Vegetated Large-Scale Channel Erosion Testing (ASTM D 6460) (Modified procedure used for vegetated channel tests)

Similar documents
Large-Scale Channel Erosion Testing (ASTM D 6460, modified) ErosionTech s ETPP-10, Double Net Synthetic Fiber Mat, over Loam

Large-Scale Channel Erosion Testing (ASTM D 6460) (Modified procedure used for vegetated channel tests)

Large-Scale Channel Erosion Testing (ASTM D 6460) (Modified procedure used for vegetated channel tests)

Large-Scale Sediment Retention Device Testing (ASTM D 7351) FLEXSTORM Inlet Filter

Quality Control, Quality Assurance and Performance Testing of ECPs. Erosion. Erosion Control

Large-Scale Sediment Retention Device Testing Representing Exposure to Post-Construction Sediment Load. FLEXSTORM PC Inlet Filters

TESTING AND SPECIFYING EROSION CONTROL PRODUCTS

User Guide. Overview. March product innovation. NTPEP test reports contain data collected according to laboratory testing protocols

Specifications for the Selection and Application of Erosion Control Blanket on Slopes or Channels

Technical Note. Hydraulic Flow Capacity of Concrete Cloth

Manual for Erosion and Sediment Control Updates

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 836 SEEDING AND EROSION CONTROL WITH TURF REINFORCING MAT January 18, 2013

NTPEP Evaluation of Erosion Control Products (ECP) and Sediment Retention Devices (SRD)

ROLLED EROSION CONTROL PRODUCTS (RECP)

EC-04 ROLLED EROSION CONTROL PRODUCTS (RECP)

RE: Bench-scale Sediment Retention Device Testing (Log # E )

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose

Recyclex TRM TURF REINFORCEMENT MAT SPECIFICATION

Development of transition mat scour protection design methodology and comparison to the state-of-the-practice

TriNet Coconut EROSION CONTROL BLANKET SPECIFICATION

TriNet Coconut EROSION CONTROL BLANKET SPECIFICATION

Curlex Enforcer EROSION CONTROL BLANKET SPECIFICATION

ARMORMAX ENGINEERED EARTH ARMORING SOLUTIONS

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Curlex II EROSION CONTROL BLANKET SPECIFICATION

AEC Premier Straw Double Net Quick Mow EROSION CONTROL BLANKET SPECIFICATION

Written by: Lindsay O Leary Date: 11 /08 /26 Reviewed by: Brandon Klenzendorf Date: 11 /08 /26 YY MM DD YY MM DD

Diversion Dikes. Fe=0.95

Flow Diversion Banks: On earth slopes

Curlex High Velocity EROSION CONTROL BLANKET SPECIFICATION

Treatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation

[1] Level spreaders can release sheet flow down steep slopes, but the level spreader itself must be constructed across a level gradient.

POST CLOSURE PLAN. CFR (d) Pond 1. Clinch Power Plant Russell County, West Virginia. November Prepared for: Appalachian Power Company

SECTION EROSION CONTROL MATTINGS AND COMPONENTS

RETENTION BASIN EXAMPLE

Sediment Retention Fiber Roll (SRFR) General Usage and Installation Guidelines

HYDRAULIC TESTING AND DATA REPORT FOR SIX- INCH TRITON FILTER MATTRESS

MATERIAL SPECIFICATION Manufactured Ditch Checks


Evaluation of ALDOT Ditch Check Practices using Large-Scale Testing Techniques

Index. outlet protection Rev. 12/93

POND SEALING OR LINING COMPACTED SOIL TREATMENT

Testing, Analyses, and Performance Values for Slope Interruption and Perimeter Control BMPs

SECTION EROSION AND SEDIMENTATION CONTROLS

Flexamat Tied Concrete Block Mats

Evaluation of ALDOT Ditch Check Practices using Large Scale Testing Techniques

Case History: Value Engineering of Driven H-Piles for Slope Stability on the Missouri River

Warner Robins Stormwater Local Design Manual

( ) or 811 or mo1call.com

NTPEP Evaluation of Spray Applied Non-Structural and Structural Pipe Liners for Storm Water Conveyance

PERMANENT EROSION CONTROL SOLUTIONS

December 6, Nate Hatleback Project Manager City of Thornton 9500 Civic Center Drive Thornton, CO 80229

Erosion Control Blankets

Sediment Basin. Fe= (Depends on soil type)

Slope Erosion Testing Identifying Critical Parameters

Dr. Mark Risse Dr. Sidney Thompson Xianben Zhu Keith Harris Department of Biological and Agricultural Engineering

COMPACTED CLAY LINERS

19 May Provide profiles for all storm sewer going into the ground with the grading permit showing 5 and 100yr HGLs.

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

Rational Method Hydrological Calculations with Excel COURSE CONTENT

Stormwater Local Design Manual For Houston County, Georgia

CCR Annual Inspection (b) for the Ash Pond at the A.B. Brown Generating Station. Revision 0

FACING OPTIONS FOR REINFORCED STEEPED SLOPES

Drop-In Specification Standard Flexamat Erosion Control System (English Units)

January 20, Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO (303)

MODEL Stormwater Local Design Manual. City of Centerville

Erosion Control Product Testing

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Awareness Training. Overview of Proposed Changes. John Showler, P.E. NJDA-SSCC

Maine s Land Use Regulations and Erosion Control Techniques

HUITEX GEOCELL INSTALLATION MANUAL

ATTACHMENT 6 WATER QUALITY SWALE DESIGN ADDENDUM

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

ROLES AND RESPONSIBILITIES Small Pond Approval. SWM MD-378 Pond Checklist Training 10/17/07. Exemptions EMBANKMENT HEIGHT. Height of Dam Weir Wall

Organic Filter Tubes. Fe= (Depends on soil type)

Precipitation Surface Cover Topography Soil Properties

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

3.11 Sand Filter Basin

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

SECTION EROSION CONTROLS

August 15, 2006 (Revised) July 3, 2006 Project No A

APPENDIX I: EROSION TEST RESULTS ON NEW ORLEANS LEVEE SAMPLES

Flexamat Erosion Control Mat

CEEN Geotechnical Engineering

MVP 17.3 WATER BAR END TREATMENT SIZING AND DETAILS 1/22/18

AMERICAN ELECTRIC POWER (SWEPCO)

Experience of a Large Scale Unintentionally Long Surcharge on Organic Soils

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

CE 435/535, Fall 2003 Preliminary Design Example 1 / 6

JASON COTE-WONG RESIDENTIAL SUBDIVISION AND STORMWATER PERMITTING EAST MONTPELIER, VERMONT JUNE 21, 2017 OWNER: JASON COTE-WONG

Transcription:

Vegetated Large-Scale Channel Erosion Testing (ASTM D 6460) (Modified procedure used for vegetated channel tests) of North American Green s P300, Double Net Poly Fiber Mat, over Loam May 2013 Submitted to: AASHTO/NTPEP 444 North Capitol Street, NW, Suite 249 Washington, D.C. 20001 Attn: Evan Rothblatt, NTPEP erothblatt@aashto.org Submitted by: TRI/Environmental, Inc. 9063 Bee Caves Road Austin, TX 78733 C. Joel Sprague Project Manager

May 3, 2013 Mr. Evan Rothblatt AASHTO/NTPEP 444 North Capitol Street, NW, Suite 249 Washington, D.C. 20001 E-mail: erothblatt@aashto.org Subject: Channel Testing over Loam of North American Green P300, Double Net Poly Fiber Mat, manufactured in Poseyville, IN. Dear Mr. Rothblatt: This letter report presents the results for large-scale channel erosion tests performed on P300, Double Net Poly Fiber Mat, over Loam. Included are data developed for target hydraulic shears ranging from 0.5 to 3+ psf (0.02 to 0.14+ kpa) for the unvegetated condition and from 1 to 13+ psf (0.04 to 0.62+ kpa) for the vegetated condition. All testing work was performed in general accordance with the ASTM D 6460, Standard Test Method for Determination of Rolled Erosion Control Product (RECP) Performance in Protecting Earthen Channels from Stormwater- Induced Erosion. The procedure was modified to use only single replicates when testing vegetated channels. Generated results were used to develop the following permissible or limiting shear (τ limit ) and limiting velocity (V limit ) for the tested material: P300, Double Net Poly Fiber Mat & 3.8 staples/sy Product Unvegetated 6+ Week Vegetated 1+ Year Vegetated Condition Condition Condition Actual growth period, wks 0 6 56 τ limit 2.8 8.8* 12.3* V limit 9.5 19.5* 24.5* * = ASTM D 6460 requires that three test replicates be performed using identical procedures to obtain an average threshold of performance. Thus, the results of vegetated testing, being single replicates of each condition, cannot be considered as an average threshold of performance. TRI is pleased to present this final report. Please feel free to call if we can answer any questions or provide any additional information. Sincerely, C. Joel Sprague, P.E. Senior Engineer Geosynthetics Services Division cc: Jarrett Nelson, Jay Sprague - TRI

P300, Double Net Poly Fiber Mat, over Loam Channel Erosion Testing May 3, 2013 Page 3 CHANNEL TESTING REPORT P300, Double Net Poly Fiber Mat, over Loam TESTING EQUIPMENT AND PROCEDURES Overview of Test and Apparatus TRI/Environmental, Inc.'s (TRI's) large-scale channel erosion testing facility is located at the Denver Downs Research Farm in Anderson, SC. Testing oversight is provided by C. Joel Sprague, P.E. The large-scale testing is performed in a rectangular flume having a 10% slope (unvegetated condition) or 20% slope (vegetated condition) using a loamy soil test section. The concentrated flow is produced by raising gates to allow gravity flow from an adjacent pond. At least four sequential, increasing flows are applied to each test section for 30 minutes (unvegetated condition) or 1 hour (vegetated condition) each to achieve a range of hydraulic shear stresses in order to define the permissible, or limiting, shear stress, τ limit, which is the shear stress necessary to cause an average of 0.5 inch of soil loss over the entire channel bottom. Testing is performed in accordance with ASTM D 6460, though the procedure was modified to use only single replicates when testing vegetated channels. Tables and graphs of shear versus soil loss are generated from the accumulated data. Rolled Erosion Control Product (RECP) The following information and index properties were determined from the supplied product. Table 1. Tested Product Information & Index Properties Product Information and Index Property / Test Units Values Product Identification - P300 Manufacturer - North American Green Manufacturing Plant Location - Poseyville, IN Lot number of sample - - Fiber - 100% Poly Fiber Netting Openings in 0. 5 x 0. 5 (approx) Stitching Spacing in 1.5 (approx) Tensile Strength MD x XD (ASTM D 6818)* lb/in 41.1 x 17.9 Tensile Elongation MD x XD (ASTM D 6818)* % 29.1 x 27.3 Thickness (ASTM D 6525)* mils 384 Light Penetration (ASTM D 6567)* % cover 74.5 Density Net Only (ASTM D 792, Method A)* g/cm 3 0.916 Mass / Unit Area (ASTM D 6475)* oz/sy 11.48 * Values from Independent Testing of Randomly Sampled Product

