ACCIDENT PREVENTION PROGRAM HAZARD ANALYSIS SAFETY HEIRARCHY

Similar documents
Lockheed Martin Space Systems Company (LMSSC) Contractor Environment, Safety & Health (ESH) Site Briefing - Boulder, Colorado

Safe Work Method Statement. 14/4/16 Approved by (Snr Management Rep):

GUIDE TO IMPLEMENTING AN EFFECTIVE SAFETY PROGRAM

JOB SAFETY ANALYSIS PROGRAM. Owner: Risk Management Revision No: 01. Document number: Q-001 Date last revised:

HEALTH AND SAFETY MANUAL

Demolition Contractor Skilled Support Personnel Pre-Qualification

HAZARD IDENTIFICATION AND ASSESSMENT

TITLE: CONTRACTOR SAFETY. Safety Procedures and Policies. Issuing Authority: Multi-Color Corporation, Page Number: 1 of 5. Date Effective: 4/1/2011

Chapter 26. Tim Foster - dba MPC (Maintenance Projects & Construction) Company Policy for Subcontractor Management Plans & Management of Change

Accident Prevention Plans Randy Acosta Safety Officer OICC MCI East Camp Lejeune NC 31 October 2012

Are designed to provide a safe working environment, and Govern use of fall protection procedures and equipment.

How Basic Orientation Plus 2010 revision works with a company s safety program to meet OSHA requirements:

Hazards. Struck-by Electrocution Falls Caught In-Between

CONTRACTOR SAFETY PRE-QUALIFICATION CHECKLIST. Name of Contractor: Date: Business Address: Telephone No.:( ) Fax No.:( )

HAZARD IDENTIFICATION AND ASSESSMENT

Safe Work Method Statement

Doc No: SUBCON Midland Engineering Co., Inc. Initial Issue Date 12/04/15 Safety Management System

XXVI. Contractor Safety & Environmental Guidelines (For General Contractors and Sub-Contractors)

QUALITY CONTROL AND SCHEDULE AND THEIR IMPACT ON SAFETY. Capital Improvement Business Line Chief Engineer NAVFAC EURAFSWA 8 Sept 2010

FASHION INSTITUTE OF TECHNOLOGY OUTLINE FOR PREPARING WORK-SPECIFIC ENVIRONMENT, HEALTH AND SAFETY (EHS) PLAN

FASHION INSTITUTE OF TECHNOLOGY OUTLINE FOR PREPARING WORK-SPECIFIC ENVIROMENT, HEALTH AND SAFETY (EHS) PLAN

Safety Approach. September 2016

Subcontractor Project Management Plan

NC Sturgeon Safety Management System

Excavation Safety Program

NCCER Progress Blvd, Alachua, Florida Phone: (888)

Transitioning to the New Erector Standard from a Checklist

HEALTH AND SAFETY MANUAL

Fire Protection Contractor QA/QC Plan Sample

Introduction. In order to be suitable and sufficient and to comply with legal requirements, a risk assessment must:

I. Introduction/Welcome to MAPP

SAN FRANCISCO PUBLIC UTILITIES COMMISSION S WATER SYSTEM IMPROVEMENT PROGRAM (WSIP) SAFETY APPROACH

POLLUTANT STORAGE CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

REGULATOR SPECIALIST. Position Summary

APPLIED INDUSTRIAL TECHNOLOGY (CONSTRUCTION TENDING AND HAZARDOUS MATERIAL ABATEMENT) (ATLB)

NEVADA DEPARTMENT OF BUSINESS AND INDUSTRY DIVISION OF INDUSTRIAL RELATIONS OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

JHA Number 1a. Job Description Hanging new ductwork. Step 1 Unloading of ductwork

2014 SAFETY EXCELLENCE AWARD SAFETY SURVEY FORM FINAL EVALUATION FOR GENERAL & HARD/SOFT CRAFT CONTRACTORS

Health & Safety Policy and Procedures Manual SECTION 23 MASONRY CONSTRUCTION

2018 MSI Training Needs Assessment Guide Page 1

2016 OSHA Update. Wayne Kerrigan. Safety Consultant Iowa Division of Labor Ph

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

WL Plastics Corp WL111A Handling WL Plastics Reeled Pipe

Tree Protection Policy

Fall Protection Plan for Construction

Safety Policy and Procedure

WORKING AT HEIGHT PROCEDURE

Lockheed Martin Space (LMS)

