Indonesia s Generation Fuel Mix in an Era of Price Uncertainty Tom Parkinson 14 April 2015

Similar documents
Understanding the Value of Gas Infrastructure in Supporting Southeast Asia s Mid-Merit Power Demand Mike Thomas, Leo Lester, Liutong Zhang, IAEE

Solar Development in the Philippines 22 nd September. The Lantau Group

LNG Infrastructure in Philippines Sarah Fairhurst. The Lantau Group

Regulation and Investment in the WESM

The LNG economy environmental panacea or tariff disaster? Tom Parkinson 27 September 2011

RYSTAD ENERGY GAS PERSPECTIVES. Jakarta, November 20 th 2017

Good morning ladies and gentlemen and thank your for the introduction. Trends and Opportunities in the Indonesian Oil and Gas sector

The 55 th Meeting of APEC Energy Working Group (EWG) Hong Kong, China, May, Diego RIVERA RIVOTA APERC Researcher

Making the Trilemma Work for Asia Mike Thomas PowerGen Asia 2013

The opportunity for coal in the context of natural gas Presented at the Coaltrans China Conference, Kerry Hotel, Pudong Shanghai, P. R.

Bcma Global LNG Liqufaction capacity existing & FID d/under construction

Developments in global gas markets & the impact on Asia LNG - my flexible friend in the face of uncertainty Neil Semple Singapore Round Table October

International gas markets: recent developments and prospects

Solar and Off-Grid Renewables

those where domestic gas prices and affordability both in absolute terms and relative to other sources of energy are likely to restrict development of

INDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati

Renewables Curtailment in China is there light at the end of the tunnel? Liutong Zhang

SECTOR OVERVIEW. Government of Indonesia, State Electricity Corporation (PLN). Electricity Power Supply Business Plan (RUPTL ). Jakarta.

Coal Oil Gas Electricity and Heat Extraction Coal mines Oil wells and field Gas wells and field (not applicable)

An Outlook of Renewable Energy Development in Malaysia

Hub-based Pricing: European Lessons for Asia

Hao Jia (Dr.), Researcher, APERC Takashi Otsuki (Mr.), Researcher, APERC* Kazutomo Irie (Dr.), General Manager, APERC. *Corresponding author

3-2. LNG in the Asia-Pacific

LNG in the Asia Pacific

BC Hydro Price Forecast

APEC Energy Outlook and Security Issues Asia Pacific Energy Research Centre (APERC)

Greening the electric power generating system: application of optimization model and sectoral approach in Indonesia

Presentation of. Clean Energy Asia 2013: Renewable Energy Policies in Indonesia A Report Card. Mini hydro power plants

Coal Dynamics in Indonesia

Asia-Pacific Gas Market Developments Long Term and Short Term Predictions Sarah Fairhurst - O&M and Lifecycle Management Strategies for CCGT Power

Does LNG Threaten Russian Supplies to Europe?

Medium Term Renewable Energy Market Report Michael Waldron Senior Energy Market Analyst Renewable Energy Division International Energy Agency

ENERGY FORUM Consumers Perspective on Energy Issues By Philip Tan Representing FMM August 9, 2010 Sheraton Imperial Hotel, KL

Securing a Sustainable Energy (Gas) Future for Malaysia

Infrastructure Needs: Electricity-Natural Gas Interdependencies

Market Fundamentals. Fuel. Competition & Commercial. Policy and Regulation

Lifting the Lid on Price Revision and Re-Opener Clauses

ECONOMICS OF ELECTRICITY GENERATION

DECADES Tool to Make Comparative Assessment of Electricity Generation in Indonesia 1

Changes and trends in global gas prices + East Med Regional Markets

Session 2: Gas demand growth beyond power generation

Is gas the right fuel for power in the Philippines? Sarah Fairhurst. The Lantau Group, Hong Kong

