Commercial Grade Dedication

Similar documents
Conformity Assessment. Section III Nuclear Requirements Buenos Aires, Argentina May 2017

REQUIREMENTS FOR SAFETY RELATED (ASME AND NON-ASME) ITEMS OR SERVICES

Łańcuch dostaw i procedury zapewnienia jakości w realizacji elektrowni jądrowej budowanej w oparciu o technologię amerykańską.

NB-435 Rev. 1 Page 2 of 5

Pressure Points. Governing Code Edition Section I Table of Contents

Definitions contained in the above mentioned document and industry regulations are applicable herein.

NRC INSPECTION MANUAL

ASME NQA-1 Certification. Matthew Vazquez September 4, 2017

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018

DAVID J. HOLLER DETAILED EXPERIENCE

Quality Assurance - Supplier Qualification

Quality Assurance Requirements for Nuclear Facility Applications. March 2019 Draft Revisions

OWNER USER INTEGRITY MANAGEMENT SYSTEM WRITTEN DESCRIPTION CHECKLIST AB-512(b)

TURBO MACH A DIVISION OF VT SAA

"Welder Certification"

Supplier Deviation Disposition Request (SDDR)

This guide is applicable to River Protection Project - Waste Treatment Plant (RPP-WTP) project suppliers and is intended for supplier use only.

FBP-QA-PDD-00001, Quality Assurance Program Description (QAPD) Requirements

I. Development, Submittal, and Acceptance of a Quality Management System

U. S. Department of Energy. Consolidated Audit Program Treatment, Storage and Disposal Facilities. Checklist 1 Quality Assurance Management Systems

"Welder Certification"

Procurement Engineering Standard Purchase Clause

Design Compliance Matrix

Requirements for Suppliers

Nuclear Quality Standard Association

ACCREDITATION OF FITTING MANUFACTURERS

NRC INSPECTION MANUAL

NUPIC DOCUMENT NO. 11

Quality Management Manual Revision 19

NQA-1 Graded Approach, 55-Gallon Drum Summary

Accepting Supplier ISO 9000 Quality Programs

Supplier Evaluation Program Doosan QA Team / Jeong Sun Kim

TABLE OF CONTENTS. 1.0 INTRODUCTION Page SCOPE Page REFERENCES Page REQUIREMENTS Page QUALITY ASSURANCE Page 8

Benchmark Connector Corp. Supplier Quality Survey

NUCLEAR QUALITY ASSURANCE MANUAL

Vendor / Sub-Contractor General Terms & Conditions

US REGULATORY OVERSIGHT OF COMMERCIAL-GRADE DEDICATION

QP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE

Implementing Procedure. DEDICATION OF COMMERCIAL GRADE ITEMS Approved/Date President & COO /vji!"l~:l

NUPIC General Membership and Vendor Meetings June Greg Galletti Quality Electrical Vendor Branch Office of New Reactors U.S.

Procurement Engineering Standard Purchase Clause

LCS International, Inc. PMP Review. Chapter 9 Conducting Procurements and Sharing Information. Presented by David J.

Procurement Engineering Standard Purchase Clause

DOE Graded Approach. IAEA January 23-27, 2012 Meeting

ThinKom Purchase Order Quality Provisions Number: Q4000 Revision: D

General Requirements for all External Providers

NRC INSPECTION MANUAL INSPECTION PROCEDURE 35065

COMMERCIAL GRADE DEDICATION OF RELAP5-3D

Overview of Draft API Standard 20M

Contracts, Subcontracts, Purchasing and the Laboratory

ISO rule Project Procurement Compliance Monitoring Audit Process

In case of of differences or inconsistencies with texts in the Main Contract, the stipulations in the Main Contract will prevail.

1.0 Purpose. 2.0 General notes 3.0 QUALITY SYSTEM REQUIREMENTS. Approved by: G. Stugart Prepared by: Schelert

FAA Conformity Inspection Checklist Form N/C 10JAN16

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

SUPPLIER QUALITY REQUIREMENTS

Prototype Integration Facility SUPPLIER QUALITY SYSTEM REQUIREMENTS

Nuclear Quality Standard Association General information about Quality Management System in the nuclear industry

PCB IPC-A 600 PCB IPC- 6012, 6018

Procurement Engineering Standard Purchase Clause

Procurement Engineering Standard Purchase Clause

SUPPLIER MANUAL SUPPLIER MANUAL

PFI Standards Program. Developing a Written Quality Management Program

Vendor Qualification Survey

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015

Procurement Engineering Standard Purchase Clause

Challenge facing the Nuclear

Supplier Quality Requirements

SELLER QUALITY REQUIREMENTS QCS-001 PROCESSING SOURCES

Welding Performance Qualification Test Administrators GUIDE FOR APPLICANTS

Product Process Integrity Analysis (PPIA)

ISO 9001:2008 and AS9100 Rev. C. Supplier Quality Manual

Certification program "Quality Mark TMT" Checklist initial surveillance inspection

SLIDES AND NARRATIVES

Orbital ATK Alliant Techsystems Defense Electronic Systems Special Mission Aircraft Fort Worth

D.P.E.LTD QUALITY CONTROL PROCEDURE NO 9 QUALITY CONTROL REQUIREMENTS FOR SUPPLIERS MASTER COPY

In case of of differences or inconsistencies with texts in the Main Contract, the stipulations in the Main Contract will prevail.

Prepared Reviewed C.0 Issues Log C1.1 Assessment Process

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS

SHELTON INDUSTRIAL PATTERN INC.