METHOD STATEMENT SCREEDING OF FLOOR

Project Safety Orientation and Procedures

Emerg. Contact: EMERGENCY CONTACT INFORMATION Fire Department Info: Municipal Police Info: County Sheriff Info: Dept Name: Dept Name: Dept Name:

CUSP Base Exams and T&D Endorsement Exam Sample Questions and Format

WATER PLANT TECHNICIAN Series Specification

Written Safety and Health Program

ECCS Information Form

Release: 1. CPCCBC4002A Manage occupational health and safety in the building and construction workplace

Marshall Municipal Utilities EXCAVATIONS AND TRENCHING Effective August 1, 2011 Revised August 17, 2017

CONSULTING OFFICE OF MORRIS S. FARKAS PROFESSIONAL SAFETY ENGINEER

Construction, Demolition & Excavation Works Doc Reference: DoMN-WHSMS 3.14 Version Number: 2.2

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS. TABULATED DATA Effective August 27, 2014

Selected pages (not a complete plan)

Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017

OSHA Today BAMA 2015

National Occupational Standards Development Pack for Sub-Structure Work Occupations (Construction)

Oil and Gas Contractor QA/QC Plan Sample Selected pages (not a complete plan)

Construction Safety Education Forum. 6 March Scaffolding. Dimitri Barlas, State Coordinator Construction Work Health and Safety Division DRAFT

Environmental Health and Safety

Barricades. Preparer: Owner: Approver: EHS Specialist EHS Team Leader Site Director J. Walker (Electronic Signature on File)

Scope of Work Bid Package C-8 - West Overhead Doors

JOB DESCRIPTION. Job Title: Operations Manager-Millwork Position #: MG3263. Position Type: Corporate Operations Corporate/Operations

SCAFFOLDING. Scaffolding Systems. Aerial Work Platforms. Access ways

Snelling Injury and Illness Prevention Program. (Reviewed : June 2016)

LAUSD Construction Safety Program Safety Boot Camp

Job Safety Analysis (JSA) is a procedure to be used in reviewing work methods and identifying hazards that may result in incidents and accidents.

Safe Work Method Statement

CAL/OSHA ELECTRICAL HIGH VOLTAGE

WHITMAN COLLEGE TRENCHING AND SHORING PLAN

210 Series UL Listed Modular Vault Panel Installation Procedures January 15, 2009

2014 SAFETY EXCELLENCE AWARD SAFETY SURVEY FORM FINAL EVALUATION FOR CRANE & RIGGING SUPPORT

Assessing Hazards in Manure Storage & Handling Systems

Earthworks QA/QC Plan Sample

Owners List of Known Workplace Hazards CONTRACT TITLE LIBRARY SQUARE ELEVATORS #10-#11 MODERNIZATION (OCT20/16)

Scope of Work Bid Package C-4 - West Polished Concrete

SECTION 1: APPLICANT INFORMATION. 1. Have you contacted your local Chapter regarding their established submission process or procedure?

Health & Safety Plan DEMOLITION WORKS: No 2 Substation

Description of Best Practice

HAZARD IDENTIFICATION AND RISK ASSESSMENT Revision Date: 04/2017

Site Specific Safety Plans (SSSP)

Construction Environmental, Health & Safety Plan (CEHSP)

SCHEDULE 8 CITY PRE-CONTRACT HAZARD ASSESSMENT FORM

Flooring Contractor QA/QC Plan Sample Selected pages (not a complete plan)

2019 ABC Maine Training Calendar

MMM MASONRY, INC. Employee Safety Guidelines

JOB SAFETY ANALYSIS. 1 P a g e

Rocky Top Materials, Inc.

CONSTRUCTION SITES (SAFETY) (AMENDMENT) REGULATION 2003

Hazard & Risk Assessment Manual Hazard Assessment & Job Safety Analysis

OSHA ANNOUNCING 3 rd Edition Curriculum and Student Manual 2017

Technical Report II. The Office Building. Rendering courtesy of DAVIS. Brett Miller. Dr. Gannon Construction

HEALTH & SAFETY ASSESSMENT SCHEME CONTRACTOR & PRINCIPAL CONTRACTOR APPRAISAL QUESTIONNAIRE

Transcription:

ACCIDENT PREVENTION PROGRAM HAZARD ANALYSIS SAFETY HEIRARCHY Engineering Controls Work Practices Personal Protective Equipment (PPE)

SAFETY HEIRARCHY Engineering Controls Example: Three foot high parapet wall on building Work Practice Examples: Working from bucket truck to bolt steel instead of climbing steel Personal Protective Equipment Safety Harness

QUESTION WHAT TWO WORD EXPRESSION PRECEDED THE TERM ACTIVITY HAZARD ANALYSIS THAT MEANS EXACTLY THE SAME TYPE OF ACTION WE TAKE TO AVOID ACCIDENTS Only 2 words?

