Bringing electricity to the rural areas: Designing Laws and Policies that work

Similar documents
Presented at the JICA Tokyo International Center. Course: Energy Policy. James Baanabe Isingoma Ministry of Energy and Mineral Development Uganda

Licensing of Electricity Projects in Uganda

UGANDA COUNTRY REPORT; ENERGY POLICY

15 TH ANNUAL EAST AFRICAN POWER INDUSTRY CONVENTION

The future of Private Sector investment in Renewable Energy in Uganda

Clean Energy Development in Sri Lanka

ADDRESS BY MINISTER FOR ENERGY, DR. JOE OTENG-ADJEI

Uganda country study: Part B Energy and Policy. Final version. Brussels,

Renewable Energy & Energy Efficiency

SECTOR ASSESSMENT (SUMMARY): ENERGY

Electricity Data Collection

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978

The Ghana Renewable Energy Act 2011: Technical Regulation

SREP MALI - INVESTMENT PLAN Scaling Up Renewable Energy. Scaling Up Renewable Energy in Low Income Countries (SREP)

PROJECT IDENTIFICATION FORM (PIF) PROJECT TYPE: Full-sized project THE GEF TRUST FUND

Reforming the electricity industry in East Africa

The Role of Renewable Energy and Energy Efficiency in Addressing Climate Change in Indonesia. with

Government Policy for Solar Irrigation Pumps in Bangladesh

HYDROPOWER EXPLOITATION AND INDUSTRIAL DEVELOPMENT OF AFRICA

ECUADOR CASE STUDY ENERGY

April 21, 2014 Dar es Salaam, Tanzania Richard Hosier World Bank

SCALING-UP RENEWABLE ENERGY PROGRAM (SREP) COUNTRY INVESTMENT PLAN KENYA

Summary of the Roadmap of the ECOWAS Solar Energy Initiative (ESEI)

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

MINISTRY OF ENERGY AND MINERAL DEVELOPMENT SCALING UP RENEWABL ENERGY IN LOW INCOME COUNTRIES PROGRAM (SREP)

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Preliminary Design Document SCF Program for Scaling-Up Renewable Energy in Low Income Countries (SREP)

Africa Energy Sector. Partner Supported Activities Progress Report March 2006

RENEWABLE ENERGY POLICY OF BANGLADESH

POWER INDABA CONFERENCE

Chapter 4. Introduction to the Toolkit

SECTOR ASSESSMENT (SUMMARY): POWER

The development and use new and renewable source of energy in Mongolia

Ing. Andrew T Barfour, FGhIE,FID Director/Project Coordinator GEDAP Ministry of Energy & Petroleum GHANA

CLEAN POWER ASIA on Policy and incentives to encourage renewable energy development in Cambodia

Investing in Uganda s Energy Sector

SCALING-UP RENEWABLE ENERGY

Democratic Socialist Republic of Sri Lanka Commercial Capital: Colombo Administrative Capital: Sri Jayawardenapura Kotte

community energy ! Our market strategy is:!

ELECTRICITY SUPPLY INDUSTRY OF SOUTH AFRICA

Brief Overview of Renewable Energy Regulation in Tanzania

business, government and civil society. It is also providing energy at rapidly decreasing cost to the consumer.

UNITED NATIONS COMMISSION ON SCIENCE AND TECHNOLOGY FOR DEVELOPMENT (CSTD), twenty-first session Geneva, May 2018

Renewable energy markets and the Global Environment Facility

POWER SECTOR IN SOUTH SUDAN

Introduction of POLIS UNIVERSITY & Co-PLAN Institute for Habitat Development and key policy issues in the electricity sector of ALBANIA

Angelica Salomon-Dealino & Dilip Limaye International Institute for Energy Conservation. Asian Development Bank, 19 June 2015

CAPACITY BUILDING IN CLEAN DEVELOPMENT MECHANISM IN UGANDA

World Bank Enables Thousands of Africans to Access Modern Energy Real results from World Bank projects in Africa s power sector

Asian Development Bank Perspective for Rural Energy Access. Pushkar Manandhar Asian Development Bank Nepal Resident Mission

