Quality, Diverse Group of Mining Assets. February 2018

Similar documents
Copper Mountain Announces Robust Preliminary Economic Assessment Results for New Ingerbelle

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation July, 2017

Creating Value Through Operational Excellence

Aley Niobium Project. Minerals North 2014

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation October, 2017

Corporate Presentation London December, 2011

A Canadian Based Resource Company Focused on Copper Projects in North America

VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX:

QUADRA ANNOUNCES THIRD QUARTER 2009 PRODUCTION RESULTS

(TSX: AUQ) (NYSE: AUQ)

Seizing Opportunity and Building Value

Nevada Copper Hits with 19 Mineralized Holes: Enhances Potential of Open Pit Economics

Low-cost, rich, DRC copper

Azure Minerals Ltd ASX Code:

The New Leader in Global Copper

The New Leader in Global Copper

Fortuna provides update on the Lindero gold Project in Argentina

Confidence in Carrapateena project grows

Forward Looking Statement

NEWS RELEASE Trading Symbol: TSX: SVM

SILVERCORP REPORTS Q3 FISCAL 2016 FINANCIAL AND OPERATING RESULTS AND FISCAL 2017 GUIDANCE ISSUED

Quebrada Blanca Phase 2. April 2012

Morrison Copper/Gold/Moly (Silver) Project

SILVERCORP REPORTS Q3 RESULTS: NET INCOME OF $12.7 MILLION, $0.08 PER SHARE AND PROVIDES FISCAL 2019 PRODUCTION AND CASH COSTS GUIDANCE

CMZ. Advancing The Zafranal Project. Bruce L. Turner Executive Director, Compañía Minera Zafranal 6 March 2017 Peru Day PDAC 2017

DENISON ANNOUNCES DECISION TO ADVANCE WHEELER RIVER PROJECT FOLLOWING POSITIVE PFS RESULTS

SECOND QUARTER REPORT 15 JULY 2014

On The Road To Silver & Gold Mining In Mexico

AVINO ANNOUNCES FOURTH QUARTER AND FULL YEAR 2017 PRODUCTION RESULTS FROM ITS AVINO PROPERTY

Development of Sisson Brook Tungsten Molybdenum Deposit in New Brunswick, Canada

Patrick Soares President & CEO Canada s Next Base Metal Mining Camp

SILVERCORP REPORTS Q2 RESULTS: NET INCOME OF $11.1 MILLION, $0.07 PER SHARE

AVINO SILVER & GOLD MINES LTD.

OXIANA LIMITED FIRST QUARTER REPORT 2008 Owen Hegarty, Managing Director & CEO 16 April 2008

Sierra Metals Exploration Update Call

Southern Copper Corporation November, 2011

METATES UPDATED PEA INDICATES EXCELLENT PROJECT ECONOMICS 26,000 METRE DRILL PROGRAM UNDERWAY

SILVERCORP REPORTS SILVER PRODUCTION OF 5.0 MILLION OUNCES, CASH FLOWS FROM OPERATIONS OF $31.9 MILLION, OR $0

Quarterly Production Report

EXCO S PROJECT PIPELINE

SIERRA METALS REPORTS A 53.5% INCREASE IN NI COMPLIANT MINERAL RESERVES AT ITS YAURICOCHA MINE, PERU

OZ MINERALS SECOND QUARTER REPORT Andrew Michelmore Managing Director & CEO. 22 July 2008

DIVERSIFIED METAL EXPLORATION & DEVELOPMENT COMPANY

Southern Copper Corporation Highlights

N E W S R E L E A S E

Transforming Resources into Mines

Investor Presentation

A Tiger in the Congo. Charles Brown, COO, S.E.K SPRL, Katanga Province, D R Congo

NGEX ANNOUNCES POSITIVE PFS RESULTS FOR JOSEMARÍA WITH A US$2.0 BILLION AFTER TAX NPV AND 19% IRR

FOR IMMEDIATE RELEASE 30 August 2018 TSX-V: AZR

PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX. November 2017 AGM Presentation

May 8, 2018 NYSE:HL. Exploration Update. To accompany 05/08/18 news release

A New Direction. Developing Copper Assets in Canada s North TSX.V:COL. 1 May 2018

For personal use only

N E W S R E L E A S E

Net income of $7.2 million, or $0.04 per share, compared to net loss of $43.2 million, or

