Food and Organic Waste Recycling Legislation and MSS CMSA Anaerobic Digestion Case Study. Jean A Bonander, Consultant to Marin Sanitary Service

4/14/2015. Brought To You By: This webcast is sponsored by Corollo Engineers.

Biosolids and Wastewater Sector Combat Climate Change: What Can We Learn From California?

Leveraging An Agency s Assets. Anaerobic Co-Digestion FOG, Food Waste and More

Strategic Business Plan Implementation Status Report for FY

Rialto Bioenergy Facility Integrated Organics Recycling and Bioenergy Production

Comprehensive Biosolids and Bioenergy Planning Authors: Cameron Clark* 1, Irina Lukicheva 1, Anna James 1, Kathy Rosinski 1, Dave Parry 1

Commercial and Institutional Food Waste Management

NW Biosolids - Biofest October 15, Greg Kester CASA Karri Ving - SFPUC

Why Codigestion? Increase biogas energy production. Reduce fossil fuel consumption. Reduce operating / energy costs. Minimize carbon footprint

LYSTEK INTERNATIONAL and AN ALTERNATIVE PROJECT DELIVERY IMPROVES BIOSOLIDS PROGRAM SUSTAINABLILTY

CWEA Hosts Biosolids Specialty Conference in El Segundo California

Frequently Asked Questions

FAIRFIELD-SUISUN SEWER DISTRICT AND LYSTEK INTERNATIONAL A COLLABORATION TO DELIVER A SUSTAINABLE BIOSOLIDS PROGRAM

Melting Organics Waste - Seeing Waste Diversion Value in Ice Cream

Re: Comments on the Short-Lived Climate Pollutant Reduction Strategy Concept Paper.

List of Tables... iii. List of Figures... iii. List of Appendices... iii. Executive Summary... ES. Section 1: Background

MUNICIPAL PROGRAMS TO DIVERT ORGANICS SOUTH BAYSIDE WASTE MANAGEMENT AUTHORITY (SBWMA) CRRA AUGUST, 2017

Riverside Water Quality Control Plant. Riverside, CA LOCATION: MBR MANUFACTURER: COMMENTS:

Utilizing Anaerobic Digester Capacity to Process Source Separated Organics: Two Case Studies

Contact Information. General Service Inquiries: Customer Service Center Hours: Monday through Friday 8am-5pm (415)

Organics to Energy Program

Wastewater Collection System Infrastructure Condition Update

Current Treatment Approaches and Planning for the Future A Panel Discussion

FOOD WASTE TO LOW CARBON ENERGY CONFERENCE APRIL 27-28, 2016 DRY ANAEROBIC DIGESTION FOR MSW ORGANICS

Role of Entrant s Firm. »» Final Design»» Completion of Funding. »» Engineering Services During Applications. »» Plant Startup and Filtration

Becoming a Net Energy Producer with Surplus Power to Sell

WA3: Green Waste Diversion

Sustainable Energy Management

Funding for New Organics Infrastructure While Addressing CalRecycle s Projected Budget Shortfall

Making Wastewater Reclamation More Sustainable

ES.1 Solids Master Planning Background and Goals

Biogas Opportunities: From Fuel to Flame

Organics Legislation and Regulations

Water Distribution System Leak Detection Program. July 26, 2016

Las Gallinas Valley Sanitation District Biogas Utilization Evaluation. LGVSD Board Meeting Presentation April 24, 2014

Del Norte Regional Recycling and Transfer Station Progress Report. November 15, 2016

San Luis Obispo AD Project. Planning a 33,000 TPY Food And Green Waste AD Facility in California

In-Vessel Digestion. General Terms and Conditions/Facility with Multiple Operations

RESOURCE RECOVERY PARK AT TAJIGUAS. More recyclables, compost and energy through new technologies

Pre-RFP Meeting for Integrated Wastewater Treatment Plant Master Plan (MWWTP Master Plan) Presentation to Interested Parties. September 13, 2018

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E.

Grease Digestion for Renewable Energy, Sustainability, and Environmental Enhancement

Board Workshop. March 22, 2016

Codigestion Case Studies Enhancing Energy Recovery From Sludge

Organic Waste Management in Rhode Island

SSIP Southeast Treatment Plant Project Updates

Systems to Manage Organics in Maine. Jean MacRae UMaine Civil and Environmental Engineering

EBMUD s Renewable Energy Initiatives

EVALUATION OF ENERGY RECOVERY OPTIONS FOR CONVERSION OF AEROBIC DIGESTERS TO ANAEROBIC DIGESTION

Organics Recovery grows Green Energy, Jobs and Agriculture

WEF Residuals and Biosolids Conference 2017

Wastewater Enterprise 1. Presentation

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1

Impact Report for IRWD s Biosolids & Energy Recovery Project. June 27, 2012

Las Gallinas Valley Sanitary District. Scope of Work for Sludge Removal and Disposal