ACCIDENT PREVENTION PROGRAM HAZARD ANALYSIS H.A IS PUTTING SAFETY FIRST!

ACCIDENT PREVENTION PROGRAM HAZARD ANALYSIS ACCIDENT PREVENTION PROGRAM HAZARD ANALYSIS 1. Contract No.: 2. Contractor: 3. Date: 4. Title: 5. Location: 6. Estimated Start Date: 7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS 10. EQUIPMENT TO BE USED 11. INSPECTION REQUIREMENTS 12. TRAINING REQUIREMENTS 13. Contractor (Signature & Date) 14. Report discussed with contractor/superintendent on 15. Contracting Officer (Signature & Date) or Contracting Officer Representative

ACTIVITY HAZARD ANALYSIS (AHA) REVIEW EM 385-1-1 para 01.A.13b: Work will not begin until the AHA for the work activity has been accepted by the GDA and discussed with all engaged in the activity, including the contractor, subcontractor(s), and Government on-site representative at preparatory and initial control phase meetings. Principle Steps column identify Sequences of Work such as Mobilization, Fencing, Demolition, Asbestos Abatement, Electrical Distribution, etc. Contractor Construction Schedule or Construction Progress Chart is a good guide to identify Sequences of Work (See page 2). Within each identified Sequences of Work there may be other successive steps to complete that phase of work such as Removal of lockers, LOTO of electrical systems, Protecting members of the public, A/C ducting installation work, Use of crane to lift 5,000 lbs. A/C unit, Excavations deeper than 6 ft for utilities, etc.

ACTIVITY HAZARD ANALYSIS (AHA) REVIEW The below are examples of major Sequences of Work or Phases of Work that could be identified on the AHAs as Principle Steps or successive steps to complete a sequence or phase of work. Installation of perimeter fencing, Placement of field office trailer, Installation of fall protection anchors, Unloading heavy equipment at staging area, etc. Examples of Principle Steps from start to finish. Within each Principle Step there may be other Successive Steps to complete the above Principle Steps. The blocks on the right are examples of other Successive Steps. Activity to be performed Rigging of pump motor and piping, Lifting of pump motor and piping from sump pump pit, etc. Placement of concrete forms, Demo of concrete forms, Placement of rebar, etc. Installation of rigging components, Lifting of steel grating, Torch cutting on steel grating, etc. LOTO pump motor, Removal of lead paint on bolts and piping, Unbolting pump motor from housing, etc. Removal of project fencing, Removal of field office, Loading of heavy equipment, Clean up of staging area of debris, etc. EM385-1-1 para 01.A.13a: AHA will define the activities being performed and identify the sequences of work, the specific hazards anticipated, site conditions, equipment, materials and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level of risk. 7

ACTIVITY HAZARD ANALYSIS (AHA) REVIEW List of questions that will help you identify most hazards: (a) Is there danger of striking against, being struck by, or otherwise making injurious contract with an object? (b) Can the employee slip or trip? (c) Can the employee be caught in, on or between objects? (d) Can the employee fall on the same level or to another? (e) Can the employee strain themselves by pushing, pulling or lifting? (f) Is there possibility of electrical, health or fire hazards? (g) Is there a possibility of employee coming in contact with a hazardous chemical or substance? Past experiences and common sense will enable development of a useful list Potential Hazard column lists potential or anticipated hazards for each Sequences of Work or Phases of Work identified from the Principle Step column.

ACTIVITY HAZARD ANALYSIS (AHA) REVIEW Potential Hazard column can have General Safety as a potential hazard to include minimal PPE dress for ROICC projects. General Safety should be identified for every phase of work. Good examples of Potential Hazards

ACTIVITY HAZARD ANALYSIS (AHA) REVIEW Recommended Controls column identify site specific control measures to be implemented to eliminate or reduce each hazard identified in the Potential Hazard column to an acceptable level. To help you come up with ideas for the best solution ask the following: (a) How can the conditions be changed to eliminate the hazard? (b) What can the employee do to prevent an accident or eliminate the hazard?

