ISU Spring Transportation Seminar Series April 1, Mark Mahan, PhD, P.E. Ron Bromenschenkel, P.E. California Department of Transportation

Similar documents
LRFD SEISMIC BRIDGE DESIGN, CALIFORNIA EXAMPLE. Mark S. Mahan 1

SUMMARY SHEETS OF INTEGRAL CONNECTIONS

CALTRANS EVOLVING SEISMIC DESIGN PRACTICE. Michael D. Keever 1

Overview of Structural Design and Detailing. (Caltrans Practice) Amir M. Malek, PE, PhD. Senior Bridge Engineer (Technical Specialist)

Bijan Khaleghi, Ph, D. P.E., S.E.

Connections between precast girders and cap beam

by Dr. Mark A. Ketchum, OPAC Consulting Engineers for the EERI 100 th Anniversary Earthquake Conference, April 17, 2006

Two integral girder connections for precast concrete bridges in seismic regions utilizing extended prestressing strands

Bridge PBEE Overview & Pilot Next Generation Bridge Studies

DESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY

Design & Seismic Detailing of Nonstandard Deep Precast Concrete Box Girders For Long Span Railroad Bridges By:

SEISMIC DESIGN STRATEGY OF THE NEW EAST BAY BRIDGE SUSPENSION SPAN

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

Accelerated Bridge Construction in High Seismic Regions by Use of Precast Concrete Girders

CALTRANS SDC PROCEDURE

Seismic Design and Retrofit. Reginald DesRoches Professor and Associate Chair Georgia Institute of Technology

USE OF PRECAST I-GIRDERS FOR ACCELERATED BRIDGE CONSTRUCTION IN HIGH SEISMIC REGIONS. Sri Sritharan 1 Justin Vander Werff 2 Rick Snyder 3

A precast Concrete Bridge Bent for Seismic Regions: Achieving both Performance and Constructability

Seismic Design of Bridges. Lucero E. Mesa, P.E.

Accelerated Bridge Construction Developments on the Earthquake Frontier

Seismic Analysis and Design of Flared Bridge Columns

Recent Advances in Seismic Design and Retrofit of Bridges

S T R U C T U R. One-of-a-Kind Design The New San Francisco-Oakland Bay Bridge Self-Anchored Suspension Span. magazine. Copyright

Fragility Curves for Seismically Retrofitted Concrete Bridges

Pile to Slab Bridge Connections

INNOVATIVE DESIGN AND TESTING OF A SEISMIC RETROFITTED STEEL DECK TRUSS BRIDGE

Fragility Curves for Seismically Retrofitted Concrete Bridges

RENOVATING CONCRETE RETROFITTING CONCRETE

SEISMIC DESIGN OF PRECAST PIERS WITH POCKET CONNECTIONS, CFRP TENDONS AND ECC/UHPC COLUMNS

Post-EQK Damage Assessment of Bridges

SUMMARY SHEETS OF HYBRID CONNECTIONS

Rumsey Bridge Project

BRIDGE JOINT PERFORMANCE IN CALIFORNIA

ON SEISMIC RETROFIT STRATEGIES OF HIGHWAY BRIDGES - EXPERIENCES LEARNED FROM CHI-CHI EARTHQUAKE

SUMMARY SHEETS OF GROUTED DUCT CONNECTIONS

Why high seismic zone matters?

Analytical Investigations and Design Implications of Seismic Response of a 2-Span ABC Bridge System

New Development in Accelerated Bridge Design and Construction in WA

Revise Sections through of Part 1 of the 2009 Provisions as follows:

Post Earthquake Bridge Safety Assessment Program

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

SEISMIC PERFORMANCE OF BRIDGE COLUMNS WITH DOUBLE INTERLOCKING SPIRALS

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

SHAKE TABLE EXPERIMENTS OF PRECAST, PRETENSIONED BRIDGE

Ductile Detailing for Earthquake Resistant R C Structures. Dr. S. K. PRASAD Professor of Civil Engineering S.J. College of Engineering Mysore

FINITE ELEMENT ANALYSIS OF REINFORCED CONCRETE BRIDGE PIER COLUMNS SUBJECTED TO SEISMIS LOADING

Strength and Ductility of Reinforced Concrete Highway Bridge Pier

APPLICATION OF ENERGY DISSIPATION TECHNOLOGY FOR RETROFITTING STEEL STRUCTURES WITH VULNERABLE PRE- NORTHRIDGE CONNECTIONS

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

BRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E.

