Prof.Rahul.R.Joshi 1,Mr.Rahul.Patil 2,Prof.G.R.Naik 3,Prof.M.V.Kharade 4

Similar documents
BUREAU OF INDIAN STANDARDS (Western Region Office, Mumbai) DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS. Our Ref: DDGW Sectt(PCO/RD) 23 Jan 2014

SMED Implementation in a Press Shop

Installation Manual For Conical Tanks. INSTALLATION and MAINTENANCE INSTRUCTIONS FOR CONICAL TANKS

DIAGRAM FOR CALCULATING PIPE SIZES, DISCHARGE VELOCITIES AND LOSS OF HEAD IN STANDARD STEEL PIPE PIPE FRICTION LOSS CHART

Bill of Quantity (BOQ)

Introduction of KHN rotating blade sand removal

DIVISION 15- MECHANICAL Section Fire Pumps

PRESTRESSED CONCRETE STRUCTURES. Amlan K. Sengupta, PhD PE Department of Civil Engineering Indian Institute of Technology Madras

COST REDUCTION THROUGH WASTE MANAGEMENT IN AUTO PARTS INDUSTRY: A CASE STUDY

Ch 26 Just-In-Time and Lean Production. What is Lean Production? Structure of Lean Production System. Activities in Manufacturing.

Borehole Pumps Best Practises

FASTENERS. STAMPINGS. FITTINGS. ASSEMBLIES.

Productivity Improvement by Using Quality Control Tools A Case Study of Chartered Rubber Products

SPECIFICATIONS - DETAILED PROVISIONS Section Horizontal Centrifugal Water Pumps C O N T E N T S

SECTION INSTALLATION OF OWNER-FURNISHED PRODUCTS

Operator s Manual for Morse Mobile-Karrier for 55-Gallon Plastic or Steel Drum

Line Balancing on AUDI B8 Cable Assembly Line using MUDA: A Case Study

RESTORATION TECHNICIAN. Job Description

SPECIFICATIONS - DETAILED PROVISIONS Section Stainless Steel Sluice Gates C O N T E N T S

ODYSSEY FLOOR MODEL. Owner s Manual. O-6400-F shown rev 118

NUCLEAR POWER CORPORATION OF INDIA LTD TECHNICAL SPECIFICATION ON SUBMERSIBLE PUMPS PAGE NO: 1 OF 4 REV NO : 0 DATA SHEET A

Forming and assembling electrical cable enclosure and support systems

STANDARD TECHNICAL SPECIFICATION FOR ROTAMETER VOLUME - IIB. SPECIFICATION No: PE-SS I010

Site Preparation... 2

DOC NO. ISSUE Page Date. GVTG of LARGE COLUMN ASSEMBLY & INSTALLATION DIAGRAM GENERAL

IMPORTANT. Use of safety surfacing (wood mulch) in compliance with ASTM specification F1292 is required. WARNING

SECTION ROLLER GATES

TECHNICAL HANDBOOK. ASME B73.1 Process Pump. Wilfley Sealing Technology. No Flush Water Required

SECTION CLIMBING WALLS

Established DOC. NO : SSI / PROFILE Rev-03

Design & Installation Manual

GOOD MORNING AND WELCOME

1.0. Post Install Kit. For Use With All Vinyl Railing BOM V1 1/13. Owner's Manual. Assembly and Installation Instructions.

CUP-CVP CONCRETE VOLUTE COOLING WATER PUMP

FIRST OF A KIND PIPE-IN-PIPE SPOOL DESIGN AND FABRICATION TECHNOLOGY FOR ITER-BURIED COOLING WATER SYSTEM

Reducing W aste in Production by Lean Thinking - A Case study

TYPICAL FACTORY LAYOUT vs THE TOYOTA APPROACH

N N O V A T I O N E F F I C I E N C Y Q U A L I T Y SWP. Self Priming Pump

A EN ROUND STORAGE SILO. Ø480cm, Ø560cm, Ø640cm, Ø720cm ASSEMBLY AND USER MANUAL. ARSKAMETALLI LTD

Weir Specialty Pumps. WEMCO Torque-Flow

The Book of Value Stream Maps II

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

Lecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar. L9: Lean synchronization

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

11, 000- L b. E x t r e m e - D u t y P a l l e t Tr u c k OWNER S MANUAL

Forming and assembling electrical cable enclosure and support systems

t y p e V S A S E W A G E P U M P

Vane Pump Test Rig. Narhe, Pune, Maharashtra, )

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION (Autonomous) (ISO/IEC Certified) SUMMER 17 EXAMINATION 17609