Reaching 100% Renewable Electricity Generation on Ovalau and Taveuni Islands in Fiji

SECTOR ASSESSMENT (SUMMARY): ENERGY

Rural Electrification by Renewable Energy in Cambodia

ROLE OF AFUR DEVELOPMENT OF A HARMONISED ENERGY REGULATORY FRAMEWORK JAMES MANDA TECHNICAL MANAGER - AFUR 27 TH MARCH, 2017 SANDTON CONVENTION CENTRE

The Current Policy and Investment Opportunities in Laos

Prospects of Solar Power Generation in Diversifying Nigeria's Energy Mix

BRAZIL - GENERAL DATA

MONGOLIA COUNTRY PROFILE 88

Eng. Moses Murengezi Simon Kalanzi Directorate of Energy Resources Development Ministry of Energy and Mineral Development, Uganda

Reliable, affordable, and sustainable energy services for agriculture,

KAKIRA SUGAR WORKS UGANDA

REPUBLIC OF MADAGASCAR MINISTRY OF WATER, ENERGY AND HYDROCARBONS SCALING UP RENEWABLE ENERGY PROGRAM INVESTMENT PLAN

Ghana s plans to increase Renewable Energy and what IPPs in Ghana are currently working on to improve the supply situation

China Renewable Energy: A Programmatic Approach

Financing Mechanisms for Energy Access in Rural and Peri-urban Areas Dr M Gbra N Guessan, VP Africa, Econoler ECREEE/UNDP Consultant, Team Leader

The amendment of the energy consumption pattern Act

Harvesting the Botswanan Solar Potential Based on German Lessons Learnt Jörg Mayer, Managing Director BSW-Solar

Implementation of a Local initiated Rural electrification Project in Northern Senegal

SMALL HYDRO PROGRAMME IN INDIA. Bhuwanesh Kumar Bhatt Ministry of New and Renewable Energy

Energy Status - Tanzania.

SUSTAINABLE ENERGY FOR ALL. Suman Basnet Sustainable Energy Coordinator (NPC/UNDP)

Supporting Renewable Energy Production with Sound Regulatory Frameworks: Insights into the Global Energy Transfer Feed-in Tariffs

World Small Hydropower Development Report 2016

Alternative Energy Promotion Centre

Energy and Environmental State aid Guidelines Frequently asked questions

Renewable energy: Investing in Africa

Investment Prospectus : General assessment and perspectives ECOWAS SUSTAINABLE ENERGY WEEK

RURAL ELECTRIFICATION WITH PV - MARKET POTENTIAL IN CAMBODIA

ROLE OF THE NATIONAL ENERGY REGULATOR (SOUTH AFRICA) Lambert du Plessis: Senior Regulatory Specialist

Universal access to electricity

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

Renewable Energy as an Option for Energy Sustainable Rural India Urja Gram Swaraj-A Policy initiative Rahul Shrivastava

SECTOR ASSESSMENT (SUMMARY): ENERGY (RENEWABLE ENERGY GENERATION SOLAR)

Renewable Energy Policies Case Study For Jordan

Promoting RE through Community Driven. Wind Turbines. M.L Sompo Ceesay. Senior Electricity Engineer Public Utilities Regulatory Authority The Gambia

Renewable energy: Investing in Africa

National Stakeholders Workshop on Accessible and Affordable Sustainable Energy. Brief Report

SECTOR ASSESSMENT (SUMMARY): ENERGY

Universal Access to Modern Energy Services and Clean Energy Development

Analysing how. Kenya. instituted its REFIT and investigating future solar plans. By Eng. David Mwangi Energy Consultant. Kenya

IMPLICATIONS OF ECONOMIC AND SOCIAL OBJECTIVES FOR ELECTRIFICATION IN SOUTHERN AFRICA

Renewable Energy Programmes in India

Mini-Grids: The Five Big Regulatory/Policy Decisions. Dr Bernard Tenenbaum Upscaling Mini-Grids Workshop Naypyidaw, Myanmar February 2017