Test Soil P300, Double Net Poly Fiber Mat, over Loam Channel Erosion Testing May 3, 2013 Page 4 The test soil used in the test plots had the following characteristics. Table 2. TRI-Loam Characteristics Soil Characteristic Test Method Value % Gravel 0 % Sand 45 ASTM D 422 % Silt 35 % Clay 20 Liquid Limit, % 41 ASTM D 4318 Plasticity Index, % 8 Soil Classification USDA Loam Soil Classification USCS Sandy silty clay (ML-CL) Preparation of the Test Channels The initial channel soil veneer (12-inch thick minimum) is placed and compacted. Compaction is verified to be 90% (± 3%) of Proctor Standard density using ASTM D 698 (sand cone method). The test channels undergo a standard preparation procedure prior to each test. First, any rills or depressions resulting from previous testing are filled in with test soil. The soil surface is replaced to a depth of 1 inch and groomed to create a channel bottom that is level side-to-side and at a smooth slope top-to-bottom. Finally, a vibrating plate compactor is run over the renewed channel surface. If a vegetated condition is to be tested, grass seed (tall fescue) is applied to the plot at the rate of 500 seeds per square foot. The submitted erosion control product is then installed using the anchors and anchorage pattern directed by the client. Installation of Erosion Control Product in Test Channel As noted, the submitted erosion control product is installed as directed by the client. For the tests reported herein, the erosion control product was anchored using a diamond anchorage patterns. The P300 anchorage consisted of 2 x 8 steel staples to create an anchorage density of approximately 3.8 staples per square yard. Specific Test Procedure Immediately prior to testing, the initial soil surface elevation readings are made at predetermined cross-sections. The channel is then exposed to sequential 30-minute (unvegetated condition) or 1-hour (vegetated condition) flows having target hydraulic shear stresses selected to create at least three flow events below and one flow event above the shear stress level that results in a cummulative average soil loss of ½-inch. During the testing, flow depth and corresponding flow measurements are taken at the predetermined cross-section locations. Between flow events, the flow is stopped and soil surface elevation measurements are made to facilitate calculation of soil loss. The flow is then restarted at the next desired flow (shear) level. Pictures of typical channel flows and resulting soil/vegetation loss are shown in Figures 7 thru 12.

P300, Double Net Poly Fiber Mat, over Loam Channel Erosion Testing May 3, 2013 Page 5 Figure 1. Typical 10% (Unvegetated Shear) Flumes on Left; 20% Flumes on Right Figure 4. Unvegetated RECP Figure 2. 6+ Week Vegetated Shear in 20% Flumes; Figure 5. 6+ Week Vegetated RECP Figure 3. Typical 20% Temporary Flume Set Up 1+ Year Vegetated Shear Plots Figure 6. 1+ Year Vegetated RECP

P300, Double Net Poly Fiber Mat, over Loam Channel Erosion Testing May 3, 2013 Page 6 Figure 7. Typical Flow in Unvegetated Channel Figure 10. Unvegetated Channel after Test with Product Removed (typical) Figure 8. Typical Flow in 6+ Week Vegetated Channel Figure 11. 6+ Week Vegetated Channel after Test (typical) Figure 9. Typical Flow in 1+ Year Vegetated Channel Figure 12. 1+ Year Vegetated Channel after Test (typical)

P300, Double Net Poly Fiber Mat, over Loam Channel Erosion Testing May 3, 2013 Page 7 TEST RESULTS Average soil loss and the associated hydraulic shear calculated from flow and depth measurements made during the testing are the principle data used to determine the performance of the product tested. This data is entered into a spreadsheet that transforms the flow depth and velocity into an hydraulic shear stress and the soil loss measurements into an average Clopper Soil Loss Index (CSLI). Measured and calculated data is summarized in Table 3. A graph of shear versus soil loss for the protected condition is shown in Figure 13. The associated velocities and time of vegetation growth are plotted in Figures 14 and 15, respectively. The graphs include the best regression line fit to the test data to facilitate a determination of the limiting shear stress, τ limit,, and limiting velocity, V limit,. The 0.5-inch intercept values are provided in Table 4. Test # (Channel # - Shear Level) Table 3. Summary Data Table Protected Test Reach Actual Growth Period (wks) Flow depth (in) Flow velocity (fps) Flow (cfs) Manning s roughness, n Max Bed Shear Cumm. CSLI (in) C1-S1, Unvegetated 1.43 2.83 0.67 0.040 0.74 0.12 C1-S2, Unvegetated 2.40 4.65 1.85 0.035 1.25 0.32 0 C1-S3, Unvegetated 3.72 7.07 4.38 0.030 1.93 0.48 C1-S5, Unvegetated 5.42 9.95 8.99 0.028 2.82 0.70 C2-S1, Unvegetated 1.56 2.75 0.71 0.044 0.81 0.12 C2-S2, Unvegetated 2.68 4.65 2.08 0.037 1.39 0.28 0 C2-S3, Unvegetated 4.08 7.25 4.93 0.032 2.12 0.42 C2-S4, Unvegetated 5.84 10.27 10.00 0.028 3.03 0.63 C3-S1, Unvegetated 1.39 2.92 0.68 0.038 0.72 0.16 C3-S2, Unvegetated 2.82 5.50 2.59 0.033 1.47 0.27 0 C3-S3, Unvegetated 4.39 8.40 6.14 0.029 2.28 0.32 C3-S4, Unvegetated 7.83 13.03 16.99 0.027 4.07 0.43 S1, 6+ Wk Vegetated 0.99 2.38 0.39 0.054 1.02 0.06 S2, 6+ Wk Vegetated 1.96 5.31 1.72 0.038 2.02 0.12 S3, 6+ Wk Vegetated 6 5.42 13.24 11.95 0.030 5.60 0.25 S4, 6+ Wk Vegetated 7.73 17.51 22.53 0.028 7.99 0.35 S5, 6+ Wk Vegetated 8.92 20.24 30.06 0.027 9.22 0.57 S1, 1+ Yr Vegetated 3.28 8.30 4.50 0.034 3.39 0.07 S2, 1+ Yr Vegetated 4.81 11.90 9.50 0.031 4.97 0.16 57 S3, 1+ Yr Vegetated 8.69 19.39 28.00 0.028 8.98 0.34 S4, 1+ Yr Vegetated 12.88 25.74 55.00 0.027 13.31 0.54 Table 4. P300, Double Net Poly Fiber Mat & 3.8 staples/sy Product Unvegetated 6+ Week Vegetated 1+ Year Vegetated Condition Condition Condition Actual growth period, wks 0 6 56 τ limit 2.8 8.8* 12.3* V limit 9.5 19.5* 24.5* * = ASTM D 6460 requires that three test replicates be performed using identical procedures to obtain an average threshold of performance. Thus, the results of vegetated testing, being single replicates of each condition, cannot be considered as an average threshold of performance.

Cummulative Soil Loss (CSLI), in Cummulative Soil Loss (CSLI), in P300, Double Net Poly Fiber Mat, over Loam Channel Erosion Testing May 3, 2013 Page 8 0.8 0.7 0.6 y = 0.1958x 0.9141 R² = 0.7942 Limiting Shear via ASTM D 6460 P300; 3.8 Anchors/SY Unvegetated Channel #1 Unvegetated Channel #2 Unvegetated Channel #3 All P300 + 6 Weeks of Vegetation P300 + 1 Year of Vegetation Power (All) Poly. (P300 + 6 Weeks of Vegetation) Poly. (P300 + 1 Year of Vegetation) Limiting Shear = 2.8 psf y = 0.0016x 3-0.0176x 2 + 0.0895x R² = 0.9842 Limiting Shear = 8.8 psf y = -0.0002x 3 + 0.0053x 2 + 0.0078x R² = 0.997 Limiting Shear = 12.3 psf 0.5 0.4 0.3 0.2 0.1 0 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 Shear, psf Figure 13. Shear Stress vs. Soil Loss Tested Product Unvegetated Channel #1 Limiting Unvegetated Velocity Channel via ASTM #2 D 6460 Unvegetated Channel #3 All P300 P300; + 6 Weeks 3.8 Anchors/SY of Vegetation P300 + 1 Year of Vegetation Power (All) Poly. (P300 + 6 Weeks of Vegetation) Poly. (P300 + 1 Year of Vegetation) 0.8 0.7 y = 0.0533x 0.9919 R² = 0.8175 Limiting Velocity = 9.5 ft/sec y = 0.0001x 3-0.0033x 2 + 0.0361x R² = 0.9895 Limiting Velocity = 19.5 ft/sec y = -2E-05x 3 + 0.0012x 2-7E-05x R² = 0.9982 Limiting Velocity = 24.5 ft/sec 0.6 0.5 0.4 0.3 0.2 0.1 0 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 26.00 28.00 30.00 Velocity, ft/sec Figure 14. Velocity vs. Soil Loss Tested Product

Manning's n Permissible Shear, psf P300, Double Net Poly Fiber Mat, over Loam Channel Erosion Testing May 3, 2013 Page 9 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Vegetation Loss vs Time of Vegetation Growth via ASTM D 6460 P300; 3.8 Staples/SY SUMMARY OF TEST RESULTS Weeks of Vegetation Growth 0 6 57 Initial Vegetative Density (stems/ft ) 0 331 245 Final Vegetative Density (stems/ft ) 0 224 203 % of Initial Vegetation after Max. Shear (%) 0 68% 83% Permissible Shear 2.8 8.8 12.3 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 Time of Vegetation Growth, weeks Figure 15. Shear Stress vs. Time of Vegetation Growth Tested Product 0.055 Manning's n vs. Water Depth P300 Unvegetated Channel #1 Unvegetated Channel #2 Unvegetated Channel #3 All Unvegetated P300 + 6 Weeks of Vegetation P300 + 1 Year of Vegetation All Vegetated Power (All Unvegetated) Power (All Vegetated) 0.05 0.045 0.04 0.035 0.03 0.025 y = 0.0447x -0.264 R² = 0.8897 y = 0.0483x -0.26 R² = 0.9258 0.02 0.015 0.01 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Water Depth, in Figure 16. Flow Depth vs. Manning s n Tested Product

