HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

Similar documents
MAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited)

NORTH NORTH NAUBASTA LIMESTONE MINE (ML-II) ML area ha. (A Unit of Jaiprakash Associates Limited) JAYPEE NAGAR REWA (M.P.

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION

Scanned by CamScanner

JAYPEE NIGRIE SUPER THERMAL POWER PLANT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

[FORM-V] PART-A PART-B

. 0.:'. e:. :'} BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA Jji'665~" 1tS8;0 b AiS77..c,b

(See Rule 14) Environment Statement for the financial year ending the 31 st March PART-A

SHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~'" 'Its ~s 71 66

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006

J aypee JAIPRAKASH. JVPL/EC/ES/ September 25th, 2017

ADITYA BIRLA. EMil. Please find enclosed herewith the environmental statement report duly filled-in Form-V

A. SPECIFIC CONDITIONS. No. Conditions Status of Compliance. Noted and Agreed

Environmental statement for the financial year ending the 31 st March 2012

J.K. Cement WORKS, NIMBAHERA (RAJ)

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

Environmental statement for the financial year ending the 31 st March 2014

Environmental statement for the financial year ending the 31 st March 2012

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL STATEMENT FOR THE YEAR

ENVIRONMENTAL STATEMENT FOR D.G.SETS OF M/s SHREE CEMENT LIMITED, BEAWAR (RAJASTHAN) FOR THE PERIOD FROM, APRIL 2009 TO MARCH 2010 PART A

Calcom Cement India Limited

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

ENVIRONMENTAL STATEMENT REPORT (FORM-V)

FORM V (See rule 14) Environmental Statement for the financial year ending the 31 st March 2017

[ Form V] (See rule 14) PART - A. (iii) Production Capacity : 3.51 Lakh Tonnes.(Chrome Ore) Per Annum. PART B WATER & RAW MATERIAL CONSUMPTION

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A

Period of Compliance Report : April, 2017 to September, 2017

vedanta HZLt fpj;l,r;tm,tl2!!1 ~JP.lL6ff~

2 x 300 MW (STAGE-I)

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

ENVIRONMENTAL STATEMENT

Ref. - CTO No. F(CPM)/Baran(Chhabra)/1(1)/ dated 29/

Agreed. 8 The project proponent shall ensure that no natural watercourse and/or water resources shall Shall be complied with.

Environmental Clearance Compliance Half Yearly Report

HALF YEARLY COMPLIANCE REPORT 14 15) ENVIRONMENTAL CLEARANCE (CLINKER 2.48 MTPA TO 2.78 MTPA AND CEMENT 3.30 MTPA TO 3.90 MTPA)

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

Sl. No. Conditions Compliance

Cement Grinding Plant, Madhukunda P.O. Sunuri Dist. - Purulia West Bengal

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

S.N. Condition in Environmental Clearance Compliance Status upto June (A) Specific Conditions (i)

Environmental Clearance Compliance Half Yearly Report

EIA Report for ha Bhatia Limestone Mine EXECUTIVE SUMMARY

J-11015/248/2007-IA.I(M) ) 13, MTPA ( ML

Environmental Clearance Compliance Half Yearly Report

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

BHILAI JAYPEE CEMENT LIMITED

NOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED

M/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Kirloskar Ferrous Industries Limited, Bevinahalli Village, Koppal Taluk & Dist Karnataka

..~..~. Regd. Office:. (). :\. BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA "'Ai66S~'". 1ts8~a6

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II

.fj..fj Regd. Office: p\.." o j ~~I BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA 166~'!o ~S8l

Government of India Ministry of Environment and Forest FORM V (See rule 14)

Environment protection measures / technology

ENVIRONMENTAL STATEMENT REPORT (FORM-V)

GRAVEL & ROUGH STONE QUARRY

Sl. No PRESENT STATUS SPECIFIC CONDITIONS

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II

1 Name of the Project Gonua Iron & Mn. Mine of Sri Pawan Kumar Ahluwalia

Hind Energy & Coal Beneficiation (India) Ltd.

EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD

Environment Statement

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village,

Hind Energy & Coal Beneficiation (India) Ltd.