Ingenuity Offers a Solution to an Anomaly in a Bridge Support

Effect of Vertical Acceleration on Highway Bridges

Seismic Performance of Precast Concrete Bents used for Accelerated Bridge Construction. Bijan Khaleghi 1

BRIDGE DESIGN MEMORANDUM DM0115

CONTINUITY OF PRECAST BRIDGE U-GIRDERS CONNECTED TO A CAST-IN-PLACE SUBSTRUCTURE SUBJECTED TO SEISMIC LOADS

Recent Changes to Seismic Design Practice in California. Mark Yashinsky 1

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY

Use of Grade 80 Reinforcement in Oregon

Pretest 3-D finite element analysis of the girder-tocap-beam connection of an inverted-tee cap beam designed for seismic loadings

SEISMIC PERFORMANCE OF BRIDGE SLAB-COLUMN JOINTS WITH HEADED REINFORCEMENT

Seismic Design Criteria of a Cable- Stayed Bridge- An Owner s Perspective

Fresno SR 180 Braided Ramp Design-Build Project. John Pologar Senior Project Manager Walsh Group. Sammy Tu, S.E. Senior Structural Engineer ARUP

NCHRP Project Michael Culmo, PE CME Associates, Inc.

34 Earthquake Damage to Bridges

Yashinsky, M. Earthquake Damage to Structures Structural Engineering Handbook. Ed. Lian Duan Boca Raton: CRC Press LLC, 2001

Final Conference Earthquake engineering Presentation of the book

Types : Metal rockers, rollers or slides or merely rubber or laminated rubber, POT - PTFE

The Influence of Vertical Earthquake Motion and Pre- Earthquake Stress State on the Seismic Response of Precast Segmental Bridge Superstructures

Bridge Seismic Response Experiment Program using E-Defense

EVALUATION OF PERFORMANCE OF A SKEW BRIDGE IN WENCHUAN 2008 EARTHQUAKE

Development and Seismic Evaluation of Pier Systems w/pocket Connections and Advanced Materials in Plastic Hinges

Loren Turner Caltrans Division of Research & Innovation. David Wald Kuo-Wan Lin U.S. Geological Survey

CYCLIC RESPONSE OF RC HOLLOW BOX BRIDGE COLUMNS STRENGTHENED USING CFRP AND RC JACKETING

Alaskan Way Viaduct Independent Technical Review

LONG SPAN BRIDGES IN CALIFORNIA - SEISMIC DESIGN AND RETROFIT ISSUES

Seismic Evaluation Of Clark County Critical Bridges Using Nonlinear Static Procedures

SEISMIC ISOLATION FOR STRONG, NEAR-FIELD EARTHQUAKE MOTIONS

Performance Objectives and the AASHTO Guide Specifications for LRFD Seismic Bridge Design

A cost-effective integral bridge system with precast concrete I-girders for seismic application

COMPARISON OF DIFFERENT METHODS FOR SEISMIC RETROFIT OF BRIDGES USING SMART MATERIALS

Special Committee on Bay-Delta Item 3b, June 24, 2014

Impact of the post-earthquake reparability of low damage dissipative controlled rocking connections on the design framework.

Enhancing the resilience of highway networks for extreme events

Seismic Analysis of Bridges Using Displacement-Based Approach. Chung C. Fu, Ph.D., P.E., Director/Associate Professor, the Bridge Engineering

Analysis, Design, and Construction of SMA-Reinforced FRP- Confined Concrete Columns

Seismic Design of a Railway Viaduct in a High Seismic Zone

PHASING CONSIDERATIONS FOR BRIDGES

Seismic. Department University

Seismic Design and Performance of Metal Buildings

6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT

Seismic Lessons Learned. W. Phillip Yen, Ph.D., P.E. Seismic Research Program Manager Office of Infrastructure R&D, FHWA

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

EXPERIMENTAL INVESTIGATION OF PRECAST CONCRETE BEAM TO COLUMN CONNECTIONS SUBJECTED TO REVERSED CYCLIC LOADS

AASHTO LRFD Seismic Bridge Design. Jingsong Liu July 20, 2017

James A. Gallego, P.E.

4.6 Procedures for Connections

Roy A. Imbsen, P.E., D.Engr. Tuesday, June 13, Presentation Topics

Transcription:

ISU Spring Transportation Seminar Series April 1, 2016 IMPLEMENTING SEISMICALLY ROBUST ACCELERATED BRIDGE CONSTRUCTION in CALIFORNIA Mark Mahan, PhD, P.E. Ron Bromenschenkel, P.E. California Department of Transportation BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 1

San Mateo-Hayward Bridge Widening (2002) Up to 270 feet of structure completed per week 5.15 mile long portion of south bay crossing PC Hollow Piles PC Cap Tubs PC Girders PC Deck Forms BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 2

California Experience: Three major California earthquakes. Influence of earthquakes on Caltrans Seismic Design Criteria (SDC). Concepts of Confinement, Continuity, and Balance in the SDC. Proof of Ductility in California Columns. BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 3

1971 San Fernando EQ: Collapse of multiple structures including Route I-5/I-405 Separation Structure resulted in a drastic increase in Confinement reinforcement in columns. BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 4

Caltrans pre- 1971 columns, 1994 damage. Caltrans new confined columns Confinement: Caltrans SDC 4.1.1 C > D BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 5

Caltrans post-1989 Column Testing BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 6

Caltrans post-1989 Column Testing BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 7

1989 Loma Prieta Earthquake: The San Francisco-Oakland Bay Bridge lost a deck segment due to insufficient hinge seat. BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 8

1989 Loma Prieta Earthquake: The Cypress Viaduct collapsed partly due to excessive joints in the structure BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 9