Elevation Relative to Benchmark, ft Elevation Relative to Benchmark, ft P300, Double Net Poly Fiber Mat, over Loam Channel Erosion Testing May 3, 2013 Page 10 200 Energy Grade Lines - All Shear Levels P300 199 198 197 196 195 194 193 192 191 Shear Level 4 Shear Level 3 Shear Level 2 Shear Level 1 Channel 1 Channel 2 Channel 3 y = -0.0844x + 198.72 y = -0.0804x + 198.71 y = -0.056x + 199.51 y = -0.0836x + 197.83 y = -0.0853x + 197.82 y = -0.0924x + 198.05 y = -0.0877x + 197.33 y = -0.0913x + 197.29 y = -0.0915x + 197.29 y = -0.0896x + 197.07 y = -0.0936x + 197.01 y = -0.0917x + 196.85 0 2 4 6 8 10 12 14 16 18 20 X-Section (ft along test reach) Figure 17a. Energy Grade Lines All Channels, Unvegetated Shears Tested Product Energy Grade Lines - All Shear Levels Vegetated Channels 208 207 206 205 204 203 202 201 200 199 198 197 196 195 194 193 192 191 190 189 6-Wk Vegetated Shear Level 5 y = -0.0977x + 202.88 1-Yr Vegetated Shear Level 4 y = -0.1073x + 201.3 y = -0.0125x + 206.32 Shear Level 3 y = -0.16x + 199.59 y = -0.1078x + 202.46 Shear Level 2 y = -0.1865x + 197.29 y = -0.1556x + 198.99 Shear Level 1 y = -0.198x + 196.98 y = -0.1677x + 197.86 0 2 4 6 8 10 12 14 16 18 20 X-Section (ft along test reach) Figure 17b. Energy Grade Lines All Channels, Vegetated Shears Tested Product

Cummulative Soil Loss (CSLI), in Percent of Initial Vegetation after Shear Stress, % Vegetation Loss vs Shear via ASTM D 6460 P300 @ 3.8 Staples/SY P300, Double Net Poly Fiber Mat, over Loam Channel Erosion Testing May 3, 2013 Page 11 100.0% P300 + 6 Weeks of Vegetation P300 + 1 Year of Vegetation Poly. (P300 + 6 Weeks of Vegetation) Poly. (P300 + 1 Year of Vegetation) 90.0% 80.0% 70.0% 60.0% 50.0% Initial 6-Week Vegetative Stand = 331 stems/ft 2 y = -0.0011x 3 + 0.013x 2-0.0623x + 1 R² = 0.9885 Initial 1-Year Vegetative Stand = 245 stems/ft 2 y = -5E-05x 3 + 0.0015x 2-0.0235x + 1 R² = 1 40.0% 30.0% 20.0% 10.0% 0.0% 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 Shear, psf Figure 18. Vegetation vs. Shear Stress Tested Product 1.00 0.90 0.80 y = -7.4065x 3 + 22.361x 2 + 4.1214x R² = 0.9998 Limiting Shear via ASTM D 6460 Control Runs Unvegetated With 6 Weeks of Vegetation With 61 Weeks of Vegetation Poly. (Unvegetated) Poly. (With 6 Weeks of Vegetation) Poly. (With 61 Weeks of Vegetation) Limiting Shear = 0.075 y = -0.4876x 2 + 1.3639x R² = 0.9242 Limiting Shear = 0.5 psf y = 0.0005x 3 + 0.0014x 2 + 0.0185x R² = 0.9996 Limiting Shear = 8.0 psf 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 Shear, psf Figure 19. Shear Stress vs. Soil Loss Controls (Vegetation Only / No RECP)

P300, Double Net Poly Fiber Mat, over Loam Channel Erosion Testing May 3, 2013 Page 12 Figure 20. Typical 6+ Week Control Vegetation-Only Before Testing Figure 22. Typical 1+ Year Control Vegetation-Only Before Testing Figure 21. Typical 6+ Week Control Vegetation-Only After Testing Figure 23. Typical 1+ Year Control Vegetation-Only After Testing CONCLUSIONS Rectangular channel (flume) tests were performed in accordance with ASTM D 6460 using Loam soil protected with an RECP. Three replicates of the unvegetated condition and one replicate each of the 6+ week and 1+ year vegetated conditions were performed. Testing in a rectangular (vertical wall) channel was conducted to achieve increasing shear levels in an attempt to cause at least 0.5-inch of soil loss. Figure 13 shows the maximum bottom shear stress and associated soil loss from each flow event. Figure 14 presents the velocity versus soil loss. Figure 15 relates the permissible shear stress to the length of time the vegetation had been allowed to grow. Figure 16 relates channel liner roughness (Manning s n ) to flow depth. Together, this data describes the relevant performance characteristics of the tested RECP. It is important to note that ASTM D 6460, the procedure used to guide the testing reported herein, requires that three test replicates be performed using identical procedures to obtain an average threshold of performance. Thus, the results of the testing of vegetated channels reported herein, being single replicates of each condition, cannot be considered as an average threshold of performance. The data in Figures 17a, 17b, 18 and 19, the calculated energy grade lines for each channel and shear level, the retained vegetation at each shear level, and the control condition shear stress vs. soil loss relationships, are included to provide a reference for the reported test results.

P300, Double Net Poly Fiber Mat, over Loam Channel Erosion Testing May 3, 2013 Appendix APPENDIX A RECORDED DATA Test Record Sheets (Note: Unvegetated Test Record Sheets are in a Separate Report)

2-5 CHANNEL 2 - SHEAR STRESS 5 Date: 10/26/11 Start Time: 9:00 AM End Time: 10:00 AM Soil: Loam Target Shear (psf): 10.00 Slope: 20% 40 ft long flume 20 ft test section RECP: P300 Anchorage: rpms 2 ft wide flume 1 2 3 Inlet Weir Weir Channel Targets FLOW TEST DATA Water Depth, in 0.00 10.00 Weir width (ft) = 2 C = 0.00 Water Velocity, ft/s 0.00 0.00 0 ft A B C Flow Rate, cfs 0.00 0.00 0.00 0.00 Cross-section 1 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 66 66.2 66.4 18.1 42.9 To eroded Surface Elev, cm 66.3 66.6 67.3 Vavg (fps) = 18.10 Soil Loss / Gain, cm -0.3-0.4-0.9 navg = 0.031 Clopper Soil Loss, cm -0.3-0.4-0.9 Flow (cfs) = 28.31 9.69 9.38 2 ft Avg Bottom Loss/Gain, in -0.21 Avg Clopper Soil Loss, in -0.21 Cross-section 2 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.5 66 65.5 18.6 44.0 To eroded Surface Elev, cm 66.7 66.6 67.5 Vavg (fps) = 18.60 Soil Loss / Gain, cm -1.2-0.6-2 navg = 0.030 Clopper Soil Loss, cm -1.2-0.6-2 Flow (cfs) = 27.99 9.33 9.03 4 ft Avg Bottom Loss/Gain, in -0.50 Avg Clopper Soil Loss, in -0.50 Cross-section 3 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 64.9 65.1 64.9 19.2 43.2 To eroded Surface Elev, cm 65.7 65.7 66.1 Vavg (fps) = 19.20 Soil Loss / Gain, cm -0.8-0.6-1.2 navg = 0.028 Clopper Soil Loss, cm -0.8-0.6-1.2 Flow (cfs) = 28.51 9.21 8.91 6 ft Avg Bottom Loss/Gain, in -0.34 Avg Clopper Soil Loss, in -0.34 Cross-section 4 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65 66 65.5 19.6 43.2 To eroded Surface Elev, cm 66 66.3 66.2 Vavg (fps) = 19.60 Soil Loss / Gain, cm -1-0.3-0.7 navg = 0.028 Clopper Soil Loss, cm -1-0.3-0.7 Flow (cfs) = 29.54 9.34 9.04 8 ft Avg Bottom Loss/Gain, in -0.26 Avg Clopper Soil Loss, in -0.26 Cross-section 5 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 66.5 66.6 66.1 20.1 44.4 To eroded Surface Elev, cm 67.6 67.7 67.7 Vavg (fps) = 20.10 Soil Loss / Gain, cm -1.1-1.1-1.6 navg = 0.028 Clopper Soil Loss, cm -1.1-1.1-1.6 Flow (cfs) = 30.69 9.46 9.16 10 ft Avg Bottom Loss/Gain, in -0.50 Avg Clopper Soil Loss, in -0.50 Cross-section 6 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 64.5 64.5 64.4 20.5 43.1 To eroded Surface Elev, cm 65.4 65.4 66 Vavg (fps) = 20.50 Soil Loss / Gain, cm -0.9-0.9-1.6 navg = 0.026 Clopper Soil Loss, cm -0.9-0.9-1.6 Flow (cfs) = 30.27 9.15 8.86 12 ft Avg Bottom Loss/Gain, in -0.45 Avg Clopper Soil Loss, in -0.45 Cross-section 7 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65 65.5 65.1 21.1 43.7 To eroded Surface Elev, cm 65.7 66.4 66.5 Vavg (fps) = 21.10 Soil Loss / Gain, cm -0.7-0.9-1.4 navg = 0.026 Clopper Soil Loss, cm -0.7-0.9-1.4 Flow (cfs) = 31.15 9.15 8.86 14 ft Avg Bottom Loss/Gain, in -0.39 Avg Clopper Soil Loss, in -0.39 Cross-section 8 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 67.8 68 67.8 21.3 46.6 To eroded Surface Elev, cm 69 69.2 69 Vavg (fps) = 21.30 Soil Loss / Gain, cm -1.2-1.2-1.2 navg = 0.025 Clopper Soil Loss, cm -1.2-1.2-1.2 Flow (cfs) = 31.40 9.14 8.85 16 ft Avg Bottom Loss/Gain, in -0.47 Avg Clopper Soil Loss, in -0.47 Cross-section 9 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 67.2 67.9 67.5 21.3 46.8 To eroded Surface Elev, cm 69 69.6 69.5 Vavg (fps) = 21.30 Soil Loss / Gain, cm -1.8-1.7-2 navg = 0.026 Clopper Soil Loss, cm -1.8-1.7-2 Flow (cfs) = 31.54 9.18 8.88 18 ft Avg Bottom Loss/Gain, in -0.72 Avg Clopper Soil Loss, in -0.72 Cross-section 10 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 67.8 67.9 67.5 21.4 47.6 To eroded Surface Elev, cm 70.5 70.2 70 Vavg (fps) = 21.40 Soil Loss / Gain, cm -2.7-2.3-2.5 navg = 0.025 Clopper Soil Loss, cm -2.7-2.3-2.5 Flow (cfs) = 31.78 9.21 8.91 20 ft Avg Bottom Loss/Gain, in -0.98 Avg Clopper Soil Loss, in -0.98 Cross-section 11 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.1 65.9 65.9 21.4 48.4 To eroded Surface Elev, cm 68.5 69.5 70.1 Vavg (fps) = 21.40 Soil Loss / Gain, cm -3.4-3.6-4.2 navg = 0.024 3.8 pins / sy Stress (psf) Stress (psf) Stress (psf) Stress (psf) Stress (psf) Stress (psf) Stress (psf) Stress (psf) Stress (psf) Stress (psf) Stress (psf) Clopper Soil Loss, cm -3.4-3.6-4.2 Flow (cfs) = 29.44 8.53 8.25 Avg Bottom Loss/Gain, in -1.47 Avg Clopper Soil Loss, in -1.47 Soil Loss / Gain, in -0.54-0.49-0.69 Avg Bottom Loss/Gain per Cross-Section = -0.57 Clopper Soil Loss, in -0.54-0.49-0.69 Avg Clopper Soil Loss per Cross-Section = -0.57

