Your partner for the right solution

Similar documents
THERMAL POWER PLANT SIMULATOR TPP 200 LABORATORY EXERCISE TUTORIAL N4: INTRODUCTION TO THE HEAT PRODUCTION SYSTEM

CHAPTER 2 STUDY OF 210 MW BOILER SYSTEM 2.1 DESCRIPTION OF 210 MW BOILER

PRODUCT DESCRIPTION PARAMETERS

Energy Efficiency: Best Practices Thermal Power Stations

Downsizing a Claus Sulfur Recovery Unit

Steam Power Station (Thermal Station)

Boiler Efficiency Testing. To understand the operation of a fire tube boiler To determine the operating efficiency of the boiler

Kawasaki Gas Turbines-Americas Gas Turbines Power Generation Technology & Applications

TABLE OF CONTENT

POWER PLANT- BOILER OPERATIONS SIMULATOR

INDUSTRIAL SOLUTIONS PRODUCTS AND SERVICES

Performance Optimization of Steam Power Plant through Energy and Exergy Analysis

Exhaust Heat Recovery Systems

IMPROVEMENTS IN P.F. COAL BOILER FOR BEST HEAT RATE PERFORMANCE VOLUME 1, ISSUE 1 AUTHOR :- A. R. KULKARNI, DIRECTOR PUBLISHED DATE :- 19/09/2009

COMPUTER SKILLS : Windows, MS Office, Internet : EMPAC (Enterprise Maintenance Planning and Control) System

Equipment Design. Detailed Plant Conceptual Design. Version 9.0

MEC-OS-E-1999 Deputy Commissioning, Start-up & Operation Manager PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS

Equipment Design. Detailed Plant Conceptual Design. Version 7.0

SCHNEIDER-KESSEL BERLIN

Power Engineering II. Technological circuits of thermal power plants

Ms.P.Aileen Sonia Dhas

Combined Cycle Power Plants. Combined Cycle Power Plant Overview (Single- and Multi-Shaft) Training Module. ALSTOM (Switzerland) Ltd )*+,

NITIN CORPORATION. 402, 4 th Floor, Bezzola Commercial Complex, V.N. Purav Marg, Sion Trombay Road, Chembur, Mumbai , India.

STORM ONE MORE TIME: FIRST APPLY THE FUNDAMENTALS! S T O R M T E C H N O L O G I E S, I NC.

HIGH PRESSURE BOILERS

BIOMASS ENERGY INSTALLATIONS SUSTAINABLE AND EFFICIENT ENERGY FROM BIOMASS.

Pre-owned 240 MW Combined Cycle Gas Turbine Power Plant

B. System Design and Performance Requirements

Incinerators for hazardous materials Safety and reliability with newest technology

Copyright 1984 by ASME COGENERATION - INTERACTIONS OF GAS TURBINE, BOILER AND STEAM TURBINE

systems for turbomachinery Power Systems Camfil Farr - clean air solutions for turbomachinery

A class of its own JUMAG STEAM BOILER COMPACT INFORMATION STEAM BOILER WATER SUPPLY MODULES BLOW DOWN VESSEL COMPACT STEAM SYSTEM.

Taravosh Jam Design & Engineering Co.

DEVELOPMENT OF A TOOL FOR SIMULATING PERFORMANCE OF SUB SYSTEMS OF A COMBINED CYCLE POWER PLANT

BENEFIT. from our products and services.

Lecture (6) on. Schematic of a Thermal Power Plant. By Dr. Emad M. Saad. Mechanical Engineering Dept. Faculty of Engineering.

BU Power Generation Energy efficiency presentation PSPG Services

Due Diligence: Efficiency Increase in Existing Power Stations - a Practice Report-

Transportable disease control units

Research Activities on Oxyfuel Combustion at IVD, Universität Stuttgart

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN

STEAM TURBINE-GENERATOR & AUXILLIARY SYSTEMS Presentation by: RANA NASIR ALI General Manager, Power Plants Projects, at PITCO November 02, 2017

BEST PRACTICES IN THERMAL POWER PLANT. Confederation of Indian Industry CII Godrej Green Business Centre, Hyderabad, India

High efficient multi-fuel CYMIC concept for biomass, rejects and coal for Hamburger Hungaria Katriina Jalkanen Valmet Technologies Oy

UC Davis - Facilities O&M Cogeneration Plant Bid Package October, 2007

Our Cyprus strategic alliance associates presentation TAPROGGE

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard

RETROFIT SOLUTIONS. For Gas Turbines And Rotating Machinery

Improving energy efficiency in an ammonia plant

GLIMPSES OF IMPROPER WATER CHEMISTRY IN A SUBCRITICAL PULVERIZED COAL FIRED BOILER AT A THERMAL POWER PLANT

Environmentally Sound Technology Biomass Fuelled Energy Plants. Combined Heat and Power Supply. Biomass Fired Steam Generator