For personal use only

Forward-looking Statements

EXCO S PROJECT PIPELINE. Unlocking the Value

For personal use only

AMERICAS SILVER CORPORATION PROVIDES THIRD QUARTER PRODUCTION RESULTS AND SAN RAFAEL PROJECT UPDATE

N E W S R E L E A S E

The Los Bronces Development Project Brian Beamish CEO Anglo Base Metals 28th November 2007

Hard Creek Nickel. Emerging Giant Turnagain Nickel Project. Ed Beswick P Eng. HNC:TSX

GLOBAL METALS & MINING CONFERENCE BMO Capital Markets February 24-27, Roque Benavides Chairman & CEO

Contained Gold (koz) Tonnes. Contained Gold (koz)

Cu-eq references throughout this press release.

A New Direction. Developing Copper Assets in Canada s North TSX.V:COL. 27 Feb 2018 CPNVF:US, FRA:79M1

Frieda River Copper-Gold Project feasibility study completed

The declining discovery rate what is the real story?

Arizona s Copper Solution Company June,

Progress Update on the Lower Footwall Zone

A New Direction. Developing Copper Assets in Canada s North TSX.V:COL. June 1, May 2013

Quarterly Production Report

N E W S R E L E A S E

PRESENTATION MINING 2010 RESOURCES CONVENTION - BRISBANE

FILO MINING REPORTS 61% INCREASE IN RESOURCE TONNES AT FILO DEL SOL PROJECT

Our Record Speaks For Itself

JULY 21, 2003 ESTIMATE OF TONNAGES AND GRADES OF FAR NORTH DEPOSIT INCREASED BY RE-CALCULATION OF INDEPENDENT RESOURCE ESTIMATE

NEWS RELEASE GREAT PANTHER SILVER ACHIEVES SEVERAL PRODUCTION RECORDS IN THIRD QUARTER 2013

Transitioning from Explorer to Miner

Arizona s Copper Solution Company November,

Hot Chili Commences Scoping Study on Productora Copper Project, Chile

Copper. Anglo American s copper business has six copper operations in Chile, two copper projects in Peru and the Pebble project in Alaska.

Bank of America Merrill Lynch 2015 Global Metals, Mining & Steel Conference

Rambler Reports Fiscal 2016 Q4 and Yearend Production Results 12% Increase in Production over Fiscal 2015

NEWS RELEASE GOLDEN QUEEN ANNOUNCES 2016 PRELIMINARY OPERATING RESULTS

Australia s leading explorer in Mexico

AuRico Gold Provides Monthly Update on Young-Davidson Ore Processing Underway

NEWS RELEASE LUNDIN MINING ANNOUNCES 2015 PRODUCTION RESULTS AND PROVIDES OPERATING AND CAPITAL GUIDANCE

Corvus Gold Receives Sulfide Gold Recovery of +90% Using AAO Process at the North Bullfrog Project, Nevada

MEDIA RELEASE OCEANAGOLD ANNOUNCES COMMENCEMENT OF CONSTRUCTION AT THE DIDIPIO PROJECT IN THE PHILIPPINES

Q PRODUCTION REPORT GUIDANCE MET FOR 2017

Southern Copper Corporation November, 2013

SILVERCORP REPORTS Q2 FISCAL 2017 RESULTS: NET INCOME UP 454%, CASH FLOWS FROM OPERATIONS OF $27.0 MILLION ON RECORD SILVER PRODUCTION

NEWS RELEASE New York AG February 25, 2019 Toronto FR Frankfurt FMV. First Majestic Announces Financial Results for Q4 and Year End 2018

Q PRODUCTION REPORT

Independent tests produced a concentrate with an extremely high grade of 56% copper

Transcription:

Quality, Diverse Group of Mining Assets February 2018 1

Forward Looking Statements Some of the statements contained in the following material are "forward looking statements". All statements in this release, other than statements of historical facts, that address estimated mineral resource and reserve quantities, grades and contained metal, and possible future mining, exploration and development activities, are forward looking statements. Although the Company believes the expectations expressed in such forward looking statements are based on reasonable assumptions, such statements should not be in any way construed as guarantees of future performance and actual results or developments may differ materially from those in the forward looking statements. Factors that could cause actual results to differ materially from those in forwardlooking statements include market prices for metals, the conclusions of detailed feasibility and technical analyses, lower than expected grades and quantities of resources, mining rates and recovery rates and the lack of availability of necessary capital, which may not be available to the Company on terms acceptable to it or at all. The Company is subject to the specific risks inherent in the mining business as well as general economic and business conditions. For more information on the Company, Investors should review the Company's annual Form 40 F filing with the United States Securities Commission at www.sec.gov. and its Canadian securities filings that are available at www.sedar.com. See Appendix for 43 101 Compliance Information 2