RENEWABLE ENERGY REGULATORY FRAMEWORK IN GHANA

Financing Sustainable Energy

Globally active. PV market Ghana Situation today. Ulrike Brückner, Kai Imolauer Hamburg 04/08/2013

MINIGRID POLICY TOOLKIT

Gender, Poverty and Energy in Implementing Sustainable Development in Uganda

Independence Freedom Happiness No: 11 /2017/QD-TTg Ha Noi, 11 th April 2017 DECISION. On the

SBP s Refinancing Scheme for Renewable Energy (Revised) Dr. Muhammad Saleem Additional Director State Bank of Pakistan

Transcription:

Bringing electricity to the rural areas: Designing Laws and Policies that work By Hon.Umaru Lule Member of Parliament / Chairman Committee on Natural Resources Parliament of Uganda

Contents Introduction The Electricity Act, 1999 Rural Electrification strategy Rural electrification fund Regulation of rural electrification projects Achievements Challenges Conclusion

Introduction New policy framework for the electricity sector set out by Government in 1999 The Power Restructuring and Privatization strategy (PSRPS). PSRPS emphasizes private sector participation as a driver for efficiency in the sector. To implement the policy change, Parliament of Uganda enacted the Electricity Act in 1999.

Introduction The Electricity Act,1999 establishes the legal framework for achieving Government s objectives for rural electrification, establishes Rural Electrification Fund and a National Rural Electrification Database. To comply with the legal requirements of the Act, Ministry of Energy and Mineral Development developed the Rural Electrification Strategy and Plan for the period 2001-2010. The plan was completed in 2001.

Electricity Act, 1999 Section 62 of the Act sets out the obligations of Government : - To achieve equitable distribution access to electricity. - Maximize the economic, social and environmental benefits of rural electrification subsidies. - Promote expansion of the grid and development of off-grid electrification and; - Stimulate innovations within suppliers.

Electricity Act, 1999 Section 63 of Act provides as follows: Minister responsible for energy shall prepare a rural electrification strategy and plan for Uganda for cabinet approval. Minister shall once in each year submit to Parliament a report on progress and achievement of the plan.

Rural Electrification Strategy The primary objective of the Rural Electrification strategy is to reduce inequalities in access to electricity By 2001, electricity was available to about only 1% of rural households. The strategy aims at achieving a rural electrification rate of 10% by 2010. The strategy gives the policy direction as far as rural electrification is concerned.

Rural Electrification Strategy Under the Government s new policy approach, development is demand driven. Government determines policy, promotes investments, sets targets and provides guidance to investors. For areas which are not yet attractive for the private sector, government will promote public private partnerships to electrify them in a realistic time.

Rural Electrification Fund The rural electrification fund is established in accordance with section 64 of the Electricity Act, 1999. It is the instrument for achieving equitable regional distribution access to electricity. The electrification of rural areas faces the challenge of huge up front investment in grid extension projects whereas initial demand is very low

Rural Electrification Fund The Rural electrification fund is already providing smart subsidies given towards the development costs of rural electrification projects. The subsidy buys down the resultant tariff.

Rural Electrification Fund The fund consists of the following: - Money appropriated by Parliament; - Any surplus monies made from the operation of the Electricity Regulatory Authority. - A levy of 5% on transmission bulk purchases of electricity from generation stations; and - Donations, gifts, grants and loans acceptable to the Minister of Energy and the Minister responsible for Finance.

Rural Electrification Board Established on 20 th Nov 2001 under Statutory Instrument No. 75 of 2001 by the Minister of Energy and Mineral Development. The Board was inaugurated in May 2002.

Rural Electrification Board Members of the REB are: 1. The Permanent Secretary Ministry of Energy & Mineral Development - Chairman 2. Permanent Secretary / Secretary to the Treasury, Ministry of Finance, Planning and Economic Development. 3. Permanent Secretary Ministry of Local Government.

Rural Electrification Board Members of Board cont d: Managing Director, M&E Associates Private Sector Representative Northern Uganda Area Programme Manager, ACCORD Representative of NGOs Country Manager, Diamond Trust Bank - Representative of the Financial Sector.

Rural Electrification Board The Rural Electrification Board (REB) has been established : To oversee the management of the Fund To define the policies for subsidy levels, project eligibility criteria Approve applications.

