ADDENDUM TO THE NEWARK GENERAL PLAN TUNE UP PROGRAM ENVIRONMENTAL IMPACT REPORT (SCH ) FOR THE NEWPARK PLACE SPECIFIC PLAN.

Similar documents
ADDENDUM TO THE NEWARK GENERAL PLAN TUNE UP PROGRAM ENVIRONMENTAL IMPACT REPORT (SCH ) FOR THE NEWPARK PLACE SPECIFIC PLAN.

ADDENDUM TO THE ENVIRONMENTAL IMPACT REPORT FOR THE NEW CENTURY PLAN. I. Introduction. II. CEQA Authority for Addendum

RESOLUTION NO. 14- The City Council of the City of Goleta does resolve as follows:

Chapter II. Community Growth Strategy A. COMMUNITY GROWTH STRATEGY DIAGRAM AND DESIGNATIONS. 1. Adoption of Growth Strategy Diagram

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE SEGUNDO INFILL HOUSING PROJECT, DAVIS CAMPUS

Patrick Prescott, Community Development Director By: David L. Kriske, Assistant Community Development Director

65 East Project (P18-045) Addendum to an Environmental Impact Report

Chapter 1. Introduction

ADDENDUM TO THE CITY OF LAKEPORT GENERAL PLAN EIR

Resolution affirming the Planning Department's certification of the Final Environmental

FIFTH ADDENDUM TO THE CIVIC CENTER SPECIFIC PLAN EIR APRIL 2015

ADDENDUM TO THE ENVIRONMENTAL IMPACT REPORT ENV EIR FOR 6901 SANTA MONICA BOULEVARD MIXED-USE PROJECT

ADOPTION OF THE MITIGATED NEGATIVE DECLARATION

Attachment 3 UC MERCED 2020 PROJECT

RECOMMENDATION REPORT

DATE: SEPTEMBER 7, 2018 FROM: PLANNING AND STRATEGY

SAN JOSE CAPITAL OF SILICON VALLEY

Sacramento Area Flood Control Agency. May State Clearinghouse No Prepared for: Prepared by: Consulting Engineers and Scientists

Lytle Creek Ranch Specific Plan

Addendum to Diablo Grande Specific Plan EIR and Water Resources Plan Supplemental EIR Diablo Grande Specific Plan, Phase I Page i.

CHAPTER 4.0 ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION

County of El Dorado Notice of Preparation Tilden Park Project

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below.

CEQA FINDINGS IN CONNECTION WITH THE APPROVAL OF THE INTEGRATIVE GENOMICS BUILDING PROJECT, LAWRENCE BERKELEY NATIONAL LABORATORY

Notice of Preparation of a Draft Environmental Impact Report Vallco Special Area Specific Plan

RE-ISSUED NOTICE OF PREPARATION SUBSEQUENT ENVIRONMENTAL IMPACT REPORT

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4

I. INTRODUCTION. Third Addendum to Final Environmental Impact Report for The Grand Avenue Project

I. CONSIDERATION OF 2020 LRDP FEIR (1/05) AND ADDENDUM #8 1

Introduction CHAPTER Project Overview

UC MERCED 2020 PROJECT. Addendum No. 7 to the 2009 UC Merced Long Range Development Plan Environmental Impact Statement / Environmental Impact Report

2. Introduction. California Environmental Quality Act (CEQA) of 1970, as amended (Public Resources Code Section et seq.)

2 Executive Summary 2.1 Project Location

Los Coyotes Country Club Development Plan

SANTA BARBARA COUNTY PLANNING COMMISSION Staff Report for Malfo Recorded Map Modification

City Manager s Recommendation: That the City Council take the following action:

EXECUTIVE SUMMARY UNIVERSITY OF CALIFORNIA, SAN DIEGO REVELLE COLLEGE APARTMENTS AND COMMONS DINING RENOVATION PROJECT

SUMMARY University of California San Francisco Institute for Regeneration Medicine

Final Environmental Impact Report BARTON PLACE

AMENDMENT GPA FARMERSVILLE AREA LAND USE PLAN

Incremental Recycled Water Program 2007 ADDENDUM TO PROGRAM ENVIRONMENTAL IMPACT REPORT

SECTION 4.0 Basis of Cumulative Analysis

UC CEQA CHECKLIST TEMPLATE INSTRUCTIONS & GLOSSARY

UC Davis Medical Center Education Building Project Phase 2 Telemedicine Resource Center and Rural PRIME Facility January CEQA Findings

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES

6. Cumulative Impacts

WHEREAS, CUP has been amended two times since it was adopted on November 19, 1999; and

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT

MITIGATED NEGATIVE DECLARATION

Addendum No.9 to the 2009 UC Merced Long Range Development Plan Environmental Impact Statement/ Environmental Impact Report

Staff Report Page No. 2 of 331

ATTACHMENT C: CEQA EXEMPTION NOTICE OF EXEMPTION. Santa Barbara County Clerk of the Board of Supervisors

... Noes: Supervisors:-N_o_n&...

