How to Cost Load a schedule. OR Understanding the SDEF

Similar documents
UFGS Project Schedule Requirements [Section ] WED by David Long

Jacksonville District Master

UNIFIED FACILITIES GUIDE SPECIFICATIONS

REPLACE SUBSTATION SWITCHGEAR SECTION ADMINISTRATIVE REQUIREMENTS 02/10

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL

SECTION NETWORK ANALYSIS SCHEDULES (NAS) FOR DESIGN-BUILD 8/10

UNIFIED FACILITIES GUIDE SPECIFICATIONS *************************************************************************** SECTION

Downloaded from

SECTION USACE QUALITY CONTROL SYSTEM (QCS)

Govt. Contracting, Dynamics 365 Operations Implementing Dynamics 365 Operations for Govt. Contractors PVBS

EXHIBIT 2-2-C SCHEDULES

UNIFIED FACILITIES GUIDE SPECIFICATIONS. References are in agreement with UMRL dated April 2018

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Schedule Guidance Document

UNIFIED FACILITIES GUIDE SPECIFICATIONS. References are in agreement with UMRL dated October 2012

SECTION CONSTRUCTION SCHEDULES (COMPUTERIZED CPM FORMAT) [LUMP SUM CONTRACTS]

UNIFIED FACILITIES GUIDE SPECIFICATIONS *************************************************************************** SECTION

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S

UNIFIED FACILITIES GUIDE SPECIFICATIONS. References are in agreement with UMRL dated January 2017

Massport Capital Programs Enterprise Schedule Management. Document 11 A. Primavera Schedule Toolkit Vertical Projects. July 2017 Version 1.

SECTION NETWORK ANALYSIS SCHEDULES (NCA)

How to Develop, Manage and Communicate Effective Schedules Using Primavera P6 Professional

PMP TRAINING COURSE CONTENT

Exposition Metro Line Construction Authority CRITICAL PATH METHOD SCHEDULE AND COST/SCHEDULE INTEGRATION SYSTEM

SECTION CONSTRUCTION SCHEDULES (COMPUTERIZED CPM FORMAT) UNIT PRICE CONTRACTS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

The Survey Says! Source: The Project Manager, Pinnell-Bush, Inc. Owner s say 31% of contractors do not submit monthly updates. 41% don t submit recove

REQUEST FOR PROPOSALS FOUR YEAR CONTRACT FOR TEMPORARY EMPLOYEE SERVICES BID NO: Addendum 1: August 16, 2018

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SAN FRANCISCO PUBLIC UTILITIES COMMISSION WATER SYSTEM IMPROVEMENT PROGRAM CONSTRUCTION MANAGEMENT PROCEDURES

P6 Instructors Sample Presentation

THIS ADDENDUM IS FOR THE PURPOSE OF MAKING THE FOLLOWING CHANGES OR CLARIFICATIONS:

Exchanging SDEF Data with RMS and QCS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

BASELINE SCHEDULING BASICS Part 2: May 3, 2007

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Identification Selection Definition Execution. Schedule.

What You Should Know For Auditing Capital Projects Presented by: Robert S. Bright, President

Oversight Procedure 34 -Project Schedule Review. Competent scheduling is necessary for sound project planning and control of costs and risks.

Lessons Learned Schedule Updating and Maintenance using Primavera P6

SECTION NETWORK ANALYSIS SCHEDULES - MAJOR PROJECTS

PMP Exam Preparation Course Project Time Management

International Association of Certified Practicing Engineers

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

Resident Management System Newsletter

PROMASTAR Instructor led Professional Training Services Primavera Accredited/Certified Class Courses

TEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER MEDICAL SCIENCE BUILDING II EARLY GMP SUB SELECTION REQUEST FOR PROPOSAL

SECTION CONTRACTOR QUALITY CONTROL

Northwest Business Park, Building 5, Bay 3. Issued for Tender: August 24, Substantial Date: November 17, 2017

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

EVMax Feature List. Configuration, Setting Up Core Data ProjStream 1

How do FIDIC contracts work

150/ G Versus 150/ H Contractor Quality Control Program

Lessons Learned Schedule Updating and Maintenance using Primavera P6 Hannah Schumacher, PSP, PMI-SP, LEED AP Hill International

