Poaka Beck Water Treatment Works (WTW) is located in South Cumbria approximately 4.5km north of Dalton-in-

Similar documents
The Blackburn Wastewater Treatment Works catchment is situated to the west of the Pennine hills between

Arnfield and Godley WTW s are located in Tameside, south east of Manchester and form part of the Longdendale

Yorkshire Water s Irton Water Treatment Works (WTW) is located 5.5km southwest of Scarborough in North

Frankley water treatment works (WTW) is located to the south west of Birmingham city centre. It is the primary

United Utilities Clay Lane WTW supplies customers in the Rochdale area with a maximum of 16Ml per day of

Barrow WwTW, in Cumbria, serves a population equivalent (PE) of 71,772 and has a consented flow to full treatment

The West East Link Main is a 125 million pipeline project that will carry water across the North West of England

Fleetwood WwTW in Lancashire is owned and operated by United Utilities and serves a catchment population of

Elsham Water Treatment Works (WTW) is located approximately 10km east of Scunthorpe in North Lincolnshire

Rivelin WTW provides drinking water for a population of approximately 200,000 in Sheffield. The raw water

Grafham WTW is located near Huntingdon and serves a population of 829,000, including Northampton,

BELFAST SEWERS MOURNE CONDUIT. Summary. Summary

Clay Lake is located 3km south of the town of Keady in County Armagh, Northern Ireland, and is a 45 hectare

by Edward Ollett BEng (Hons) MICE CEng

Lee Tunnel Flow Transfer System twin 2.4m diameter elevated steel gravity pipelines to transfer stormwater across Beckton STW

PCI AFRICA RANGE OF PRE-ENGINEERED WATER TREATMENT PLANTS

Build Off Site. Standard Products. Mark Froggatt Engineering Alliance

Scottish Water has recently commenced the first phase of construction on a 120m investment project designed

by Geraud Ramond MAPM RPP & Peter Ratcliffe Bsc CEng MICE

Glencorse WTW Edinburgh s new 130m WTW is a feat of modern construction methods and sustainable engineering

Keeping Cumbria flowing Paul Brown UU Andy Harford Atkins

PSF Wales QUALITY SERVICE FLEXIBILITY STEEL HOUSINGS, ENCLOSURES BUILDINGS & STRUCTURAL STEELWORK

Meeting Manganese Removal Goals: A Pilot Study

5.2.2 Lower Mgeni System

Oswestry WTW 54m project to upgrade plant to 21st century standards ensuring drinking water quality for a million people well into the future

The Vyrnwy Large Diameter Trunk Mains (LDTM) consists of 3 (No.) parallel, 80km long gravity pipelines, laid a 3m

PIGGING OF THE O SHANNASSY OUTLET MAINS. Paul Balassone. Melbourne Water

CONTAIN PROTECT SECURE. LPCB SECURITY ENCLOSURES Anti Vandal & Anti Terrorist

USING PARTICLE COUNTERS TO OPTIMISE WATER TREATMENT PLANTS. Michelle Colwell. Michelle Colwell, Water Treatment Technologist.

TARCUTTA TREATMENT PLANT IRON AND MANGANESE REMOVAL. Peter Outtrim. Riverina Water County Council

A NEW MEMBRANE FILTRATION PLANT FOR GIRGARRE. Geoffrey Frost. Geoffrey Frost, Principal Water Engineer, Parsons Brinckerhoff Australia P/L

SCARCE RAW WATER RESOURCES

DBO : AN IN-HOUSE SUCCESS AT ESKDALE. Jason Mullins. North East Water

Attachment N o F Control & Monitoring

Llywn Onn WTW assessing the challenges overcome during the largest project in Dee Valley Water s AMP5 capital programme

Phosphorus Removal Schemes phosphorus removal to meet new environmental consent concentrations for final effluent discharges into Carmarthen Bay

Blackburn & Darwen WwTW WFD a 140m project to construct Europe s largest purpose-built Nereda process plant at Blackburn wastewater treatment works

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY

Drinking Water Audit Report

City of Saint John, New Brunswick. Safe, Clean Drinking Water Project

Wessex Water s Trowbridge STW is a regional sludge processing centre currently treating approximately 2,000

Capital Investment Plan (CIP) Quarterly Report for the period ending December 2013