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

1DIVISION 15- MECHANICAL Section Fire Pumps. A. Single Stage, Double Suction, 9100 Series Horizontal Splitcase Fire Pump (Base Mounted)

Electrical Craft Helper (Class Code 3799) Task List. Installation

ALUMINUM SCAFFOLDING

Kanban Applied to Reduce WIP in Chipper Assembly for Lawn Mower Industries

DO NOT INSTALL, OPERATE OR SERVICE PRODUCT WITHOUT HAVING READ AND FULLY UNDERSTAND ALL SAFETY PROCEDURES, WARNINGS, INSTALLATION AND OPERATING

EAL Assessment Route Summary

GRUNDFOS WHITE PAPER. Although a baseplate is designed to be a. FOUNDATIONS by Greg Towsley DESIGN RECOMMENDATIONS

Pressure Control Supplier Quality Requirements Machining Services SQ-09 Rev: 1.1. Table of Contents

Prime Shower Enclosure & Base

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

2200-Lb. Stacker. Fixed Straddle Leg OWNER S MANUAL

1470 Dale Court Austell, GA Phone: Fax:

Industrial Coating & Automotive Segment: Continuous Improvement

IT 470a Six Sigma Chapter X

SECTION COLD-FORMED METAL FRAMING

30mm Height Linear Drain Shower Trays

Logistics Strategy Leagile Thinking

C. Miscellaneous Metal Fabricators are specified elsewhere in Division 5.

EXPRESSION OF INTEREST (EOI) FOR. Mechanical Works

Series Sump and Sewage Systems

Changes for the. TOHOPEKALIGA WATER AUTHORITY Standards, Specifications and Details

All definitions are defined according to ANSI/AWWA C b. Flanged Joint: The flanged and bolted joint as described in ANSI/AWWA C110/A21.10.

Triple offset valve with metallic seat for High performance. Class 300: 6 to 36 (DN 150 to 900) Design in accordance with EN and ASME B16-34

Implementation of Lean Manufacturing System on Oil Pump

Stud Welding. What is stud welding and how does it work? The 12 most important questions and answers

2. REFERENCE SPECIFICATIONS

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

STRUCTURAL PRECAST CONCRETE RAMP, STEP, AND ELEVATED PLATFORM UNITS

SPECIFICATION CUM COMPLIANCE CERTIFICATION FOR PRESSURE TESTING PUMP

Minerals. WARMAN Centrifugal Slurry Pumps WBV Vertical Cantilever Slurry Sump Pump Series

Forming and Assembling Electrical Cable Enclosure and Support Systems D/508/5092

Protective Capony RTC-16

Lean Six Sigma Assembly Transformation

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

SEMPEO SQA Unit Code FP3G 04 Forming and assembling electrical cable enclosure and support systems

Project No: Pakenham Branch Library, Pakenham, Ontario Section

Flow and Pull Systems

I. In-Plant Quality Control Manual Specifics

OPERATION OF THE STATEWIDE DETOUR BRIDGING PROGRAM

BakeMax Dough Mini Moulder BMMDM02

LPG CYLINDER PRODUCTION LINES

SHRI RAMSWAROOP MEMORIAL COLLEGE OF ENGG. & MANAGEMENT

CONDUCTIVE AND NON CONDUCTIVE ADJUSTABLE PCB CARRIERS

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.

CONDUCTIVE AND NON CONDUCTIVE ADJUSTABLE PCB CARRIERS

Index - Section 40M Medium Sump / Drainage Pumps Bulletins 4508

DESIGN, ANALYSIS AND FABRICATION OF A HYDRAULIC DIE EJECTOR FOR A POWDER METALLURGY COMPONENT

INSTALLATION GUIDE. 4-Post Lift. Model United States. United Arab Emirates. Egypt.

Transcription:

IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) ISSN: 2278-1684, PP: 40-45 www.iosrjournals.org Prof.Rahul.R.Joshi 1,Mr.Rahul.Patil 2,Prof.G.R.Naik 3,Prof.M.V.Kharade 4 1.(Asst.Professor, Department of Mechanical Engineering,, Dr.JJMCOE,,Jaysingpur), 2. (Manager, Department of Planning and Production Control) 3. (Asso.Professor, Department of Production Engineering,, KIT s College of Engineering,Kolhapur, 4. (Asso.Professor, Department of Mechanical Engineering,, Dr.JJMCOE,,Jaysingpur) Abstract: - To stand up in today s Globalization world, Manufacturers need to find ways to reduce Production time and cost in order to improve operating performance and Product quality. Lean manufacturing is the systematic elimination of waste. Lean is focused at cutting non value-added activities from production. This Paper details the use of lean manufacturing Techniques in reducing waste in Pump manufacturing Company. This Study Shows the 35% reduction in Through-Put Time is achieved to increases the productivity Keywords: - Lean Manufacturing, Waste, Muda, Mura, Muri, Process. I. Introduction to Lean manufacturing:- Lean manufacturing is an overall methodology that seeks to minimize the resources required for production by eliminating waste (non-value added activities) that inflate costs, lead times and inventory requirements, and emphasizing the use of preventive maintenance, quality improvement programs, pull systems and flexible work forces and production facilities. Principles of lean include zero waiting time, zero inventory, scheduling (internal customer pull instead of push system), batch to flow (cut batch sizes), line balancing and cutting actual process times.[1] &[5]. To find out the Muda, Mura, Muri in process we go for detail time study of all activities. Time studies consist measuring the time taken in series of operations in such a way that the ineffective time is shown up and can be separated out. In practice, proving existence of the ineffective time is the most difficult task. Breaking the job into elements to ensure that productive work (or effective time) is separated from unproductive activity (or ineffective time). Then, distinct part of a specified job selected for convenience of observation, measurement and analysis. We carried out time study for all activities of BHR240 Bowl.[4] II. Problem Statement:- As explained earlier in introduction, the number of BHR240 pumps dispatched by large pumps division 4 set / month. Our aim is to increase the number of BHR240 pumps to be dispatch. It could be done by reducing the cycle time of process. Reduction of process cycle time could be done by, Eliminating the non value added works in each individual process stage. As concentrated to reduce the cycle time of material flow. As per physical observation, there are some non value added works. To eliminate those non value added works Time Study & Activity sequence need to be modified & need to use lean manufacturing techniques. This improvement horizontal deployed for all other pump models. In pump major components is Impeller, Pump Bowl, Discharge head, Bell Mouth, Impeller Guide piece, Shafts etc. All mentioned components having long lead time in process. Pump bowl is most critical component to achieve on time delivery due to more activities involved in process such as Cleaning, Hydro Testing, Check-fitment, and Third party witness, Assembly, Painting and Packing. So focus reduction of lead time of pump bowl. The Existing throughput time for BHR240 Pump Bowl (FC to Dispatch) is 3222 Minute. The Targeted throughput time is 2125 Minute (35% time reduction).the Gap of 1085 minute throughput time to be reduced by Lean Manufacturing Techniques. III. Methodology to address Problem:-To reduce cycle time we Employed the following process for manufacturing change. 1. Observation of Process To Identify 3 M s Lean manufacturing is a Japanese method focused on 3M s. These Ms are: 1. Muda the Japanese word for waste in process. 2. Mura the Japanese word for inconsistency in product, processes and systems. 3. Muri the Japanese word for unreasonableness physical strain of operators. (Activity like: Bending, Climbing, Stretching, Lifting heavy wt.) 40 Page

Muda means waste. Muda specifically focuses on activities to be eliminated. Waste is broadly defined as anything that adds cost to the product without adding value to it. [3] and [10]. 1. Identify Projects for Improvements. Reduction of process cycle time by using Lean manufacturing techniques. For this project we Selected component of BHR240 pump bowl. Our objective is to reduce process time of bowl from assembly to dispatch. 2. Measuring Cycle Time for Each Process. Breaking the job into elements to ensure that productive work (or effective time) is separated from unproductive activity (or ineffective time). Then, distinct part of a specified job selected for convenience of observation, measurement and analysis. We recorded time for all activities of BHR240 Bowl. IV.PARETO ANALYSIS:- We carried out time study of BHR240 Bowl and for Pareto diagram analysis is as shown in table following: Sr. no. Activity Cycle Time (Min.) % Total Comm.% 1 Cleaning 930 28.86 28.86 2 Hydro 468 14.53 43.39 3 Painting 423 13.13 62.85 4 Packing 421 13.07 79.99 5 Waiting 300 9.56 85.7 6 W. Transport. 180 5.74 88.55 7 Inspection 150 4.78 91.4 8 Fitment 120 3.83 94.25 9 Dry 120 3.83 97.1 10 Transport. 110 3.51 100 TOTAL 3222 100 Table No.01 Pareto diagram analysis of BHR240 Bowl After analysis from Pareto Diagram we find out major activities to be focused so as to reduce through put time to credit the component. Following major activities are to be focused as per 70-30 rule of the Pareto analysis. 1) Cleaning. 2) Hydro testing. 3) Painting. 4) Packing. Total time required time for above major activity=2238 min. It is to be reduced. We focused on above major activities with lean techniques, we reduced total through put time of credit the component BHR240 Bowl by following process improvements. 1) Cleaning Improvements. SR. NO. TRIGGERED / MUDA / 1 Template Fitting- Inlet and Out let vanes. 1.1. Handling for tilting, locating suitable for working position etc. 1.2.Grinding. 1.3. Inspection by template EXT 600 0 Muda of Find root cause of problem. Activity shifted to Foundry. 41 Page

