTEM

Miller Collective Safety at Height Solutions EPIC ULTRA Barrier System EPIC Post-N-Barrier System EPIC Basic Barrier System

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

Confined masonry. An illustrated guide for masons. This manual explains this technique. Confined masonry. RC frames. Columns first, walls after

UNIT III Earthwork Estimation & Reinforcement Estimation

SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE

Tender Schedule for the Work "Construction of Staff qtrs. at Tainda S/S (1no.)

Construction Measurement III SBQ3314. Precast Pre stressed Concrete Works. Dr. Sarajul Fikri Mohamed

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.)

EUROACCESSORIES COLUMN FORMERS

Prestressed Concrete Tanks. Design & Construction

SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES

Tolerances for Concrete Construction. Tolerances for Concrete Construction. Tolerance 6/16/2015

PROJECT: PROPOSED MIGRANTS RESOURCE CENTER - MOGADISHU - IMPLEMENTED BY: CLIENT.

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M.

CHAPTER 3 BEHAVIOUR OF FERROCEMENT HOLLOW SLABS

Civil Engineering Construction Chapter 5

Calculation of requirement of Labour. for construction of IAY/CMRHM

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

LIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS. Diagram 1: Standard Membrane Continuation 150 mm Overlap

1. Structural Steel Sections Structural steel sections can be classified into various groups according to their shapes.

TRANSPORT and LIFTING spherical head anchors

ARCHITECTURAL DRAWINGS

WCU ALUMNI TOWER MASONRY & ENVELOPE REPAIRS

Statement of Special Inspections 2013 CBC

Construction of the Manulife Tower Redevelopment of the previous Lee Gardens Hotel in Causeway Bay

Bison Precast Flooring Specification

Selection, installation and USage of HatcHeS

Transcription:

Description Page No Summary Amount Summary 1/7 230,694.60 22,019.25 22,642.65 2/6 96,801.30 80,150.60 114,056.00 Total Per Unit (MYR) 327,495.90 102,169.85 136,698.65 Total Unit(s) X 1 2 2 Total Per Type (MYR) 327,495.90 204,339.70 273,397.30 Total Amount To Form Of Tender (MYR) 805,232.90 Summary 1/1

ELEMENT NO. 2 - WORK BELOW LOWEST FLOOR FINISH Excavate, get out, part return, fill in and ram and deposit in making up levels where directed within the site and remainder load and cart away A Oversite to reduce level m3 11.00 824 9,064.00 23 253.00 4 44.00 B Pile cap not exceeding 1.50m deep including working around pile heads m3 9.00 141 1,269.00 23 207.00 5 45.00 C Ground beam not exceeding 1.50m deep m3 9.00 71 639.00 - - 5 45.00 D Trench not exceeding 1.50m deep m3 9.00 24 216.00 3 27.00 55 495.00 E Prepare and apply 'Simechem' or other equal and approved anti-termite chemical treatment to building lot. The Tenderer shall also allow for a warranty period of 10 years including annual inspection m2 2.90 2,288 6,635.20 4 11.60 55 159.50 F 100mm Bed of hardcore as described spread, levelled, well rammed and consolidated, watered and blinded with fine sand, well rolled and finished to receive concrete bed (measured separately) m2 4.80 2,288 10,982.40 34 163.20 5 24.00 50mm Concrete Grade 10 as described blinding screed, spread and levelled under G Pile cap including working around pile head m2 7.40 175 1,295.00 34 251.60 5 37.00 To Collection (MYR) 30,100.60 913.40 849.50 1/1

