Power Capacity. Jobs. Effects on Water, Land and Wildlife. predetermine the pace, scale and nature of development in the region for decades to come.

Similar documents
Galore Creek Project Update Minerals North Conference April 2006

N E W S R E L E A S E

Trans-Boundary Mining in a Rain Forest: Long Term Impacts to Land and Water. Robert Sanderson Jr. Guy Archibald

Northwest Transmission Line. Public open houses: Dease Lake, April 27, 2010 Smithers April 28, 2010 Terrace April 29, 2010

ENVIRONMENTAL ASSESSMENT TRACK REPORT GALORE CREEK COPPER-GOLD-SILVER MINE PROJECT. Northwestern British Columbia

Presentation to the Oil Sands Multi-stakeholder Committee Bonnyville, September 13, 2006

TRANSBOUNDARY WATERS. Friends & Neighbors: Background on the Bilateral Working Group FALL Members of the Bilateral Working Group Alaska

YUKON S ENERGY CONTEXT

Cassiar Iskut-Stikine Land and Resource Management Plan

Mineral Development Agreement. Canada-British Columbia

Prepared by: David Suzuki Foundation, Pembina Institute, Watershed Watch Salmon Society, West Coast Environmental Law

MOUNT KLAPPAN COAL PROJECT

APPENDIX O COMPREHENSIVE ALTERNATIVES ASSESSMENT TABLES. RAINY RIVER PROJECT Final Environmental Assessment Report

Hardrock Mining POTENTIAL IMPACTS TO WATER, WILDLIFE, AIR AND LAND. BY BONNIE GESTRING

December 12, 2014

ACID MINE DRAINAGE IN THE AMBLER MINING DISTRICT

USE NATURAL RESOURCES?

Solving Energy Sprawl: Case Studies

More Creek Hydroelectric Project Prefeasibility Study

BACKGROUNDER. Watershed Watch Salmon Society. February 5, 2009 THE BUTE INLET HYDROELECTRIC PROJECT

Côté Gold Project. Where is the Côté Gold Project located? Who owns the Côté Gold Project? Frequently Asked Questions. May 2018.

REPORT OF THE FEDERAL PROSPERITY REVIEW PANEL EXECUTIVE SUMMARY

More Creek Hydroelectric Project Prefeasibility Study

Creating Value Through Operational Excellence

Coastal Gaslink Pipeline Project

What is the Terms of Reference?

Audit of Forest Planning and Practices. West Fraser Mills Ltd. Skeena Sawmills Division Tree Farm Licence 41

Indigenous Knowledge in Environmental Impact Assessment: Insights from Examining Case Studies

The Morice WFSP Planning Linkages and Forest Licensee Support

EAST-WEST TIE TRANSMISSION PROJECT

Taseko Prosperity Gold-Copper Project. Appendix 5-4-F

NWT Mining After Devolution

Estuary Working Group

2 OVERVIEW OF THE NORTHWEST TERRITORIES SETTING POPULATION ECONOMY EMERGING ISSUES CLIMATE CHANGE...

New Afton. A Renaissance in Mining

Klappan Plan. February 10, Prepared for. The Tahltan People and all British Columbians. Prepared by

Proposed Northwest Transmission Line

EAST-WEST TIE TRANSMISSION PROJECT

Skeena Salmon & Climate Change Adapting to an uncertain future. Greg Knox SkeenaWild Conservation Trust

Environmental Resources: Renewable & Non-Renewable Resources & Energy

BACKGROUND INFORMATION. for the INITIAL FEDERAL PUBLIC COMMENT PERIOD. on the

Facts and Figures. Greater Victoria Water Supply Area. May 2015

River Diversion Hydropower in BC: Impacts, Assessment, and Planning

N E W S R E L E A S E

A summary Yukon Energy s 2016 Resource Plan

Sustainable Forests, Sustainable Communities

Clean Power: Now and in the Future

Water Quality indicators and How Human Activities Affect Water Quality

Application for an Environmental Assessment Certificate/ Environmental Impact Statement for the KSM Project

Climate Change, Energy and Green Economy. What is important to you?

