AMRDEC Counterfeit Risk Management Recommendations

Similar documents
MIL-STD-11991A Overview

JUL 14 Rev B All Paragraphs Revised

PROCESS SPECIFICATION- COUNTERFEIT PARTS PREVENTION

Counterfeit Mitigation

Counterfeit Parts Prevention

TITLE: Counterfeit Parts Avoidance Plan DOCUMENT #: DOCUMENT CLASS: K-Purchase PRC RESPONSIBLE DEPT: Purchasing REF: QMS 7.

KOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts

The purpose of this document is to describe the process and due diligence performed by

L-3 PHOTONICS QUALITY CODES Reference

SUPPLIER QUALITY REQUIREMENTS

A Practitioner s Guide for Implementing DoD Parts Management

Risk Management for Counterfeit Materials: The Role of the COTS Board Manufacturer

Approved for public release; distribution is unlimited.

Counterfeiting Update

Work Instructions No. 0621P2 Rev: AG Counterfeit Parts Risk Mitigation Date: 09/07/12 Procedure Page: 1 of 13

DSPO PSMC - #LRR

Quality Flow-Down Requirements to Suppliers

ECIA Distributor Counterfeit Product Mitigation Internal Audit Checklist

Helical Products Company

Quality Flow-Down Requirements to Suppliers

The Counterfeit Parts Prevention procedure applies to all employees within the company and extends to our suppliers and outsourced services.

Counterfeit Part Prevention & Mitigation Process

Counterfeit Parts Prevention Revision: C

National Aeronautics and Space Administration

L3 Counterfeit Parts Prevention

IKHANA Aircraft Services, Fabrication Division PO Quality Clauses

PURCHASE ORDER SUPPLEMENT

Document Title: Icore Supplier Quality Requirements Revision: D Released Date:

VOLTAGE MULTIPLIERS, INC. QUALITY SUPPLEMENT TO PURCHASE ORDERS

Purchase Order Quality Clause SCC40 Revision G, Effective 1/20/2015

Quality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100)

Counterfeit Prevention, Detection and Avoidance Standards Gap Analysis for Hardware Products

January 21, 2013 Huaqiang Square Hotel Shenzhen, China Mark A. Rinehart, Managing Director

A Year On... Why Trusted Independent Distribution is Key to the Solution. Geoff Hill President/Managing Director, Astute Electronics 19th April 2013

TITLE: TEKTRONIX COMPONENT SOLUTIONS SUPPLIER QUALITY MANUAL

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015

Supplier Quality System Requirements

STRAN Technologies Quality Notes

Counterfeit Part Prevention Policy

Obsolescence Management

EP-QC Supplier s General Requirements. Revision AK

ZODIAC INTERCONNECT US

Anti-Counterfeit Policy Mouser has adopted this Anti-Counterfeit Policy to eliminate the impact of counterfeit products on Mouser and its customers.

SQR Supplier Quality Requirements TRANSLINE TECHNOLOGY, INC. (TTI) SQRs SUPPLIER QUALITY REQUIREMENTS

Section I: General Quality Assurance Requirements Applicable To All Purchase/Subcontract Orders;

Counterfeit Control Plan for Electrical, Electronic and Electromechanical Parts

Procedure Documentation

ALTA Precision Inc. Quality Procedure

SUPPLIER REQUIREMENTS FOR QUALITY, DESIGN & MANUFACTURING

Counterfeit Parts: A Lockheed Martin perspective

Parts Management Implementation Spring LMI. PSMC Spring

ZODIAC INTERCONNECT US

Strata-G Solutions Quality Assurance Clauses

COUNTERFEIT PARTS PLAN

Teledyne QPR 001 Electronic Safety Products Rev F Page 1 of 9 QUALITY INSTRUCTION

Supply Chain Security: DFARS Detection & Avoidance of Counterfeit Electronic Parts March 22, 2017

