FOREWORD 02 ENERGY CONSULTANCY SERVICES 04 FUNDAMENTAL MARKET MODELLING 04 OPERATIONAL MARKET SIMULATION 05 ECONOMIC AND TECHNICAL ANALYSIS 06

Similar documents
APLUS Energy Investment Technology Consultancy. Short-term and mid-term price forecasting in Turkey Istanbul Energy Day September 08, 2015

olumbia River Treaty The Columbia by Steve Oliver, Vice President, Generation Asset Management, Bonneville Power Administration 16 Oct

The Future of Electricity: A Market with Costs of Zero? Marginal

Sustainable peaking power development planning of Sri Lanka with hydropower

The Future of Electricity: A Market with Costs of Zero? Marginal

California Independent System Operator Corporation. California ISO. Import resource adequacy. Department of Market Monitoring

The Confluence Model. Presentation to Modeling and Forecasting Working Group January 21, 2015

Solar, Wind and Market Power in the New Zealand Electricity Market (and hydro lake dynamics) Mina Bahrami Gholami and Stephen Poletti

CRT Operations in Low Water Conditions

NON-TREATY STORAGE AGREEMENT

PORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS

"NewCo" Connector Project

Feasibility Report Madian Hydropower Project. Conclusions and Recommendations. 7166P02/Vol. II, Recommendations

REGIONAL FORECASTING OF GENERATION FROM SMALL HYDROPOWER PLANTS

BC Hydro Generation system operation Columbia Basin Regional Advisory Committee

ERCOT Public LTRA Probabilistic Reliability Assessment. Final Report

Keeyask Generation Project. Public Involvement. Supporting Volume. Environmental Impact Statement

The Impacts of Climate Change on Portland s Water Supply

Annex 5 - Hydropower Model Vakhsh

Valuing ecosystem services linked to river flows in Lower Zambezi basin, Mozambique. Safa Fanaian, Susan Graas, Yong Jiang & Pieter van der Zaag

City of San Clemente Water Usage Report

Integrated Resource Planning at Tacoma Power. Ahlmahz Negash EE 500E Energy & Environment Seminar University of Washington

Transmission Planning at the Midwest ISO. Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008

Impacts of the EU ETS on Electricity Prices

Bidding Strategy I Day-Ahead Market 8 th February 2017 I New Delhi

MRC's role in relation to planning and implementation of mainstream dams and its strategic assessment framework

Executive summary. Value of Smart Power Generation for utilities in Australia. A white paper by Wärtsilä and Roam Consulting

Camp Far West Hydroelectric Project Relicensing

PJM ENERGY PRICES 2005 Response to Howard M. Spinner Paper

2016 ISO Flexible Capacity Needs Assessment: Study Methodology, Assumptions, and Preliminary Results

Valuing Distressed Generation Assets

Effects of projected climate change on energy supply and demand in the Pacific Northwest and Washington State

The Texas Experience: Implications of 8,000+ MW Wind Generation Resources In ERCOT. David Campbell CEO, Luminant 2009 Summer Seminar August 3, 2009

Current Water Management Practices for Kerr Reservoir

Proposed Work Plan for Seventh Plan Development. October 2, 2014 GRAC Tom Eckman

Flexible Resource Adequacy Criteria and Must Offer Obligation Working Group Meeting

Schedule 2 TECHNICAL INFORMATION

Electric Forward Market Report

Hetch Hetchy Integrated Resource Plan Commission Meeting May 23, 2017

Climate Change Impacts on Hydrological Regime in Latvia

global science solutions

CCA Pilot Project Update

Analyst Presentation Managing Hydrology Risk

Ibrahim Sinan AK CFO, Zorlu Enerji Group TURKISH ENERGY SECTOR OUTLOOK & SECTORAL REFORMS

Presentation for the Local Government Commission and the Community Environmental Council. July 13, 2007