Rajasthan State Pollution Control Board

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance]

MIEL/NP/EMD/ 303/2015 Date:

Name of Project: Panchagavi Laterite Mine, M/s J.K. Cement Works, Muddapur (Karnataka)

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

Executive Summary for R-EIA Report for 60

My Home Industries Private Limited Srinagar, Mellacheruvu (V & M) , Suryapet Dist., Telangana State

PKA/Gonua/MoEF/ Date:

ENVIRONMENTAL STATEMENT IN FORM-V. (Under Rule-14, Environmental protection Rules, 1986) ( )

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

3. DATA COLLECTION 3.1 DATA COLLECTION 3.2 DATA COLLECTION AGENCIES

Environment Statement Report April 2015 to March 2016

Environmental Clearance Compliance Half Yearly Report

Bhushan Steel Limited 1. Name & Address of the owner/occupier of the industry, operation or process

Environmental Management Plan. For Mining of. Building Stone & Road Metal

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENT STATEMENT

THE RAMCO CEMENTS LIMITED

Transcription:

HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.)

Jaypee Sidhi Cement Plant (A Unit of Jaiprakash Associates Limited) Jaypee Group is 3 rd largest cement producer in the country. The group produces special blend of Portland Pozzolana Cement under the brand name Jaypee Cement (PPC) and Ordinary Portland Cement brand name Jaypee Cement (OPC). The Group is well committed towards the safety and health of employees and the public & motto is Work for Safe, Healthy, Clean & Green Environment. The Limestone Mining lease named as Hinauti is spread over area 378.261 ha. in villages Hinauti, Dengrahat, Biharganj & Jurmani in Ram Nagar Tehsil of Satna District in M.P. and Geographically, it is located at Latitude 24 0 17 35 to 24 0 18 50 North and Longitude 81 0 15 30 to 81 0 18 50 East The Mines is Captive Lime Stone Open Cast Mechanized Mine and rated capacity of mine 1.0 MTPA Limestone Production.

FORM- V (See rule 14) ENVIRONMENTAL STATEMENT FOR THE FINANCIAL YEAR ENDING THE 31 st MARCH 2013 PART- A (i) Name and address of the owner/ : Hinauti Limestone Mines Occupier of the Industry, operation JAYPEE SIDHI CEMENT PLANT or process Hinauti, Ram Nagar, Satna (M.P.) (ii) Industry Category : Red Category, Large Industry Primary ( STC CODE ) (Primary STC Category ) Secondary ( SIC CODE ) (iii) Production Capacity : 1.0 MTPA (iv) Year of Establishment : October, 2009 (v) Last Environment Statement : 30.09.2012 Submitted (i) Water consumption m 3 /d PART- B WATER AND RAW MATERIAL CONSUMPTION Spraying : 103 Domestic : 2.7 Process : Nil Name of Products Limestone Process water consumption per unit of Product output M 3 /MT of Limestone During the previous Financial During the Current Financial Year (2011-12) Year (2012-13) 0.0585 0.0579 (ii) Raw Material Consumption Name of raw material consume Name of products Consumption of raw material Per unit of output MT/ MT of Limestone

1. Diesel ( HSD) 2. Explosive Limestone During the Previous Financial Year (2011-12) 0.49 Lit /MT 0.05 Kg /Tones During the Current Financial Year (2012-13) 0.50 Lit /MT 0.127Kg /Tones (iii) Production of Limestone (MT) Production During the Previous During the Current Financial Year(11-12) Financial Year(12-13) Limestone 548532 902502 PART- C Pollution discharges to environment/ unit of output. (Parameter as specified in the consent issued) (i) Pollution Quality of Pollutants Discharged (Mass/day) (Tons/day) Concentration of Pollutants discharges (mass/volume) (mg/nm3) (a) Water i)domestic ii)industrial Percentage of variation from prescribed standards Zero discharge is maintained. Treated domestic water is being used in horticulture and plant process (b)air RSPM parameter within limit and report attached as Annexure-I Stack emission(pm) Hinauti L.S crusher - Bag filter Nil Nil Nil PART- D HAZARDOUS WASTES Hazardous Wastes Total Quantity (Kg.)