2-4 CHANNEL 2 - SHEAR STRESS 4 40 ft long flume 20 ft test section RECP: Anchorage: rpms 2 ft wide flume Date: 10/26/11 Start Time: 9:00 AM End Time: 10:00 AM Soil: Loam Target Shear (psf): 5.00 Slope: 20% 1 2 3 Inlet Weir Weir Channel Targets FLOW Water Depth, in 0.0 5.00 Weir width (ft) = 2 C = 0.00 Water Velocity, ft/s 0.0 0.00 0 ft A B C Flow Rate, cfs 0.0 0.0 0.0 0.00 Cross-section 1 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 66.0 66.2 66.4 15.5 45.9 To eroded Surface Elev, cm 66.3 66.6 67.3 Vavg (fps) = 15.5 Soil Loss / Gain, cm -0.3-0.4-0.9 navg = 0.033 Clopper Soil Loss, cm -0.3-0.4-0.9 Flow (cfs) = 21.2 8.5 8.2 2 ft Avg Bottom Loss/Gain, in -0.2 Avg Clopper Soil Loss, in -0.2 Cross-section 2 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.5 66.0 65.5 16.0 46.8 To eroded Surface Elev, cm 65.9 66.2 67.5 Vavg (fps) = 16.0 Soil Loss / Gain, cm -0.4-0.2-2.0 navg = 0.031 Clopper Soil Loss, cm -0.4-0.2-2.0 Flow (cfs) = 20.7 8.0 7.8 4 ft Avg Bottom Loss/Gain, in -0.3 Avg Clopper Soil Loss, in -0.3 Cross-section 3 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 64.9 65.1 64.9 16.6 46.0 To eroded Surface Elev, cm 65.5 65.5 66.0 Vavg (fps) = 16.6 Soil Loss / Gain, cm -0.6-0.4-1.1 navg = 0.030 Clopper Soil Loss, cm -0.6-0.4-1.1 Flow (cfs) = 21.4 8.0 7.7 6 ft Avg Bottom Loss/Gain, in -0.3 Avg Clopper Soil Loss, in -0.3 Cross-section 4 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.0 66.0 65.5 16.8 46.0 To eroded Surface Elev, cm 65.8 66.1 66.1 Vavg (fps) = 16.8 Soil Loss / Gain, cm -0.8-0.1-0.6 navg = 0.030 Clopper Soil Loss, cm -0.8-0.1-0.6 Flow (cfs) = 22.0 8.1 7.9 8 ft Avg Bottom Loss/Gain, in -0.2 Avg Clopper Soil Loss, in -0.2 Cross-section 5 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 66.5 66.6 66.1 17.2 47.5 To eroded Surface Elev, cm 67.5 67.0 67.0 Vavg (fps) = 17.2 Soil Loss / Gain, cm -1.0-0.4-0.9 navg = 0.029 Clopper Soil Loss, cm -1.0-0.4-0.9 Flow (cfs) = 22.2 8.0 7.7 10 ft Avg Bottom Loss/Gain, in -0.3 Avg Clopper Soil Loss, in -0.3 Cross-section 6 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 64.5 64.5 64.4 17.7 45.8 To eroded Surface Elev, cm 65.1 65.3 65.0 Vavg (fps) = 17.7 Soil Loss / Gain, cm -0.6-0.8-0.6 navg = 0.028 Clopper Soil Loss, cm -0.6-0.8-0.6 Flow (cfs) = 22.5 7.9 7.6 12 ft Avg Bottom Loss/Gain, in -0.3 Avg Clopper Soil Loss, in -0.3 Cross-section 7 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.0 65.5 65.1 18.0 46.5 To eroded Surface Elev, cm 65.5 66.4 66.0 Vavg (fps) = 18.0 Soil Loss / Gain, cm -0.5-0.9-0.9 navg = 0.027 Clopper Soil Loss, cm -0.5-0.9-0.9 Flow (cfs) = 23.0 7.9 7.7 14 ft Avg Bottom Loss/Gain, in -0.3 Avg Clopper Soil Loss, in -0.3 Cross-section 8 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 67.8 68.0 67.8 18.3 49.0 To eroded Surface Elev, cm 68.8 69.0 68.8 Vavg (fps) = 18.3 Soil Loss / Gain, cm -1.0-1.0-1.0 navg = 0.027 Clopper Soil Loss, cm -1.0-1.0-1.0 Flow (cfs) = 23.9 8.1 7.8 16 ft Avg Bottom Loss/Gain, in -0.4 Avg Clopper Soil Loss, in -0.4 Cross-section 9 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 67.2 67.9 67.5 18.5 49.5 To eroded Surface Elev, cm 69.0 70.0 68.3 Vavg (fps) = 18.5 Soil Loss / Gain, cm -1.8-2.1-0.8 navg = 0.027 Clopper Soil Loss, cm -1.8-2.1-0.8 Flow (cfs) = 23.8 8.0 7.7 18 ft Avg Bottom Loss/Gain, in -0.6 Avg Clopper Soil Loss, in -0.6 Cross-section 10 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 67.8 67.9 67.5 19.0 49.5 To eroded Surface Elev, cm 69.5 68.4 68.6 Vavg (fps) = 19.0 Soil Loss / Gain, cm -1.7-0.5-1.1 navg = 0.026 Clopper Soil Loss, cm -1.7-0.5-1.1 Flow (cfs) = 24.1 7.9 7.6 20 ft Avg Bottom Loss/Gain, in -0.4 Avg Clopper Soil Loss, in -0.4 P300 TEST DATA Cross-section 11 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.1 65.9 65.9 19.0 48.5 To eroded Surface Elev, cm 66.2 67.6 67.3 Vavg (fps) = 19.0 Soil Loss / Gain, cm -1.1-1.7-1.4 navg = 0.025 3.8 pins / sy Clopper Soil Loss, cm -1.1-1.7-1.4 Flow (cfs) = 23.1 7.5 7.3 Avg Bottom Loss/Gain, in -0.6 Avg Clopper Soil Loss, in -0.6 Soil Loss / Gain, in -0.4-0.3-0.4 Avg Bottom Loss/Gain per Cross-Section = -0.4 Clopper Soil Loss, in -0.4-0.3-0.4 Avg Clopper Soil Loss per Cross-Section = -0.4

2-3 CHANNEL 2 - SHEAR STRESS 3 40 ft long flume 20 ft test section RECP: Anchorage: rpms 2 ft wide flume Date: 10/25/11 Start Time: 3:00 PM End Time: 4:00 PM Soil: Loam Target Shear (psf): 3.00 Slope: 20% 1 2 3 Inlet Weir Weir Channel Targets FLOW Water Depth, in 12.5 3.00 Weir width (ft) = 2 Water Velocity, ft/s 2.3 9.38 0 ft A B C Flow Rate, cfs 0.0 4.7 0.0 4.69 Cross-section 1 A B C V @ 0.2d V @ 0.6d To Water Surf, cm To original Surface Elev, cm 66.0 66.2 66.4 12.0 52.0 To eroded Surface Elev, cm 66.0 66.4 67.0 Vavg (fps) = 12.0 Soil Loss / Gain, cm 0.0-0.2-0.6 navg = 0.034 Clopper Soil Loss, cm 0.0-0.2-0.6 Flow (cfs) = 11.4 5.9 5.7 2 ft Avg Bottom Loss/Gain, in -0.1 Avg Clopper Soil Loss, in -0.1 Cross-section 2 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.5 66.0 65.5 12.4 52.6 To eroded Surface Elev, cm 65.6 66.0 67.1 Vavg (fps) = 12.4 Soil Loss / Gain, cm -0.1 0.0-1.6 navg = 0.031 Clopper Soil Loss, cm -0.1 0.0-1.6 Flow (cfs) = 11.1 5.5 5.4 4 ft Avg Bottom Loss/Gain, in -0.2 Avg Clopper Soil Loss, in -0.2 Cross-section 3 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 64.9 65.1 64.9 12.8 51.7 To eroded Surface Elev, cm 65.1 65.5 66.0 Vavg (fps) = 12.8 Soil Loss / Gain, cm -0.2-0.4-1.1 navg = 0.031 Clopper Soil Loss, cm -0.2-0.4-1.1 Flow (cfs) = 11.6 5.6 5.4 6 ft Avg Bottom Loss/Gain, in -0.2 Avg Clopper Soil Loss, in -0.2 Cross-section 4 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.0 66.0 65.5 12.9 51.9 To eroded Surface Elev, cm 65.6 66.1 66.0 Vavg (fps) = 12.9 Soil Loss / Gain, cm -0.6-0.1-0.5 navg = 0.031 Clopper Soil Loss, cm -0.6-0.1-0.5 Flow (cfs) = 11.9 5.7 5.5 8 ft Avg Bottom Loss/Gain, in -0.2 Avg Clopper Soil Loss, in -0.2 Cross-section 5 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 66.5 66.6 66.1 13.1 53.2 To eroded Surface Elev, cm 67.0 66.8 66.8 Vavg (fps) = 13.1 Soil Loss / Gain, cm -0.5-0.2-0.7 navg = 0.030 Clopper Soil Loss, cm -0.5-0.2-0.7 Flow (cfs) = 11.7 5.6 5.4 10 ft Avg Bottom Loss/Gain, in -0.2 Avg Clopper Soil Loss, in -0.2 Cross-section 6 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 64.5 64.5 64.4 13.3 51.5 To eroded Surface Elev, cm 64.8 65.3 64.6 Vavg (fps) = 13.3 Soil Loss / Gain, cm -0.3-0.8-0.2 navg = 0.029 Clopper Soil Loss, cm -0.3-0.8-0.2 Flow (cfs) = 11.7 5.5 5.3 12 ft Avg Bottom Loss/Gain, in -0.2 Avg Clopper Soil Loss, in -0.2 Cross-section 7 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.0 65.5 65.1 13.4 51.9 To eroded Surface Elev, cm 65.4 66.2 65.4 Vavg (fps) = 13.4 Soil Loss / Gain, cm -0.4-0.7-0.3 navg = 0.0 Clopper Soil Loss, cm -0.4-0.7-0.3 Flow (cfs) = 12.1 5.6 5.4 14 ft Avg Bottom Loss/Gain, in -0.2 Avg Clopper Soil Loss, in -0.2 Cross-section 8 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 67.8 68.0 67.8 13.6 54.9 To eroded Surface Elev, cm 68.6 68.8 68.6 Vavg (fps) = 13.6 Soil Loss / Gain, cm -0.8-0.8-0.8 navg = 0.029 Clopper Soil Loss, cm -0.8-0.8-0.8 Flow (cfs) = 12.3 5.6 5.4 16 ft Avg Bottom Loss/Gain, in -0.3 Avg Clopper Soil Loss, in -0.3 Cross-section 9 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 67.2 67.9 67.5 13.9 55.1 To eroded Surface Elev, cm 68.5 69.6 68.0 Vavg (fps) = 13.9 Soil Loss / Gain, cm -1.3-1.7-0.5 navg = 0.028 Clopper Soil Loss, cm -1.3-1.7-0.5 Flow (cfs) = 12.4 5.5 5.4 18 ft Avg Bottom Loss/Gain, in -0.5 Avg Clopper Soil Loss, in -0.5 Cross-section 10 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 67.8 67.9 67.5 14.0 54.9 To eroded Surface Elev, cm 69.2 69.2 67.5 Vavg (fps) = 14.0 Soil Loss / Gain, cm -1.4-1.3 0.0 navg = 0.028 Clopper Soil Loss, cm -1.4-1.3 0.0 Flow (cfs) = 12.6 5.6 5.4 20 ft Avg Bottom Loss/Gain, in -0.4 Avg Clopper Soil Loss, in -0.4 P300 TEST DATA Cross-section 11 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.1 65.9 65.9 14.2 53.1 To eroded Surface Elev, cm 65.7 67.2 67.0 Vavg (fps) = 14.2 Soil Loss / Gain, cm -0.6-1.3-1.1 navg = 0.027 3.8 pins / sy Clopper Soil Loss, cm -0.6-1.3-1.1 Flow (cfs) = 12.6 5.5 5.3 Avg Bottom Loss/Gain, in -0.4 Avg Clopper Soil Loss, in -0.4 Soil Loss / Gain, in -0.2-0.3-0.3 Avg Bottom Loss/Gain per Cross-Section = -0.3 Clopper Soil Loss, in -0.2-0.3-0.3 Avg Clopper Soil Loss per Cross-Section = -0.3