CCA Pilot Project Update

Appendix D. System Model & Assumptions. 1.0 BC Hydro System Modelling for Columbia Alternatives

HKU announces 2017 Q4 HK Macroeconomic Forecast

How do we cover the shortfall? Carbon Market update: IETA Conference Paris, September 27 th Stefan Judisch Managing Director RWE Trading GmbH

CONTENTS. Forward Executive Summary The Council s Resource Adequacy Standard Recent Adequacy Assessments... 8

Final Flexible Capacity Needs Assessment for 2019

Summary of Integrated Capacity and Energy Revenue Modelling

Energy Management at Statkraft. Short Term Energy Management

For Bandon Utilities Commission

HKU announces 2016 Q3 HK Macroeconomic Forecast

Peter Randall Solar Kingdom Ltd

ENERGY AND WATER STATISTICS 2016

multiconsult.no Hydropower modelling Vientiane January

MISO PJM Cross-Border Planning

2001 Annual Report on the New York Electricity Markets

Cape Town Water Outlook Updated 21 February 2018 Department of Water and Sanitation City of Cape Town

Modelling the Effects of Climate Change on Hydroelectric Power in Dokan, Iraq

Xu Guosheng Zhaoheng Hydropower

Reforming the Mexican Electricity Market: Design and Regulatory Issues

HKU announces 2018 Q1 HK Macroeconomic Forecast 1

March 5, SUBJECT: Additional Background Materials for Scenario Input Assumptions

Session V Market Driven ES Existing Business Cases give an Insight to their Revenue Streams. Business Cases for large Capacity Storage Projects

Powergen International 2003 IMTE AG

Leveraging Ahuroa and managing a fluid gas book

Xayaburi Hydroelectric Power Project

Techno-economic feasibility study of solar and wind based Irrigation Systems in Northern Colombia

Hydroelectric System Scheduling by Simulation

ENERGY AND WATER STATISTICS 2017

IOP Concept 5 Forecast 03 Apr 2007 to 31 Dec COE HEC-5 Simulation of IOP using hydrologic conditions of 2000 and 2001

Eugene Water & Electric Board. The Future of Utilities in the Pacific Northwest

Pathways to Integrate 175 Gigawatts of Renewable Energy into India s Electric Grid

Hedging Coal Price Risk in a Deregulated Power Market

EVALUATION OF ARTIFICIAL NEURAL NETWORKS IN OPTIMIZATION MODELS OF HYDROPOWER RESERVOIR OPERATION

Stephen Batstone THE NZ ELECTRICITY MARKET: TEETERING ON THE EDGE OF TRANSFORMATION?

System Needs: An Energy Planning Perspective. Randy Reimann

OPTIMIZATION FOR PEAKING POWER SUPPLY

Impact of Climate Change on Water Resources of a Semi-arid Basin- Jordan

Reservoir on the Rio Boba

Capacity and Flexibility Needs under Higher Renewables

BRITISH INSTITUTE OF ENERGY ECONOMICS. RENEWABLES AND CCGTS: COMPETITORS OR COMPLEMENTARY? 11 October 2012 Andrew Morris

Overstock.com, Inc Financial Results Presentation. February 7, 2006

INTEGRATED FORECAST AND RESERVOIR MANAGEMENT (INFORM) FOR NORTHERN CALIFORNIA Water Resources Assessment for Northern California

CHANGING DYNAMICS WITHIN THE SOUTH AFRICAN CONSTRUCTION INDUSTRY

WaterNSW Water Operations Report. Murray-Lower Darling November 2017

Wind Update. Renewable Energy Integration Lessons Learned. March 28, 2012

Final 2014 Flexible Capacity Needs Assessment

August 22, 2014 FIRE ISLAND WIND

Manitoba Hydro - Power Plants and SWOT Analysis, 2011 Update

WATER & WASTEWATER PLATFORM

/ Q2-19 / Quarterly Operating Report / September 2018

edart Roadmap As of February 21 st, 2018

Pathways to Integrate 175 Gigawatts of Renewable Energy into India s Electric Grid

A Bulk Energy Storage Resource Case Study with 40% RPS in 2024

HIGH WATER MARK. History First From roughly 1993 to 1998, tie suppliers. Small Market Purchases

Section 3 Characteristics of Credits Types of units. Economic Noneconomic Generation.