2 Hydraulic passage cleaning. 2.1.Handling for tilting, locating suitable for working position etc 2.2.Grinding where ever roughness noticed EXT 180 0 Muda of Find root cause of problem. Activity shifted to Foundry. 3 Cleaning before assembly INT 30 30 4 Cleaning before painting 4.1. Cleaning by Polish paper. 4.2. Cleaning by compressed air. 4.3. Thinner wash INT 120 120 Mainly time consumed due to Heavy corrosion of Bowl surface. Surface protection at foundry stage can help to save 90 min. Total 930 150 Initial time required for Cleaning the BHR240 bowl = 930 min. After improvements time required for cleaning the BHR240 bowl. =150 min. Total time reduced for cleaning the BHR240 bowl. = 780 min. 2) Hydro Testing improvements: SR. NO. TRIGGERED / MUDA / 1 Locate bowl in yard EXT 15 0 Muda of searching/ idle 2 Taking bowl from yard to hydro testing station. EXT 30 30 Muda of transportation. 3 Measure PCD, number of holes of flange. EXT 5 2 Muda of over 4 Search hydro plate from yard EXT 71 30 Muda of searching / idle & 2S. 5 Collect pressure plates at hydro station EXT 14 0 Muda of transportation. 6 Cleaning pressure plates. EXT 11 11 Muda of over Done before hydro loading. Identification marked on bowl. Propose to change the layout of storage location near work center. PCD & No. of holes marked during machining. Reduce time by coding system. Separate location to be given so that searching time come down up to 5 min Do this activity before loading of Hydro After Hydro test plates need to clean 8 Take & Put " O" ring in groove of plate with applying grease 9 Locate wooden blocks suitable for bowl size and weight, put wooden blocks in hydro area and put the bottom plate on the blocks. INT 14 14 INT 25 18 Muda of over Make painted wooden block storage location in hydro location. 10 Check the drill size, decide stud size. Searching for studs & nuts (Around 24 nos.) for fastening INT 17 12 Muda of over processing Modified rack based on size 11 Lifting bowl for vertical position INT 15 15 12 Make arrangement to lift bowl vertically. INT 30 0 Do when pressure apply & (D-shackle & chain ) retain 13 Filing of water into bowl. INT 30 20 Muda of idle / waiting Use 2" pipe for filling water 14 Fitting of top pressure testing plate. Fix the pressure gauge. 16 Apply the pressure, Retain pressure (30 min,) inspection. INT 38 33 Muda of motion Provide threading socket for pneumatic-studder. INT 60 60 lifting provision 42 Page

17 Removing fasteners of top pressure plate INT 60 60 with help of pneumatic studder. Keeping nuts & bolts in rack. 18 Remove water from bowl (30 min.) INT 30 30 19 Remove bowl from pressure testing arrangement. Collecting used nuts & bolts & kept in rack. 20 Remove bottom plate and send top and bottom plates to stores by forklift. INT 7 7 EXT 22 22 Muda of transportation Layout to be modified. Total 464 338 Initial time required for hydro testing of BHR240 bowl = 464 min. After improvements time required for hydro testing of BHR240 bowl. =338 min. Total time reduced for hydro testing of BHR240 bowl. = 126 min. 3) Painting : SR. NO. TRIGGERED / MUDA / 1 Offer for Q.A. Check (Pump No,Q.A. Assembly sticker) prior to painting INT 20 10 Muda of over Inspection done at assembly end with QA sticker 2 Movement the bowl to paint booth. INT 30 30 3 Clear the space in the paint booth. EXT 48 0 1S implement Clear space after completion of each component 4 Lift component with EOT crane, move to paint booth. INT 30 10 Muda of searching/ idle Standardize "D" shackle 5 Clean the component with solvent & polishing paper. INT 30 30 6 Mask the machined surfaces. INT 35 25 Process improvement Use of 3" size masking tape instead of 1" 7 Primer preparation. EXT 25 0 Muda waiting of Keep primer ready in paint booth. 8 Apply primer as per the decided painting procedure (surfaces inside & outside & also bottom side by lifting the component with the help of crane) INT 40 40 Process improvement Can be reduced to 30min. By using High pressure guns. 9 Wait for the drying the primer INT 30 30 10 After dry out the primer, polish all the surfaces. INT 20 20 Process improvement By using orbital sander, time can be reduced to 10 min. 11 Apply finish coat of final paint as per the decided painting procedure (inside,outside & bottom side by lifting the component with the crane) INT 30 30 12 Wait for drying of this coat & offer for Q.A. check INT 30 30 43 Page