Rural Electrification Agency Rural Electrification Agency, also established under Statutory Instrument No.75 of 2002, became fully functional during the financial year 2003/2004 Rural Electrification Agency was established to assist the Rural Electrification Board in the implementation of the rural electrification programmes and this is the secretariat of the Rural Electrification Board.

Rural Electrification Agency Roles of the Agency include: Build and maintain a national database on Rural Electrification (RE) projects. Prepare for the REB an annual status report on the RE programme. Recommending to the REB the most efficient use of the fund. Generate and provide information relating to investment opportunities, costs and benefits of RE.

Rural Electrification Agency Roles of the Agency continued: Undertake basic planning defined by the Board as eligible for support under the fund. Process applications for financial support from the fund. Carry out other functions determined by the Board in consultation with the Minister responsible for Energy.

Regulation of Rural Electrification Projects Regulation will be the responsibility of the Electricity Regulatory Authority (ERA).ERA still building capacity to take on the role. Regulation of small grids will be light handed to encourage private sector participation. Regulatory responsibilities for small electricity systems may be delegated to local authorities, in accordance with the Electricity Act.

Achievements of Rural Electrification An increase in electricity access in rural areas from approximately 1% at the beginning of 2001 to about 4% to date.

Achievements of Rural Electrification The programme has been implemented under the following components: 1.Expansion of the main grid. 2.Isolated photovoltaic systems (Solar Energy Development). 3.The Energy for Rural Transformation programme (ERT).

The expansion of the main grid The power distribution network has expanded by 5.1% from 15,831 km in 2001 to 16,643 km in 2003. The expansion of the main grid is being implemented under: 1) Government funded projects 2) Donor funded projects.

Government Funded Projects By the end of June 2004, 165 out of 261 schemes had been completed. The funding of Rural electrification projects by the Government was obtained from the tariff mechanism during the financial year 2003/2004. By June 2004, approximately US$ 720,000 had been spent on Government funded projects.

Donor Funded Projects Pilot Project - The first donor-funded scheme was initiated as a pilot project. The scope of the project was distribution of electricity between Uganda s South Western border post at Katuna and Ryakarimira, the subcounty headquarters of Rubaya. The project was completed at a cost of US$1.57 million provided by the Swedish Agency for International Development (SIDA).

Donor Funded Projects District Headquarters Schemes are to be executed under the second phase of Swedish Agency for International Development (SIDA) funded projects, which will cost US$10 million. Under the Energy for Rural Transformation (ERT) Programme, other schemes to supply power to Uganda s district headquarters are in the pipeline.

Isolated Solar Photovoltaic Systems The first Solar PV system installations were made under the UNDP funded project, the Uganda Photovoltaic Pilot Project for Rural Electrification (UPPPRE), which ended in March, 2003. Prior to the start of the solar energy development component under the Energy for Rural Transformation Programme, the total number of systems sold from 1998 to June 2004 was 2500.

Isolated Solar Photovoltaic Systems The current component for Solar Energy Development is under the World Bank funded Energy for Rural Transformation (ERT) Programme and is handled by the Private Sector Foundation of Uganda. Under this project, about 1000 systems have been installed and audited for compliance with international standards. These systems are spread over 50 districts in Uganda.

The Energy for Rural Transformation Programme The main purpose of the Energy for Rural Transformation (ERT) programme is to develop Uganda s energy and information/communication technologies (ICT) sectors so that they may make a significant contribution to bringing about rural transformation. The programme has also a global purpose, which is to contribute to global environment protection by reducing greenhouse gas emissions.

The Energy for Rural Transformation Programme The programme was developed by Government with the assistance of the World Bank. Other donors like NORAD and SIDA are also participating in the programme. The ERT is a 10-year programme intended to implement the Government s overall goal of at least 10% electricity access in rural areas.

