SECTION 012200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting a bid for the work of this SECTION. 1.02 A. The predetermined Unit Prices for items of work set forth in the Schedule of Unit Prices attached to this Section shall be used to determine adjustments to the Contract Sum when changes in the work involving said items are made in accordance with the Contract Documents. B. Unit Prices listed under ADDITIONS have been computed at net cost plus overhead, profit and all other charges. Unit Prices listed under DEDUCTIONS have been computed at net cost alone. Unit Prices shall apply until the date of Substantial Completion established at the time of Contract signing. If the date of Substantial Completion has been modified by Change Order, Unit Prices may be adjusted at the discretion of the Owner by Change Order. C. Unit Prices for excavation include the costs of sheeting and bracing, pumping and dewatering and all other costs in connection therewith. D. All materials, methods of installation, and definitions of terms set forth under the various Unit Price items in the Schedule of Unit Prices shall be as indicated in the Contract Documents. 1.03 APPLICABILITY OF A. The payment lines shall be as indicated in the Contract Documents. B. Prior to commencing removal or placement of materials set forth in the Schedule of Unit Prices, the Contractor shall notify the Architect in sufficient time to permit proper measurements to be taken on behalf of the Owner. Only quantities which have been approved in writing by the Architect will be considered in the determination of adjustments to the Contract Sum. C. Performance of work which is not required under the Contract Documents or which is not authorized by Change Order, whether or not such work items are set forth hereunder as a Unit Price item, shall not be considered cause for any extra payment on account of the Contract. The Contractor will be held fully responsible for such unauthorized work, including the performance of all corrective measures required by the Architect. 012200-1
SECTION 012200 SCHEDULE OF Additions 1. General excavation by machine. $ 6.60/CY $ 5.28/CY 2. General excavation by machine. 14.60/CY 11.68/CY 3. Trench excavation by machine. 10.80/CY 8.64/CY 4. Trench excavation by machine. 18.80/CY 15.04/CY 5. Hand excavation to 6' depth. 55.00/CY 44.00/CY 6. Hand excavation to 6' depth. 63.00/CY 50.40/CY 7. Hand excavation per each foot of 50.00/CY 40.00/CY additional depth below 6'. (Add to items 5 and 6) 8. Rock excavation encountered in 58.00/CY 46.40/CY general excavation using explosives. 9. Rock excavation encountered in 68.00/CY 54.40/CY general excavation using explosives. 10. Rock excavation encountered in 80.00/CY 64.00/CY trenches and piers using explosives. 11. Rock excavation encountered in 90.00/CY 72.00/CY trenches and piers using explosives. 12. Rock excavation encountered in 90.00/CY 72.00/CY general excavation using non-blasting methods. 13. Rock excavation encountered in 100.00/CY 80.00/CY general excavation using non-blasting methods. 012200-2
Additions 14. Rock excavation encountered in $105.00/CY $84.00/CY trenches and piers using non-blasting methods. 15. Rock excavation encountered in 115.00/CY 92.00/CY trenches and piers using non-blasting methods. 16. Removal of boulders over 2 Cu.Yd. 66.00/CY 52.80/CY encountered in general excavation. 17. Removal of boulders over 2 Cu.Yd. 67.00/CY 53.60/CY encountered in general excavation. 18. Removal of boulders over 1 Cu.Yd. $ 50.50/CY $ 40.50/CY encountered in trench excavation. 19. Removal of boulders over 1 Cu.Yd. 58.50/CY 48.50/CY encountered in trench excavation. 20. Crushed stone or gravel, in place, 27.00/CY 21.60/CY compacted as specified. 21. Graded gravel, in place, compacted 24.00/CY 19.20/CY as specified. 22. Graded fill, in place, compacted 14.30/CY 11.80/CY 23. Ordinary fill, in place, compacted 16.80/CY 13.44/CY as specified. 24. Sand fill around pipes in trenches, 14.75/CY 11.75/CY in place, as specified. 25. 3000 psi concrete, in place, not 142.00/CY 113.60/CY including forms and reinforcing. 26. 4000 psi concrete, in place, not 148.00/CY 118.40/CY including forms and reinforcing. 012200-3