Occupational Health and Safety Management System. OHSAS 18001:2007 OH&S Manual

Clauses applicable only when specified by Q-number on the purchase order.

Regardless of any alternative pricing provided, a quotation for the items specified herein shall be provided.

MASTER PLANNING FOR VALIDATION

Application for an Ontario Certificate of Authorization For Ontario based businesses CSA N285.0 Nuclear Components

Quality Management System Plan

Supplier Partnership. BPF 2123 Quality Management System

Qualification of manufacturers of special materials

ACCREDITATION OF PRESSURE RELIEF VALVE REPAIR ORGANIZATIONS

Application for an Ontario Certificate of Authorization For businesses based Outside Ontario CSA N285.0 Nuclear Components

GE Oil & Gas Quality Management System Pressure Control Supplier Quality Requirements Heat Treatment Services SQ-07 Rev: 2.0

Regardless of any alternative pricing provided, a quotation for the items specified herein shall be provided.

Quality System Manual - Section 00

2001 NBIC Interpretations

ZOLL Document Number: 90E0004 Page 5 of 15 Maintenance of Quality Records

AFS-SE of 5

Management System Requirements

Quality Control Manual Submission Information

Procurement Engineering Standard Purchase Clause

Transcription:

Waste Treatment Plant Project Commercial Grade Dedication Spencer Daw WTP Commercial Grade Dedication Manager 06-August-2015

Overview of Commercial Grade Dedication What is the purpose of commercial grade dedication? Commercial grade dedication is performed to establish reasonable assurance that a commercial item or service will perform its intended safety function How is commercial grade dedication performed? Commercial grade dedication is performed by creating a technical evaluation of an item or service. From the technical evaluation critical characteristics and acceptance criteria are established. Then objective evidence through testing, source verification, or other methods are used to establish reasonable assurance that the item or service will perform its intended safety function Why is Engineering Procurement Construction (EPC) different for commercial grade dedication? In an EPC environment the design is not always finalized and the item is often unique, i.e., not a standard production item 92

Overview of Commercial Grade Dedication Cont. Why is dedication necessary? There are three ways that an NQA-1 supplier can procure a required item from a sub-supplier 1. Buy the item directly from an ASME NQA-1 qualified subsupplier who has been audited and approved by the supplier 2. Buy the item directly from a sub-supplier who has an ASME Boiler and Pressure Vessel Code, Section III, Subsection NCA, Article NCA-3800 Material Organization Quality System Certificate (QSC), or from an Article NCA-4000 N certificate holder for the items, in accordance with the guidance included on the Q Datasheet for Quality Assurance Program Requirements or Quality Assurance Program Specification, as applicable to the associated purchase order 3. Buy the item from a sub-supplier who is not implementing an ASME NQA-1 program and perform commercial grade dedication on the item 93

Overview of Commercial Grade Dedication Commercial Grade Item or Service Technical Evaluation Critical Characteristics Acceptance Criteria Acceptable Verification of Critical Characteristics Dedicated Material or Services 94

Bechtel Commercial Grade Dedication (BCGD) vs. Vendor CGD (VCGD) BCGD Bechtel CGD refers to Bechtel being responsible for writing, evaluating and developing critical characteristics and acceptance criteria BCGD is performed for items and services when the supplier is not responsible for the design or is not an approved NQA-1 supplier Common items associated with BCGD are supplier surveys, supplier surveillances, requirements for document reviews, sub-tier supplier interactions, hold points during normal production processes 95

Bechtel Commercial Grade Dedication (BCGD) vs Vendor CGD (VCGD) cont. VCGD Vendor CGD refers to the supplier being responsible for producing the technical evaluation and associated critical characteristics and acceptance criteria under an approved NQA- 1 quality program VCGD is performed when the supplier has design responsibility All VCGD documents will be sent to Bechtel for review and status coding before work will be allowed to continue (procedures, plans and reports) 96

Requirements of 24590-WTP-3PS-G000-T0019 Rev. 1 Supplier is responsible for flowing down all requirements to subsuppliers performing dedication Dedication plans are required to be submitted and code statused by Bechtel for suppliers and sub-suppliers performing dedication Supplier is responsible for providing a technical evaluation when design scope is included Technical evaluations document the process for determining critical characteristics and acceptance criteria for each item requiring CGD Technical evaluations consider the design of the item, design conditions, Quality (Q) function, and failure modes/mechanisms For items comprised of multiple components, the technical evaluations will evaluate and document what components support the Q function and those that are Commercial (CM) 97

Technical Evaluations Technical evaluations include the following Item identification Item design functions Item Q function Credible failure mechanisms Critical characteristic determination Acceptance criteria including tolerances (referencing specs, drawings, etc.) Dedication method Sampling plans and justifications 98

Documentation of Results All results from inspections, testing, and source inspections should be clearly documented in a results package Inspection and testing data should include measuring equipment and calibration, tolerances, and measured values Source inspection reports should include objective evidence of what was witnessed (including procedures used), when it was witnessed, and what material was being watched (including heat numbers, serial numbers, etc.) All inspections and testing should follow the sampling plans identified in the commercial grade dedication plans 99

Lessons Learned Any engineering judgment used in creating a technical evaluation needs to be justified Ensure that flow-downs from Bechtel to suppliers make it all the way to sub-suppliers and documentation provided by subsuppliers is provided for code status Continual communication is paramount for successful execution Sample size selection needs to be supported with justification Compliance with all contracted terms is the expectation Documentation needs to be thorough and accurate Open lines of communication need to be present throughout the dedication process 100

QUESTIONS? Email or Text wtppse@bechtel.com 101