Diversified Asset Base Principal Operating Asset Gibraltar: Second largest open pit copper mine in Canada Stake: 75% (unincorporated JV) Commodities: copper (primary), molybdenum (by product) and silver (byproduct) 688 million tons P&P reserves at a grade of 0.28% Cu Eq as of December 31, 2016, with additional resources expected to convert to reserves Expected avg. annual production (LOM): 140 million lbs Cu & 2.5 million lbs Mo Mine life: 22 years Florence: Low cost in situ copper recovery project Stake: 100% Commodity: copper 345 million ton probable reserves at a grade of 0.36% Cu Projected annual capacity: 85 million lbs Cu Estimated production life: 21 years Development Projects Aley: Third largest niobium deposit in the world Stake: 100% Commodity: niobium 84 million tonne P&P reserves at 0.50% Nb2O5 (286 million tonne M&I resource at 0.37% Nb2O5) Projected avg. annual production (LOM): Option for 5 mm kgs Nb or 9 mmm kgs Nb Expected mine life: +24 years New Prosperity: 10 th largest copper gold development project globally Stake: 100% Commodity: copper (primary), gold (by product) 831 million tonnes P&P reserves at a grade of 0.23% Cu and 0.41 g/t Au 1.0 billion tonne ore body (P&P reserves plus M&I resources) 5.3 billion lbs of contained Cu and 13.3 million ounces of contained gold Expected mine life: 20+ years Source: Company filings. Note: See NI 43-101 Compliance and Reserves and Resources details in Appendix on Pages 29, 30 & 31 Information extracted from technical reports is presented as of the date thereof (Gibraltar (2016), Florence (2017), Aley (2014) and New Prosperity (2009)). 3

Gibraltar Copper Mine Canada s Second Largest Open Pit Copper Mine Location: 65 km north of Williams Lake, British Columbia Ownership: 75% Mineral Reserves: Mine Type: Mine Life: 3.3 billion pounds recoverable copper 62 million pounds recoverable molybdenum Reserves Update (Dec 2016: 688mm tons at 0.28% copper equivalent*) Open-pit, Copper-Moly Porphyry, average annual copper production (LOM) 140 million lbs & 2.5 million lbs moly 22 years Project Highlights 22 year mine life at a milling rate of 85,000 tpd LOM annual average ~140 Mlbs cu Operating at steady-state since 2014 after 6 years of expansion activities 150 120 90 60 30 0 Gibraltar Production (100%, Mlbs Cu) 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Note: See See NI 43-101 Compliance and Reserves and Resources details in Appendix on Pages 29 & 30 *Copper equivalent is based on: 85% copper recovery, US$3.00/lb copper price, 50% molybdenum recovery & US$10.00/lb molybdenum price 4

Operating Costs Focussed on Lower Cost per Ton Milled Cost per ton milled sustained at ~C$10 per ton milled for past three years due to cost saving initiatives, including revised mine plan with lower strip ratio Comparable open pit mines in South America at $15-20 per ton milled $14 Cost Per Ton Milled (C$) $12 $10 $8 $6 $4 2012 2013 2014 Q1 15 Q2 15 Q3 15 Q4 15 Q1 16 Q2 16 Q3 16 Q4 16 Q1 17 Q2 17 Q3 17 Q4 17 Capitalized Stripping per ton milled 5

Strengthening Metal Prices $4.50 Copper $16.00 Molybdenum $4.00 $12.00 $3.50 $3.00 $8.00 $2.50 US$ Copper C$ Copper US$ Molybdenum C$ Molybdenum $2.00 Jan-10 Jan-11 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jan-17 Jan-18 $4.00 Mar-17 May-17 Jul-17 Sep-17 Nov-17 Jan-18 Significant benefit from weak Canadian dollar ~80% of operating costs are C$ denominated Hedge against $USD metal price volatility 6

Recent Results Performance Over Last Four Years Strong production performance and copper price recovery has resulted in excellent financial results in 2017 150 Copper Production MM lbs $3.00 Total Operating Costs (C1) US$/lb 100 $2.00 50 $1.00 0 2014 2015 2016 2017 $0.00 2014 2015 2016 2017 $180 Adjusted EBITDA MM$ $240 Cash Flow from Ops MM$ $120 $160 $60 $80 $0 2014 2015 2016 2017 $0 2014 2015 2016 2017 7