Water Solutions for the Food and Beverage Industry

CLARENCE COLLIERY WATER TREATMENT

SOLIDS REMOVAL SYSTEMS IN WASTEWATER TREATMENT TIME FOR SOME AGILE THINKING

This Minewater Treatment Scheme is located in the village of Clough Foot, near Todmorden, West Yorkshire. The

SCHEDULE-A MODIFIED CLAUSES/ PAGE NUMBERS: Vol. No. Section/ Description SECTION IA/ ANNEXURE XII :INPUT DRAWINGS (PT plant) Clause no of 920

Drift Water Treatment Works is the most westerly water treatment works in mainland England, situated just

Metropolitan Water District

Drinking Water Audit Report

INFRASTRUCTURE & OPERATION

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

The fresh approach to engineering and project management.» Rich in experience» Responsive & flexible» Delivery certainty

LEARNINGS FROM SEVERAL HIGH CHLORINE EVENTS. Raj Mahendrarajah. Coliban Water

Drinking Water Audit Report

Fleetwood WwTW successful collaboration during design and construction

SECURING THE SHIRES WATER SUPPLY. Barry Jones. Eurobodalla Shire Council

COMPANY PROFILE. CIDB 8ME. Majority Black-Owned. Significantly Black Women-Owned

Trident. Package Water Treatment System

Manganese Removal in the Poconos A Success Story. Hemlock Farms Community Association

Lakeview Water Treatment Plant Phase 2 Expansion (OBM2)


Drinking Water Audit Report

COLLECTION AND DISTRIBUTION OF WATER

General Procurement Notice

Drinking Water Audit Report

I P E L I N E : M I D M A R I D M A R D A M T O M I D M A R

The Mgeni System is an integrated water resources and potable bulk water distribution system comprising of two major sub-systems, viz.

MECHANICAL DIVISION We act today with the future in mind. CONTACT US

Resilience Planning for Large Diameter Trunk Mains. Joe Hartley MWH

COWRA S WATER TREATMENT PLANT - A CHANGE IN PROCESS CONTROL PHILOSOPHY. Ken Keliher. Cowra Council

Written submission from Scottish Water

Water Resource Management Plan 2019 Methodology for Estimating Scheme Costs South Staffs Water. November 2017

Lowering The Total Cost Of Operation

DAFF AIR DISPERSION REVAMP. Wes Wilkie. Goulburn Valley Water

WHEN ALL THE DUCKS LINE UP: CASE STUDIES ON HITS AND VERY NEAR MISSES. Leanne Wells. Department of Health

WATER SUPPLY SERVICES

Agenda Item IV A-1 (TAHOE) Meeting Date: Douglas County Sewer Improvement District #1. Wastewater Reclamation Facilities

GAS ENGINEERING & ASSET MANAGEMENT SERVICES INTELLIGENT DOERS, DEPENDABLE DELIVERY

Strongford STW restoring digestion efficiency and achieve phosphorus permit compliance

Liverpool WwTW construction nears completion with the project moving smoothly into fit out and commissioning phases

Laighpark STW, Shieldhall STW & Dalmarnock STW Scottish Water s Bundle 25A project improves water quality of the River Clyde and its tributaries

by Thomas Stell Existing site Woolston Wastewater Treatment Works includes the following stages and processes:

Accounting Separation Methodology Statement. Upstream Services YW 2014/15

ph BUFFERING IN THE GREAVES CREEK WATER SUPPLY SYSTEM Carolyn Haupt Sydney Water

Separations Overview TDRL Seminar

DEWATERING DRINKING WATER SLUDGE S IN REED BED SYSTEMS Nielsen, S 1. and Cooper D.J., 2 1 Orbicon A/S, Denmark,

HYDAF DISSOLVED AIR FLOTATION SYSTEMS INDUSTRIAL HD RANGE. Water l Science l Technology

PRODUCT OVERVIEW OWS

NOVEL APPROACHES TO TRIHALOMETHANE MANAGEMENT. Dr Rino Trolio. Water Corporation (WA)

SECTION 6.0 DESIGN CRITERIA, LAYOUTS, & HYDRAULICS

The Mersey Valley Processing Centre (Shell Green), a strategic digested sludge incineration scheme, is an existing

Drinking Water Audit Report

WATER AND WASTEWATER FACILITY CLASSIFICATION APPLICATION FORM

Capital Improvement Plan Update:

PNW AWWA Conference 2009 Todd Reynolds, PE, BCEE

SODIUM HYPOCHLORITE PORTABLE DOSING UNIT. Max Hadzidimitriou. Yarra Valley Water

Zero Liquid Discharge Project Extends Potable Water Supplies

Hunter Water S170 Register

The next step in ozone purification

Transcription:

Poaka Beck WTW maximum output needed increase from 13Ml/d to 16 Ml/d Poaka Beck Water Treatment Works (WTW) is located in South Cumbria approximately 4.5km north of Dalton-in- Furness. The WTW is supplied from three impounding reservoirs: Poaka Beck, Harlock and Pennington. The existing WTW was upgraded in the 1980 s with clarification by Dissolved Air Flotation (DAF) being added to the original filtration through Rapid Gravity Filters (RGF s). Poaka Beck WTW supplies the Poaka Beck Zone which comprises the towns of Askam-in-Furness. Dalton-in-Furness, Marton village and outlying farms. In addition the WTW can export water into Barrow-in-Furness via a connection into the Ulpha trunk mains network at Askham-in-Furness. The existing WTW had a maximum output of 13 Ml/d serving an equivalent per capita population of 80,000. The Poaka Beck zone has an average daily demand of 6-8 Ml/d with the rest of the 13 Ml/d available for export. Poaka Beck WTW Photo shows Lamella Thickeners installed The Asset Management Period (AMP) 4 drivers for this project were - cryptosporidium, disinfection and plumbosolvency. In 2003, a strategic review of the South Cumbria sources and demands was carried out by United Utilities identifying that the WTW maximum output needed to increase from 13 Ml/d to 16 Ml/d to meet future demands. The outline design for the project was carried out by Solutions and Engineering (a joint venture between United Utilities and MWH, United Utilities Solutions Service Provider). As part of this outline design a hydraulic study was carried out which revealed that the existing trunk mains downstream of the WTW did not have the capacity to meet the increase in flow whilst maintaining existing levels of service (pressure) to customers within the Poaka Beck zone. Therefore, if the WTW were to achieve a maximum output of 16 Ml/d it would require a new outlet trunk main. Poaka Beck Link Main Design Several solutions for the outlet trunk main from the WTW were photo courtesy of KMI+ investigated by Solutions and Engineering and, after analysis of various options the preferred option was identified as a new trunk main from the WTW to Highfield Service Reservoir (SR). Highfield SR operates as a break pressure tank on the Barrow Link Main, a large diameter trunk main supplying water into Barrow-in-Furness. A new trunk main between the WTW and Highfield SR (called the Poaka Beck Link Main) would enable water to be exported from the WTW to Highfield SR, meeting the 16 Ml/d criteria. As the design for the new Link Main developed, it became apparent that water from Highfield SR could be gravitated to the WTW via a pressure sustaining valve at the inlet to Highfield SR. The benefit of being able to import water to the WTW is that it could be designed to automatically provide security of supply to the Poaka Beck zone in the event of a shutdown at the WTW. Poaka Beck WTW Design The WTW site is small, confined, sloping and on the border of the Lake District National Park. Five options for enhancements to the existing WTW were investigated to obtain the optimal layout for the site. 193