Transcription:

INDEX FOREWORD 02 ENERGY CONSULTANCY SERVICES 04 FUNDAMENTAL MARKET MODELLING 04 OPERATIONAL MARKET SIMULATION 05 ECONOMIC AND TECHNICAL ANALYSIS 06 FINANCIAL MODELLING 06 SELECTED REFERENCES 08 APLUS ENERJİ CONSULTANCY TEAM MEMBERS 10 1

FOREWORD The privatization process in Turkish Electricity Market, which started with electricity distribution companies, followed by small HEPP portfolios and lignite power plants; has now reached another important step; the privatization of the second group of EUAS HEPPs. There are 16 Hydroelectric Power Plants to be privatized in total and those are being privatized in eight different groups with a total installed capacity of 842.79 MW. When the tenders for the privatization of EUAS HEPP portfolio is completed, the total installed capacity share of private generation companies will increase from 59% to 60% while EUAS share will drop to 26.6%. However, it is obvious that a detailed technical and financial feasibility study of these power plants is necessary due to worn-out equipment, even though there is a significant gain in the investment cost of state-owned electricity generation power plants which have ready infrastructure. In addition to this, the excess supply caused by water level reaching normal levels at reservoir dams in 2015 increased the significance of evaluating the EUAS Hydroelectric Power Plants to be privatized. In today s conditions, risk factors such as hydrology, market structure and regulations are being discussed intensively. In this frame, this explanatory document does not only describe our approach for a technical evaluation study of a HEPP, but also contains information on services which we provide on market modelling, dispatch optimization and financial modelling studies. As APLUS Enerji, with our expertise in market forecasts, dispatch optimization and feasibility studies since 2009, we would be pleased to support you esteemed investors during EUAS HEPP assets privatization process. Please note that APLUS Enerji works on an "exclusivity" basis and we have already signed exclusivity agreement for the EUAS Portfolio Groups 5, 7 and 8. For the remaining portfolio groups, we are happy to deliver our consultancy services from technical part to market and dispatch modelling. For further details regarding the remaining portfolios that APLUS Enerji is still offering services to investors, please see the pre-evaluation study material for EUAS Portfolio Groups 1, 2, 3, 4 and 6. 2

Table 1. EUAS Privatization Portfolio No Power Plant Installed Capacity (MW) Type Bid Submission Deadline Availability of APLUS Enerji Portfolio 1 1 Şanlıurfa 51.8 Canal 18.02.2016 Available Portfolio 2 2 Tortum 26.2 Lake 29.02.2016 Available Portfolio 3 3 Kemer 48 Reservoir 3 Adıgüzel 62 Reservoir 10.03.2016 Available Portfolio 4 4a Kesikköprü 76 Reservoir 4a Derbent 56.4 Reservoir 4b Yenice 37.89 Reservoir Portfolio 5 5 Almus 27 Reservoir 5 Köklüce 90 Reservoir 5 Çamlıgöze 32 Reservoir Portfolio 6 6 Seyhan 1 60 Reservoir 6 Seyhan 2 7.5 Run-of-River 6 Yüreğir 6 Canal Portfolio 7 7 Kılavuzlu 54 Reservoir 7 Menzelet 124 Reservoir Portfolio 8 8 Çamlıca 1 84 Run-of-River Awaiting Public Announcement Awaiting Public Announcement Awaiting Public Announcement Awaiting Public Announcement Awaiting Public Announcement Available Exclusivity Agreement in Place Available Exclusivity Agreement in Place Exclusivity Agreement in Place 3