East Central College

SECTION CONSTRUCTION PROGRESS DOCUMENTATION SECTION CONSTRUCTION PROGRESS DOCUMENTATION

Pre-Construction Conference Discussion Guide

MANDATORY PRE-BID MEETING FLORIDA KEYS AQUEDUCT AUTHORITY

NAVFAC Northwest. Naval Facilities Engineering Command Southwest INDUSTRY FORUM. Multiple Award Remediation Action Contract (MARAC)

Getting Started in P3: Basic Tips and Techniques. Beverley M. Sheafer Assistant Professor, CSUS

UNIFIED FACILITIES GUIDE SPECIFICATIONS *************************************************************************** SECTION

Resident Management System Newsletter

SECTION QUALITY CONTROL

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION CONSTRUCTION PROGRESS DOCUMENTATION

COUNTY OF ALAMEDA. REVISED BID DUE DATE: 2:00 p.m., THURSDAY, NOVEMBER 17, 2016

STUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 4, Lesson 1 Differences between Cost & Price Analysis

STUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 4, Lesson 1 Differences between Cost & Price Analysis

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Appendix. Process Inputs and Outputs

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

User Manual. Microsoft Dynamics 365 Business Central for Government Contractors. Table of Contents. Pleasant Valley Business Solutions, LLC

IMMEDIATE POLICY CHANGE

CONSTRUCTION MANAGEMENT CORE COMPETENCIES

Scheduling Challenges in the Industrial Construction Sector

International Subawards

CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING)

ROLES AND RESPONSIBILITIES

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

A62 PRE-CONSTRUCTION MEETING AGENDA

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATION

Creating HRMS Combination Codes and their Use as a Payroll Funding Source

Project Management Concepts, Tools & Techniques

RMS 3.0 Contractor Mode (RMS 3.0 CM)

Job Costing (JC) General Features: Interface with other Systems: System Setup and Maintenance:

Construction Auditing: UTILIZING INDUSTRY STANDARDS, BEST PRACTICES AND CHANGE ORDER AUDITING APRIL 4, 2017

EJCDC Contract Documents for America s Infrastructure Buy online at

Audio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program

COUNTY OF SAN JOAQUIN

Transcription:

How to Cost Load a schedule for USACE s QCS/RMS OR Understanding the SDEF

(understanding the SDEF) Introduction David Long Sr. Project Controls Specialist With 20+ years of Scheduling and Cost Analysis experience on USACE funded/managed projects. Including Environmental, Bid/Construct, and Design/Build. Cost reimbursable, Time and Material, and Firm Fixed Price Contracts. It is important to understand the USACE intent and usage of a cost loaded schedule and QCS/RMS as part of the Progress Payment process. That is, your cost loaded schedule is your SOV. Therefore, it is understanding the Process and the Standard Data Exchange File (SDEF) that becomes the key to understanding how to Cost Load the Schedule.

(understanding the SDEF) Introduction Today s presentation is built around Primavera s P6 Version 6.2 but the principles and techniques are applicable to MS Project and other Scheduling Applications It is also based on Firm Fixed Price Contracts, however, applicable for Cost Reimbursable and T&M contracts.. Based on Actual Cost not Earned Value Firm Fixed Price vs. Cost Reimbursable Affects the source of Actual Cost not the Field used.

Relative Standards / Documents

ER 1-1-11

ER 1-1-11 This regulation states the policy on the use of any of the various scheduling management methods. various systems (bar charts, network analysis etc.) as well as administration of contract provisions. This regulation is applicable to all USACE commands. FAR 52.236 15 DOD FAR Supplement 236.273

Primavera P6 SDEF Conversion

Primavera P6 SDEF Conversion

Unified Facilities Guide Specifications (UFGS) ************************************************************************** USACE / NAVFAC / AFCEC / NASA UFGS 01 32 01.00 10 (August 2008) Change 1 08/13 Preparing Activity: USACE Superseding UFGS 01 32 01.00 10 (July 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in agreement with UMRL dated October 2013 ************************************************************************** SECTION 01 32 01.00 10 PROJECT SCHEDULE ************************************************************************** NOTE: This guide specification covers the requirements for the preparation and maintenance of the project schedule for construction projects or design build construction projects.