The alternatives addressed in this EIR were selected in consideration of one or more of the following factors:

The Palm Beach County Water Utilities

Co-Digestion: The Path to Net-Zero Energy Consumption

Encouraging the Recovery and Beneficial Use of Biogas Generated from Municipal Solid Waste

SUSTAINABILITY HIGHLIGHTS REPORT

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES

The Water Resources Utility of the Future: Emergence of an Innovation Ecosystem

Senate committee approves bill to convert biosolids to clean energy

Co-Digestion of food wastes at wastewater treatment plants. Alice Varkey, PEng Senior Engineer Mike Muffels, MSc PEng Senior Engineer June 2016

San Carlos Climate Action Plan

Canadian Biogas Metrics Study: Quantifying the Economic, Environmental and Social Benefits of Biogas Energy in Canada

! Overview of Waste-to-Energy! Waste Sources and Quantities! Waste-to-Energy Drivers and Benefits! West Lafayette Case Study. !

To Codigest or Not to Codigest?

Encouraging the Recovery and Beneficial Use of Landfill Gas

5/14/2013. Why Power Independence? Co-digestion + Cogeneration. Ultra Low Emission Case Study. Our Vision: Zero Organic Waste Future

Nineteen Agencies Team to Convert Biosolids to Energy for Regional Solution

The Impact of Co-Digestion on Water Resource Recovery Facilities In Order to Achieve Energy Neutrality

Renewable Energy Options. National Grid s Connect21. Agenda. yet, a very local New York business. An International Energy Company.

Rethinking Food Waste Food Waste Prevention/Rescue/and Recycling

Table of Contents. LASAN CLARTS OPF Abbreviated Feasibility Report November 17, Page 1 of 10

CHAPTER 4 DESCRIPTION OF EXISTING FACILITIES

PROGRESSIVE AGRICULTURE Energy Options for Ohio Agriculture

Hydrothermal Processing in Wastewater Treatment

Managing Greenhouse Gas (GHG) Emissions

Canadian Biogas Study: Quantifying the Energy, Environmental and Economic Benefits of Biogas in Canada

4.13 UTILITIES AND SERVICE SYSTEMS

Landfill Gas to Cash: $30+ Million in 3 Years

Municipal Project Development Considerations. Mike Muffels MSc P.Eng. March 22, 2018

ACHIEVING 75% RECYCLING Building a Sustainable Solid Waste Program. UF Bioenergy Summer Internship Program Gainesville, Florida July 12, 2012

Resource Recovery With Wollongong Water Recycling Plant as a Case Study

Reduce Grid Required Energy to Utilize Your Wastewater Treatment Facility

Answering the Call for. Class A

4/19/2018. How to Win with RINs. Thursday, April 19, :30 2:45 PM ET

SOURCE SEPARATED FOOD WASTE FLOW TO FARM DIGESTERS. N. Goldstein BioCycle/The JG Press, Inc. Emmaus, PA INTRODUCTION

City and County of San Francisco 2030 Sewer System Master Plan

Irvine Ranch Water District SCAP Energy Committee Meeting IRWD Biosolids Project Update. August 26, 2015

Biogas Policy Recommendations

INNOVATIVE DEPACKAGER AND FOOD WASTE PROCESSOR

Turning Waste Organics Into Energy:

City of Fort Wayne Wastewater Treatment Plant

MSDGC Biosolids and Odor Control Master Planning Efforts. Matt Spidare, MSDGC // Natalie Sierra, Brown and Caldwell

Resource Recovery at Post Point. Turning our waste into valuable resources

Transcription:

Marin Sanitary Service & Central Marin Sanitation Agency Central Marin Commercial Food-to-Energy (F2E) Program NACWA Energy Workgroup January 26, 2017

Presentation Outline Central Marin s Commercial Food-to-Energy (F2E) Initiative What is F2E? Public-Private Partnership CMSA and Marin Sanitary Service Marin Sanitary Service F2E Program Quality Control Transfer Station Improvements MSS outreach, training, services, and collection statistics CMSA F2E Program About CMSA Treatment plant organic waste receiving facility Anaerobic digestion and energy production Program Metrics, Benefits, and Next Steps Questions

Commercial Food Waste to Energy Program

Commercial Food Waste to Energy Process: Anaerobic digestion Central Marin Food Waste Biogas (methane)