2-2 CHANNEL 2 - SHEAR STRESS 2 40 ft long flume 20 ft test section RECP: Anchorage: 1500 rpms 2 ft wide flume Date: 10/25/11 Start Time: 1:00 PM End Time: 2:00 PM Soil: Loam Target Shear (psf): 2.00 Slope: 20% 1 2 3 Inlet Weir Weir Channel Targets FLOW Water Depth, in 8.5 2.00 Weir width (ft) = 4 Water Velocity, ft/s 1.5 6.38 0 ft A B C Flow Rate, cfs 0.0 4.3 0.0 2.13 Cross-section 1 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 66.0 66.2 66.4 4.2 60.6 To eroded Surface Elev, cm 66.0 66.3 66.5 Vavg (fps) = 4.2 Soil Loss / Gain, cm 0.0-0.1-0.1 navg = 0.052 Clopper Soil Loss, cm 0.0-0.1-0.1 Flow (cfs) = 1.6 2.3 2.2 2 ft Avg Bottom Loss/Gain, in 0.0 Avg Clopper Soil Loss, in 0.0 Cross-section 2 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.5 66.0 65.5 4.5 61.0 To eroded Surface Elev, cm 65.5 66.0 66.5 Vavg (fps) = 4.5 Soil Loss / Gain, cm 0.0 0.0-1.0 navg = 0.044 Clopper Soil Loss, cm 0.0 0.0-1.0 Flow (cfs) = 1.5 2.0 2.0 4 ft Avg Bottom Loss/Gain, in -0.1 Avg Clopper Soil Loss, in -0.1 Cross-section 3 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 64.9 65.1 64.9 4.8 60.2 To eroded Surface Elev, cm 65.1 65.5 65.5 Vavg (fps) = 4.8 Soil Loss / Gain, cm -0.2-0.4-0.6 navg = 0.042 Clopper Soil Loss, cm -0.2-0.4-0.6 Flow (cfs) = 1.6 2.1 2.0 6 ft Avg Bottom Loss/Gain, in -0.2 Avg Clopper Soil Loss, in -0.2 Cross-section 4 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.0 66.0 65.5 5.0 60.6 To eroded Surface Elev, cm 65.4 66.0 65.7 Vavg (fps) = 5.0 Soil Loss / Gain, cm -0.4 0.0-0.2 navg = 0.040 Clopper Soil Loss, cm -0.4 0.0-0.2 Flow (cfs) = 1.7 2.1 2.0 8 ft Avg Bottom Loss/Gain, in -0.1 Avg Clopper Soil Loss, in -0.1 Cross-section 5 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 66.5 66.6 66.1 5.3 61.9 To eroded Surface Elev, cm 66.5 66.7 66.8 Vavg (fps) = 5.3 Soil Loss / Gain, cm 0.0-0.1-0.7 navg = 0.036 Clopper Soil Loss, cm 0.0-0.1-0.7 Flow (cfs) = 1.7 1.9 1.9 10 ft Avg Bottom Loss/Gain, in -0.1 Avg Clopper Soil Loss, in -0.1 Cross-section 6 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 64.5 64.5 64.4 5.4 59.9 To eroded Surface Elev, cm 64.5 64.7 64.5 Vavg (fps) = 5.4 Soil Loss / Gain, cm 0.0-0.2-0.1 navg = 0.035 Clopper Soil Loss, cm 0.0-0.2-0.1 Flow (cfs) = 1.7 1.9 1.8 12 ft Avg Bottom Loss/Gain, in 0.0 Avg Clopper Soil Loss, in 0.0 Cross-section 7 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.0 65.5 65.1 5.6 60.2 To eroded Surface Elev, cm 65.3 65.6 65.3 Vavg (fps) = 5.6 Soil Loss / Gain, cm -0.3-0.1-0.2 navg = 0.037 Clopper Soil Loss, cm -0.3-0.1-0.2 Flow (cfs) = 1.9 2.1 2.0 14 ft Avg Bottom Loss/Gain, in -0.1 Avg Clopper Soil Loss, in -0.1 Cross-section 8 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 67.8 68.0 67.8 5.8 63.4 To eroded Surface Elev, cm 68.2 68.6 68.2 Vavg (fps) = 5.8 Soil Loss / Gain, cm -0.4-0.6-0.4 navg = 0.034 Clopper Soil Loss, cm -0.4-0.6-0.4 Flow (cfs) = 1.9 2.0 1.9 16 ft Avg Bottom Loss/Gain, in -0.2 Avg Clopper Soil Loss, in -0.2 Cross-section 9 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 67.2 67.9 67.5 5.8 63.4 To eroded Surface Elev, cm 68.0 68.2 67.7 Vavg (fps) = 5.8 Soil Loss / Gain, cm -0.8-0.3-0.2 navg = 0.032 Clopper Soil Loss, cm -0.8-0.3-0.2 Flow (cfs) = 1.7 1.9 1.8 18 ft Avg Bottom Loss/Gain, in -0.2 Avg Clopper Soil Loss, in -0.2 Cross-section 10 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 67.8 67.9 67.5 6.0 63.1 To eroded Surface Elev, cm 68.4 68.0 67.5 Vavg (fps) = 6.0 Soil Loss / Gain, cm -0.6-0.1 0.0 navg = 0.033 Clopper Soil Loss, cm -0.6-0.1 0.0 Flow (cfs) = 1.9 2.0 1.9 20 ft Avg Bottom Loss/Gain, in -0.1 Avg Clopper Soil Loss, in -0.1 P300 TEST DATA Cross-section 11 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.1 65.9 65.9 6.0 61.4 To eroded Surface Elev, cm 65.5 66.0 67.0 Vavg (fps) = 6.0 Soil Loss / Gain, cm -0.4-0.1-1.1 navg = 0.032 3.8 pins / sy Clopper Soil Loss, cm -0.4-0.1-1.1 Flow (cfs) = 1.9 1.9 1.9 Avg Bottom Loss/Gain, in -0.2 Avg Clopper Soil Loss, in -0.2 Soil Loss / Gain, in -0.1-0.1-0.2 Avg Bottom Loss/Gain per Cross-Section = -0.1 Clopper Soil Loss, in -0.1-0.1-0.2 Avg Clopper Soil Loss per Cross-Section = -0.1