During the previous financial Year (2011-12) During the current financial Year (2012-13) (a) From process Used Oil(5.1) Nil Nil (b) From pollution Control Facilities(Attached Bag filter) Nil Nil PART- E SOLID WASTES TOTAL QUANTITY (Ts) (a) From Process- Over Burden waste from mines During the Previous Financial Year (2011-12) 155635.2 MT of Over Burden is generated during the limestone mining and stored at earmarked location.. During the Current Financial Year (2012-13) 66378.0 MT of Over Burden is generated during the limestone mining and stored at earmarked location. (b) From Pollution Control facilities (c) (i) Qty. recycled or reutilized within the unit. (ii)sold (iii)disposed All the collected material is recycled in the process. Nil Nil Nil All the collected material is recycled in the process. Nil Nil Nil

PART- F Please specify the characterizations (in terms of composition of quantum) of Hazardous as well solid wastes and indicate disposal practice adopted for both these categories of wastes. Solid waste: OB is generated during the limestone mining 66378.0 MT and stored at earmarked location. PART- G Impact of the pollution abatement measures taken on conservation of natural resources and on the cost of production. Pollution Control Measures Adopted for Control of Pollution 1. Wet drilling process adopted for control the fugitive dust emission. 2. Water sprinkling on roads by water tanker capacity of 12 KL for control of dust emission. 3. Blasting is done with Nonel to control the ground vibrations 4. Top soil if any available is stack at earmarked location and used for plantation work 5. Green Belt Development Measures: As a part of green belt development, planted more than 2121 plant sapling in 1.25 ha. mines area up to FY 2012-13. Following measures have been adopted for abatement of pollution, conservation of natural resources:- 1. Wet drilling We are very conscious for the fugitive emission during drilling operation. We have adopted wet drilling practices for drilling of limestone in mines. The water are injected along the drill rod through compressed air in the bore and simultaneously drilling is being done. System is very effective and no emission is observed. Also we have provided all PPEs to the operator and drill helper. WET DRILLING

2. Controlled Blasting- Blasting is being done in controlled way by adoption of Nonel-Delay detonators for control of noise pollution. After blasting water spray is being done for reduction of fugitive dust emission. Blasting is being done only in day time from 1PM to 2PM. 3. Loading activity Loading of blasted lime stone in wet condition is being done with the help of sufficient capacity 2.5 m3 shovel and transported by the high capacity 22 MT Dumper. The high capacity of shovel and Dumper reduces the fugitive emission during material handling. 4. Plying of water tanker on haulage road We have a dedicated water tanker capacity of 12 m3 for mines haulage road water spraying. The mine water is being used for water spraying on haulage roads. The haulage roads are always kept in wet condition so fugitive emission is minimal. WATER SPRAY TANKER 5. Water spraying system at crusher dump hopper Blasted limestone is transported by dumper through wet haulage road and dumped to the plant crusher hopper. A self innovated water spraying system namely ECO FRIEND has been installed at crusher dump hopper. The system is equipped with high pressure water pipeline for generation of moist air for suppression of dust generated after limestone dumping. 6. Treatment of Auto workshop effluent A gravity settler oils separator has been installed for treatment of auto workshop effluent. The treated water is used for spraying on mines haulage road for dust suppression & collected oil is sold out to authorized recycler.. Gravity settler oil separator compartments are made to give retention time to water to separate oil from water and oil will be

collected from the upper surface manually in empty oil drum and water will be collected in last compartment will be used for road dust suppression. No water will be allowed to discharge outside the mine premises. Zero discharge is maintained.. Oil & Grease Separator 7. Collection of Hazardous waste Used oil generated from the maintenance of heavy machinery at auto workshop is collected at identified storage shed and sold out to authorized recyclers. 8. Use of STP treated water for the plant purpose-we have latest and advance aerobic technology based 800KLD Sewage Treatment Plant. The treated water is used for horticulture and plantation purpose. Sewage Treatment Plant 800KLD

1. Screen Chamber with Oil & Grease Trap-800 KLD 2. Equalization Tank-69.60 m3/hr 3. Aerator I&II-64.0 m3/hr 4. Tube Settlers Tank-75.0 m3/hr 5. Primary Sand Filter (PSF)-33.30 m3/hr 6. Activated Carbon Filter-33.30 m3/hr 7. Chlorine Contact Tank-34.20 m3/hr 8. Treated Water Tank-188.10 m3/hr 9. Sludge dry beds-15.0-unit 4 m3 The capacity of sewage treatment plant is 800 KL per day. The sewage generated at different parts of colony and plant is being collected in raw sewage tank where blowing is being done for homogenization of raw sewage water. Then this homogenized sewage water comes to aeration tank for sufficient aeration of sewage and then conveyed to clarifier where the suspended particle is settles. After this clarified water is collected in intermediate holding tank and sludge settled at the bottom of clarifier is transported to sludge drying beds. Now the water from the intermediate tank is passed through pressure sand filter and activated carbon filter. It is ultimately collected in the final holding tank. 9. Silt control measures for formation of garland drains around the over burden dump The Garland drain has been constructed all around the mine pit and waste dump area. To control outside rainwater entering into the mines working area, peripheral garland drains have been provided and all those garland drain have been connected to settling pond which has been already provided in mines for settle down the heavy particles.. To check soil erosion from the overburden (OB) dumps retaining wall have been provided around the matured over burden dump. Plantation has been done on inactive waste dump slopes.