QUALITY CONTROL INSTRUCTION

Q-CLAUSES FOR STAFFORD SPRINGS REVISION HISTORY. Updated to change the retention period to 7 years 10/03/07

Previous Meeting Summary. Parts Standardization & Management Committee Meeting

Avoiding Counterfeit Components

Supplier Quality Clauses

Atrenne Computing Solutions Quality Clauses

AAI CORPORATION TEXTRON SYSTEMS

EP-QC Supplier s General Requirements. Revision AH

Counterfeit Parts in DoD s Supply Chain: TechAmerica Webinar on Section 818 of 2012 NDAA April 16, 2012

Counterfeiting It s Worse Than You Think!

Supplier Quality Requirements

Implementation of Counterfeit Parts Control Plan for Advanced Electronic Components for Space

INTRODUCTION TO PARTS MANAGEMENT

Prime Contractor. Parts Management. Presented to DoD Parts Standardization and Management Committee Ronald Froman, Boeing Technical Fellow 1 Nov 2016

BC Systems, Inc. Quality Assurance Department. Q.A. Provisions. (Clauses are incorporated in and part of the Contract or Purchase Order.

Supplier Quality Requirements (Including Terms & Conditions)

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept

Appendix QX Supplier Quality Requirements

STANDARD QUALITY ASSURANCE PROVISIONS FOR PURCHASED MATERIALS

PURCHASE ORDER QUALITY SYSTEM REQUIREMENTS

SUPPLIER QUALITY REQUIREMENTS (SQR S)

Strata-G Solutions Quality Assurance Clauses

Anti-Counterfeit Control Plan Version A Dated 08/24/2018

DEPARTMENT OF DEFENSE STANDARD PRACTICE PARTS MANAGEMENT

SUPPLIER QUALITY REQUIREMENTS (SQR S)

PROTECTION AGAINST COUNTERFEIT GOODS PROCEDURE

Supplier Requirements Manual

Quality Procedure QP-843 Information for External Providers

Supplier Quality Clauses

Meggitt Oregon Purchase Order Quality Notes

TERMS AND CONDITIONS. No charges are allowed for boxing, packing, crating, and insurance unless specifically provided for in the Purchase Order.

Work Instructions No. 0621P2 Rev: AH Counterfeit Parts Risk Mitigation Date: 10/27/15 Procedure Page: 1 of 18

Control-On-Use Controlados-En-Uso

External Provider Quality Requirements

Understanding and Complying with EEE Parts and Assembly Management Requirements

Intro Corporation Purchase Order General Terms and Conditions

External Provider Quality Requirements

SQRs SUPPLIER QUALITY REQUIREMENTS

SQRs SUPPLIER QUALITY REQUIREMENTS

Aerojet Rocketdyne Quality Note

DEPARTMENT OF DEFENSE STANDARD PRACTICE PARTS MANAGEMENT

Supplier Quality Manual

Transcription:

AMRDEC Counterfeit Risk Management Recommendations Approved for public release; distribution unlimited. Review completed by the AMRDEC Public Affairs Office 29 Aug 2013; PR0033.. August 2013 Presented by: David Locker David.Locker@us.army.mil (256-842-0163) Engineering Directorate U.S. Army Aviation and Missile Research, Development, and Engineering Center

Aerospace and Defense Electronics Supply Chain Using products that may meet requirements for awhile To build products that must meet requirements for a long time A&D Electronics Dependent on materials and components developed for other applications Vastly different lifecycle from applications components generally designed for Requirements flow-down vs. products flow-up process is disrupted here 1. Parts & Materials Suppliers Parts 2. Board Assemblers 3-6 yr Lifecycl e Contract Mfg. Boards Aerospace Captive Solder etc. 3. Avionics OEMs, Logistics, Maintenance and Repair Suppliers 4. Platform Integrators 15-40 yr Lifecycle Customers 5. Operators & Regulators Global Supply Chain fundamentally defining dependence Majority of procurement costs incurred here Majority of lifecycle costs incurred here 2 FileName.pptx