Implementation Arrangements The ERT is composed of a number of components and projects implemented by various actors/agencies namely: The private sector Ministry of Energy and Mineral Development Electricity Regulatory Authority Rural Electrification Board Rural Electrification Agency

Implementation Arrangements Components and projects implemented by various actors/agencies continued: Line Ministries Uganda Communications Commission Private Sector Foundation

Private Sector Projects- Public Private Partnerships Currently, the main highlight of the ERT Programme implementation are four fast track private sector sponsored projects. They were initiated as flag bearers for the various approaches in rural electrification.

Private Sector Projects- Public Private Partnerships The four fast track projects include: West Nile Rural Electrification Project Rukungiri/Bushenyi/Kanungu Project Kakira Co-generation Project Kisiizi Mini-grid Project. These projects have project sponsors. The policy of the Rural Electrification Agency is that project sponsors recover their investment

West Nile Rural Electrification Project This is a large, regional mini-grid project for electrification of Arua and Nebbi districts in North Western Uganda. A brief project description is as follows: Mini hydropower generation of 3.5 MW and distribution concession. Project sponsor is West Nile Rural Electrification Company (WENRECO).

West Nile Rural Electrification Project Project description continued: Total project cost is US$14 million. The subsidy is US$7.5 million. The project was implemented in two phases. The first phase commissioned in February 2005 involved the use of a 1.5MW Heavy Fuel Oil (HFO) generator. The second phase involves the construction of the 3.5 MW Nyagak Hydro Power station.

Kisiizi Mini-grid Project This is a small mini grid project for electrifying a community in, Rukungiri District in South Western Uganda. A summary description of the project is as follows: The project was to increase current generation from 60KW to 250KW with a possibility of increasing output to 365KW.

Kisiizi Mini-grid Project Summary description continued: The project sponsor is Kisiizi Hospital Power Limited. The project will cost US$690,000. A subsidy of US$420,000 will be provided. Construction started during the second quarter of 2005 and civil works are going on.

Rukungiri/Bushenyi/Kanungu Project The project is expected to generate electricity from the 5.5MW Ishasha hydropower site in Kanungu District and distribute power to the districts of Kanungu, Rukungiri and Bushenyi in Western Uganda. The Project Developer, Eco Power Ltd. of Sri Lanka has been conducting Site Investigations since July, 2005.

Kakira Co-generation Project The project was set up to demonstrate support to other renewable energy sources other than hydro. It generates 14MW from bagasse by Kakira Sugar Works. 7MW are to be sold to the grid while 7MW is for internal use at the factory.

Expenditure on ERT projects The programme is funded from a number of sources. So far, contributions have come from World Bank (IDA, IFC, GEF and PCF), bilateral donors (SIDA and NORAD) and a levy on bulk purchases by the Electricity Transmission Company Ltd. Total expenditure on the ERT programme to date excluding the ICT component is US$2,666,268.23.

Challenges to Implementation of Rural Electrification Inability of the local financial institutions to provide term finance. Likelihood of inadequate financing of the Rural Electrification Fund (REF) to provide subsidies. Estimates show that over the lifetime of the project, US$480 million may be required and US$120 million over the next 5 years to provide subsidies.

Challenges to Implementation of Rural Electrification Power supply constraints as they exist now are a deterrent to investment in distribution concessions. Investors would want to be assured of constant and reliable power supply. Negotiations for small power investors to sell power to UETCL have been taking too long because UETCL is not willing to take the more expensive energy from these power plants than that supplied by Eskom at off peak hours.

Challenges to Implementation of Rural Electrification Funding from Government sources has been limited and has not matched the requirements of the planned Government schemes. The resources that could have been available for the schemes were utilized to subsidize existing grid consumers following the tariff increase of 2001.

Conclusion The Rural Electrification Programme is important to Uganda because it will stimulate balanced national development between the rural and urban areas. The Programme requires massive investment to achieve the target of 10% coverage in the rural areas by 2010. Another challenge to rural electrification is the high unit cost of energy coupled with low demand thus needing continuous tariff subsidies.

Conclusion At present, Uganda s development partners are providing significant funding towards rural electrification. Investment through public private partnerships between the Government and private developers will help deliver socially desirable but not financially viable schemes. A fundraising strategy is being developed to deal with funding problems.

Bringing electricity to the rural areas: Designing Laws and Policies that work