2016 2018 2020 2022 2024 2026 2028 2030 2032 2034 2036 2038 2040 USD/tcm 2016 2018 2020 2022 2024 2026 2028 2030 2032 2034 2036 2038 2040 ENERGY CONSULTANCY SERVICES APLUS Enerji provides various services, from technical & financial feasibility studies to market and regulation research, to local and international investors who are active or willing to be active in electricity generation, distribution and trade sectors. Fundamental Market Modelling: AVIEW MARKETSIM is an energy market price forecasting software developed by R&D department of APLUS Enerji. The model obtains all required assumptions and data as a result of integration with AVIEW EMDB (Energy Market Database). Fundamental Market Modelling 4.3% 4.1% 3.9% 3.7% 3.5% 3.3% 3.1% 2.9% 2.7% 2.5% Operational Market Simulation Energy Investment Consulting Economic and Technical Analysis Low Base High Figure 2 GDP Growth Low, Base and High Scenarios Financial Modelling Figure 1 Energy Investment Consulting Services APLUS Enerji executed investment consulting services for various institutions and organizations in and abroad. Our selected services for power plant investment projects include; Energy market modelling studies, Techno-economic assessment, Hydrology assessment for HEPPs, Financial feasibility consulting, Lender s engineering studies, Tender consultancy for hydroelectric and thermal power plants of EUAS. AVIEW MARKETSIM generates mid- and longterm price forecasts under various scenarios and does not only provide Day-Ahead Market Price forecasts to users but also predicts fuel prices, economic growth and gross electricity demand in a given period of time. 490 440 390 340 290 240 Low Base High Figure 3 Natural Gas Prices Low, Base and High Scenarios 4

2016 2018 2020 2022 2024 2026 2028 2030 2032 2034 2036 2038 2040 USD/MWh 6.5 15.1 17.8 19.4 22.8 24.5 25.3 26.2 28.0 35.4 37.1 37.3 38.5 39.1 40.7 41.3 41.6 42.2 43.9 44.5 45.3 45.7 Bidding Price (USD/MW) 2016 2018 2020 2022 2024 2026 2028 2030 2032 2034 2036 2038 2040 USD/ton 85 80 75 70 65 60 55 Operational Market Simulation: By using various fuel and electricity price forecasts generated by AVIEW MARKETSIM, power plants potential revenues from Day- Ahead Market is calculated with the models and analyses which are developed by APLUS Enerji. Low Base High Figure 4 Imported Coal Prices Low, Base and High Scenario AVIEW MARKETSIM generates merit order curve for each hour by using all power plant data provided by AVIEW EMDB. Future merit order curve results of selected power plants can be examined annually, monthly and hourly basis by using the results of market model. 200 2016 July Avg. Demand 2016 July Max Demand Day Ahead Electricity Market Price Forecasts Dispatch Optimization for HEPPs Net Income Prediction for Hydropower Plants 150 100 50 0 Bidding Price Bidding Amount (GW) EUAS Bursa CCPP Marginal Cost Figure 5 Merit Order Output AVIEW MARKETSIM enables the electricity generators, retail and wholesale companies and the investors to foresee the future development of Turkish Electricity Market. 120 110 100 90 80 70 60 50 40 Activities of HEPPs in Day-Ahead Electricity Market is simulated by using a dispatch optimization software; AVIEW HYDROSIM which is a product developed by R&D team of APLUS Enerji. AVIEW HYDROSIM is a software that provides operation regime optimizations for HEPP operations and investments. With in-house developed algorithms, various flow and precipitation data is used for the deterministic hydrology forecasts. By using these deterministic forecasts and plant constraints, operation optimizations are carried out for hydropower plants in a cascade basin. Figure 6 Average DAM Price Forecast 2016-2040 5