PHOTO GRAPHS OF GARLAND DRAIN SETTALING POND AT MINES PART- H Additional measures/ investment proposal for environmental protection including abatement of pollution, prevention of pollution. Ground vibration study is already done by CIMFR, Dhanbad and all suggestions are implemented at our mines. PART- I Any other particulars for improving the quality of the environment: Nil Prepared By Environment Cell Dated: 26.08.2013 For Jaypee Sidhi Cement Plant (Authorized signatory) S.C.Srivastava Sr. Vice President (Tech)

Annexure-1 HINAUTI LIME STONE MINES AMBIENT AIR QUALITY MONITORING REPORT (CORE ZONE), APRIL-2012 TO MARCH -2013 LOCATION -> Near Driling Side Near L/S Loading Side Near L/S Unloading Side Near Haulage Road PARAMETERS -> RPM µg/m 3 SO2 µg/m 3 NOX µg/m 3 CO SO2 3 RPM µg/m3 µg/m µg/m 3 NOX µg/m 3 CO µg/m 3 RPM µg/m3 SO2 µg/m 3 NOX µg/m 3 CO µg/m 3 RPM NOX 3 SO2 µg/m3 µg/m µg/m 3 CO µg/m 3 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 58.06 7.0 23.0 123.0 55.44 8.0 22.0 127.0 55.17 7.0 21.0 120.0 54.44 9.0 24.0 129.0 59.12 8.0 24.0 58.45 21.0 57.41 23.0 57.23 25.0 125.0 6.0 123.0 7.0 120.0 6.0 128.0 55.24 6.0 24.0 126.0 56.14 5.0 20.0 125.0 53.25 8.0 24.0 121.0 58.21 7.0 23.0 120.0 49.34 7.0 21.0 141.0 46.4 6.0 20.0 128.0 45.8 7.0 22.0 132.0 43.7 5.0 20.0 129.0 48.74 7.0 22.0 150.0 45.5 5.0 19.0 140.0 46.6 6.0 20.0 137.0 44.2 5.0 18.0 132.0 48.52 6.0 24.0 158.0 46.4 5.0 21.0 148.0 47.5 4.0 22.0 145.0 45.4 5.0 24.0 138.0 51.05 10.0 15.0 120.0 50.03 11.0 14.0 118.0 49.25 9.0 13.0 112.0 48.18 9.0 11.0 114.0 58.00 9.0 20.0 118.0 52.70 12.0 18.0 116.0 54.20 11.0 19.0 124.0 51.72 13.0 16.0 118.0 60.27 11.0 21.0 119.0 55.49 10.0 20.0 115.0 52.08 12.0 18.0 120.0 50.29 10.0 17.0 119.0 49.34 7.0 21.0 141.0 46.38 6.0 20.0 128.0 45.82 7.0 22.0 132.0 43.74 5.0 20.0 129.0 59.35 7.0 22.0 187.0 58.47 5.0 19.0 168.0 57.82 6.0 18.0 172.0 56.32 5.0 15.0 165.0 59.05 8.0 22.0 185.0 57.94 5.0 20.0 167.0 57.27 4.0 18.0 173.0 55.89 6.0 21.0 165.0 AVERAGE -> 54.67 7.75 21.58 141.08 52.44 7.00 19.50 133.58 51.85 7.33 20.00 134.00 50.78 7.08 19.50 132.17 MPPCB LIMIT 100 80 80 2000 100 80 80 2000 100 80 80 2000 100 80 80 Min 48.52 6.00 15.00 118.00 45.52 5.00 14.00 115.00 45.82 4.00 13.00 112.00 43.74 5.00 11.00 114.00 Max 60.27 11.00 24.00 187.00 58.47 12.00 22.00 168.00 57.82 12.00 24.00 173.00 58.21 13.00 25.00 165.00