Indonesia s Energy Requirements Part One: Current Energy Dynamics

Philippines LNG: Developing New Import Markets

ACCELERATION OF SMALL SCALE LNG SUPPLY CHAIN INFRASTRUCTURE FOR CENTRAL AND EAST REGION OF INDONESIA

Renewable Energy Policies in Southeast Asia. Renewable Energy Auctions: A New Paradigm for Asia ACEF, 8 June 2018

The Impact of the Recession on Gas Markets

The consumer and societal benefits of wind energy in Texas

Short Term Energy Outlook March 2011 March 8, 2011 Release

Mike Thomas

BP Statistical Review of World Energy

Logistics of Delivering Supply to Market Midstream Infrastructure Neil Semple 6 November 2012

LNG The Roadmap. Martin Houston LNG Asia - Singapore - 14 th February 2017

Meeting the Challenge of Climate Change

Can Asia lead the way in efficient renewable network integration? Sarah Fairhurst 6 June 2016

The New Global Gas Market Dynamic. Emmanuel Grand, FTI-CL Energy

Medium Term Renewable Energy Market Report 2013

POWER PLANTS: POSITIONING IN THE FAST CHANGING ENERGY WORLD

THE ELECTRIC POWER INDUSTRY: Power Capacity Mix

UPSTREAM PERSPECTIVE ON INDONESIA GAS SUPPLY DEMAND. Jean-Francois Hery Head of Commercial Division

Assessing the Impact of the Diffusion of Shale Oil and Gas Technology on the Global Coal Market

LNG market transformation

Investment Insights from Trends in Indonesian Gas Markets

H APAC LCOE UPDATE

Opportunities and challenges of the Indonesian electrification drive. March 2015

Profound changes underway in energy markets Signs of decoupling of energy-related CO 2 emissions and global economic growth Oil prices have fallen pre

Chapter 1. Integrated, Trans-boundary Energy and Electricity Markets in the BIMP Region A Quantitative Assessment. Yuhji Matsuo and Miyuki Tsunoda

Financial Issues and the Future of Coal

Are European hubs driving global gas prices?

Risk managing cost-effective decarbonisation of the power sector in Germany

WILL THERE BE A TWO-TIER LNG CONTRACT PRICING MECHANISM IN ASIA?

Roadmap for Solar PV. Michael Waldron Renewable Energy Division International Energy Agency

Collaborative EPRI Analysis of CO 2 Price Impacts on Western Power Markets:

THE THIRD IEA-IEF-OPEC SYMPOSIUM ON GAS AND COAL MARKET OUTLOOKS. Deep dive into the Asian market Sylvie Cornot-Gandolphe Paris, 14 December 2016

The economic benefits of wind energy in the Southwest Power Pool

INTERNATIONAL ENERGY AGENCY WORLD ENERGY INVESTMENT OUTLOOK 2003 INSIGHTS

T A O F C O PART A GLOBAL ENERGY TRENDS TO 2030 PART B POST-2012 CLIMATE POLICY FRAMEWORK PART C PROSPECTS FOR NATURAL GAS

Impacts of High Variable Renewable Energy (VRE) Futures on Electric-Sector Decision Making

Gas Pricing and Financing

Substantial Changes Ahead for MISO North Michigan Impacts 2018 MMEA Fall Conference

PJM s Experience with the RPM Capacity Market

Nuclear Energy: Combating Climate Change

Ministry of Energy and Mineral Resources Republic of Indonesia Electricity Investment Opportunity In Indonesia Economic Development Corridors

CHAPTER 4 KEY MODEL INPUTS

EUROPEAN GAS MARKET :

World Energy Outlook 2035: A focus on LNG supply and demand dynamics

The Global Natural Gas Industry

The Future of Electricity: A Market with Costs of Zero? Marginal

Gas Market Report 2017

Chapter 7. Indonesia Country Report. September 2016

The challenges of a changing energy landscape

MODELLING THE MARKET IMPACT OF BATTERY STORAGE IN ASIA-PACIFIC ELECTRICITY MARKETS

Using TIMES models to inform power sector strategy

PowerSimm for Applications of Resource Valuation

The impact of LNG exports on US markets

INDONESIA REGIONAL OVERVIEW

Coal markets update marks the largest 2-year drop in global coal demand - The drop occurred in spite of economic growth 216 was the 3rd consec