Industrial Accessories Company 4800 Lamar Ave Mission, Kansas ETHANOL MARKET. PP007

ELEVATING VAM RTO INLET CONCENTRATION THROUGH CMM BLENDING FOR POWER GENERATION

Retrofit of Rodenhuize 4 power station: The Max Green and Cold Back-up-projects

Steam Turbine Performance Improvements Through R&M

RL SERIES. Two Stage Light Oil Burners FIRING RATES LIGHT OIL

natcom burner solutions Advanced burner technology for stringent emissions requirements

Cleaner Production and Energy Efficiency in Industry. With Focus on the Electricity Supply

Nilan VPL Active heat recovery and cooling (air/air)

Appendix 4.2 Furnace Start Up and Shut Down Procedures

THE ALL-IN-ONE INLET AIR COOLING AND FILTRATION SOLUTION USING YOUR WASTE HEAT FREUDENBERG FILTRATION TECHNOLOGIES

Thai-German Technology Conference Biogas CHP Solutions / exhaust gas heat recovery - GTP Solutions GmbH (D) Bangkok, Hotel Crowne Plaza

COURSE TITLE : POWER PLANT INSTRUMENTATION COURSE CODE : 5215 COURSE CATEGORY : E PERIODS/WEEK : 4 PERIODS/SEMESTER: 52 CREDITS : 4

ADECOS II. Advanced Development of the Coal-Fired Oxyfuel Process with CO 2 Separation

Di ti agnos cs & O ti p i m t za ittion of of Pollution Control Systems y Dan Bemi MEGTEC Systems I nc Inc.

Combustion Laboratory Unit C492

MARAMA Webinar August 7, Angelos Kokkinos Chief Technology Officer Babcock Power, Inc.

MEC-MOS-E-2004 Gas Turbine Maintenance Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

NTPC-SAIL POWER COMPANY PRIVATE LIMITED (A Joint Venture of NTPC & SAIL)

COMBINED CYCLE OPPORTUNITIES FOR SMALL GAS TURBINES

4th Class Power Engineering (PEN) Curriculum Mapping

DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED

Conceptual Facility Plans and Details. Appendix B

KEPCO KEPRI Kim eui hwan

WASTE HEAT BOILERS FOR NITRIC ACID, CAPROLACTAM AND FORMALDEHYDE PLANTS

Combustion Laboratory Unit C492

OUTCOME 1 TUTORIAL 1 PLANT OPERATIONS

Babcock Borsig Steinmüller GmbH. Bełchatów - Retrofitting the EU s Largest Power Plant Site

Wood Products Energy Savings Guide

oil cleaner Electrostatic Product brochure

Han MK, Business Development (Power Generation), 23rd March 2010 ABB Power and Automation Days ABB in Power Generation

YKN2open A R C 032 A B

The Filterautomat. Our Filter Systems Protect. The New Definition of Purity for Your Medium. flow rate 5 m 3 /h to 4,000 m 3 /h. filter fineness 5 µm

SUMMER 15 EXAMINATION

Indo-German Energy Forum: Flexibility Case Study at Dadri and Simhadri An overview. Dr. Claudia Weise, December 1, 2017, Delhi

WASTE HEAT BOILERS FOR NITRIC ACID, CAPROLACTAM AND FORMALDEHYDE PLANTS

Welcome to. Kendal Power Station

Practical Boiler. Operation Engineering and Power Plant FOURTH EDITION. Amiya Ranjan Mallick

1 st Renewable Energy Technologies, LP. Organic Rankine Cycle

ELE-CMOS-E : Commissioning Leader PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Pratt & Whitney. Power Systems MOBILEPAC. Gas Turbine Package. It s in our power.

Coal-Fired Boiler Optimization

Hydraulic systems Quality without cutting corners

NUCLEAR TRAINING CENTRE COURSE 134 FOR ONTARIO HYDRO USE ONLY

GAS TURBINE POWER PLANTS

DESIGN BASIS FOR AIR CONDITIONING AND VENTILATION SYSTEM FOR SUBSTATION AND CONTROL BUILDING HINDUSTAN PETROLEUM CORPORATION LTD.

A SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS

RL SERIES. Two Stage Light Oil Burners FIRING RATES LIGHT OIL

Transcription:

Your partner for the right solution Project engineering of power stations Environment protection in energy sector Equipment supplying Supervision of installation of the equipment supplied Commissioning of the equipment supplied Long-term after-sale services such as maintenance, overhaul, supplying of spare parts and consumables

whb Energietechnik I 2 Table of contents 1. Company profile and philosophy Page 3 2. whb Energietechnik is specialized in Design and Engineering 5 3. Gas systems 7 4. Fuel oil systems 10 5. Boiler equipment 12 6. Air and flue gas equipment 14 7. Water systems 17 8. Steam and condensate systems 20 9. Automation 22 10. Auxiliaries 25 11. Transmission and distribution 26

1. Company profile and philosophy whb Energietechnik I 3 Head office Energietechnik GmbH founded in Bochum/Germany in 1989, provides design, engineering and project management of installations and complete systems in power projects. is committed to provide the customer with advanced technology on a high level of quality. s corporate philosophy is to make available new and better system designs to the market with special emphasis on safety, long service life and easy maintenance. has implemented its Quality Management System ISO 9001. Its quality policy applies to every step from receipt of customer enquiry through to commissioning/after sales service. This brochure is intended to give a view of several possibilities that whb can offer.

whb Energietechnik I 4

whb Energietechnik I 5 2. whb Energietechnik is specialized in Design and Engineering in accordance to european standards and ASME code requirements in the scope of: Gas systems Filtering station Pressure reducing station Flow control Metering station Safety shut-off and control valves Fuel oil systems Pumping station Heating station Flow control Metering station Safety shut-off and control valves Boiler equipment Igniters Gas and oil burners Flame control Burner valve station for control, metering and shut-off Soot blowers Air and flue gas FD and ID fans Recirculating fans Dampers Silencers Fans for cooling towers Water systems Cooling water pumps Cooling water filters Condenser ball cleaning systems Water treatment equipment Chiller Stations Magnetic filters Auxiliaries Fire fighting equipment Emergency power supply station Compressor station Hydrogen production plant Industrial closed circuit TV systems Busduct-systems including SF6 Steam and condensate Steam conditioning HP and LP By-pass system Safety valves Condenser protection Condensate pumps Injection valves Automation Control systems Control desks, cabinets and panels Transmitters, analyzers and recorders Panel mounted indicators Alarm signalling units Transmission and distribution Transformers up to 400MVA LV, MV and HV switchgears Earthing & Lightning equipment Generator circuit breaker, neutral earth cells and busducts All kinds of control and power cables

whb Energietechnik I 6 HP Gas Pressure Reducing & Metering Station Inlet/Outlet: 70/6 bar with a capacity of 2 x 110.000 nm 3 /h For a Thermal Power Station 3 x 200 MW LP Gas Pressure Reducing & Metering Station Inlet/Outlet: 6/1 bar with a capacity of 3 x 55.000 nm 3 /h For a Thermal Power Station 3 x 200MW Overall view of whole station shown above

3. Gas systems whb Energietechnik I 7 whb designs and manufactures HP and LP Gas Pressure Reducing and Metering Stations. The gas is transported normally by means of pipelines under the pressure of 70 to 80 bar. The end-user of the gas needs generally a lower pressure. An HP Reducing Station is required to reduce the gas pressure coming by pipeline, for example down to 20 bar for gas turbine applications. For most of the other applications, an HP Reducing Station is required as a first stage pressure reducing station followed by an LP station to reduce the gas pressure according to the requirements of the end-user, mostly down to less than 4 bar.

whb Energietechnik I 8 1 2 3 6 7 6 HP Gas Pressure Reducing Station Inlet: 24" ANSI 600 Outlet: 2 x DN 700 PN 10 Capacity: 2 x 110.000 nm 3 /h 7 LP Gas Pressure Reducing & Metering Station Inlet/Outlet: 17/2 bar with a capacity of 60.000 nm 3 /h For a Thermal Power Station 1 x 200 MW

whb Energietechnik I 9 4 5 1 Safety shut-off and pressure control valves 2 Gas heater 3 Safety shut-off valve 4 Auxiliary boiler for gas heating 5 Pressure control valve A typical gas reducing station is consisting of: emergency shut-off device (ESD) condensate knock-out drum filter station flow measuring heater line safety shut-off valve(s) pressure reducing valve silencer pressure relief valve(s) outlet section instrumentation control system. and following auxiliaries: condensate collecting facility N 2 -purging facility flare Venting facilities According to application, some of above facilities may not be needed. 8 whb has designed and installed several High Pressure and Low Pressure Reducing Stations according to International and German standards since more than 14 years, around the world. 9 8 Filter and heater skid with safety shutdown valves for gas turbines 9 Gas filter station for a thermal power station 1 x 200 MW 10 Manual and electrical isolation valves at gas line outlet 10