Additions 27. Form work for footings and found- 7.50/SF 6.00/SF ation walls as per contact area including stripping. 28. Reinforcing steel, in place 1.12/LB.90/LB including accessories. 29. Removal & disposal of asbestos-containing pipe/ $18.00 LF $16.00 LF fitting insulation less than 6 outside diameter, including in chase or above ceilings, and any contaminated debris 30. Removal & disposal of asbestos-containing pipe/ $25.00 LF $19.00 LF fitting insulation greater than or equal to 6 outside diameter, including in chase or above ceilings, and any contaminated debris 31. Removal & disposal of asbestos-containing $2.95 SF $2.15 SF floor tile & associated mastic 32. Removal & disposal of asbestos-containing $2.00 SF $1.75 SF floor tile. 33. Removal & disposal of asbestos $1.75 SF $1.50 SF containing mastic. 34. Removal & disposal of asbestos-containing slip-sheet vapor barrier. $5.00 SF $4.50 SF 35. Removal of asbestos-containing pipe/elbow insulation. $15.00 LF N/A 36. Removal & disposal of asbestos-containing debris. $15.00 SF N/A 37. Removal & disposal of asbestos-containing boiler insulation. $17.00 SF N/A 38. Removal & disposal of asbestos-containing boiler gaskets, caulking/rope. $16.00 LF N/A 39. Removal & disposal of asbestos-containing boiler breeching. $23.00 SF N/A 40. Removal of asbestos-containing fire doors. $65.00 EA N/A 41. Wall penetrations for glove-bag removal. $65.00 EA N/A 012200-4
Additions 42. Removal of asbestos-containing pipe $225.00 EA N/A insulation via glove bag. 43. Removal of asbestos-containing $5.75 LF N/A window and door caulking. 44. Removal & disposal of asbestos-containing window glazing. $5.75 LF N/A 45. Removal & disposal of asbestos-containing roofing compound/sealant. $7.00 SF N/A 46. Removal & disposal of asbestos-containing flashing cements (windows, doors, roofing/parapet, etc). $6.50 LF $4.00 LF 47. Removal & disposal of asbestos-containing $4.00 SF N/A felt or paper products found in wall chases. 48. Removal & disposal of asbestos-containing $4.00 SF N/A ceiling/wall mastic (including black/cork boards). 49. Removal & disposal of asbestos-contaminated $250 Ton N/A concrete and/or brick 50. Removal & disposal of buried asbestos- $30.00 LF N/A containing pipe and fitting insulation, including required hand excavation. 51. Removal & disposal of buried asbestos- $6.00 SF N/A containing transite or insulation behind radiators, including pulling of radiators (excluding disconnection of radiators). 52. Removal & disposal of asbestos-containing $15.00 SF N/A exterior vapor barrier materials. 53. Demolition, removal and disposal of asbestos- $250 Ton N/A containing waterproofing or mastic found on building materials. 54. Removal & disposal of PCB-containing light. $5.00 EA N/A ballasts. 55. Removal & disposal of asbestos containing $ 7.50 SF $ 5.50 SF Roofing Material Additions 012200-5
56. Removal & disposal of asbestos containing $ 150.00 Unit $ 120.00 Unit caulking/glazing from Window or Door Unit 57. Transplanting existing trees on site, up to $375 EA $300 EA 8 inch caliper, including protection and maintenance. 58. Instructional Technology Work (by SECTION 270000-INSTRUCTIONAL TECHNOLOGY NETWORK SYSTEM) Unit prices for all the equipment and components shown in the contract documents, including the following: A. D1 Outlet $175.00 $175.00 B. D2 Outlet $260.00 $260.00 C. DV Outlet $260.00 $260.00 D. Wall or Desk Phone Outlet $175.00 $175.00 E. TD Outlet $260.00 $260.00 F. TD2 Outlet $390.00 $390.00 G. TD2V Outlet $420.00 $420.00 H. VH Outlet $160.00 $160.00 END OF SECTION 012200-6