ACTIVITY HAZARD ANALYSIS (AHA) REVIEW Your recommended controls measures are to be site specific and should provide sufficient information to personnel on how to eliminate or reduce anticipated hazards for each phase of work. General statements such as Provide adequate fall protection, Proper shoring techniques will be followed, LOTO procedures will be implemented, etc. are not site specific recommend controls measures and will not be accepted. Site specific plans such as Fall Protection, Confined Space, LOTO, Critical Lift, etc. can be attached to the AHAs as a supplement to the AHAs. General statements that are not acceptable.

ACTIVITY HAZARD ANALYSIS (AHA) REVIEW List equipment to be used for the phase of work such as crane, backhoe, powder actuated tools, electric saws/drill, etc. List inspection requirements for the phase of work such as confined space by an competent person, Attach proof of competent person to AHA, daily housekeeping, hand and power tools daily inspections, machinery and equipment inspected daily, etc. List training requirements for the phase of work such as fall protection, confined space, HAZCOM, qualified equipment operators, safe use of ladders, HAZWOPER, etc. 01.A.13c The names of the competent/person (s) required for a particular activity (i.e., excavations, scaffolding, fall protection, other activities as specified by OSHA and this annual) will be identified and included in the AHA. Proof of their competency/qualification must be submitted to the GDA for acceptance prior to the start of that work activity

HAZARD ANALYSIS EVERY CONSTRUCTION, REPAIR OR ALTERATION PROJECT HAS HAZARDS!!! AHA IS IDENTIFYING THE HAZARDS. DETERMINING WHAT TO DO TO OVERCOME THE HAZARDS

ACCIDENT PREVENTION PROGRAM HAZARD ANALYSIS A HA can be used to evaluate and identify all substances, agents, and environments that present a hazard and the recommendations for control measures. Physical controls should be considered first (work practices), and in cases where not possible, then PPE may be used. Yea I Remember! 1st Engineering Controls 2nd Work Practices (physical controls) 3rd PPE

ACCIDENT PREVENTION PROGRAM HAZARD ANALYSIS REQUIRED AS PART OF QUALITY CONTROL PREPARATORY/INITIAL INSPECTION

CONTRACTOR QC DUTIES AS PART OF THEIR QUALITY CONTROL RESONSIBILITIES CONTRACTOR QC PERSONNEL SHALL CONDUCT & DOCUMENT DAILY SAFETY INSPECTIONS 01.A.12 b & SPECS. 013526

DOES THE PRIME CONTRACTOR SUBMIT HIS A.H.A I SAW SOMETHING IN THE APP?? WITH THE ACCIDENT PREVENTION PLAN?

ACCIDENT PREVENTION PLAN COE MANUAL APPENDIX A Requires contractor to list the phases of work and Hazardous activities requiring ACTIVITY HAZARD ANALYSIS Appendix A Paragraph 2-f.

ACCIDENT PREVENTION PROGRAM HAZARD ANALYSIS WHEN DOES THE CONTRACTOR SUBMIT THE H.A?

ACCIDENT PREVENTION PROGRAM HAZARD ANALYSIS Submit the HA for the Preparatory Phase. before each phase of work and at initial phase meeting. Submit subsequent AHA for each major phase of work prior to start of that phase. NO WORK WILL START UNTIL THE AHA HAS BEEN ACCEPTED BY THE DESIGNATED GOVERNMENT REPRESENTATIVE. format subsequent AHA as amendments to the Accident Prevention Plan specifications section 013526

ACCIDENT PREVENTION PROGRAM HAZARD ANALYSIS Who would normally develop the H.A?

THE CONTRACTOR WHO WILL ACTUALLY BE DOING THE WORK

ACCIDENT PREVENTION PROGRAM HAZARD ANALYSIS As a minimum, define activity being preformed, sequence of work, potential hazards, control measures to eliminate or reduce each hazard to an acceptable level, inspection & training & equipment needed. Name the competent person for the phase of the work. Proof of their competency/qualification must be submitted to the GDA for acceptance prior to the start of that activity. COE Page 8 & 9, Figure 1-2 Safety Resource Manual: Section A, Pages 26 & 27 Sample HA & extra copies

WHAT IS AN ACCEPTABLE H.A? CLASS DISCUSSION OF SAMPLE HA Construct new masonry wall that is 8 foot high and 20 foot long. See sample on page 26