2-1 CHANNEL 2 - SHEAR STRESS 1 40 ft long flume 20 ft test section RECP: Anchorage: rpms 2 ft wide flume Date: 10/25/11 Start Time: 11:30 AM End Time: 12:30 PM Soil: Loam Target Shear (psf): 1.00 Slope: 20% 1 2 3 Outlet Weir Weir Channel Targets FLOW Water Depth, in 5.5 1.00 Weir width (ft) = 2 Water Velocity, ft/s 0.7 3.58 0 ft A B C Flow Rate, cfs 0.0 0.6 0.0 0.60 Cross-section 1 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 66.0 66.2 66.4 2.0 63.2 To eroded Surface Elev, cm 66.0 66.2 66.5 Vavg (fps) = 2.0 Soil Loss / Gain, cm 0.0 0.0-0.1 navg = 0.071 Clopper Soil Loss, cm 0.0 0.0-0.1 Flow (cfs) = 0.4 1.2 1.2 2 ft Avg Bottom Loss/Gain, in 0.0 Avg Clopper Soil Loss, in 0.0 Cross-section 2 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.5 66.0 65.5 2.1 63.2 To eroded Surface Elev, cm 65.5 66.1 66.1 Vavg (fps) = 2.1 Soil Loss / Gain, cm 0.0-0.1-0.6 navg = 0.063 Clopper Soil Loss, cm 0.0-0.1-0.6 Flow (cfs) = 0.4 1.1 1.1 4 ft Avg Bottom Loss/Gain, in -0.1 Avg Clopper Soil Loss, in -0.1 Cross-section 3 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 64.9 65.1 64.9 2.2 62.7 To eroded Surface Elev, cm 65.0 65.5 65.2 Vavg (fps) = 2.2 Soil Loss / Gain, cm -0.1-0.4-0.3 navg = 0.058 Clopper Soil Loss, cm -0.1-0.4-0.3 Flow (cfs) = 0.4 1.0 1.0 6 ft 25.5 Loss/Gain, in -0.1 Avg Clopper Soil Loss, in -0.1 Cross-section 4 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.0 66.0 65.5 2.3 63.0 To eroded Surface Elev, cm 65.2 65.9 65.6 Vavg (fps) = 2.3 Soil Loss / Gain, cm -0.2 0.1-0.1 navg = 0.056 Clopper Soil Loss, cm -0.2 0.0-0.1 Flow (cfs) = 0.4 1.0 1.0 8 ft Avg Bottom Loss/Gain, in 0.0 Avg Clopper Soil Loss, in 0.0 Cross-section 5 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 66.5 66.6 66.1 2.3 63.9 To eroded Surface Elev, cm 66.5 66.7 66.4 Vavg (fps) = 2.3 Soil Loss / Gain, cm 0.0-0.1-0.3 navg = 0.056 Clopper Soil Loss, cm 0.0-0.1-0.3 Flow (cfs) = 0.4 1.1 1.0 10 ft Avg Bottom Loss/Gain, in -0.1 Avg Clopper Soil Loss, in -0.1 Cross-section 6 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 64.5 64.5 64.4 2.3 62.1 To eroded Surface Elev, cm 64.5 64.6 64.4 Vavg (fps) = 2.3 Soil Loss / Gain, cm 0.0-0.1 0.0 navg = 0.053 Clopper Soil Loss, cm 0.0-0.1 0.0 Flow (cfs) = 0.4 1.0 0.9 12 ft Avg Bottom Loss/Gain, in 0.0 Avg Clopper Soil Loss, in 0.0 Cross-section 7 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.0 65.5 65.1 2.4 63.1 To eroded Surface Elev, cm 65.2 65.5 65.2 Vavg (fps) = 2.4 Soil Loss / Gain, cm -0.2 0.0-0.1 navg = 0.048 Clopper Soil Loss, cm -0.2 0.0-0.1 Flow (cfs) = 0.3 0.9 0.9 14 ft Avg Bottom Loss/Gain, in 0.0 Avg Clopper Soil Loss, in 0.0 Cross-section 8 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 67.8 68.0 67.8 2.5 65.4 To eroded Surface Elev, cm 68.0 68.4 68.0 Vavg (fps) = 2.5 Soil Loss / Gain, cm -0.2-0.4-0.2 navg = 0.053 Clopper Soil Loss, cm -0.2-0.4-0.2 Flow (cfs) = 0.4 1.1 1.1 16 ft Avg Bottom Loss/Gain, in -0.1 Avg Clopper Soil Loss, in -0.1 Cross-section 9 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 67.2 67.9 67.5 2.6 65.4 To eroded Surface Elev, cm 67.5 68.0 67.6 Vavg (fps) = 2.6 Soil Loss / Gain, cm -0.3-0.1-0.1 navg = 0.046 Clopper Soil Loss, cm -0.3-0.1-0.1 Flow (cfs) = 0.4 0.9 0.9 18 ft Avg Bottom Loss/Gain, in -0.1 Avg Clopper Soil Loss, in -0.1 Cross-section 10 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 67.8 67.9 67.5 2.7 65.6 To eroded Surface Elev, cm 68.0 68.0 67.5 Vavg (fps) = 2.7 Soil Loss / Gain, cm -0.2-0.1 0.0 navg = 0.043 Clopper Soil Loss, cm -0.2-0.1 0.0 Flow (cfs) = 0.4 0.9 0.9 20 ft Avg Bottom Loss/Gain, in 0.0 Avg Clopper Soil Loss, in 0.0 P300 TEST DATA Cross-section 11 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.1 65.9 65.9 2.8 63.6 To eroded Surface Elev, cm 65.5 66.0 66.2 Vavg (fps) = 2.8 Soil Loss / Gain, cm -0.4-0.1-0.3 navg = 0.042 3.8 pins / sy Clopper Soil Loss, cm -0.4-0.1-0.3 Flow (cfs) = 0.4 0.9 0.9 Avg Bottom Loss/Gain, in -0.1 Avg Clopper Soil Loss, in -0.1 Soil Loss / Gain, in -0.1 0.0-0.1 Avg Bottom Loss/Gain per Cross-Section = -0.1 Clopper Soil Loss, in -0.1-0.1-0.1 Avg Clopper Soil Loss per Cross-Section = -0.1

3-4 CHANNEL 3 - SHEAR STRESS 4 40 ft long flume 20 ft test section RECP: Anchorage: rpms 2 ft wide flume Date: 4/18/13 Start Time: 2:51 PM End Time: Soil: Loam Target Shear (psf): 12.00 Slope: 20% 1 2 3 Inlet Weir Weir Channel Targets FLOW Water Depth, in 0.00 0.00 Weir width (ft) = 2.00 C = 0.00 Water Velocity, ft/s 0.00 0.00 0 ft A B C Flow Rate, cfs 0.00 0.00 0.00 55.00 Cross-section 1 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 67.5 67.7 67.6 21.90418118 30.5 To eroded Surface Elev, cm 68.7 68.8 68.8 Vavg (fps) = 21.90 Soil Loss / Gain, cm -1.2-1.1-1.2 navg = 0.035 Clopper Soil Loss, cm -1.2-1.1-1.2 Flow (cfs) = 55.00 15.56 15.07 2 ft Avg Bottom Loss/Gain, in -0.46 Avg Clopper Soil Loss, in -0.46 Cross-section 2 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.5 65.2 65.1 23.83507109 31.4 To eroded Surface Elev, cm 66.7 66.8 66.2 Vavg (fps) = 23.84 Soil Loss / Gain, cm -1.2-1.6-1.1 navg = 0.031 Clopper Soil Loss, cm -1.2-1.6-1.1 Flow (cfs) = 55.00 14.30 13.85 4 ft Avg Bottom Loss/Gain, in -0.51 Avg Clopper Soil Loss, in -0.51 Cross-section 3 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.7 66.1 65.3 25.04581673 33.3 To eroded Surface Elev, cm 67 67.1 66.2 Vavg (fps) = 25.05 Soil Loss / Gain, cm -1.3-1 -0.9 navg = 0.028 Clopper Soil Loss, cm -1.3-1 -0.9 Flow (cfs) = 55.00 13.61 13.18 6 ft Avg Bottom Loss/Gain, in -0.42 Avg Clopper Soil Loss, in -0.42 Cross-section 4 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 64 63.3 62.8 25.42568251 31.5 To eroded Surface Elev, cm 65.4 64.3 63.7 Vavg (fps) = 25.43 Soil Loss / Gain, cm -1.4-1 -0.9 navg = 0.028 Clopper Soil Loss, cm -1.4-1 -0.9 Flow (cfs) = 55.00 13.41 12.98 8 ft Avg Bottom Loss/Gain, in -0.43 Avg Clopper Soil Loss, in -0.43 Cross-section 5 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 62.1 61.9 61.5 25.58087487 30.5 To eroded Surface Elev, cm 63.6 63.2 63 Vavg (fps) = 25.58 Soil Loss / Gain, cm -1.5-1.3-1.5 navg = 0.027 Clopper Soil Loss, cm -1.5-1.3-1.5 Flow (cfs) = 55.00 13.33 12.90 10 ft Avg Bottom Loss/Gain, in -0.56 Avg Clopper Soil Loss, in -0.56 Cross-section 6 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 61.2 61 60.5 26.0310559 30.0 To eroded Surface Elev, cm 63 62 61.6 Vavg (fps) = 26.03 Soil Loss / Gain, cm -1.8-1 -1.1 navg = 0.026 Clopper Soil Loss, cm -1.8-1 -1.1 Flow (cfs) = 55.00 13.10 12.68 12 ft Avg Bottom Loss/Gain, in -0.51 Avg Clopper Soil Loss, in -0.51 Cross-section 7 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 63.4 63.1 62.5 26.0310559 32.5 To eroded Surface Elev, cm 64.8 64.4 64.9 Vavg (fps) = 26.03 Soil Loss / Gain, cm -1.4-1.3-2.4 navg = 0.026 Clopper Soil Loss, cm -1.4-1.3-2.4 Flow (cfs) = 55.00 13.10 12.68 14 ft Avg Bottom Loss/Gain, in -0.67 Avg Clopper Soil Loss, in -0.67 Cross-section 8 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 61.3 61 61 26.89411765 31.5 To eroded Surface Elev, cm 62.4 63 62.6 Vavg (fps) = 26.89 Soil Loss / Gain, cm -1.1-2 -1.6 navg = 0.025 Clopper Soil Loss, cm -1.1-2 -1.6 Flow (cfs) = 55.00 12.68 12.27 16 ft Avg Bottom Loss/Gain, in -0.62 Avg Clopper Soil Loss, in -0.62 Cross-section 9 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 61.5 61 60.4 27.03870968 31.2 To eroded Surface Elev, cm 62.7 62.3 61.6 Vavg (fps) = 27.04 Soil Loss / Gain, cm -1.2-1.3-1.2 navg = 0.025 Clopper Soil Loss, cm -1.2-1.3-1.2 Flow (cfs) = 55.00 12.61 12.20 18 ft Avg Bottom Loss/Gain, in -0.49 Avg Clopper Soil Loss, in -0.49 Cross-section 10 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 60.8 61 60.9 26.95176849 31.3 To eroded Surface Elev, cm 63 62.4 61.8 Vavg (fps) = 26.95 Soil Loss / Gain, cm -2.2-1.4-0.9 navg = 0.025 Clopper Soil Loss, cm -2.2-1.4-0.9 Flow (cfs) = 55.00 12.65 12.24 20 ft Avg Bottom Loss/Gain, in -0.59 Avg Clopper Soil Loss, in -0.59 P300 TEST DATA Cross-section 11 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 61 60.9 60.9 28.34949267 33.0 To eroded Surface Elev, cm 63 62.7 62 Vavg (fps) = 28.35 Soil Loss / Gain, cm -2-1.8-1.1 navg = 0.023 3.8 pins / sy Clopper Soil Loss, cm -2-1.8-1.1 Flow (cfs) = 55.00 12.03 11.64 Avg Bottom Loss/Gain, in -0.64 Avg Clopper Soil Loss, in -0.64 Soil Loss / Gain, in -0.58-0.53-0.50 Avg Bottom Loss/Gain per Cross-Section = -0.54 Clopper Soil Loss, in -0.58-0.53-0.50 Avg Clopper Soil Loss per Cross-Section = -0.54