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Million USD Jan-22 Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Reservior Height (meter) Generation Income (USD) 1,520 1,510 1,500 1,490 1,480 1,470 1,460 1,450 1,440 14,000 12,000 10,000 8,000 6,000 4,000 2,000 0 As a result of the dispatch optimizations and techno-economic analyses, the most appropriate technology in terms of technical and economic aspects is provided to the potential investor. The result of these economic analyses are used as assumptions and inputs for the financial model. Reservoir Height Hourly Generation Income Figure 7 Reservoir Height vs. Generation Income AVIEW HYDROSIM supports the decision making process for water retention or generation and also ensures water usage with the highest utilization for the HEPPs in the same basin. Financial Modelling: Financial models are formed for the evaluation of financial viability of power plant investments through financial parameters obtained by APLUS Enerji s experience and income and expenditure results of Operational Market Simulations and Economic Analysis studies. Past Planning Today Electricity Generation Water Storage Future Wet Dry Wet Dry Correct Decision High Prices are Missed Flood Possibility Correct Decision 200 150 100 50 0-50 -100-150 Figure 8 Algorithm of AVIEW l HydroSim -200-250 AVIEW HYDROSIM helps investors for the establishment of financial models and provides optimum pricing strategies during the operation period and thus conducts income and expense simulations for the Day-Ahead Electricity Market. Economic and Technical Analysis: As APLUS Enerji, we have completed various numbers of pre-feasibility & feasibility studies as well as evaluations in techno-economic context for power plants. In these studies, various turbine brands and types, operation and maintenance costs, maintenance characteristics, and performance data have been examined. Investments Depreciation Project Finance Cash Flow Net Income Figure 9 Detailed Equity Cash Flow Analysis Within the financial modelling sensitivity, analyses are performed for investors in order to suggest the most accurate decision. Financial Results Unit Value Project Payback Time Year 8 Project IRR % 11,88 Project NPV USD 56.028.709 Equity Payback Time Year 11 Equity IRR % 13,01 Equity NPV USD 67.501.498 6

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Million USD In sensitivity analysis studies, the impact on investment probability is examined in case of any changes in plant s income expenditures, capital expenditure, and financial parameters. As a result of these analyses, risk matrices of investors is created in order to facilitate the decision making process of investor. In conclusion, knowledge on potential risks and the decision on the best possible investment is provided. 1,000 800 600 400 200 0-200 -400 Figure 10 Equity Cash Flow Analysis 7

Selected References: Project Description: Turkish Energy Market Fundamental Market Simulation Software Project Description: Lender s Engineering Services for Devecikonağı Dam and HEPP EMRA Commercial Bank Project Aim: Development of AVIEW MARKETSIM energy market fundamental market simulation software for Energy Market Regulatory Authority (EMRA). Project Result: All the requirements have been fulfilled and the software has been delivered to EMRA. Project Aim: Monitoring of construction process of Devecikonağı Dam and HEPP in Bursa on behalf of the Lender. Project Result: All research and inputs were submitted to the Lender via periodic progress reports. Project Description: Technical and Economic Evaluation Reports for the Privatization of Run-of- River type Hydropower Plants owned by EUAS Project Description: Technical and Economic Evaluation Reports for the Privatization of Run-of- River type Hydropower Plants owned by EUAS Confidential Confidential Project Aim: Technical and economical evaluation report, short- and long-term electricity price forecast, dispatch optimization, OPEX estimations, financial model and recommended tender strategy for various scenarios delivered to Client. Project Result: Client used all inputs provided by APLUS Enerji for the evaluation of HEPPs and determination of its tender strategy. Project Aim: Technical evaluation report, short- and long-term electricity price forecast, dispatch optimization, OPEX estimations, portfolio based financial models and recommended tender strategy including tender price for 4 portfolio groups which are formed by 10 run-of-river HEPPs delivered to Client. Project Result: Client used all inputs provided by APLUS Enerji for the evaluation of HEPPs and determination of its tender strategy. 8