TABLE OF CONTENTS 6 MEDIUM-TERM COAL MARKET REPORT 2016

Generation Technology Assessment & Production Cost Analysis

Transcription:

Indonesia s Generation Fuel Mix in an Era of Price Uncertainty Tom Parkinson 14 April 215

Who we are Helping Our Clients Create Value Market analysis and insights Asset valuation / M&A Policy / regulation Disputes Strategy Price projections & advanced analytics Offerings: Deep, critical, and useful insights Office/Presence Senior Advisors Ability to connect the dots across the energy sector Analysis-based recommendations Highly relevant international experience Accessible experts focussed on the region TLG is a deeply-experienced economic consulting firm to the energy sector based in Asia 1

Our partners and principals have consulted for leaders throughout the region Large Users Oil & Gas companies International Aid Agencies Leading Utilities Financial Institutions Market and System Operators Government Ministries Regulatory Agencies Independent Power Producers 2

Overview 1 2 3 4 5 6 Indonesia s capacity expansion plans Historical fuel price movement Screening curve analysis Comparison with regional players Recent fuel price volatility Impacts on economic expansion 3

Installed Capacity (MW) We focus on Java-Bali, as they dominate the total capacity mix 4, 35, 3, 25, Hydro Steam-turbine Gas-turbine Others Geothermal Combined Cycle Diesel IPP 2, 15, 1, 5, Java-Bali Sumatera Sulawesi Kalimantan NTB Maluku Papua NTT Source: PLN, TLG analysis Furthermore, most coal-on-gas competition occurs on Java-Bali 4

Annual Generation (TWh) The official expansion plan for Java-Bali relies heavily on new coal investment 35 3 25 2 Gas Coal Hydro Fuel Oil & Diesel Geothermal The latest official plan (RUPTL) forecasts out to 222 Gas usage is static, although some LNG is needed as part of the gas mix Domestic coal use increases substantially (assuming all coal plant comes online as planned) 15 1 There is some expansion of geothermal following on from Geothermal Law 21/214 and a higher FiT of between USD 13 to 3 per MWh 5 The rate at which new build can be finished to meet demand is probably over-optimistic 213 215 217 219 221 Source: PLN, TLG analysis 5

Average Capacity Factor (percent) New coal build will depress capacity factors for gas-fired plant 8 7 Steam Coal Build-out of coal-fired plant is fast official plans predict additions of close to 2 GW by 222, doubling coal-fired capacity 6 5 4 3 CCGT New coal pushes the average CCGT capacity factor down to about 4 percent But delays in financing, permitting, and PPA negotiations have tended historically to cause delays to new coal additions 2 Such delays were seen in coal-build Fast Track Program I 1 213 215 217 219 221 Source: PLN, TLG analysis 6

Capacity Added (MW) Capacity additions for Fast Track Program I lagged plan by two to four years and we suspect that similar underlying issues could affect Fast Track Program II 5, 4,5 4, Original Plan 3,5 3, 2,5 2, 1,5 Revised Plan 1, 5 29 21 211 212 213 214 215 Source: PLN, TLG analysis 7

Overview 1 2 3 4 5 6 Indonesia s capacity expansion plans Historical fuel price movements Screening curve analysis Comparison with regional players Recent fuel price volatility Impacts on economic expansion 8

Fuel Price (USD/mmbtu) Fuel prices have historically been key drivers in capacity mix decisions 3 Coal window #1 Coal window #2 25 2 15 1 Brent Crude 5 Newcastle FOB Coal 197 1974 1978 1982 1986 199 1994 1998 22 26 21 214 218 Notes: Coal: 197 to 222: Australian Newcastle FOB coal. Historic from World Bank, futures from ICE. Oil: 197 to 1997: Dubai crude adjusted to approximate Brent. 1997 to 222: Brent. Historic from World Bank, futures from ICE. Technology and fuel use decisions are easy when large price gaps emerge 9