Counterfeit Situation Counterfeit Any materiel whose identity or pedigree has been deliberately altered, misrepresented or offered as an unauthorized product substitution Could be as simple as re-marking scrapped or stolen and possibly nonworking parts, or as complex as illegally manufacturing complete parts from original molds or designs. Obsolete components are not the only parts being counterfeited there are also counterfeit versions of the newest parts and components currently being manufactured by Original Component Manufacturers (OCM) Reasons for Counterfeit Occurrences and Risk Two major challenges facing the U.S. military services 1. Extension of weapon systems and platform lifecycles 2. Sustainment of the aging systems Less expensive to find part substitutions and aftermarket manufacturing for needed electronic parts than reengineering and redesigning parts and components Defense electronics represents only about 1% of market place, resulting in long lead times for many parts that meet defense requirements (e.g., temp range and lead finishes) 3 FileName.pptx

Types of Common Counterfeits Counterfeit Types and Sources Used / New Product Re-Marked as Higher Grade New Product Used Product Sold as New (Not Remarked) Invalid Part Marking Counterfeit Impact: Reduced System Performance and Reliability Fake Non-Working Product Top Counterfeit Sources* Reported by OCMs Brokers (50%) Non-Franchised Distributors (45%) Internet Exclusive Sources (36%) Counterfeit sources almost always outside the manufacturer s approved distribution channel * U.S. Department of Commerce, Office of Technology Evaluation, Counterfeit Electronics Survey, November 2009 4 FileName.pptx

Supply Chain Management Criticality Component Paths to Application Component Application Original Component Manufacturer (OCM) Component Broker Customer X OCM Authorized Distributor Component Distributor Green paths acceptable Red paths to be avoided Purple paths potential risk contributor 5 FileName.pptx

Requirements Addressing Counterfeits 18 U.S.C 2320, codification of Trademark Counterfeiting Act, 1984, criminalizes counterfeiting FAR 52.203-13, Contractor Code of Business Ethics and Conduct Requires contractors to notify Inspector General and Contracting Officer of violations, including fraud FAR 27.202-1 includes similar requirements FAR 52.211-5, Material Requirements Prohibits use of used material without Contracting Officer approval DODI 4140.67, DoD Counterfeit Prevention Policy Implements FY12 National Defense Authorization Act Accompanying DFARS report due 25 Sep 2013 (Case 2012-D055) Program Protection Plan (DODI 5200.39 and DODI 5000.02) Parts, Materials, and Processes contract statement of work inputs Requires Government approval for use of parts not from manufacturer approved distribution Requires Government approval for parts with date codes over 5 years old 6 FileName.pptx

FY12 National Defense Authorization Act Signed into law on 31 December 2011 Includes a Federal Anti-Counterfeiting Amendment that requires development of DoD policies and regulations Trusted suppliers must be used by DoD and DoD contractors Requires all DoD contractors to report counterfeits and suspect counterfeits to GIDEP (or similar system defined by DoD); used parts represented as new to be covered by counterfeit definitions Authorizes the debarment of contractors who fail to detect and avoid counterfeit parts or do not exercise adequate due diligence Covered contractors* are now prohibited from charging the DoD for the costs of rework or corrective work to remove and replace counterfeit parts Covered contractors* are now responsible for the remedies required after the use or inclusion of counterfeit components they may have accidentally supplied, regardless of where the counterfeit entered the supply chain Requirements generally consistent with contract requirements suggested by AMRDEC for several years * Covers contractors for orders over $5M, so small spares purchases may not be covered by these provisions 7 FileName.pptx