The Social and Economic Importance of Canada s Privately Owned Forest Lands

Statement of. Tony Ferguson, USDA Forest Service Director of Minerals and Geology. Management. Before the. House Committee on Natural Resources

Hydropower, Aboriginal Peoples and Environmental Assessment in Canada

All Candidates Questionnaire

2018 BC Freshwater Public Opinion Insights Topline Report

Reasons for Ministers Decision

Watershed Management in Alberta Green Area

For 100 years private mining and refining

Finding Balance: The Proposed Mackenzie Valley Pipeline

ALBERTA WILDERNESS ASSOCIATION

Ministry of Energy, Mines and Petroleum Resources

Yukon Electrical Energy and Capacity Need Forecast (2035 to 2065)

Map. Map 1. Mackenzie River Basin Transboundary Sub basins

AVANTI MINING INC. Kitsault Mine Project: Nisga a Community Presentation. April 2011

Peter Smith P.Eng and Guy Van Uytven, M. Eng., MBA, P.Eng., FCSSE

FACT & ACTION SHEET THE TARKINE

The Gold King Mine Acid Drainage Spill

Northwest Hydropower and Columbia Basin River Benefits Fast Facts

We re here to share information about the project so you can see how it might affect you, your community, and the environment.

Environment Environnement Canada Canada. Ministry Of Environment, Lands And Parks. Canada - British Columbia Water Quality Monitoring Agreement

Yukon Transmission Market Benefits Assessment

Comprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number:

Northwest Hydropower and Columbia Basin River Benefits Fast Facts

Q&A: Omineca spruce beetle outbreak May 4, 2018

Highway 11 Realignment

Thank you very much Mr. Chair. My name is Tom Hoefer, Executive Director of the NWT & Nunavut Chamber of Mines. I m joined by Gary Vivian, our

Page 1 of 5. FrontCounterBC Kamloops 441 Columbia Street Kamloops, BC V2C 2T3

RENEWABLE ENERGY IN THE PACIFIC NORTHWEST

LONG-TERM SOLUTIONS FOR NEW YORK S CLEAN ENERGY FUTURE

Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining in the Yukon Territory

Resources in the Amazon

FACT & ACTION SHEET THE TARKINE

Grassy Mountain Coal Project Environmental Impact Assessment Project Summary Table

Seven Generations Energy Ltd.

Environment and Climate Change

Lower Churchill Project

D-1. SOUTH PEACE EAST AND WEST SOP PROJECTS PATRICK HENN, DEVELOPMENT MANAGER PRRD Board of Directors Meeting, April

CHAPTER 2: KEY TRENDS AND ISSUES

Renous River Sub-Watershed Monitoring 2006

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.

EVOLUTION OF RECLAMATION FOR WILDLIFE HABITAT AT SULPHIDE MINES IN BRITISH COLUMBIA, CANADA. Natalie Tashe November 9, 2012

TOWARDS SUSTAINABLE FISHERIES

Riverfront Property. Land use related water pollution. Creek Connections Water Pollution Module Riverfront Property. Grade Level: Basic

Mapping online the environmental impact of mining operations in New Brunswick

and Transfer Registry: A Canadian NGO perspective

Episode 6: CSI to the Rescue. Synopsis. Link to the Ontario Grade 7 Curriculum: Science and Technology

Update on the action plan on the responsible development of oil and gas resources

Millar Western Forest Products Ltd.

Appendix 7-B Brucejack Gold Mine Project: 2012 Air Quality Baseline Report

GREAT BEAR RAINFOREST UPDATE MAY 2010 Key milestones achieved March 2009 and Five-Year Plan

Transcription:

PRIMER E N E R G Y, M I N I N G A N D S U S T A I N A B I L I T Y I N N W B R I T I S H C O L U M B I A F E B R U A R Y 2 0 0 8 Sustainable Energy Solutions Sizing It Up Scenarios for Powering Northwest British Columbia Northwest British Columbia is at a turning point. A mining boom is underway, and there is pressure to find ways to power up new mining projects. Options for providing more power to the region include the Northwest Transmission Line, a 287-kilovolt (kv) power line that would run along Highway 37; a smaller, 138-kV transmission line; or development of regional renewable energy resources. Each option would have impacts far beyond the mere presence or absence of transmission wires. By determining how much power is available for communities, and how much is available to industry, transmission infrastructure could predetermine the pace, scale and nature of development in the region for decades to come. A 287-kV transmission line from Kemano to Kitimat in British Columbia. PHOTO: GREG BROWN, THE PEMBINA INSTITUTE In particular, the 287-kV Northwest Transmission Line, the option favoured by the British Columbia government, could be a significant driver for new mining development. Communities should consider the proposal carefully because it could dramatically alter the region s future. Sizing Up Highway 37 Transmission Scenarios Issue Power Capacity Jobs Effects on Communities Effects on Water, Land and Wildlife Climate Change Impacts Regional Energy Self-Sufficiency Using Renewable Sources 138-kV Transmission Line (along with the Forest Kerr Run-of-River Hydro Project) 287-kV Northwest Transmission Line (see Figure 4 on page 7) (see Figure 3 on page 6) (see Figure 2 on page 5) Enough potential to meet local industry and community needs. Responsibility for industrial power borne by companies. Long-term local jobs in renewable power generation, as well as jobs in mining at a pace and scale consistent with local power potential. Communities develop and potentially own renewable power generation projects. Mining developments proceed at a measured pace, allowing for advanced planning to minimize negative social impacts and maximize benefits. Impacts on rivers if hydropower sources are not developed to best standards. Improved opportunities for long-term planning in the region. Mine activity proceeds at a more measured pace; intensity of short-term impacts reduced. Greenhouse gas emissions reduced as communities switch from polluting diesel generators to renewable sources. Industrial development proceeds with fairly minimal energy-related emissions. 1 The Galore Creek Mine contains one of the most valuable copper and gold deposits in North America. Construction on the mine began in 2007, but was halted due to rising costs. The project partners, NovaGold and Tech Cominco, plan to initiate a comprehensive review to evaluate alternative development strategies. Sufficient power for one major mine, roughly equivalent in size to the Galore Creek Mine. 1 Regional energy projects needed for additional power. About 500 jobs in a mine the size of Galore Creek. More jobs likely over time through additional mines and local power projects. Communities remain on diesel power, without grid access in the foreseeable future. Mining developments proceed with one mine initially; overall, a less dramatic pace than with the 287-kV transmission line. About 20 kilometres of right-of-way cleared north of Meziadin Junction. No transmission line construction required south of Meziadin Junction. Improved opportunities for long-term planning for development in the region. Mine activity proceeds at a more measured pace; intensity of short-term impacts reduced. Greenhouse gas emissions from mining increase at a more measured pace in the short term. Sufficient power for at least five major mines, and potentially more. Regional energy projects could tie into the line. About 3,700 short-term construction jobs and over 2,000 medium-term mine operation jobs if the five currently proposed mines proceed. Communities remain on diesel power, without grid access in the foreseeable future. Mining developments proceed rapidly, likely creating heavy social pressures on communities. Over 300 kilometres of additional right-of-way from Terrace to Bob Quinn Lake cleared, opening new access corridors for hunting and recreation. Significant cumulative environmental impacts, affecting four major watersheds from multiple mines built in the same time frame. Rapid mining development increases regional greenhouse gas emissions by up to 1,200%.