Florence Copper A Near Term, Low Cost Copper Producer Location: Ownership: Mineral Reserves: Mine Type: Mine Life: Central Arizona near the community of Florence 100% (acquired in 2014 for US$70 million) 345 million tons grading 0.36% TCu (at a 0.05% total copper cutoff) containing 1.7 billion pounds of recoverable copper In-situ copper recovery 21 years Project Highlights All major power, transportation, road and rail infrastructure in place All required permits for Phase 1 test facility have been issued Potential for commercial production in 2021 Over US$135 million spent on project by former owners Conoco, Magma and BHP Copper Inc. plus subsequent $15 million spent by Taseko Note: See NI 43-101 Compliance and Reserves and Resources details in Appendix on Pages 29 & 30 8

Florence Copper 2017 Technical Study In January 2017, Taseko announced the results of a two-year metallurgical test program as well as an optimization of the project well field development sequence The updated data was used to re-cost the project which resulted in a significant improvement in project economics Technical Study* Highlights Initial capital cost of US$200 million Payback of capital 2.3 years (pre-tax) Operating cost of US$1.10/pound LME Grade copper cathode Annual copper production capacity of 85 million pounds Total life of mine production in excess of 1.7 billion pounds of copper 21 year mine life Copper price US$/lb $3.00 Net Present Value (NPV) Analysis* NPV (7.5%) / IRR US$920 Million / 44% - pre-tax US$680 Million / 37% - after-tax** *The NI 43-101 technical report documenting these results including tax implications and discussion was filed on www.sedar.com on February 28, 2017. **Under review as new US corporate tax rates are expected to have a significant positive impact on the after-tax NPV of the project. 9

Florence Copper Profitability (NPV / Initial capex) Potential impact of new US corporate tax rates With an after-tax NPV of US$680 million (significant increase expected with new US corporate tax rates) and initial capital cost of US$200 million, Florence will be one of the most profitable copper mines in the world. 3.4x 3.4x 2.4x 0.9x 0.9x 0.7x 0.4x 0.4x 0.3x 0.3x Florence Kamoa-Kakula Timok Los Azules Constellation Taca Taca Rosemont Pebble Frieda River Quebrada Blanca 2 Capex Intensity (Initial capex / Production capacity) With initial capital cost of US$200 million and annual production of 40,000 tonnes, Florence is the least capital intensive copper project in the world. $16,204 $16,613 $17,142 $17,152 $9,921 $11,322 $12,688 $7,000 $5,195 Florence Kamoa-kakula Timok Taca Taca Los Azules Frieda River Constellation QB2 Rosemont Source: Company Filings 10

In Situ Copper Recovery (ISCR) How does in situ copper recovery work? Injection and recovery wells are drilled deep into the bedrock where the oxide copper ore is Wells are concrete encased and sealed to protect water quality Highly diluted acid (99.5% water, 0.5% acid) is pumped under low pressure through the injection wells to dissolve the copper within the copper oxide zone Copper rich solution is pumped to surface through recovery wells for processing into pure copper cathode sheets Perimeter and observation wells are monitored continuously to ensure hydraulic control of fluids is maintained at all times and water quality is protected 11

Florence Copper Project Project Development Plan Final permits issued and Board approval for construction of Production Test Facility (PTF) in September 2017, with construction commencing in October. The PTF will mainly consist of a wellfield (24 wells in total: four injection wells, nine recovery wells, and 11 groundwater monitoring-related wells) and a small SX/EW plant. Operation of the PTF is intended to prove the ability to control the movement of fluid within the oxidized zone and also will provide valuable information for the operation of the full scale facility Project Timeline 2018 PTF development & construction (underway) Commissioning of SX/EW expected to begin in third quarter 2018/19 PTF operation and permitting for commercial operation 2020 Construction of commercial facility estimated at 18 months 2021 Estimated commercial production 12

Positioned for Next Cycle Taseko is poised for growth with improving copper prices Copper fundamentals remain strong Demand continues to grow, but where will the supply come from? What is the incentive price for new mine supply? Gibraltar Mine operating at steady-state Highly levered to improving copper prices (~140M lbs/year) Strengthened balance sheet No maturities until 2022 Florence Copper Project moving forward Near-term, low cost production Potential ~80% increase in Taseko copper production 13

Thank You