3-3 CHANNEL 3 - SHEAR STRESS 3 40 ft long flume 20 ft test section RECP: Anchorage: rpms 2 ft wide flume Date: 4/18/13 Start Time: 12:03 PM End Time: 1:03 PM Soil: Loam Target Shear (psf): 8.00 Slope: 20% 1 2 3 Inlet Weir Weir Channel Targets FLOW Water Depth, in 0.00 0.00 Weir width (ft) = 4 Water Velocity, ft/s 0.00 0.00 ft A B C Flow Rate, cfs 0.00 0.00 0.00 28.00 Cross-section 1 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 67.5 67.7 67.6 17.00 43.2 To eroded Surface Elev, cm 68.2 68.5 68.2 Vavg (fps) = 17.00 Soil Loss / Gain, cm -0.7-0.8-0.6 navg = 0.034 Clopper Soil Loss, cm -0.7-0.8-0.6 Flow (cfs) = 28.00 10.21 9.88 2 ft Avg Bottom Loss/Gain, in -0.28 Avg Clopper Soil Loss, in -0.28 Cross-section 2 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.5 65.2 65.1 18.47 43.0 To eroded Surface Elev, cm 66.4 66.3 65.6 Vavg (fps) = 18.47 Soil Loss / Gain, cm -0.9-1.1-0.5 navg = 0.030 Clopper Soil Loss, cm -0.9-1.1-0.5 Flow (cfs) = 28.00 9.40 9.09 4 ft Avg Bottom Loss/Gain, in -0.33 Avg Clopper Soil Loss, in -0.33 Cross-section 3 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.7 66.1 65.3 18.50 43.4 To eroded Surface Elev, cm 66.7 66.8 65.9 Vavg (fps) = 18.50 Soil Loss / Gain, cm -1-0.7-0.6 navg = 0.030 Clopper Soil Loss, cm -1-0.7-0.6 Flow (cfs) = 28.00 9.38 9.08 6 ft Avg Bottom Loss/Gain, in -0.30 Avg Clopper Soil Loss, in -0.30 Cross-section 4 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 64 63.3 62.8 19.22 42.0 To eroded Surface Elev, cm 65.01 64 63.6 Vavg (fps) = 19.22 Soil Loss / Gain, cm -1.01-0.7-0.8 navg = 0.028 Clopper Soil Loss, cm -1.01-0.7-0.8 Flow (cfs) = 28.00 9.03 8.74 8 ft Avg Bottom Loss/Gain, in -0.33 Avg Clopper Soil Loss, in -0.33 Cross-section 5 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 62.1 61.9 61.5 19.28 40.5 To eroded Surface Elev, cm 63 62.7 62.2 Vavg (fps) = 19.28 Soil Loss / Gain, cm -0.9-0.8-0.7 navg = 0.028 Clopper Soil Loss, cm -0.9-0.8-0.7 Flow (cfs) = 28.00 9.00 8.71 10 ft Avg Bottom Loss/Gain, in -0.31 Avg Clopper Soil Loss, in -0.31 Cross-section 6 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 61.2 61 60.5 19.57 40.0 To eroded Surface Elev, cm 62.6 61.7 61.1 Vavg (fps) = 19.57 Soil Loss / Gain, cm -1.4-0.7-0.6 navg = 0.027 Clopper Soil Loss, cm -1.4-0.7-0.6 Flow (cfs) = 28.00 8.87 8.58 12 ft Avg Bottom Loss/Gain, in -0.35 Avg Clopper Soil Loss, in -0.35 Cross-section 7 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 63.4 63.1 62.5 19.88 42.5 To eroded Surface Elev, cm 64.2 63.6 64.1 Vavg (fps) = 19.88 Soil Loss / Gain, cm -0.8-0.5-1.6 navg = 0.026 Clopper Soil Loss, cm -0.8-0.5-1.6 Flow (cfs) = 28.00 8.73 8.45 14 ft Avg Bottom Loss/Gain, in -0.38 Avg Clopper Soil Loss, in -0.38 Cross-section 8 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 61.3 61 61 19.88 40.5 To eroded Surface Elev, cm 61.8 62.1 62 Vavg (fps) = 19.88 Soil Loss / Gain, cm -0.5-1.1-1 navg = 0.026 Clopper Soil Loss, cm -0.5-1.1-1 Flow (cfs) = 28.00 8.73 8.45 16 ft Avg Bottom Loss/Gain, in -0.34 Avg Clopper Soil Loss, in -0.34 Cross-section 9 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 61.5 61 60.4 20.03 40.5 To eroded Surface Elev, cm 62.4 61.8 61.2 Vavg (fps) = 20.03 Soil Loss / Gain, cm -0.9-0.8-0.8 navg = 0.026 Clopper Soil Loss, cm -0.9-0.8-0.8 Flow (cfs) = 28.00 8.66 8.39 18 ft Avg Bottom Loss/Gain, in -0.33 Avg Clopper Soil Loss, in -0.33 Cross-section 10 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 60.8 61 60.9 20.42 41.0 To eroded Surface Elev, cm 62 62.1 61.6 Vavg (fps) = 20.42 Soil Loss / Gain, cm -1.2-1.1-0.7 navg = 0.025 Clopper Soil Loss, cm -1.2-1.1-0.7 Flow (cfs) = 28.00 8.50 8.23 20 ft Avg Bottom Loss/Gain, in -0.39 Avg Clopper Soil Loss, in -0.39 41382 3.8 pins / sy TEST DATA Cross-section 11 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 61 60.9 60.9 21.02 41.6 To eroded Surface Elev, cm 62.2 62 61.5 Vavg (fps) = 21.02 Soil Loss / Gain, cm -1.2-1.1-0.6 navg = 0.024 Clopper Soil Loss, cm -1.2-1.1-0.6 Flow (cfs) = 28.00 8.26 7.99 Avg Bottom Loss/Gain, in -0.38 Avg Clopper Soil Loss, in -0.38 Soil Loss / Gain, in -0.38-0.34-0.30 Avg Bottom Loss/Gain per Cross-Section = -0.34 Clopper Soil Loss, in -0.38-0.34-0.30 Avg Clopper Soil Loss per Cross-Section = -0.34

3-2 CHANNEL 3 - SHEAR STRESS 2 40 ft long flume 20 ft test section RECP: Anchorage: 1500 rpms 2 ft wide flume Date: 4/18/13 Start Time: 10:49 AM End Time: 11:49 AM Soil: Loam Target Shear (psf): 4.00 Slope: 20% 1 2 3 Inlet Weir Weir Channel Targets FLOW Water Depth, in 0.00 0.00 Weir width (ft) = Water Velocity, ft/s 0.00 0.00 0 ft A B C Flow Rate, cfs 0.00 0.00 0.00 9.50 Cross-section 1 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 67.5 67.7 67.6 10.34 54.0 To eroded Surface Elev, cm 67.8 68.2 68 Vavg (fps) = 10.34 Soil Loss / Gain, cm -0.3-0.5-0.4 navg = 0.038 Clopper Soil Loss, cm -0.3-0.5-0.4 Flow (cfs) = 9.50 5.69 5.51 2 ft Avg Bottom Loss/Gain, in -0.16 Avg Clopper Soil Loss, in -0.16 Cross-section 2 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.5 65.2 65.1 10.62 52.0 To eroded Surface Elev, cm 65.8 65.7 65.4 Vavg (fps) = 10.62 Soil Loss / Gain, cm -0.3-0.5-0.3 navg = 0.037 Clopper Soil Loss, cm -0.3-0.5-0.3 Flow (cfs) = 9.50 5.55 5.37 4 ft Avg Bottom Loss/Gain, in -0.14 Avg Clopper Soil Loss, in -0.14 Cross-section 3 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.7 66.1 65.3 11.08 53.0 To eroded Surface Elev, cm 66 66.6 65.6 Vavg (fps) = 11.08 Soil Loss / Gain, cm -0.3-0.5-0.3 navg = 0.034 Clopper Soil Loss, cm -0.3-0.5-0.3 Flow (cfs) = 9.50 5.31 5.14 6 ft Avg Bottom Loss/Gain, in -0.14 Avg Clopper Soil Loss, in -0.14 Cross-section 4 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 64 63.3 62.8 11.55 51.2 To eroded Surface Elev, cm 64.2 63.8 63.2 Vavg (fps) = 11.55 Soil Loss / Gain, cm -0.2-0.5-0.4 navg = 0.032 Clopper Soil Loss, cm -0.2-0.5-0.4 Flow (cfs) = 9.50 5.10 4.93 8 ft Avg Bottom Loss/Gain, in -0.14 Avg Clopper Soil Loss, in -0.14 Cross-section 5 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 62.1 61.9 61.5 12.13 50.3 To eroded Surface Elev, cm 62.4 62.4 61.9 Vavg (fps) = 12.13 Soil Loss / Gain, cm -0.3-0.5-0.4 navg = 0.029 Clopper Soil Loss, cm -0.3-0.5-0.4 Flow (cfs) = 9.50 4.85 4.70 10 ft Avg Bottom Loss/Gain, in -0.16 Avg Clopper Soil Loss, in -0.16 Cross-section 6 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 61.2 61 60.5 12.27 49.5 To eroded Surface Elev, cm 61.7 61.4 60.8 Vavg (fps) = 12.27 Soil Loss / Gain, cm -0.5-0.4-0.3 navg = 0.029 Clopper Soil Loss, cm -0.5-0.4-0.3 Flow (cfs) = 9.50 4.80 4.65 12 ft Avg Bottom Loss/Gain, in -0.16 Avg Clopper Soil Loss, in -0.16 Cross-section 7 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 63.4 63.1 62.5 12.52 51.8 To eroded Surface Elev, cm 63.8 63.5 62.8 Vavg (fps) = 12.52 Soil Loss / Gain, cm -0.4-0.4-0.3 navg = 0.028 Clopper Soil Loss, cm -0.4-0.4-0.3 Flow (cfs) = 9.50 4.70 4.55 14 ft Avg Bottom Loss/Gain, in -0.14 Avg Clopper Soil Loss, in -0.14 Cross-section 8 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 61.3 61 61 12.63 50.0 To eroded Surface Elev, cm 61.6 61.4 61.4 Vavg (fps) = 12.63 Soil Loss / Gain, cm -0.3-0.4-0.4 navg = 0.027 Clopper Soil Loss, cm -0.3-0.4-0.4 Flow (cfs) = 9.50 4.66 4.51 16 ft Avg Bottom Loss/Gain, in -0.14 Avg Clopper Soil Loss, in -0.14 Cross-section 9 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 61.5 61 60.4 12.66 50.0 To eroded Surface Elev, cm 62 61.5 60.8 Vavg (fps) = 12.66 Soil Loss / Gain, cm -0.5-0.5-0.4 navg = 0.027 Clopper Soil Loss, cm -0.5-0.5-0.4 Flow (cfs) = 9.50 4.65 4.50 18 ft Avg Bottom Loss/Gain, in -0.18 Avg Clopper Soil Loss, in -0.18 Cross-section 10 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 60.8 61 60.9 12.30 49.6 To eroded Surface Elev, cm 61.2 61.6 61.3 Vavg (fps) = 12.30 Soil Loss / Gain, cm -0.4-0.6-0.4 navg = 0.029 Clopper Soil Loss, cm -0.4-0.6-0.4 Flow (cfs) = 9.50 4.79 4.63 20 ft Avg Bottom Loss/Gain, in -0.18 Avg Clopper Soil Loss, in -0.18 P300 TEST DATA Cross-section 11 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 61 60.9 60.9 12.81 50.1 To eroded Surface Elev, cm 61.5 61.4 61.3 Vavg (fps) = 12.81 Soil Loss / Gain, cm -0.5-0.5-0.4 navg = 0.027 3.8 pins / sy Clopper Soil Loss, cm -0.5-0.5-0.4 Flow (cfs) = 9.50 4.60 4.45 Avg Bottom Loss/Gain, in -0.18 Avg Clopper Soil Loss, in -0.18 Soil Loss / Gain, in -0.14-0.19-0.14 Avg Bottom Loss/Gain per Cross-Section = -0.16 Clopper Soil Loss, in -0.14-0.19-0.14 Avg Clopper Soil Loss per Cross-Section = -0.16