Project Description: Long-Term Hydrological Forecasting Model for Project Description: Market Modelling, Feasibility Study and Financial Modelling Confidential Confidential Project Aim: Establishing a long-term hydrological forecasting model for important river basins in in order to generate scenarios for monthly water volume received by large reservoir HEPPs until 2040. Project Result: The hydrology model and its outcome were submitted to the Client. Project Aim: Market modelling, feasibility study report and financial modelling for a reservoir-type HEPP with an installed capacity of 100 MW. In the scope of study, AVIEW HYDROSIM dispatch optimization tool owned by APLUS Enerji was used. Project Result: Financing agreement is in evaluation phase by Lender. Project Description: Market Modelling and Techno-Economic Portfolio Assessment Project Description: EUAS Privatization Process Tender Evaluation Confidential Confidential Project Aim: Within the scope of a re-financing project, technical and economic evaluation report, dispatch optimization, short- and long-term electricity price forecast, OPEX estimations, longterm income modelling for a generation portfolio consisting of hydro power and thermal power plants were submitted to Client. Project Result: Re-financing was accepted by Lender and financing was provided to the energy company. Project Aim: Technical and economical evaluation report, short- and long-term electricity price forecast, dispatch optimization, OPEX estimations, financial model and recommended tender strategy for various scenarios delivered to Client. Project Result: As result of the study, the investor decided not to participate in the privatization tender for the selected portfolios. 9

Ozan Korkmaz Founding Partner After completing his undergraduate studies in METU Civil Engineering in 2003, Ozan Korkmaz studied for his Master s Degree concentrating on Hydropower Feasibilities in METU Civil Engineering. He has been continuing his Ph.D. degree in ITU Energy Institute concentrating on Hydropower Feasibilities. During his doctorate studies, he researched on applying Artificial Neural Networks on stochastic hydrological data and published articles. He has been working on feasibility analysis, hydrological and meteological evaluations, forecasting models, distribution and retail tariff modelling of electricity generation projects. Erdem Sezer Manager, Consultancy Erdem Sezer pursued his undergraduate education on a scholarship and graduated with honours in 2010 from Bahcesehir University with a double major in Political Science and Economics. His graduation Project was on liberalization of the Electricity Market. He completed his Master s Degree in the University of Dundee with a scholarship in 2011 concentrating on Energy Financing. He has been studying in Yeditepe University for his doctorate studies in Financial Economics. He works on financial modelling, long-term forecasting models, and management consultancy as the Manager in Consultancy Department. Can Hakyemez Senior Consultant After completion of his Master s Degree of Economics in the University of Windsor, Canada, Can Hakyemez studied for his Ph.D. degree in Economics in Carleton University. Can Hakyemez holds a Bachelor Science degree in Civil Engineering from the Technical University, Istanbul. Following a Canadian based experience for seven years in macroeconomic analysis, Can Hakyemez is working on econometric modelling of the energy market, analyses of impacts / scenarios on market participants, feasibility analyses, sectoral analyses, financial analyses, long term price and demand forecast, and reporting in the consultancy department. Uğur Kurban Senior Consultant After completing his undergraduate degree in Trakya University Mechanical Engineering with honours, Uğur Kurban has two years of experience in the Energy sector. He works on analyses and preparation of reports with respect to the Turkish Energy Market, dispatch optimization model development for electricity generation plants, development of financial models, preparation and reporting of feasibility and pre-feasibility studies for plant investment projects as a part of APLUS Enerji Consultancy Department. 10

Volkan Yiğit Senior Consultant Volkan Yiğit completed his undergraduate studies in the Civil Engineering Department of Yıldız Technical University. During his undergraduate studies, he spent two semesters at University of Portsmouth in United Kingdom. He is currently completing his master thesis studies in Istanbul Technical University's Energy Science and Technologies (MSc) Program. Having started his career in construction project management, Volkan then moved to energy business with a strategy and market analysis role in a leading utility company. Since joining APLUS Enerji, he focuses on market research & analysis, feasibility studies, privatization studies and periodical reports. 11

12