(CONT'd) ELEMENT NO. 2 - WORK BELOW LOWEST FLOOR FINISH (CONT'd) 50mm Concrete Grade 10 as described blinding screed, spread and levelled under (CONT'd) A Ground beam m2 7.40 272 2,012.80 32 236.80 5 37.00 B 150mm Base m2 7.40 20 148.00 32 236.80 5 37.00 C 100mm Bed m2 7.40 2,288 16,931.20 32 236.80 55 407.00 Reinforced concrete Grade 25 as described in D Ground beam m3 159.00 125 19,875.00 32 5,088.00 55 8,745.00 E 150mm Base m2 23.85 20 477.00 32 763.20 55 1,311.75 F 150mm Wall m2 23.85 44 1,049.40 32 763.20 55 1,311.75 G 100mm Bed m2 15.90 2,288 36,379.20 32 508.80 5 79.50 H ^^Extra over for thicknessing to an average width of 250mm and to a total depth of 200mm including all additional excavation, formwork, hardcore and handpacking hardcore to one side m 12.00 30 360.00 32 384.00 55 660.00 J ^^Ditto to an average width of 650mm and to a total depth of 200mm ditto m 31.00 16 496.00 33 1,023.00 55 1,705.00 To Collection (MYR) 77,728.60 9,240.60 14,294.00 1/2

(CONT'd) ELEMENT NO. 2 - WORK BELOW LOWEST FLOOR FINISH (CONT'd) Reinforced concrete Grade 25 as described in (CONT'd) A Reinforced concrete Grade 30 as described in pile cap m3 167.00 132 22,044.00 33 5,511.00 5 835.00 Mild steel bar reinforcement as described in B 10mm Diameter as column starter bar links kg 1.66 1,308 2,171.28 33 54.78 5 8.30 C 10mm Diameter as stirrups in ground beam kg 1.66 129 214.14 33 54.78 5 8.30 D 8mm Ditto kg 1.66 3,165 5,253.90 33 54.78 5 8.30 High yield steel bar reinforcement as described in Pile cap E 20mm Diameter kg 1.55 2,901 4,496.55 33 51.15 F 16mm Ditto kg 1.55 8,905 13,802.75 33 51.15 G 12mm Ditto kg 1.64 5,052 8,285.28 33 54.12 H 10mm Ditto kg 1.64 125 205.00 33 54.12 55 90.20 To Collection (MYR) 56,472.90 5,885.88 950.10 1/3

(CONT'd) ELEMENT NO. 2 - WORK BELOW LOWEST FLOOR FINISH (CONT'd) High yield steel bar reinforcement as described in (CONT'd) Column Starter Bar A 20mm Diameter kg 1.55 4,049 6,275.95 33 51.15 55 85.25 B 16mm Ditto kg 1.55 3,429 5,314.95 33 51.15 55 85.25 Ground beam C 16mm Diameter kg 1.55 454 703.70 33 51.15 55 85.25 D 12mm Ditto kg 1.64 4,679 7,673.56 33 54.12 55 90.20 E 10mm Ditto kg 1.64 1,631 2,674.84 23 37.72 55 90.20 F 10mm Diameter in base kg 1.64 260 426.40 23 37.72 5 8.20 G 10mm Diameter in wall kg 1.64 555 910.20 34 55.76 55 90.20 Sawn formwork as described to H Sides of pile cap m2 20.00 279 5,580.00 34 680.00 5 100.00 J Sides of ground beam m2 20.00 1,573 31,460.00 34 680.00 5 100.00 K Sides of wall m2 20.00 93 1,860.00 34 680.00 5 100.00 L Edge of concrete not exceeding 100mm high m 2.30 31 71.30 34 78.20 55 126.50 To Collection (MYR) 62,950.90 2,456.97 961.05 1/4

(CONT'd) ELEMENT NO. 2 - WORK BELOW LOWEST FLOOR FINISH (CONT'd) High yield steel bar reinforcement as described in (CONT'd) Ground beam (CONT'd) Sawn formwork as described to (CONT'd) A 75mm x 75mm Triangular fillet planted on formwork to form rebate m 2.20 43 94.60 34 74.80 5 11.00 B Forming 100mm x 100mm deep scupper drain on concrete slab including trowelling smooth and all additional formwork m 7.60 31 235.60 34 258.40 55 418.00 C 75mm x 75mm x 6mm Thick mild steel as described angle framing with and including 12mm diameter mild steel anchor bar 100mm long welded to angle frame at 300mm centres with fishtailed and cast into concrete including painting exposed surfaces with one coat metallic primer and two coats bituminous paint m 43.00 43 1,849.00 34 1,462.00 55 2,365.00 D 75mm Precast concrete Grade 20 as described cover slab size 300mm x 425mm long reinforced with and including 3 Nos. 10mm diameter mild steel bars horizontally and 10mm diameter mild steel bars vertically at 200mm centres with 2 Nos. lifting notches at ends and placing in position no. 10.00 6 60.00 34 340.00 55 550.00 To Collection (MYR) 2,239.20 2,135.20 3,344.00 1/5