More Than One Way to Power the Region Mining companies have applied for permits to build several new mines in Northwest British Columbia, and many more exploration projects are underway. To facilitate new mine development, some companies are calling for an extension of the power grid up Highway 37. As proposed, the 287-kV Northwest Transmission Line would indeed open the door to multiple mines, but would not provide power to local, dieseldependent communities, such as Iskut and Telegraph Creek. The company behind one of the region s proposed mines, Galore Creek, was to contribute $158 million to building the Northwest Transmission Line. However, construction on Galore Creek was suspended in 2007, temporarily halting the power line project as well. The break gives government and local communities an important opportunity to re-evaluate the 287-kV line in the context of other scenarios for powering the Northwest. One alternative is to combine a 138-kV power line with a run-of-river hydro project at Forest Kerr. This system was the British Columbia government s initial choice and could produce enough energy to power one major mine. Northwest British Columbia also has significant renewable energy resources, including hydro and wind, that could supply enough clean energy for local communities and some new industrial projects. The Pembina Institute has evaluated the 287-kV power line as well as a 138-kV line scenario and a renewables-based scenario to help inform a public dialogue about energy options for the region. Peak Power Flow Demand: Existing and Proposed Developments (Megawatts) Dease Lake Iskut Telegraph Creek Eskay Creek Mine Galore Creek Mine Schaft Creek Mine Red Chris Mine Mount Klappan Coal Mine Kutcho Creek Mine 1.6 0.8 0.7 3.2 Figure 1: Peak power demand from existing communities and mines and from proposed mine developments. The Galore Creek Mine would require 112 times more power than the community of Iskut presently uses. Mining comprises 97% of the demand for power in the region. SOURCE: FOR DETAILED SOURCE DATA, SEE SIZING IT UP FULL REPORT, PAGE 11 Who Needs the Power? Peak power demand projections show that proposed mines account for more than 97% of the demand for the Northwest Transmission Line. Figure 1 compares the energy needs of existing communities and the Eskay Creek Mine with that of the five main mines proposed for the region (see Figure 5 on page 8). The Northwest Transmission Line as proposed would not provide power to local diesel-dependent communities, such as Iskut and Telegraph Creek. Fish, Wildlife, Communities and Culture Highway 37, which connects Kitwanga to Watson Lake in the Yukon, is virtually the only road that travels through Northwest British Columbia. It is a pristine place with stunning scenery and diverse and abundant wildlife, encompassing the traditional territories of several First Nations. The area contains globally significant wilderness, including the headwaters of four major wild salmon ecosystems: the Taku, 0 20 40 60 80 100 6 5 Northwestern British Columbia contains four major wild salmon ecosystems. Nass, Stikine and Skeena, the latter three known also as the Sacred Headwaters. 37 Existing Communities and Mines 90 96 Proposed Mine Developments

The three main communities in the region are those of the Tahltan people, who have a long history on the land: Iskut, which has a population of about 350 people; Dease Lake, which has a population of 700 people; and further west down the Stikine River, Telegraph Creek, which has a population of 450. Power supply choices made today will greatly impact the future of Northwest British Columbia, shaping cultures and communities and altering landscapes. The Northwest Transmission Line would likely encourage rapid industrial development. If several new mines are built over the next few years, it would create employment and contract opportunities, and potentially increase community revenue. However, such rapid development could also have harmful environmental and social impacts. For example, the population of Iskut, Dease Lake and Telegraph Creek currently amounts to 1,500 people. If the five proposed mining projects go forward, there would be more than 3,700 construction jobs and 2,000 permanent jobs in the region, leading to a huge influx of new residents and the potential for social problems (see The Downside of Booms, right). By moderating the pace and scale of development, residents stand to benefit more and risk less. The Downside of Booms Rapid industrial development often puts pressure on communities. If the multiple mines proposed for Northwest British Columbia proceed, impacts on local communities could include: increased social problems, including increased access to drugs and alcohol loss of connection with traditional cultural activities, either through a reduction in the value placed on these activities or through the degradation of the natural environment Sustainable Energy Solutions Relying on Renewable Power from local and potentially community-owned renewable sources could provide enough energy for communities and some new development along Highway 37. Northwest British Columbia boasts significant hydropower resources, from small micro-hydro to larger run-of-river projects. The Iskut/Stikine region also contains promising wind resources, energy that can be combined with hydropower or diesel generators to provide a consistent source of power. Before the Gold Rush Before a final decision is made on the Northwest Transmission Line or any other power option, careful consideration is needed to ensure development is well planned, economic benefits are shared, and social and environmental costs are minimized. Important questions to consider include: What will the region s landscape look like in 20 years? 2 Visit www.afterthegoldrush.ca for our primer on labour and employment issues associated with the proposed mining activity. By managing the pace of development, communities can maximize the long-term benefits of development. PHOTO: GARY FIEGEHEN an increase in transitional living arrangements, with workers and families moving to the region temporarily, but not settling an increasing gap between the haves (miners and mining service suppliers) and have-nots (traditional harvesters, community based workers, unemployed, elderly) pressures on families from increased long-distance commuting (also called fly-in, fly-out commuting), usually with a two-week in, two-week out schedule 2