3-1 CHANNEL 3 - SHEAR STRESS 1 40 ft long flume 20 ft test section RECP: Anchorage: rpms 2 ft wide flume Date: 4/18/13 Start Time: 9:27 AM End Time: 10:27 AM Soil: Loam Target Shear (psf): 2.00 Slope: 20% 1 2 3 Outlet Weir Weir Channel Targets FLOW Water Depth, in 0.00 0.00 Weir width (ft) = 2 Water Velocity, ft/s 0.00 0.00 0 ft A B C Flow Rate, cfs 0.00 0.00 0.00 4.50 Cross-section 1 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 67.5 67.7 67.6 7.32 58.4 To eroded Surface Elev, cm 67.6 68 67.7 Vavg (fps) = 7.32 Soil Loss / Gain, cm -0.1-0.3-0.1 navg = 0.041 Clopper Soil Loss, cm -0.1-0.3-0.1 Flow (cfs) = 4.50 3.81 3.69 2 ft Avg Bottom Loss/Gain, in -0.07 Avg Clopper Soil Loss, in -0.07 Cross-section 2 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.5 65.2 65.1 7.30 56.0 To eroded Surface Elev, cm 65.6 65.4 65.2 Vavg (fps) = 7.30 Soil Loss / Gain, cm -0.1-0.2-0.1 navg = 0.042 Clopper Soil Loss, cm -0.1-0.2-0.1 Flow (cfs) = 4.50 3.82 3.70 4 ft Avg Bottom Loss/Gain, in -0.05 Avg Clopper Soil Loss, in -0.05 Cross-section 3 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 65.7 66.1 65.3 7.56 56.8 To eroded Surface Elev, cm 65.8 66.4 65.4 Vavg (fps) = 7.56 Soil Loss / Gain, cm -0.1-0.3-0.1 navg = 0.039 Clopper Soil Loss, cm -0.1-0.3-0.1 Flow (cfs) = 4.50 3.69 3.57 6 ft 25.5 Loss/Gain, in -0.07 Avg Clopper Soil Loss, in -0.07 Cross-section 4 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 64 63.3 62.8 8.07 55.0 To eroded Surface Elev, cm 64 63.5 63 Vavg (fps) = 8.07 Soil Loss / Gain, cm 0-0.2-0.2 navg = 0.035 Clopper Soil Loss, cm 0-0.2-0.2 Flow (cfs) = 4.50 3.46 3.35 8 ft Avg Bottom Loss/Gain, in -0.05 Avg Clopper Soil Loss, in -0.05 Cross-section 5 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 62.1 61.9 61.5 7.82 53.2 To eroded Surface Elev, cm 62.2 62 61.7 Vavg (fps) = 7.82 Soil Loss / Gain, cm -0.1-0.1-0.2 navg = 0.037 Clopper Soil Loss, cm -0.1-0.1-0.2 Flow (cfs) = 4.50 3.57 3.45 10 ft Avg Bottom Loss/Gain, in -0.05 Avg Clopper Soil Loss, in -0.05 Cross-section 6 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 61.2 61 60.5 8.30 52.8 To eroded Surface Elev, cm 61.4 61.2 60.6 Vavg (fps) = 8.30 Soil Loss / Gain, cm -0.2-0.2-0.1 navg = 0.034 Clopper Soil Loss, cm -0.2-0.2-0.1 Flow (cfs) = 4.50 3.36 3.25 12 ft Avg Bottom Loss/Gain, in -0.07 Avg Clopper Soil Loss, in -0.07 Cross-section 7 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 63.4 63.1 62.5 8.20 54.8 To eroded Surface Elev, cm 63.6 63.4 62.5 Vavg (fps) = 8.20 Soil Loss / Gain, cm -0.2-0.3 0 navg = 0.034 Clopper Soil Loss, cm -0.2-0.3 0 Flow (cfs) = 4.50 3.40 3.29 14 ft Avg Bottom Loss/Gain, in -0.07 Avg Clopper Soil Loss, in -0.07 Cross-section 8 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 61.3 61 61 8.61 53.3 To eroded Surface Elev, cm 61.5 61.2 61.1 Vavg (fps) = 8.61 Soil Loss / Gain, cm -0.2-0.2-0.1 navg = 0.032 Clopper Soil Loss, cm -0.2-0.2-0.1 Flow (cfs) = 4.50 3.24 3.14 16 ft Avg Bottom Loss/Gain, in -0.07 Avg Clopper Soil Loss, in -0.07 Cross-section 9 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 61.5 61 60.4 9.18 53.7 To eroded Surface Elev, cm 61.7 61.3 60.5 Vavg (fps) = 9.18 Soil Loss / Gain, cm -0.2-0.3-0.1 navg = 0.028 Clopper Soil Loss, cm -0.2-0.3-0.1 Flow (cfs) = 4.50 3.04 2.94 18 ft Avg Bottom Loss/Gain, in -0.08 Avg Clopper Soil Loss, in -0.08 Cross-section 10 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 60.8 61 60.9 9.35 53.8 To eroded Surface Elev, cm 61 61.3 61.1 Vavg (fps) = 9.35 Soil Loss / Gain, cm -0.2-0.3-0.2 navg = 0.027 Clopper Soil Loss, cm -0.2-0.3-0.2 Flow (cfs) = 4.50 2.98 2.89 20 ft Avg Bottom Loss/Gain, in -0.09 Avg Clopper Soil Loss, in -0.09 P300 TEST DATA Cross-section 11 A B C V @ 0.2d V @ 0.6d V @ 0.8d To Water Surf, cm To original Surface Elev, cm 61 60.9 60.9 9.61 54.0 To eroded Surface Elev, cm 61.2 61.1 61.1 Vavg (fps) = 9.61 Soil Loss / Gain, cm -0.2-0.2-0.2 navg = 0.026 3.8 pins / sy Clopper Soil Loss, cm -0.2-0.2-0.2 Flow (cfs) = 4.50 2.90 2.81 Avg Bottom Loss/Gain, in -0.08 Avg Clopper Soil Loss, in -0.08 Soil Loss / Gain, in -0.06-0.09-0.05 Avg Bottom Loss/Gain per Cross-Section = -0.07 Clopper Soil Loss, in -0.06-0.09-0.05 Avg Clopper Soil Loss per Cross-Section = -0.07

P300, Double Net Poly Fiber Mat, over Loam Channel Erosion Testing May 3, 2013 Appendix APPENDIX B TEST SOIL Test Soil Grain Size Distribution Curve Compaction Curves Veneer Soil Compaction Verification

Percent Finer January 2010 100 90 80 Plasticity (ASTM D 4318) Liquid Limit: 35 Plastic Limit: 30 Plastic Index: 5 Soil classifies as a sandy silt (ML) in accordance with ASTM D 2487 70 60 50 40 30 DDRF ASTM D 6459 & D 6460 Blended Test Soil 20 10 ASTM ASTM D 6459 & D 6460 Target Loam 0 100 10 1 0.1 Particle Size (mm) 0.01 0.001

Proctor Compaction Test 120 Project: TRI-DDRF 115 Sample No.: DDRF Test Soil - January 2010 TRI Log No.: E2337-12-04 Dry Density (pcf) 110 105 100 95 Test Method: ASTM D 698 - Method A Maximum Dry Density (pcf): 98.7 Optimum Moisture Content (%): 20.0 2.80 2.70 2.60 90 85 80 5 10 15 20 25 30 35 40 45 Moisture Content (%) Cheng-Wei Chen, 02/03/10 Quality Review/Date Tested by: Tamika Walker The testing herein is based upon accepted industry practice as well as the test method listed. Test results reported herein do not apply to samples other than those tested. TRI neither accepts responsibility for nor makes claim as to the final use and purpose of the material. TRI observes and maintains client confidentiality. TRI limits reproduction of this report, except in full, without prior approval of TRI. 9063 Bee Caves Road Austin, TX 78733-6201 (512) 263-2101 (512) 263-2558 1-800-880-TEST

Compaction Worksheet ASTM D 1556 Calibration Date: 8/16/2009 Sand Used: Pool Filter Sand Volume Measure: Liquid Volume, V m (cm 3 ): 425 Wt. of Sand to Fill Known Volume: Total Wt (g) Pan Wt (g) Net Wt (g) Trial #1 (g) 663.3 11.5 651.8 Trial #2 (g) 661.3 11.5 649.8 Trial #3 (g) 657.3 11.5 645.8 W a (g) 649.1 Density of Sand, ɣ sand (g/cm 3 ) = W a / V m = 1.53 Wt. of Sand to Fill Cone: Total Wt (g) Cone Wt (g) Net Wt (g) Trial #1 (g) 7046.0 5152.9 1893.1 Trial #2 (g) 7045.3 5152.9 1892.4 Trial #3 (g) 7046.9 5152.9 1894.0 Wt. of Sand in Cone (g): 1893.2 Field Data Date: 2/10/2010 Soil Data: Wt. of Wet Soil + Pan (g) 934.6 Wt. of Dry Soil + Pan (g) 792.4 Wt. of Pan (g) 14.5 Wt. of Wet Soil, W' (g) 920.1 Wt. of Dry Soil (g) 777.9 Wt. of Water (g) 142.2 Water Content, w (%) 18.3% Volume Data: Sand Used: Pool Filter Sand Unit Wt. of Sand, ɣ sand (g/cm 3 ) = 1.53 Wt. of Jug & Cone Before (g) = 7050.10 Wt. of Jug & Cone After (g) = 4348.33 Wt. of Sand Used (g) = 2701.77 Wt. of Sand in Cone (g) = 1893.17 Wt. of Sand in Hole, W (g) = 808.60 Volume of hole, V h (cm 3 ) = W / ɣ sand = 529.41 Density Calculation: Wet density, ɣ wet = W' / V h (kn/m 3 ) = 1.74 Wet density, ɣ wet = W' / V h (lb/ft 3 ) = 108.40 Dry density, ɣ dry = ɣ wet / [1 + w] (kn/m 3 ) = 1.47 Wet density, ɣ wet = W' / V h (lb/ft 3 ) = 91.65 Max Std. Proctor Dry density (kn/m 3 ) = 98.70 Opt. Moisture via Std. Proctor density (%) = 20.00 Compaction as % of Std. Proctor = 92.9%