(CONT'd) ELEMENT NO. 2 - WORK BELOW LOWEST FLOOR FINISH (CONT'd) High yield steel bar reinforcement as described in (CONT'd) Ground beam (CONT'd) Sawn formwork as described to (CONT'd) A 75mm Ditto size 300mm x 725mm long ditto no. 16.80 43 722.40 34 571.20 55 924.00 B 75mm Ditto size 300mm x 1025mm long ditto no. 24.00 20 480.00 34 816.00 55 1,320.00 To Collection (MYR) 1,202.40 1,387.20 2,244.00 1/6

Description Amount Collection Page No. 1/1 30,100.60 913.40 849.50 Page No. 1/2 77,728.60 9,240.60 14,294.00 Page No. 1/3 56,472.90 5,885.88 950.10 Page No. 1/4 62,950.90 2,456.97 961.05 Page No. 1/5 2,239.20 2,135.20 3,344.00 Page No. 1/6 1,202.40 1,387.20 2,244.00 Carried To Summary (MYR) 230,694.60 22,019.25 22,642.65 1/7

ELEMENT 2 - VIBRATED REINFORCED CONCRETE GRADE 25 AS DESCRIBED IN A Column m3 175.00 102 17,850.00 23 4,025.00 5 875.00 B Projected coping m3 175.00 4 700.00 22 3,850.00 5 875.00 C Column on beam m3 175.00 1 175.00 22 3,850.00 5 875.00 D Circular column m3 175.00 38 6,650.00 22 3,850.00 55 9,625.00 E Stiffener (Provisional) m3 175.00 25 4,375.00 - - 5 875.00 F Suspended ground beam m3 175.00 91 15,925.00 2 350.00 55 9,625.00 G Ditto; circular on plan of 1875mm radius m3 175.00 2 350.00 22 3,850.00 - - H Suspended curved ground beam m3 175.00 1 175.00 33 5,775.00 55 9,625.00 J Suspended floor beam m3 175.00 55 9,625.00 33 5,775.00 55 9,625.00 K Arch beam; to a varies radius m3 175.00 17 2,975.00 33 5,775.00 55 9,625.00 L Sloping roof beam m3 175.00 6 1,050.00 33 5,775.00 55 9,625.00 M Lower roof beam m3 175.00 48 8,400.00 33 5,775.00 55 9,625.00 N Upstand lower roof beam m3 175.00 9 1,575.00 33 5,775.00 55 9,625.00 P Upper roof beam m3 175.00 19 3,325.00 33 5,775.00 5 875.00 To Collection (MYR) 73,150.00 60,200.00 81,375.00 2/1

(CONT'd) ELEMENT 2 - (CONT'd) VIBRATED REINFORCED CONCRETE GRADE 25 AS DESCRIBED IN (CONT'd) A Lower ring beam m3 175.00 9 1,575.00 33 5,775.00 55 9,625.00 B Upper ring beam m3 175.00 6 1,050.00 33 5,775.00 55 9,625.00 C Plinth m3 175.00 5 875.00 33 5,775.00 55 9,625.00 D 200mm Thick wall m2 35.00 26 910.00 33 1,155.00 55 1,925.00 MILD STEEL BAR REINFORCEMENT TO CONCRETE AS DESCRIBED IN Column E 6mm Diameter bar as links kg 1.90 511 970.90 33 62.70 5 9.50 F 8mm Diameter ditto kg 1.90 268 509.20 33 62.70 5 9.50 G 10mm Diameter ditto kg 1.90 269 511.10 33 62.70 55 104.50 Projected coping H 6mm Diameter bar as links kg 1.90 18 34.20 33 62.70 55 104.50 Column on beam J 6mm Diameter bar as links kg 1.90 2 3.80 33 62.70 5 9.50 To Collection (MYR) 6,439.20 18,793.50 31,037.50 2/2