AMRDEC Counterfeit Risk Management Require Government approved Parts Management Plans (per MIL-STD- 3018) that include Counterfeit Risk Mitigation Plans (IAW SAE AS5553 and AS6174) Implemented contractual requirements since 2005 to exclude situations responsible for most counterfeit parts: Parts not procured from the original manufacturer or a manufacturer certified distributor. Reused, reinstalled, recycled, or salvaged parts or materials. Parts or materials previously installed or otherwise attached to another assembly are considered used and not new. Parts with date codes more than 5 years old at the time of contract award without an approved recertification process Require Obsolescence Management Plans 8 FileName.pptx

Contract SOW Input Comprehensive PMP Plan X.X Parts, Materials, and Processes (PMP) Plan The contractor shall develop, implement, and maintain a PMP IAW DI-SDMP-81748, with government approval. The PMP Plan shall address the requirements of MIL-STD-3018, and. In addition, the Plan shall include flow-down requirements for parts and materials, including off-the-shelf and non-developmental items, to suppliers for assemblies procured. The use of any of the problem PMPs listed in Attachment TBD#1 shall require government approval. The PMP program shall ensure that: a. Parts performance b. Materials utilized will c. Processes utilized d. Lead-free Control Plan. The Contractor shall prepare, e. Counterfeit Risk Management. The Contractor shall prepare, or update existing, Counterfeit Risk Management Plan for submittal and approval as a portion of the PMP Plan. The Plan shall meet the requirements of SAE AS5553 for electronics and SAE AS6174 for items not considered electronics. Components (or parts) not directly procured from the original component manufacturer (OCM) or the OCM s authorized distributor shall require Government approval. Contractors shall report counterfeits and suspected counterfeits to the Government and in the Government Industry Data Exchange Program. f. Commercial Off-the-Shelf (COTS) Management. The Contractor shall prepare X.Y Obsolescence Management 9 FileName.pptx

Recommendations for Counterfeit Risk Management Verify inclusion/recognition of suitable regulations in contract DFAR 252.246-7003, Notification of Potential Safety Issues FAR 52.203-13, Contractor Code of Business Ethics and Conduct FAR 52.211-5, Material Requirements Contractors need to provide Counterfeit Risk Management Plan, as portion of Parts, Materials, and Processes Management Plan Government approval should be required to assure effectiveness Intent of requirement must be met for all delivered hardware Flow down requirement throughout supply chain COTS requires special attention, as it must meet system requirements In cases where COTS supplier is nonresponsive the contractor must take responsibility and have effective plan to manage risk Verify implementation of Program Protection Plan per OSD policy Report counterfeits and suspected counterfeits in GIDEP Proper Definition and Implementation of Counterfeit Risk Mitigation Plan can meet the OSD policy IAW DODI 4140.67 10 FileName.pptx

Counterfeit Risk Mitigation Plan Detailed Requirements SAE AS5553 (electronics) and SAE AS6174 (non-electronics) requirements Counterfeit control plan Obsolescence management Purchasing practices to preclude risk of counterfeits Procure from original manufacturer (OCM) or their authorized suppliers Establish approved suppliers when parts not available from OCM Establish traceability to OCM Utilize Excluded Parties List, and similar tools, to assess supplier risk https://www.sam.gov/ (System for Award Management) Detection/Verification process Apply methods to identify counterfeits depending on supply chain risk Material control Assure suspect parts do not reenter supply chain: quarantine Reporting (GIDEP, ERAI, customer, etc.) Verify FAR compliance to DODIG/contracting officer notification of counterfeits and suspect counterfeits, in addition to Program Office 11 FileName.pptx

Counterfeit Risk Management FY12 NDAA and OSD Policy has gotten attention! But Ineffective flow-down Not taking responsibility for validating subcontractor plans Not sufficient to just state in purchase orders that subs not deliver counterfeits Aversion to getting customer approval or even giving notification for non-preferred sources Stove-piped functions Plans not enforcing coordination of key organizations, such as Purchasing, Quality, Component Engineering Reporting requirement not forceful or comprehensive Commitment to GIDEP reporting still tepid Plans typically don t require DOD IG and KO notification Required by FAR, Business ethics on fraud reporting 12 FileName.pptx