ACCIDENT PREVENTION PROGRAM HAZARD ANALYSIS Prime Contractor: ABC Construction Superintendent : Joe Can Do Masonry Sub-Contractor: Masonry Inc. Forman for Sub-Contractor: I. KnowItAll Materials: All Materials on site Equipment: On site ready to perform work Electric Mortar Mixer Forklift on Site Scaffolding on Site Personnel All Prime and Masonry subcontractor personnel on site

ACCIDENT PREVENTION PROGRAM HAZARD ANALYSIS 1. Contract No.: 2. Contractor: 3. Date: 4. Title: 5. Location: 6. Estimated Start Date: 7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS 10. EQUIPMENT TO BE USED 11. INSPECTION REQUIREMENTS 12. TRAINING REQUIREMENTS 13. Contractor (Signature & Date) 14. Report discussed with contractor/superintendent on 15. Contracting Officer (Signature & Date) or Contracting Officer Representative

HA PRACTICE CONSTRUCT AN 8' HIGH x 20' LONG MASONRY WALL PPE (STANDARD) ADDITIONAL PPE?? (Block Cutter) SCAFFOLDING EQUIPMENT/QUALS/TRAINING MSDS INFORMATION (Mortar) DESIGNATED COMPETENT PERSON MORTAR MIXER GFCI BLOCK SAW GFCI TRAINING DOCUMANTATION LIMITED ACCESS ZONE??

QUESTION? Once the HA has been completed and accepted by the Government the project work can start. Is it necessary to do another HA for this same phase of work on this same project?

HAZARD ANALYSIS PRIOR TO START OF ANY NEW PHASE OR TYPE OF WORK PRESENTING HAZARDS NOT PREVIOUSLY EXPERIENCED A NEW/DIFFERENT WORK CREW OR SUB-CONTRACTOR ARE EMPLOYED.

Under what circumstances should a contractors work operations be stopped?

IMMINENT DANGER!!!!

IMMINENT DANGER DEFINITION Immediately dangerous to life or health (IDLH respiratory hazard): an atmosphere that poses an immediate threat to life, would cause irreversible adverse health effects, or would impair an individual s ability to escape from a dangerous atmosphere Immediately dangerous to life or health (IDLH-confined space): any condition that poses an immediate or delayed threat to life or that would cause irreversible adverse health effects or would interfere with an individual s ability to escape unaided from a permit space APPENDIX Q page Q-40

IMMINENT DANGER DEFINITION A condition or practice exists in any place of employment (our jobs) which could reasonably be expected to cause death or serious physical harm immediately or before the imminence of such danger can be eliminated through the enforcement procedures (ie: Administrative Procedures) Ref: OSHA 1903.13 Imminent Danger Situations

ACTION The observation of ANY IMMINENT DANGER situation---the work and/or situation should immediately stop the imminent danger eliminated. then resolution action can be worked out after employees/situation are no longer in jeopardy ( A Pgs 17-20)

SUMMARY Prime Contractor submit APP listing phases of work and qualifications of personnel, QC does document safety HA submitted before work starts to be accepted by GDA Imminent danger requires ACTION!

SAFETY QUESTION WHEN SHOULD A CONTRACTOR SUBMIT HIS ACCIDENT PREVENTION PLAN? APP

SAFETY QUESTION WHO USUALLY IS RESPONSIBLE FOR COMPLETING THE HA? WHY? We can t start work until you finish the HA!

SAFETY QUESTION WHAT OTHER DUTIES DOES THE CONTRACTOR QUALITY CONTROL PERSON HAVE BESIDES QUALITY CONTROL?

SAFETY QUESTION WHAT IS THE NAME OF THE DOCUMENT THAT MUST BE COMPLETED AND ACCEPTED BY THE GOVERNMENT REPRESENTATIVE BEFORE ANY PHASE OF WORK IS STARTED? AHA

SAFETY QUESTION Once an HA has been developed, work environments and hazards involved in the work identified, what control measures should be taken to reduce the hazard. a. Chemical and mechanical controls, then environmental controls b. Engineering and administrative controls, then PPE c. Physical and environment controls, then PPE d. Environmental and Engineering controls, then mechanical controls

SAFETY QUESTION WHEN YOU ARE VISITING A JOB SITE. HOW CAN YOU KNOW WHAT PHASES OF WORK ARE IN PROGRESS? I am praying for a break from this class Why are you on your knees?? HINT: See 01.A.06d

FINAL QUESTION: WHAT TIME IS IT? Who Knows? Time to STOP!