Basic Reason for Cost Loading the Schedule USFG Section 01 32 01.00 10 Paragraph 3.2 BASIS FOR PAYMENT AND COST LOADING To Get Use the schedule as the basis for determining contract earnings during each update period and therefore the amount of each progress payment. That is, the cost loaded schedule is your schedule of value for progress payments. Therefore

Cost Loading the Schedule It is reasonable. Acceptable to the Contracting Officer. The activity scope is measurable and represents a deliverable value to the Government. All activities for a specified CLIN sums up to the CLIN value USFG Section 01 32 01.00 10 Paragraph 3.2 BASIS FOR PAYMENT AND COST LOADING Activity cost loading shall be reasonable, as determined by the Contracting Officer. The aggregate value of all activities coded to a contract CLIN shall equal the value of the CLIN on the Schedule. The schedule is your schedule of value for progress payments.

Cost Loading the Schedule The Earnings Report Budgeted Total Cost at the activity level must roll up and equal to the Contract CLINs (SubCLINS) Actual Cost is the actual cost to date for Cost Reimbursement Contract or is equal to the Earned Value for FFP Contracts (SOV Value)

Cost Loading the Schedule Only Resource Assignment Budget and Actual Cost are exported to QCS/RMS. That is: User Defined Cost Fields or P6 Expenses are not included in the SDEF Multiple Resource Assignments are allowed, however, it is only the Resource Assignment s total Budget and Actual Cost that are exported to QCS/RMS. Resource units, Activity Earned Value, Activity % Complete are not exported to QCS/RMS. That is: % Complete is calculated in QCS/RMS by dividing the Actual Cost by the Budget, that is, % Spent.

Cost Loading the Schedule Role ID SUB/MTL Resource ID $$$$.Fully Burdened Cost Resource Type Nonlabor [NOTE: can use Labor or Material Resource Type] Rate Type Used with Resource or Role Rate Source Rate Source Override (allows for manual entry of Price/Unit) [NOTE: Resource or Role Rate Source can be used] Price/Unit Used if Calculate Cost form Units is Checked Budgeted Cost Budget (Price/Unit * Budget Units) Actual Units Actual Units to date (Entered value unless using Auto Compute ) Actual Cost Actual Cost to date (Entered value unless using Cal cost from units) SDEF PROG Record PROG C1040 31AUG12 3 12000.00 4800.00.00 06SEP12 17SEP12 + 7

Cost Loading the Schedule The Earnings Report Review

Cost Loading the Schedule

Cost Loading the Schedule? SDEF ACTV Record ACTV C1040 Install Storm Water System 3 5 0 CVIL DRNG 000000 0002 CN W Stabilization Methods

Cost Loading the Schedule Direct Cost (Direct Labor include Fringe and Overhead) Any Contingency and prorated General Conditions and PMO Costs G&A and any other indirect costs excluding Bond and Insurance costs Fee / Profit (unless allowed as a separate billing line item typically Cost Re) Cost must be loaded on deliverable activities with measurable scope having value to the Government.

Cost Loading the Schedule Prep/Submit Concept Design Design Management/Support Staff (GC) Gov't Review Concept Design Prep/Submit 100% Civil Design Design Conf. Concept Design Gov't Review 100% Civil Design Construction Management/Support Staff (GC) Prep/Submit SWS Submittal Design Conf. 100% Design Prep/Submit IFC Civil Design Gov't Review/Acceptance IFC Civil Design Issue IFC Civil Design Civil and SWS Preparatory Remove Fencing Fill/Compact Sinkhole Del. Fencing Materials Install Storm Water System $ 2,600.00 $ 0.00 $ 0.00 $ 5,200.00 $ 0.00 $ 0.00 $ 0.00 $ 1,000.00 $ 0.00 $ 1,300.00 $ 0.00 $ 1,300.00 $ 0.00 $ 560.00 $ 6,400.00 $ 2,000.00 $12,000.00

The Process Schedule Review and Reports Network Diagram Earnings Report Activity Report Logic Report Total Float Report Generate the SDEF Load SDEF into QCS [CLINs must balance with RMS] Submit to RMS Draft Prompt Payment and Application for Payment Progress Cost Loaded Schedule Payment Received Internal Approval, Compliance, and Billing Process [Signed Prompt Payment and Pay Application]

Understanding SDEF Requirements Cost Loaded That is: Cost to the Government. Activity Coded That is: 10 specifically defined activity codes in ER 1 1 11 USFG Section 01 32 01.00 10 Paragraph 3.1.1 Approved Project Schedule Use the approved Project Schedule to measure the progress of the work Make the schedule cost loaded and activity coded. The schedule will provide the basis for all progress payments.