2 21 22 23 24 25 26 27 28 29 21 211 212 213 214 Gas Price (USD/mmbtu) In 27, Asian LNG prices opened a large gap relative to US and UK prices as Asian LNG is priced off Brent and the gap widened until roughly a year ago 25 2 Asian LNG price (assuming 13.5 slope and USD.8 constant) JKM 15 1 NBP 5 Henry Hub Sources: ICE, CME, Platts, TLG analysis 1

Coal price (USD/mmbtu) By contrast, Indonesian coal prices closely track the Newcastle (AUS) index 6 5 4 3 FOB Newcastle FOB Indonesian Coal Reference Price The Newcastle FOB coal price and the FOB Indonesian coal reference (HBA) price track each other closely in terms of USD per tonne Also, as the calorific values are very similar, the price per energy unit (mmbtu) also exhibit a close correlation 2 In order to have a basis for a forward price for Indonesian coal, we have used forward prices for Newcastle coal as a proxy 1 29 21 211 212 213 214 215 (to March) Sources: World Bank, Ministry of Energy and Mineral Resources 11

Fuel Price (real USD/mmbtu) Indonesia s capacity expansion plans were probably formed based on relative marginal gas and coal prices, prior to fuel prices falling last year 2 18 16 14 12 1 8 6 4 2 Imported LNG Newcastle Delivered 29 21 211 212 213 214 215 216 217 218 219 22 221 Notes: Imported LNG price is based on ICE Brent futures times a 12.5 percent slope plus shipping of USD 1./mmbtu and regas of USD.7/mmbtu. Coal price is based on ICE futures for Newcastle coal. While the gas/coal spot price ratio neared 5:1 last year, declining Brent futures prices implied a reduction in the ratio to about 3.5:1 by 221 12

Overview 1 2 3 4 5 6 Indonesia s capacity expansion plans Historical fuel price movements Screening curve analysis Comparison with regional players Recent fuel price volatility Impacts on economic expansion 13

In this section, I analyze Indonesia s optimal fuel mix decision My intent is to identify the least-cost mix of Indonesian resources, based on fuel price expectations as of June 214 In order to simplify presentation, I will focus on a first-year analysis of units coming on line in 218 A key issue involves the determination of gas value, since there are three distinctly different sources of gas in Indonesia: Piped gas. This gas is priced via existing contracts, whereby prices escalate with inflation and defined indices Imported LNG. Prices for imported and exported LNG are largely tied to crude prices (particularly Brent) Domestic market obligation (DMO) LNG. By law, gas producers seeking to export LNG must set aside at least 25 percent of production for the domestic market, at prices that represent roughly a 15 percent discount to imported LNG While the marginal source of gas for PLN is probably the DMO LNG, I argue that imported LNG sets the opportunity cost of gas for Indonesia. 14

From producers perspective, the domestic market obligation is basically a tax Without DMO Allocation Total LNG Production With DMO Allocation DMO Allocation Tax Imported LNG Price Revenues = Total LNG Production * Imported LNG Price DMO LNG Price Revenues = Total LNG Production * Imported LNG Price (Imported LNG Price DMO LNG Price) * DMO Allocation This tax is passed directly to consumers as a subsidy 15

Screening curve analysis is based on fixed and variable cost components for each technology (using real dollars) Plant Type Gas CCGT Greenfield Coal Geothermal Capital Cost Generic Cost (USD/kW) 9 1,6 3,475 Construction Time (years) 2.5 3.5 7. Total Cost (USD/kW) 976 1,832 5,754 Economic Life (years) 25 3 3 Station-Own Consumption (percent) 1.5 4. 4. Annualized Capital Cost (USD/kW) 118.22 999 Fixed Cost Fixed O&M (USD/kW-year) 13 25 16 Fuel Costs Gross Fuel Cost (HHV) (USD/mmbtu) 13.4 3.55 Heat Rate (mmbtu/mwh) 7. 9.. Variable Costs Variable O&M (USD/MWh) 2 4 1 16