(CONT'd) ELEMENT 2 - (CONT'd) VIBRATED REINFORCED CONCRETE GRADE 25 AS DESCRIBED IN (CONT'd) Circular column A 6mm Diameter bar as links kg 1.90 44 83.60 33 62.70 5 9.50 B 8mm Diameter ditto kg 1.90 327 621.30 33 62.70 55 104.50 Stiffener (Provisional) C 6mm Diameter bar as links kg 1.90 138 262.20 33 62.70 55 104.50 Suspended ground beam D 6mm Diameter bar as stirrups kg 1.90 68 129.20 3 5.70 55 104.50 E 8mm Diameter ditto kg 1.90 79 150.10 33 62.70 55 104.50 F 10mm Diameter ditto kg 1.90 1,399 2,658.10 33 62.70 55 104.50 Suspended ground beam, circular on plan of 1875mm radius G 10mm Diameter bar as stirrups kg 1.90 111 210.90 33 62.70 55 104.50 Suspended curved ground beam H 10mm Diameter bar as stirrups kg 1.90 21 39.90 33 62.70 55 104.50 To Collection (MYR) 4,155.30 444.60 741.00 2/3

(CONT'd) ELEMENT 2 - (CONT'd) VIBRATED REINFORCED CONCRETE GRADE 25 AS DESCRIBED IN (CONT'd) Suspended floor beam A 6mm Diameter bar as stirrups kg 1.90 118 224.20 3 5.70 55 104.50 B 8mm Diameter ditto kg 1.90 33 62.70 3 5.70 55 104.50 C 10mm Diameter ditto kg 1.90 3,192 6,064.80 33 62.70 5 9.50 Arch beam; to a varies radius D 6mm Diameter bar as stirrups kg 1.90 36 68.40 33 62.70 5 9.50 E 10mm Diameter ditto kg 1.90 144 273.60 33 62.70 5 9.50 Sloping roof beam F 10mm Diameter bar as stirrups kg 1.90 175 332.50 3 5.70 55 104.50 Lower roof beam G 6mm Diameter bar as stirrups kg 1.90 37 70.30 33 62.70 55 104.50 H 10mm Diameter ditto kg 1.90 1,872 3,556.80 33 62.70 5 9.50 Upstand lower roof beam J 8mm Diameter bar as stirrups kg 1.90 6 11.40 33 62.70 55 104.50 To Collection (MYR) 10,664.70 393.30 560.50 2/4

(CONT'd) ELEMENT 2 - (CONT'd) VIBRATED REINFORCED CONCRETE GRADE 25 AS DESCRIBED IN (CONT'd) Upstand lower roof beam (CONT'd) A 10mm Diameter ditto kg 1.90 240 456.00 33 62.70 55 104.50 Upper roof beam B 8mm Diameter bar as stirrups kg 1.90 99 188.10 33 62.70 5 9.50 C 10mm Diameter ditto kg 1.90 333 632.70 33 62.70 5 9.50 Lower ring beam D 10mm Diameter bar as stirrups kg 1.90 314 596.60 33 62.70 55 104.50 Upper ring beam E 10mm Diameter bar as stirrups kg 1.90 120 228.00 3 5.70 5 9.50 Plinth F 10mm Diameter bar as stirrups kg 1.90 153 290.70 33 62.70 55 104.50 To Collection (MYR) 2,392.10 319.20 342.00 2/5

Description Amount Collection Page No. 2/1 73,150.00 60,200.00 81,375.00 Page No. 2/2 6,439.20 18,793.50 31,037.50 Page No. 2/3 4,155.30 444.60 741.00 Page No. 2/4 10,664.70 393.30 560.50 Page No. 2/5 2,392.10 319.20 342.00 Carried To Summary (MYR) 96,801.30 80,150.60 114,056.00 2/6