Understanding the SDEF Requirements Standard Activity Codes USFG Section 01 32 01.00 10 Paragraph 3.4.5 Standard Activity Coding Dictionary Use the activity coding structure defined in the Standard Data Exchange Format (SDEF) in ER 1 1 11, Appendix A. This exact structure is mandatory, even if some fields are not used. The SDEF format is as follows: Activity Code Field Code Length Description 1 WRKP 3 Workers per Day 2 RESP 4 Responsible Party (e.g. GC, subcontractor, USACE) 3 AREA 4 Area of Work 4 MODF 6 Modification or REA number 5 BIDI 6 Bid Item (CLIN or SubCLIN) 6 PHAS 2 Phase of Work 7 CATW 1 Category of Work 8 FOW1 10 Feature of Work (used up to 10 characters in length) 9 FOW2 10 Feature of Work (used up to 20 characters in length) 10 FOW3 10 Feature of Work (used up to 30 characters in length)

Understanding the SDEF Requirements Standard Activity Codes USFG Section 01 32 01.00 10 Paragraph 3.4.5 Standard Activity Coding Dictionary These activity codes were originally defined for P3 which was a flat and finite length register. Therefore, all codes had to be Use the activity coding structure defined in the Standard Data Exchange Format defined (SDEF) in the in ER order 1 1 11, shown Appendix and A. with This code exact length structure as is specified. mandatory, even if some fields are not used. The SDEF format is as follows: Several Tips and Tricks for P6: The order Activity is no Code longer important, in fact you do not even need to define all Fieldof them. Code Length Description 1 The Max WRKP length of 3 the Code Workers ID per is still Dayimportant, except: 2 FOW RESP 1, 2, & 43 needs Responsible to be replaced Party (e.g. with GC, just subcontractor, FOW with a USACE) code value of 3 AREA 4 Area of Work 1 to 20 characters it is not the code value that gets converted to the 4 MODF 6 Modification or REA number SDEF, it will load up to 30 characters of the Code Value Description. 5 BIDI 6 Bid Item (CLIN or SubCLIN) 6 You can PHAS use the Hierarchical 2 Phase Activity of Work Code feature in P6 What gets 7 converted CATW to the 1 SDEF is Category simple of the Work code assigned at whatever level you 8 assign FOW1 it. 10 Feature of Work (used up to 10 characters in length) 9 FOW2 10 Feature of Work (used up to 20 characters in length) 10 FOW3 10 Feature of Work (used up to 30 characters in length)

Title Sub-Title

Understanding the SDEF Requirements Calendars First work day = NTP +1d 7 day no holiday calendar for activities contractually assigned calendar days. Use an appropriate work week calendar for each activity as you plan to work it. Identify Weather Sensitive Installation with a weather day calendar. Plan the work then work the plan. If you do not show non work periods you cannot claim as non work days in a time impact analysis. USFG Section 01 32 01.00 10 Paragraph 3.3.3 Scheduled Project Completion and Activity Calendars The first scheduled work period shall be the day after NTP is received by the Contractor. Activities may be assigned to a 7 day calendar when the contract assigns calendar day durations for the activity If the Contractor intends to perform physical work less than seven days per week, schedule the associated activities on a calendar with non work periods identified including weekends and holidays. Assign the Category of Work Code [CATW] Weather Sensitive Installation to those activities that are weather sensitive. Original durations must account for anticipated normal adverse weather. The Government will interpret all work periods not identified as non work periods on each calendar as meaning the Contractor intends to perform work during those periods.

Understanding the SDEF Requirements The SDEF Records ER 1 1 11 Part 2 SDEF SPECIFICATION, Section 6. SDEF Organization: The SDEF shall consist of the following records provided in the exact sequence shown Below: Volume Record Mandatory First Line of File Project Record Mandatory Second Line of File Calendar Record(s) Mandatory One Record Min. (one record for each calendar) Holiday Record(s) Mandatory if Holidays Used (one record for each calendar) Activity Record(s) Mandatory Records (one for every activity) Precedence Record(s) Mandatory for Precedence (one record for each pred.) Unit Cost Record(s) Mandatory for Unit Costs (scheduling application specific) Progress Record(s) Mandatory Records (one for every activity) File End Record Mandatory Last Line of Disk/File SDEF Example

UFGS Project Schedule Requirements [Section 01 32 01.00 10] WED 0115 0230 UFGS Project Schedule Reporting Requirements [Section 01 32 01.00 10] WED 0245 0400

Thank you Q & A