192 Water Treatment and Supply

Poaka Beck WTW; Picture shows First stage filter gallery & second stage filters courtesy KMI+ United Utilities Integrated Alliance North construction partner KMI+ (a Kier, Murphy, Interserve and Mouchel Joint Venture) provided valuable detailed design and constructability advice on the options and all three integrated Alliance North partners (UU, MWH, & KMI+) reviewed and agreed a preferred layout. The new 1st and 2nd stage filter building was developed using 3D modelling techniques, which assisted with the access, lifting and maintenance & health & safety reviews. The detailed design was carried out by two teams working collaboratively: * M & E design was carried out by the KMI+ in house design team; * civil design was carried out by GHA Livigunn. Project Phasing The overall project was delivered in two phases: * Phase 1 the Poaka Beck Link Main; * Phase 2 the enhanced WTW. Once Phase 1 was completed, the existing WTW was shutdown and compliant water was supplied to the Poaka Beck zone via the new Link Main. This allowed Phase 2 to be constructed without having to keep the existing WTW operational, making construction and commissioning of the enhanced WTW much simpler. Scope of Works Phase 1 comprised a new bidirectional 4.5km trunk main from the existing Highfield SR to the WTW. The trunk main utilised 400 mm NB ductile iron and 500 mm OD Polyethylene (PE) 100. The actuated control valves required for the Link Main bi-directionality were included in Phase 1 as well as new secondary disinfection using Sodium hypochloride at Highfield SR. Phase 2 comprised new inlet control valves to the existing DAF plant, which was retained, with an interstage pumping station to pump the clarified water to the new 1st stage (RGFs). Five new 1st stage RGFs were provided as well as four new 2nd stage RGFs. A new contact tank was provided to meet the disinfection driver. A new flow balancing tank balances out instantaneous demands and provides storage to enable changeover between importing and exporting water through the new Link Main. The existing chlorine gas storage and dosing system was replaced by a new sodium hypochlorite system The existing polymer and ferric sulphate storage and dosing systems were retained. New sulphuric acid and orthophosphate storage & dosing systems were installed. A new wastewater treatment and re-cycling plant was provided, comprising new lamella thickeners, sludge transfer system, modifications to the existing sludge storage tanks, modifications to the existing 1st stage dirty washwater tanks and new 2nd stage dirty washwater tanks. Poaka Beck Link Main Construction KMI+ was appointed Principal Contractor for the new Link Main, which had some significant construction challenges to overcome. Great Crested Newts were identified on the route as well as a badger sett. The majority of the pipeline route also passed through two haematite mining areas. The pipeline crossed the A590, which is the major trunk road into Barrow-in-Furness. The crossing method agreed with the Highways Agency was open cut using two phased partial road closures to keep one side of the carriageway open at all times. Two tunnels were crossed, one the West Coast Railway Line and the other an old mining tunnel. Construction of the Poaka Beck Tunnel began in May 2006 and was completed on schedule in April 2007. The Link Main supplied the Poaka Beck zone with potable water from May 2007 until March 2008, when the enhanced WTW was commissioned. 195

Poaka Beck WTW: Construction of the filter building Poaka Beck WTW Construction KMI+ was appointed as Principal Contractor for the enhanced WTW. M & E work packages were awarded to specialist sub-contractors. These were: Boulting Group (electrical installation), Compass Ltd (Process pipework), Lloyd Morris Electrical Ltd (Control Panels), Tata Control systems (Software), Hydroclear Services Ltd (Chemical dosing), AMT Ltd (Filter media installation), Hydro International (Lamella thickeners). Construction of the main civil elements started in January 2007 with site excavations, a tower crane being erected at the end of January to service the filter building, contact tank, flow balancing tank and the interstage pumping station. The filter building was the most complex of the structures, being of cellular design, and having five different levels. Some of the civil designs depended on the detail design of items of M & E kit, so early procurement of these items was important. Once the main structures were nearing completion, sections were handed over to allow M & E installations, requiring close co-ordination between the site teams as different disciplines worked alongside each other using the same accesses. Poaka Beck Commissioning The Poaka Beck process commissioning required close co-operation between KMI+, their sub-contractors and UU, resulting in seamless courtesy KMI+ hand-over from commissioning to the end users. UU Operations, as part of the commissioning team, had developed a good understanding of how the plant was controlled as commissioning progressed. Problems were overcome as they occurred by the team working together and being committed to achieving an end result. Some events could have been show stoppers, but thanks to the team working together they were overcome. The Poaka Beck project team delivered water into supply on 27th March 2008, four days earlier than the March 31st target and project commission is expected within the 20.3 million budget and ahead of August 2008 target. Health & Safety The project delivered water into supply having completed over 200,000 man hours without a reportable accident. This was a magnificent achievement by all parties concerned and is a model for how a project can be successfully delivered within tight constraints, whilst maintaining a focus on safe working. Note: The Editor & Publishers wish to thank Mat Bingham, Engineering Delivery Manager at MWH, John Williamson, Site Manager at KMI+ and David Dewar, Project Manager at United Utilities for preparing the above article for publication. 196

3 The Point Business Park Rockingham Road, Market Harborough, Leicestershire LE16 7QU Tel: (01858) 410101 Fax: (01858) 433934 E-mail: sales@cadar.ltd.uk Website: www.cadar.ltd.uk Morgan Marine Limited GRP & Steel Housing Solutions Morgan Marine specialise in the design, manufacture and installation of complete housing and cover solutions using GRP or Steel offering a complete turnkey solution. Housings can be fitted with electrics, Air Conditioning, Intruder and Fire alarms. We also offer steel stairways, access platforms and structural steelwork. Morgan Marine Ltd Llandybie, Ammanford, Carms, SA18 3JG T. 01269 850437 F. 01269 850656 Email sales@morgan-marine.com www.morgan-marine.com 194