Total Cost (USD/kW-year) Given the fixed and variable cost components, the total cost of generation is proportional to capacity factor 1,4 1,2 1, 8 6 4 2 Geothermal CCGT Coal 1 2 3 4 5 6 7 8 9 1 Capacity Factor (percent) Our analysis assumes a 218 start date for new plant We used the forward curve for Newcastle coal plus delivery to approximate the Indonesian Reference Coal Price, yielding a real price of 3.55 USD/mmbtu in 218 We assumed that the imported LNG price equals the Brent forward price times a slope of 12.5 percent, plus shipping of 1. USD/mmbtu and regas cost of.7 USD/mmbtu, yielding a real gas price of 13.4 USD/mmbtu Source: TLG analysis 17

Cost (USD/MWh) We can also express the results directly in terms of USD/MWh energy cost 32 28 Coal-fired plant is clearly the least expensive base load option 24 2 Geothermal CCGTs are the least expensive option for capacity factors below 21-22 percent 16 12 8 4 CCGT Coal CCGT Coal At our assumed costs (consistent with breakeven operation at the lower end of the geothermal FiT), geothermal is simply not economic 1 2 3 4 5 6 7 8 9 1 Capacity Factor (percent) Source: TLG analysis 18

Load (MW) The breakeven capacity factor coupled with the load duration curve provides some indication of the optimal mix of coal and CCGT capacity CCGT Capacity Breakeven Capacity Factor Load Duration Curve Coal Capacity % 1% 2% 3% 4% 5% 6% 7% 8% 9% 1% Cumulative Hours (percent) This screening curve analysis suggests an optimal capacity mix quite similar to that in the RUPTL official plan except with lower CCGT capacity factors 19

Total Cost (USD/kW-year) Cost (USD/MWh) Even with CO 2 priced at 5 USD/tonne, the optimal mix does not shift but the breakeven CCGT capacity factors rise to about 4 percent 1,4 32 1,2 Geothermal 28 Geothermal 1, 8 CCGT 24 2 6 4 Coal 16 12 8 CCGT Coal 2 Breakeven Capacity Factor 4 Breakeven Capacity Factor 1 2 3 4 5 6 7 8 9 1 1 2 3 4 5 6 7 8 9 1 Capacity Factor (percent) Capacity Factor (percent) Source: TLG analysis 2

Overview 1 2 3 4 5 6 Indonesia s capacity expansion plans Historical fuel price movements Screening curve analysis Comparison with regional players Recent fuel price volatility Impacts on economic expansion 21

Generation (TWh) Thailand is overbuilding gas-fired plant due to social resistance to coal 4 35 Domestic Hydro Gas Imported Coal Renewables Import Hydro Domestic Lignite Import Lignite Nuclear This is based on new build in Power Development Plan 21 (revision 3), but generation dispatch is based on our fuelto-power optimization modelling 3 Large rise in hydro imports from Laos 25 2 15 1 5 21 215 22 225 23 Source: TLG analysis Generation is dominated by gas, but the percentage eases from 67 to 57 percent of the total by 23 Domestic lignite (Mae Moh plant) holds at present generation levels, while lignite-fired imports from Laos rise Generation from imported coal-fired plant gradually rises Renewables (mainly wind and solar) rise steadily through the forecast period Nuclear comes on line by 226 22

Malaysia s generation mix is the legacy of mispriced domestic gas Source: Energy Commission Surge in coal-fired generation reflects impact of pricing signals on new build decisions 23

1971 1974 1977 198 1983 1986 1989 1992 1995 1998 21 24 27 21 213 Generation (percent) By contrast, Singapore has migrated almost entirely to gas-fired generation 1% 9% 8% 7% 6% 5% 4% 3% 2% 1% Oil Gas Singapore inherited oil-fired generation capacity from the 197s Missed the coal development window of the late 7s and early 8s Committed to pipeline natural gas (PNG) imports in the 9s Began development of the LNG regas terminal in 26, which came online in 213 % Source: IEA (1971-21), EMA website (211 212), 213 and 214 numbers are estimated Placed a moratorium on new PNG and induced generators to commit to LNG Policy decisions have driven Singapore s dependency on gas 24