TRIGGERED / MUDA 13 14 15 After inspection of finish coat, remove all masking from machined surfaces Apply rust preventive oil on the machined surfaces. Offer the component for final inspection w.r.t. pkg. note INT 25 25 INT 10 10 INT 20 20 Total 423 310 Initial time required for painting of BHR240 bowl = 423 min. After improvements time required for painting of BHR240 bowl. =310 min. Total time reduced for painting of BHR240 bowl. = 113 min. 4) Packing : S R. N O. / 1 Offer for Final Q.A. Check prior to 20 20 packing 2 Preparation of packing material. INT 120 85 Process Improvements Drilling of sides for lifting done at box mfg. stage 3 Keep Bowl on wooden base INT 25 15 Standardize "D" shackle 4 Place & nail 04 side panels one after other. INT 40 40 5 Fix10 Nos. of side supports INT 80 70 Muda of over 2 nos of rafters (Wooden Rafters), to restrict reduced. movement of bowl. 6 Create Stencil mark -- To have packing details. 7 Offer for Final inspection to Q.A. Prior to dispatch. 8 Enclose signed Packing note. (Packing details) 9 Load the bowl in the Trailer with the help of D-shackles provided for lifting it. EXT 23 0 Do this activity while final inspection being done INT 20 20 INT 5 5 60 60 10 Fix wooden top panel INT 23 23 11 Ready to Dispatch. INT 5 5 421 343 Initial time required for packing of BHR240 bowl = 421 min. After improvements time required for packing of BHR240 bowl. =343 min. Total time reduced for packing of BHR240 bowl. = 78 min. 44 Page

Time in (min.) Benefits obtained: The cycle time of BHR240 pump reduced by eliminate some non value added works as per Lean Manufacturing System. Ultimately due to cycle reduction the number of pumps dispatch per month has been increased to 8 as below in table. It show increase in the total monthly production of large Pump Division. MONTH NOV DEC JAN FEB MARCH BHR240 PUMP DISPATCHED QTY Final result after improvements: Sr. No. Activity 4 5 6 6 8 Initial time (min.) Time achieved after Lean (min.) 1 Cleaning 930 150 780 2 Hydro Testing 464 338 126 3 Painting 423 310 113 4 Packing 421 343 78 Total:- 2238 1141 1097 Time reduced by project. (min.) 1000 900 800 700 600 500 400 300 200 100 0 930 150 464 338 423 421 343 310 Initial time (min.) 930 464 423 421 Time achieved after improvements. (min.) Cleaning Hydro Testing Painting Packing 150 338 310 343 Activities Initial time (min.) Time achieved after improvements. (min.) V.Conclusion:- Lean manufacturing appears to hold considerable promise for addressing a range of simultaneous, competitive demands including high levels of process and product quality, low cost and reductions in lead times. This Case Study addresses the application of lean manufacturing concepts to the continuous production sector with a focus on the Pump manufacturing industry. The EXISTING THROUGHPUT TIME before Application of lean Manufacturing = 3222 MIN. The reduced THROUGHPUT TIME = 2125 MIN. Totally saving of 1085min are achieved which shows 35% reduction in THROUGHPUT TIME. References:- [1] Nasreddin dhafr & Munir Ahmad, Improvement of quality performance in manufacturing organizations by minimization of production defects,robotics and Computer-Integrated Manufacturing( 2006)pp536-542. [2] Colin Herron & Paul M. Braiden, A methodology for developing sustainable quantifiable Productivity Improvement in manufa cturing Companies, International Journal of Production Economics(2006)pp143-153. [3]Saurabh Tiwari& Nishi Tripathi, The journey of lean Indian Journal of Commerce and Management Studies( 2011)pp200-208. [4]Jirapat & Apichat, A framework for implementing lean manufacturing system in small and medium enterprises (2010). [5] A.Abduelmula & R.MacIsaac, Lean Manufacturing Implementation (2008). 45 Page