Caltrans columns and shafts, new construction BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 10

Caltrans hinge seat, before 1971 Continuity: Caltrans SDC 7.2.5.4 and 7.8.3 Equation 7.5, minimum 24 seat width for in-span hinges and Equation 7.46, minimum 30 at abutments. Caltrans Cast-In-Place, post-tensioned box girder bridges have excellent continuity and framing. They meet the SDC requirements. Do Pre-Cast bridges meet the continuity requirements? BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 11

1994 Northridge Earthquake: I- 5/SR-14 collapse, lack of stiffness and mass Balance from bent to bent. BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 12

1994 Northridge Earthquake: I-5/SR-14 collapse. BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 13

Caltrans Seismic Design Criteria Balance: Caltrans SDC 7.1.1, Any two bents or columns: k e m i j 0.50 k e m j i BENT 2 FRAME 1 FRAME 2 BENT 3 BENT 4 BENT 5 BENT 6 T 1 T 2 m 2 m3 m 4 m 5 m 6 k 2 k 3 k 4 k 5 k 6 Adjacent bents or columns: k e m i j 0.75 k e m j i k 2 k 1 BENT 3 BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 14

UCSD 4-foot Diameter Column Test BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 15

UCSD 4-foot Diameter Column Test Videos 3, 5, 10 are shown as examples of performance Test ID EQ Record Magnitude Scale Table PGA Target Ductility 2 Loma Prieta 1 6.9 1.0 0.409 2 3 Loma Prieta 2 6.9 1.0 0.526 4 5 Kobe-Takatori 6.9-0.8-0.533 8 7 Kobe-Takatori 6.9 1.0 0.646? 8 Kobe-Takatori 6.9-1.2-0.829? 9 Kobe-Takatori 6.9 1.2 0.819? 10 Kobe-Takatori 6.9 1.2 0.851? BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 16

UCSD 4-foot Diameter Column Test Video 3 at ductility demand of 4 Video 5 at ductility demand of 8 Video 10 at ductility demand beyond 8 BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 17

Summary of Cast-In-Place (CIP) practice Single Column Bents supported on fixed foundation μd 4 Multi-Column Bents supported on fixed or pinned footings μd 5 Columns designed for ductility values of 4 and 5 are proved to perform to ductility values of 8 to 10 in laboratory testing. CIP post-tensioned box girder and properly detailed PC bridges can meet the above seismic requirements. BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 18

BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 19

40,000,000 Western States Population: US Census Bureau CA 35,000,000 30,000,000.California 25,000,000 20,000,000 15,000,000.Washington.Arizona.Utah.Nevada.Alaska 10,000,000 5,000,000 0 1980 1985 1990 1995 2000 2005 2010 2015 WA AZ UT NV AK BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 20

CISN ShakeMap Loma Prieta EQ M6.9 October 1989 63 lives lost $ 6,000,000,000 damage CISN ShakeMap Napa EQ M6.0 August 2014 0 lives lost $ 1,000,000,000 damage (est) BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 21

BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 22

ABC Column Connection Research PC Column with partially debonded bars plunged into UHPC filled voids Testing at University of Nevada, Reno BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 23

PC Girder Continuity through Bent Caps BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 24

PC Girder Continuity through Bent Caps BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 25

ISOLATED ABC BRIDGE LIFE CYCLE COST ANALYSIS BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 26

ISOLATED ABC BRIDGE LIFE CYCLE COST ANALYSIS BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 27

PC Shear Key Concept (2013) BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 28

BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 29

Proposed Type II shaft with PC Column BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 30

BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 31

CA BRIDGE DECK REPAIR 2005-2015 Misc, 307, 7% Replace, 2, 0% Patch Spalls, 1009, 23% Potholes, 90, 2% Rehab, 100, 2% Resurface, 109, 3% Overlay, 188, 4% Methacrylate, 2646, 59% BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 32

BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 33

Caltrans positive moment connections for joining PC girders to bent caps are based on proof testing done at Iowa State University. Six details are being developed to provide designers with options at different ABC (and non-abc) sites. BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 34

PC Girder Continuity Hwy 50, El Dorado Hills, CA (2013) Strand tails lapped and hooked, then tied into place for longitudinal continuity BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 35

PC multi-column bents using pinned bases can offer construction fit-up tolerance challenges.. This detail allows the PC column to be spun or shifted to better align with top of column bars being inserted into a PC cap. PC Column with adjustable Pipe Pin base BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 36

Excerpt from two-span Caltrans ABC pilot project featuring PC columns, inverted T bent cap, and PC girders. Looped strand girder continuity detail used. BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 37

Excerpt from second two-span Caltrans ABC pilot project featuring PC columns, drop-bent cap, and PC girders. Hooked strand girder continuity detail used. BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 38

Comments? Questions? BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 39

BACKGROUND RESEARCH DETAILS GUIDANCE PROJECTS 40

41

42

43

44

45

6 -diameter column/shaft test at UCLA 46

6 -diameter column/shaft test at UCLA 47

48