Increased truck traffic on Highway 37 from extensive new development could strain regional road infrastructure. PHOTO: PROTECT OUR PORTS COMMITTEE Want More Information? For more information on power options for Northwest British Columbia, download our full report entitled Sizing It Up: Scenarios for Powering Northwest British Columbia at: www.afterthegoldrush.ca To learn more about the potential impacts of new mine development in Northwest British Columbia, check out our After the Gold Rush series of reports, primers, photos and other information available at: www.afterthegoldrush.ca This report was prepared by Karen Campbell and Greg Brown of The Pembina Institute: www.pembina.org Truck Traffic: An Accident Waiting to Happen? Increased mining activity would mean much more truck traffic on Highway 37. If five currently proposed mines proceed, truck traffic on Highway 37 to the port of Stewart would rise to 640 trucks per day. 3 That works out to a truck passing Meziadin Junction every three minutes. Combined with existing logging truck traffic, this increase could strain Highway 37 infrastructure and have a real impact on road safety. Will there still be healthy, abundant salmon in the rivers and wildlife on the land? What jobs and economic opportunities will be available when the mining rush is over? How will a rapid increase in population affect local cultures and communities? Given the significant ramifications of a 287-kV power line, the Pembina Institute recommends that the British Columbia government re-evaluate the Northwest Transmission Line proposal in the context of a comprehensive analysis of all the options for providing power to Northwest British Columbia. Environmental Impacts of Development The cumulative environmental impacts of a new transmission line and related development could include: acid mine drainage, generated by waste rock from mines, that pollutes water and harms aquatic life toxic mine tailings that can contaminate soil and water for decades road construction that disturbs hundreds of kilometres of wilderness greatly increased greenhouse gas emissions Acid mine drainage is one of the biggest environmental challenges for the mining industry. PHOTO: CARRI SLANINA, CENTRE FOR SCIENCE IN PUBLIC PARTICIPATION 3 Sizing It Up full report, 6. Data from: Mount Klappan Coal = 100 trucks. Source: Fortune Minerals Limited, Mount Klappan Anthracite Coal Project, presentation at Minerals North 2007, Terrace B.C., April 18, 2007). Galore Creek = 70 trucks. Source: Environmental Assessment Office, Transport Canada, Fisheries and Oceans Canada, Natural Resources Canada, Environment Canada, Galore Creek Copper-Gold-Silver Project: Assessment Report/Comprehensive Study Report, February 2007, 52. Shaft Creek = 75 trucks. Estimated using the ratio of truck per day versus rate of production for Galore Creek. Schaft Creek rate of production (70,000 tpd) taken from EA project description. Red Chris = 14 trucks. Source: Environmental Assessment Office, Red Chris Porphyry Copper-Gold Project Assessment Report, July 2005, pg 80. Kutcho Creek = 10 trucks. Source: Knight Piesold Ltd., Western Keltic Mines Inc. Kutcho Creek Project Description Report, July 2006, 11.

Figure 2 287-kV Transmission Line Scenario This map shows the 287-kV transmission line proposal (the solid red lines) and one scenario of possible mines and connections (in red dashed lines). Please note there are no plans in the proposal to connect this line to Iskut. Sizing It Up Primer For more information visit www.afterthegoldrush.ca

Figure 3 138-kV Transmission Line Scenario This map shows the 138-kV transmission line as originally proposed. It also shows a low-voltage line between Dease Lake and Iskut, a possibility which was not part of the original 138-kV line proposal. Sizing It Up Primer For more information visit www.afterthegoldrush.ca

Figure 4 Renewable Energy Resources This map shows the wind and small hydro renewable energy resources of the region. There are fairly significant medium to very good wind resources in the region and numerous opportunities to develop small hydro power projects. Sizing It Up Primer For more information visit www.afterthegoldrush.ca

Figure 5 Mineral Resources This map shows the mineral resources of the region including the past producing mines from the southern regions and the potential mines in the north. The map underlines both the potential for mining and the need to plan now to manage the social, economic and environmental effects before a mining boom is fully underway. Sizing It Up Primer For more information visit www.afterthegoldrush.ca