whb Energietechnik I 10 4. Fuel oil systems Fuel oil facilities from pump house till burners are one of the most important part of the power stations that use it as main or spare fuel. Fuel oil pumps, heaters, filters, flow control, metering, safety shut-off and control valves are main equipment that are subject to engineering and supply of whb. Fuel oil pumping station whb's innovative design of valve train in front of the boiler makes it possible to combine all components into a compact, factory pre-fabricated and tested station on a high quality standard, as shown on the pictures. This makes not only the installation works easy, but also the operation and maintenance. Increased safety through internal interlocks, real quick closing function (less then 1 sec.) through pneumatically actuated reliable shut-off valves are other important benefits of these stations.

whb Energietechnik I 11 Burner management station that includes oil flow measuring and metering, flow control and safety shutoff in front of the burner. Furthermore purging and atomizing steam and control air solenoid valves are also incorporated. The station is completely factory assembled, wired to a control cabinet and tested.

whb Energietechnik I 12 5. Boiler equipment whb makes engineering and supplies several boiler equipment such as: Reliable igniters and flame detector systems, Gas and oil burners for any capacity, Burner valve trains for burner management including flow control, metering and shut-off valves Soot blowers. 1 Fuel: Flame Monitoring: Flame detectors: Oil, Gas, Coal, Wood Monitoring systems designed to deliver reliable data. Monitoring quality is in no manner affected by varying operation conditions as a basis for safe and reliable plant operation. High quality flame detectors of different types are provided, depending on type of fuel and number of burners installed at the boiler monitored. 3 Gas supply line 2 Gas feed line to Igniters 1 Air feed line to Igniters 5 4

whb Energietechnik I 13 3 2 Air feed line to second boiler 6 8 7 Item Description 1 Igniter ZA 1S 2 Igniter gas control devices 3 Igniter air control devices 4 Flame detector assembly 5 Local control panel 6 Pressure control valve for igniter gas supply 7 Fans for igniter air supply, 100% each 8 Local control panel for fans Selection of spectral range Fuel Oil [nm] 190 1100 Gas [nm] 190 280 Coal [nm] 780 1800 Wood [nm] 780 1800 4 1 Combined valve station for natural gas and fuel oil 2 Natural gas valve station installed in front of the burner 3 Combined gas and fuel oil burners ready for shipment 4 Fuel oil valve station installed in front of the burner Typical schematic diagram of gas electric igniters and flame detectors

whb Energietechnik I 14 6. Air and flue gas equipment The huge amount of the air to be used for combustion of fuel shall be supplied to the furnace and the flue gas shall be exhausted to the atmosphere by means of big ventilators shown on the pictures. For the fresh air supply to the furnace, Forced Drought fans shall be installed. These fans are mostly furnished with inlet air silencers. Induced Drought fans are used to feed a part of flue gas into the furnace, for burning optimization and reducing the NO x emission. The flue gas shall be sucked from the boiler and led to the stack by means of Induced Drought axial fans. whb makes engineering and supply of all kind of fans and as well as dampers to control the airflow and shut-off the air and flue gas in ducts. The vibration control systems will be incorporated into the control system of the fans supplied by whb. 1 2 1 Control and shut-off dampers installed on an air duct 2 Forced Drought (FD) radial fan, 704.000 m 3 /h, 1800/750 kw with silencers at its double inlets 3 Induced Drought (ID) axial fan, 1.065.000 m 3 /h, 1500/675 kw 4 Recirculation ID radial fan, 308.000 m 3 /h, 1100/450 kw

whb Energietechnik I 15 3 4

whb Energietechnik I 16 Waste water M Permeate 75m 3 /h CIP CIP-Station 200m 3 /h Filtered Water Pre-filter Pre-filter RO Modules RO Modules M M Concentrate 50m 3 /h CIP Chemical Dosing Chemical Dosing Permeate 75m 3 /h

7. Water systems whb Energietechnik I 17 The water to be used to produce steam must be very clean and demineralized so that scale forming in pipes and equipment can be eliminated. Therefore it must be treated. whb s engineering and supply ranges from turn-key Water Treatment Plants (WTP) to particular systems of it, such as Reverse Osmosis Plant shown on the background. Furthermore, whb supplies all kinds of water and condensate valves and pumps for WTP plants and cooling water systems. For condenser of the plant, if it is cooled by raw water taken from a river or sea, a Condenser Ball Cleaning system is needed to eliminate the fouling and bio fouling of cooling water pipes in condensers because of different kinds of particles in cooling water, such as impurities, salts, corrosion, macro and micro organisms. whb solves this by cleaning the tubes periodically by means of sponge balls that circulates automatically. Another engineering and supply of whb is turn-key chiller stations to acclimatize the operation and control rooms. The chiller station cools down a rather big amount of water used in acclimatization of power plants that locates in high ambient temperature areas. The biggest Chiller Station whb engineered and supplied is 5 x 2 GCal turnkey plant that cools 1800 m 3 /h water from 12 C down to 6 C.