Agenda (Items may be taken out of order)

NEPA THE NATIONAL ENVIRONMENTAL PROTECTION ACT CEQA THE CALIFORNIA ENVIRONMENTAL QUALITY ACT

STATUS REPORT ON THE UPDATE TO THE NORTH SAN JOSE AREA DEVELOPMENT POLICY

CHAPTER 7B TAFT RECYCLING & SANITARY LANDFILL

Commerce Park. Draft Environmental Impact Report. CITY OF FONTANA Citrus Commerce Park SCH SEPTEMBER 2014 VOLUME 1. Project Applicant:

General Plan EIR Scoping Meeting

RINCONADA WATER TREATMENT PLANT RELIABILITY IMPROVEMENT PROJECT Second Addendum to the Final Environmental Impact Report

Subsequent or Supplemental Impact Report; Conditions.

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

3 PROJECT DESCRIPTION

RINCONADA WATER TREATMENT PLANT RELIABILITY IMPROVEMENT PROJECT Addendum to the Final Environmental Impact Report

DRAFT FOCUSED TIERED ENVIRONMENTAL IMPACT REPORT. Conference Center, Hotel, and Graduate School of Management Building University of California, Davis

Scoping Meeting for Vista Del Agua Project Environmental Impact Report

2.0 RECOMMENDATIONS AND PROCEDURES

JACK LONDON SQUARE REDEVELOPMENT PROJECT

An Overview of the California Environmental Quality Act

ALAMEDA COUNTY COMMUNITY DEVELOPMENT AGENCY. September 15, 2014

5.0 ALTERNATIVES 5.1 INTRODUCTION

I will probably not be able to attend the Wednesday January 15 meeting of the Commission.

IRVINE UNIFIED SCHOOL DISTRICT RESOLUTION NO

A G E N D A. REGULAR MEETING JUNE 8, :00 p.m.

Environmental Quality Act. October 19, 2016

Public EIR Scoping Meeting South Shoreline Specific Plan. October 16, 2014, 6:00 PM City Council Chambers

LOCAL AGENCY FORMATION COMMISSION REGULAR MEETING AGENDA. Wednesday, July 28, :00 a.m.

Agenda Fremont Successor Agency Meeting May 14, :00 PM

Sacramento Municipal Utility District Headquarters Building and Site Rehabilitation Project

1.0 INTRODUCTION. Executive Summary

Purpose of the EIR. Chapter 1 Introduction

Exhibit C. Page 1 of 90. Prepared for: Prepared by: November 2011

SECTION 7.0 Other CEQA Considerations

ADDENDUM (No. 4) TO SAN RAFAEL GENERAL PLAN 2020 ENVIRONMENTAL IMPACT REPORT (SCH# )

SAN CITY OF CAPITAL OF SILICON VALLEY

Findings of Fact and Statement of Overriding Considerations

CEQA Addendum. The Caves at Soda Canyon P Planning Commission Hearing April 19, 2017

SECTION 5: OTHER CEQA STATUTORY CONSIDERATIONS

5.0 INTRODUCTION TO THE ENVIRONMENTAL ANALYSIS AND ASSUMPTIONS USED

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE MUSIC BUILDING PROJECT

PROPOSED CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) TRANSPORTATION SECTION UPDATE

City of Fountain Valley. Fountain Valley Crossings Specific Plan Project: Draft EIR Public Hearing. January 25, 2017

METRO BLUE LINE TRACK IMPROVEMENT PROJECT. July2016 TRANSMITTAL NO. 3

Addendum to the Final Supplemental Environmental Impact Report (SEIR) to the 2030 Concord General Plan EIR for the Concord Development Code Project

DENSITY BONUS ORDINANCE UPDATE

INITIAL STUDY FOR NEIGHBORHOODS K AND L AT MOUNTAIN HOUSE

ADDENDUM to the Environmental Impact Report for the Rosamond Solar Project

3.8 LAND USE AND PLANNING

Transcription:

ADDENDUM TO THE NEWARK GENERAL PLAN TUNE UP PROGRAM ENVIRONMENTAL IMPACT REPORT (SCH 2013012052) FOR THE NEWPARK PLACE SPECIFIC PLAN. INTRODUCTION The City of Newark (City) certified a Environmental Impact Report (EIR) for the General Plan Update (State Clearinghouse No. 2013012052, December 2013). The Proposed Specific Plan is an implementation of the General Plan. An Initial Study (IS) was conducted to determine whether the specific Plan would result in any new or more substantial impacts from those identified in the prior adopted General Plan Tune Up EIR. The Initial Study is attached. This Addendum has been prepared to provide information regarding: (1) the history of the project; (2) the proposed project implementation; (3) standards for adequacy under the California Environmental Quality Act (CEQA) and State CEQA Guidelines; (4) a description of the format and content of this Addendum; and (5) the applicable CEQA processing requirements for the proposed Specific Plan. BACKGROUND The Newark General Plan, as updated in 2013 includes a focus area Greater Newpark Focus Area located in the southern portion of the City adjacent to interstate 880 and Mowry Avenue. The focus area contains NewPark Mall and surrounding commercial properties. The General Plan included a vision for a revitalized commercial area with a mix of supporting residential, hotel and office development. Consistent with the general plan vision for the Greater NewPark Mall/Greater NewPark Focus Area, the specific plan vision focuses on revitalization of the Greater NewPark area into a vibrant, active and thriving mixed-use destination. The specific plan land use plan translates this vision into an arrangement of land uses and amenities. The existing NewPark Mall remains the retail focus but residential development up to 1519 housing units, hotel development of up to 367 rooms, and up to 500,000 square feet of office development is enabled by the Specific Plan. PROJECT DESCRIPTION The General Plan Update included the Greater NewPark Focus Area that is located south of Mowry Avenue. The Specific Plan includes an area of 125 acres. The new development capacity assumed for the specific plan boundary is a subset of the total new development capacity assumed in the general plan and evaluated in the general plan EIR for the Greater NewPark Focus Area as described previously. Since the general plan was adopted in 2013, a 281-unit high density residential project on approximately 9.5 acres located on the north side of Mowry Avenue between Cedar Boulevard and Mowry Avenue within the Focus Area has been NEWPARK PLACE SPECIFIC PLAN / CITY OF NEWARK 1 ADDENDUM TO THE MITIGATED NEGATIVE DECLARATION MARCH 2018

approved and developed. Therefore, of the 1,800 new residential unit development capacity assigned to the Greater NewPark Focus Area, 281 units are no longer available resulting in a balance of 1,519. Also 333 of the assumed 700 hotel rooms have been approved in the area thus reducing the capacity in the specific plan area to 367 rooms. Thus the development enabled by the Specific Plan is completely consistent with the development capacity identified in the General Plan and its environmental document. BASIS FOR AN ADDENDUM The State CEQA Guidelines environmental review procedures allow for the updating and use of a previously adopted Environmental Impact Report for projects that are different from the previous project or the conditions under which the project was analyzed. Section 15164 of the State CEQA Guidelines states the following with respect to an addendum to an adopted EIR: a) An addendum to an adopted negative declaration may be prepared if only minor technical changes or additions are necessary or none of the conditions described in Section 15162 calling for the preparation of a subsequent EIR or negative declaration have occurred. b) An addendum need not be circulated for public review but can be included in or attached to the final EIR or adopted negative declaration. c) The decision making body shall consider the addendum with the final EIR or adopted negative declaration prior to making a decision on the project. In accordance with State CEQA Guidelines Section 15164, this Addendum has been prepared to document that the proposed project modifications do not require preparation of a subsequent environmental document under Section 15162. The proposed modified project is substantially similar to the project evaluated in the adopted 2013 EIR. Like the approved project, the proposed modified project involves constructing a mixed-use commercial development on the project site which is consistent in area and intentisy with development analyzed in the 2013 EIR. As supported in the analysis contained in the accompanying Initial Study, there are no substantial changes proposed in the project which would result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects. There is no new information of substantial importance which was not known for the 2013 EIR, and no new mitigation measures are necessitated by new impacts. None of the circumstances listed in State CEQA Guidelines Section 15162 requiring the preparation of a subsequent environmental Document are present, and only minor technical NEWPARK PLACE SPECIFIC PLAN / CITY OF NEWARK 2 ADDENDUM TO THE MITIGATED NEGATIVE DECLARATION MARCH 2018

changes or additions are necessary to update the previously adopted 2013 EIR; therefore, an addendum may be prepared. A. FORMAT, CONTENT, AND CONCLUSIONS OF THIS ADDENDUM The accompanying CEQA Initial Study (IS) comprises the Addendum to the General Plan Tune Up EIR. An IS has been prepared to determine whether the proposed amendments to the approved project analyzed in the adopted EIR would require major revisions to the EIR due to any new or more severe significant environmental impacts as compared to those analyzed in the prior adopted EIR. The proposed Specific Plan, because is it consentient with the envisioned development in the approved EIR would have similar impacts than the approved General Plan Update. It will not introduce new or more significant impacts that were not previously disclosed in the General Plan Update EIR. Based on the conclusions of the IS, an Addendum to the approved EIR is the appropriate CEQA-compliance document for the Specific Plan. B. ADDENDUM PROCESSING The City of Newark Community Development Department directed and supervised the preparation of this addendum, which has been reviewed and determined to be complete and accurate by the Community Development Department. The City has concluded based on the accompanying IS, that an Addendum is the appropriate CEQA compliance document for the proposed NewPark Place Specific Plan project. NEWPARK PLACE SPECIFIC PLAN / CITY OF NEWARK 3 ADDENDUM TO THE MITIGATED NEGATIVE DECLARATION MARCH 2018