What is Food to Energy? CO 2 Methane Engine/Generator Solid Food Waste Anaerobic Digesters at CMSA Electricity for CMSA and future sale Food Waste Receiving and Separation at MSS Transfer Station Biosolids Beneficial reuse: Landfill ADC and Soil Amendment/Fertilizer

F2E Processing @ MSS and CMSA

Public-Private Partnership Central Marin Sanitation Agency

MSS F2E Program

First Line in Quality Control Customer Enrollment: pre-consumer food waste Staff Training & Monitoring; Retraining Tools for Success Labeling & Signage Kitchen Layout Internal and External collection containers

Second Line in Quality Control: Contamination Removal Protocol Removes contaminants after tipping on floor Removes visible contaminants from cart prior to dumping Removes visible contaminants from cart as contents tipped into truck

CLEAN FEEDSTOCK

MSS Tipping Floor Tipping Area

Loading materials onto the conveyor

MSS Processing Equipment

Hopper, Belts, and Magnet

CMSA FOG/F2E Program

Central Marin Sanitation Agency - CMSA Regional Wastewater Agency in San Rafael, Marin County Serves about 110,000 people and San Quentin State Prison Joint Powers Agency (JPA) with four satellite collection agencies Wide range of influent flows: 7MGD (ADWF) to 120.5 MGD (PWWF) Contract services: Collection system O&M for San Quentin Village Pump station O&M for SQ prison and Corte Madera P2 for six local agencies

F2E/FOG Facility

Drum Screen Paddle Finisher

Digestion - Anaerobic Digesters

Biogas Purification Step 1

Biogas Purification Step 2

750 kw (1000 hp) Engine Generator

CMSA Capacity for FOG and Food Waste Digester Solids Treatment Capacity Biogas Biogas 100 % 2nd Cogen unit, fuel cell, or Microturbine 68 % 54 % Excess Capacity Excess Capacity Additional Food Waste Additional Food Waste 20 tons of Food Waste 750 kw (Existing Cogen capacity) 600 kw (Plant load) Export Power Above 600 kw Plant Load 27 % FOG & Food Waste FOG & Food Waste 5,000-gal FOG and 20 tons of Food Waste WW Solids WW Solids Electrical Power to Plant Two Existing Digesters (with improved mixing) Biogas Supply Cogen

First FOG Load November 2013

First Food Waste Load January 2014

Questions Permitting and or Operation Comments? MSS regulated by CalRecycle, and CMSA is regulated by the San Francisco Bay Regional Water Board. CalRecycle Regulations changes on January 1, 2016 Wastewater agencies that receive organics for co-digestion with wastewater solids in anaerobic digesters exempt from regulations CalRecycle s Local Enforcement Agency (LEA) approved a Solids Waste Transfer Station Permit amendment for MSS. CMSA Notified S.F. Bay Regional Water Board that the facility is operational NPDES permit Standard Operation Procedure (SOP) developed Digester health has remained stable and has not been affected by the new organic loading Minimal operational issues with new facilities and equipment

FOG/ F2E Program Metrics and Benefits

FOG and Food Waste Program Metrics Amounts Received FOG: up to 20,000 gallons per day, 6 days a week Food waste: average 7.5 tons/day, up to 6 days a week Biogas generation increase from 127,000 ft 3 (5-yr average) to over 300,000 ft 3 /per day. Volatile Solids Ave: 93% for FOG; 91% for food waste Digester Hydraulic Residence Time Ave: 35 days +/- Cogenerator runtime on biogas increased from approximately 7-9 hours/day up to 23+ hours/day (average); and 24 hr operation most days Program Expenses: CMSA facility cost: $2 million ($1.9 for construction) MSS equipment cost: $530,000 MSS operating costs: $315,000 (collection, processing, disposal, outreach)

Benefits of F2E Program A local renewable energy project Reduces landfilling of food waste; reject material is composted Increases CMSA s energy self sufficiency to align with State renewable energy generation goals Utilization of existing CMSA asset capacity cogen and digesters CMSA to deliver energy to local utility grid in future Reduces greenhouse gas emissions about 2,000 metric tons per year

FUTURE OF F2E POTENTIAL EXCESS ENERGY AND METHANE Pipeline injection for other local uses. Send electricity back to the grid. Fuel vehicles

Next Steps for CMSA Obtain certification from the California Energy Commission as a renewable power generator Modify the Agency s utility interconnection agreement to allow delivery of power to the local grid Negotiate a power sale agreement terms and price with the two local energy providers Complete biogas utilization tasks in the Agency s 2017 Master Plan Deliver power and determine how to use future excess biogas

Contact Information Jason Dow CMSA jdow@cmsa.us 415-459-1455, ext 145 Kim Scheibly MSS kim.scheibly@marinsanitary.com rc301nwea.ppt