Overview 1 2 3 4 5 6 Indonesia s capacity expansion plans Historical fuel price movements Screening curve analysis Comparison with regional players Recent fuel price volatility Impacts on economic expansion 25

2 21 22 23 24 25 26 27 28 29 21 211 212 213 214 215 Gas Price (USD/mmbtu) In the last year, the Asian LNG premium virtually disappeared in the blink of an eye forever? 25 2 Asia LNG price (assuming 13.5 slope and USD.8 constant) JKM 15 1 NBP 5 Henry Hub Source: ICE, CME, Platts, TLG analysis 26

2 21 22 23 24 25 26 27 28 29 21 211 212 213 214 215 216 217 218 219 22 Gas Price (USD/mmbtu) Now that Asian spot LNG prices have fallen so drastically, the forward curve slopes strongly upward 25 2 15 1 Asian oil-indexed LNG prices based on oil forward curve 5 Source: ICE, CME, Platts, TLG analysis 27

Fuel Price (real USD/mmbtu) While spot gas prices have dropped dramatically, long-term price expectations have moved far less perhaps 2 percent for both gas and coal 2 18 16 14 12 1 8 6 4 Imported LNG Newcastle Delivered 2 29 21 211 212 213 214 215 216 217 218 219 22 221 Notes: Imported LNG price is based on ICE Brent futures times a 12.5 percent slope plus shipping of USD 1./mmbtu and regas of USD.7/mmbtu. Coal price is based on ICE futures for Newcastle coal. Coal futures prices have also declined, such that the long-term gas/coal price ratio has actually widened to 3.9:1 over the last year 28

Overview 1 2 3 4 5 6 Indonesia s capacity expansion plans Historical fuel price movements Screening curve analysis Comparison with regional players Recent fuel price volatility Impacts on economic expansion 29

Cost (USD/MWh) Cost (USD/MWh) Fuel price declines make new-build CCGTs for mid-merit operation only marginally more competitive June 214 April 215 32 32 28 28 24 Geothermal 24 Geothermal 2 2 16 16 12 8 CCGT Coal 12 8 CCGT 4 CCGT Coal 4 CCGT Coal Coal 1 2 3 4 5 6 7 8 9 1 Capacity Factor (percent) 1 2 3 4 5 6 7 8 9 1 Capacity Factor (percent) Coal at USD 3.55/mmbtu, LNG at USD 13.4/mmbtu Coal at USD 2.43/mmbtu, LNG at USD 9.7/mmbtu 3

Summary Relative coal vs gas pricing Since June 214 the prices of crude oil, international gas, and coal have fallen significantly Forward prices for all fuels indicate a modest recovery These fuel price shifts have not significantly altered the relative pricing and role of coal and gas Java Bali Our screening curve analysis focuses on Java-Bali, which accounts for 75 percent of electricity demand in Indonesia Java-Bali is also the area which is resource short and so has to import fuels from other regions or abroad Coal vs gas windows We are still in a coal window in which pricing favours coal for base load operation Gas pricing places it in a mid-merit role Domestic and imported LNG will play an increasing role in gas supply to Java-Bali Constraints Delays to coal new build may be repeated in Fast Track Program II There is potential for power transmission constraints in West Java Both factors could drive building of gas-fired CCGTs above that in an unconstrained world 31

Thank you! For more information please contact us: Power Utilities Energy By email Insight Rigour Value Tom Parkinson tparkinson@lantaugroup.com Neil Semple nsemple@lantaugroup.com By phone +852 2521 551 (office) By mail 462-466 Tower 1, Metroplaza 223 Hing Fong Road, Kwai Fong, Hong Kong Online www.lantaugroup.com 32 The The Lantau Lantau Group Group