whb Energietechnik I 18 Filter Presses to dewater the solids separated from raw water Several vessels in a Water Treatment Plant (WTP) Filters in the WTP

whb Energietechnik I 19 For the power plants that has an open circuit cooling system and uses river or sea water, a Water Intake plant shall be installed. The plant shall filter the water mechanically to reduce the maximum size of impurities down to 1 mm. For this, differently sized gratings and finally fine band screens are used in line. whb s biggest supply of such Water Intake Plant was 5 x 42.500 m 3 /h plant. Grab cleaners of a Water Intake Plant with a capacity of 5 x 42.500 m 3 /h Hydraulically actuated valves in the WTP

whb Energietechnik I 20 8. Steam and condensate systems whb`s supplies for steam and condensate are: Steam Conditioning systems that controls the pressure and temperature of steam for several applications, such as; turbine by-pass, process steam conditioning, pressure relief, etc., HP an LP By-Pass Station that reduces the pressure and temperature of the steam for; cooling of reheater, cooling of final super heater, pressure control/turbine bypass, to build-up controlled pressure in the boiler, etc., LP by-pass valve Inlet: DN 400, 18 bar, 545 C Outlet: DN 700, 6 bar, 200 C Safety Valves that blow-off the steam to the atmosphere in emergency cases, Condenser Protection to protect the condenser in case of disturbance, Condensate pumps that delivers the condensate into the cycle again, Injection Valves that are used for injection of water into steam for temperature reducing.

whb Energietechnik I 21 Typical steam - water cycle of a power station HP-Bypass HP LP LP-Bypass LP-Bypass Hydraulic control units with accumulators for fail-safe function

whb Energietechnik I 22 9. Automation In a power station, there are thousands of measuring points to be able to control the temperature, pressure, flow, level, water quality, pollution of environment, etc. All these measurements are part of automation of many functional parts of systems and the whole station. Numerous references and its experience enable whb to make engineering and supply reliable equipment for controlling of systems in the form of control desks, cabinets or panels, any kind of transmitters, analyzers and recorders, alarm signalling units and vibration control systems. Typical graphic displays

whb Energietechnik I 23 Control panel of a LP gas pressure reducing station

whb Energietechnik I 24 1 2 4

10. Auxiliaries whb Energietechnik I 25 5 6 As for every plant, a power station also needs many specific auxiliary equipment such as Fire Fighting, Emergency Power Supply, Pressure air Supply, Hydrogen Production Plant, Closed Circuit TV-System, Busduct System, etc. whb has furnished several power stations with high quality auxiliaries in the past and is able to supply any auxiliary system trough its long-term experience in the field. 1 Multiple air compressor station 2 Emergency diesel power station, 1,9 MVA 3 Fire fighting pumping station 4 Air receivers, filters and oil separators 5 Visualization of furnace 6 Diesel fire fighting pump unit 3

whb Energietechnik I 26 11. Transmission and distribution For the power transmission and distribution, whb has several possibilities to furnish engineering and supply equipment, such as: Transformers up to 400 MVA LV, MV and HV switchgears Earthing and Lightning equipment Circuit breaker, neutral earth cell and busducts for generators. With its well experience, whb has supplied reliable equipment for several power stations and it is in the position to extend its scope of supply. SF6 (Sulfur Hexafluoride gas) switchgear, that minimizes space because of insulation and arc-interrupting ability of SF6 gas

whb Energietechnik I 27 Switchgear of a diesel emergency power supply set 1 2 1 Switchgear 2 Transformer

whb Energietechnik GmbH Am Vorort 14 44894 Bochum Germany Tel.: +49 234 92 235-0 Fax: +49 234 92 235-50 www.whb-energietechnik.de email : info@whb-energietechnik.de Moscow Branch: World Trade Center Mezhdunarodnaya II Entrance 6, Office 1550 Krasnopresnenskaya nab. 12 123610 Moscow Russia Tel.: +7 095 258 14 27 Fax: +7 095 258 14 20 email : whb.moscow@wtt.ru whb 05.2004/1.000