Endure 900 Suspended Ceiling Installation Guide

Similar documents
Panelized Linear Walls Installation Guide

Curvalon and Curvatone Ceilings Installation Guide

RULON ACOUSTICAL CEILING SYSTEM ALURATONE 100 ARCHITECTURAL SPECIFICATIONS

RULON LINEAR OPEN SUSPENDED WOOD CEILING SYSTEMS ARCHITECTURAL SPECIFICATIONS

Submittal Transmittal

RULON WOOD SQUARE SUSPENDED CEILING SYSTEMS ARCHITECTURAL SPECIFICATIONS

A. ASTM C635, Standard Specifications for Metal Suspension Systems. B. ASTM C636, Recommended Practice for Installation of Metal Suspension System

EXTERIOR PLANK SERIES SPECIFICATION DATA

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description

DETAIL INSTRUCTION No. 1

Optima Vector Plank. Installation Instructions. Ceiling

OPTIMA Vector Plank Installation Instructions

METALWORKS RH215 Faceted Custom Hook-on Panels

Optima Vector Ultima Vector

SUSPENSION REQUIREMENTS SEE DETAIL B1.2 TYPICAL SYSTEM SECTION SEE DETAIL 'A' THIS SHEET 2" MODULE. SPECIFICATIONS (unless noted otherwise)

4 " " SEE DETAIL B1.2. SPECIFICATIONS (unless noted otherwise)

Technical Data VARIABLES

SECTION GYPSUM BOARD PART 1 - GENERAL

AXIOM Direct Light Coves Assembly and Installation Instructions

INSTALLATION GUIDE GUIDE TO ASC ISO-WALL CONSTRUCTION SYSTEM APPLICATION ISO-WALL SYSTEM. ASC Iso-Wall System Includes: Materials Required:

AXIOM Indirect Field Light Coves

Student Services & Classroom Addition

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

SECTION (09512) - ACOUSTICAL TILE CEILINGS

Project No: Pakenham Branch Library, Pakenham, Ontario Section DECEMBER, 2016 Page 1 of 6

OPTIMA Concealed. Installation and Maintenance Guide

Construction Standards PAGE

SOUNDSCAPES BAFFLES. Assembly and Installation Instructions

CEILING & WALL SYSTEMS

Technical Data VARIABLES

OPTIMA and LYRA Concealed

Union County Vocational - Technical Schools Scotch Plains, New Jersey

BASICS Direct-Attach Ceiling Panels

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual

LINEAR METAL CEILINGS Section

OPTIMA, ULTIMA, and LYRA Vector

Acoustic Ceiling Products (ACP) Fasäde Thermoplastic Panels Section Digicon Information Inc. Page 1

Siding and Soffit Installation Guidelines

OPTIMA Vector ULTIMA Vector

Basics Direct-Attach Ceiling Panels

AXIOM Indirect Light Coves

AXIOM Building Perimeter System Assembly and Installation Instructions

Technical Data VARIABLES

Basic Suspension Systems

SECTION LINEAR METAL CEILINGS

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

Easy Elegance Ceiling Panel Installation Instructions

METALWORKS Torsion Spring

Siding and Soffit Installation Guidelines

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

Technical Data VARIABLES

OptimA, Ultima, CALLa, and LYRA Vector

SECTION DRYWALL GRID LINEAR LIGHTING INTEGRATION

Suspension System Data Center Ceiling Solutions

Technical Data VARIABLES

SECTION ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL

6" MAX CARRIER OVERHANG, TYP. MAX CARRIER SPACING VARIES DEPENDING ON DESIGN WIND PRESSURE, SEE DETAIL B1.2, TYP.

SECTION ACOUSTICAL PANEL CEILINGS

SPECIFICATIONS (unless noted otherwise)

ECONO 200 INPLANT OFFICE

SECTION NON-STRUCTURAL METAL FRAMING

PRELUDE. 24 MAX TM Suspension System Data Centre Ceiling Solutions. Assembly and Installation Instructions

OmniFlex 300 Plus Installation Instructions

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700

Geometrik Manufacturing Inc.

Ceiling Tiles C200B - Specification

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Impression Graphic panels

GigaHouse Specifications

Store No MAY 13 Addendum No. 1 SECTION ACOUSTICAL PANEL CEILINGS

CI/SfB. June RockLink 24 Monolith. Installation system

Genesis Panel Systems LLC Dura-Max Brick Panel Siding Installation Instructions

ALL-ALUMINUM DOOR & WINDOW FRAMING

SECTION NON-STRUCTURAL METAL FRAMING

Advanced Wind Mitigation Methodologies, Pt. 1- Internet Course (5th Edition)

SECTION COMPOSITE CORE ACOUSTICAL PANEL CEILINGS. Sound-Rite Inc. #9, rd Avenue NE Calgary, AB T2A 7P3

BASICS Direct-Attach Ceiling Panels

SYSTEM S4-RHOMBOS INSTALLATION MANUAL

Resysta Wall Cladding Installation Guidelines

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD SYSTEM

MODELS FWF/FWFC-300/500 & FWS/FWSC-200/400 INSTALLATION INSTRUCTIONS

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

Installation Guide December 2012

A. Product Data: Submit manufacturer's descriptive literature, and recommendations and instructions for installation.

Knauf MF Suspended Ceilings

Current Seismic Code Development and Adoption

SECTION GYPSUM BOARD SYSTEM

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

Architectural Roof Products Guide Specifications

Axiom Building Perimeter System

SECTION ACOUSTICAL CEILINGS

THIS SECTION IS BASED ON ROCKFON S PLANOSTILE SNAP-IN METAL CEILING PANELS.

(Suited for seismic categories A, B, C, D, E, F)

Design No. HI/BP PERIMETER FIRE BARRIER SYSTEM Hilti, Inc. ASTM E 2307 Table 1

AXIOM Building Perimeter System

Section GYPSUM DRYWALL

NRDCA GUIDELINE FOR APPLICATION of CEMENTITIOUS WOOD FIBER ROOF DECK SYSTEMS

Transcription:

Endure 900 Suspended Ceiling Installation Guide World Commerce Center 2000 Ring Way Road, St. Augustine, FL 32092 Phone: 800-227-8566 or 904-584-1400 www.rulonco.com

Receipt and Storage: a. All material shall be delivered to the project site in the original, labeled, unopened packages. b. Material shall be stored flat and level in a fully enclosed space, preferably in the room in which they are to be installed. DO NOT store Endure ceiling strips and spacers in direct sunlight. c. Care in handling must be exercised to avoid damage. Before You Begin Installation: a. Ensure that all necessary tools are available (see below) b. Check Ceiling components to ensure all items required are at hand (see Page 2) c. Review this guide in its entirety. If you have any questions, call Rulon Company before you start the installation If You Need Further Assistance: - If you have any questions, or if you encounter a situation not covered by this installation guide, contact the Rulon Technical Department. Phone: 1-800-22RULON (1-800-227-8566), 904-584-1400 Fax: 1-904-584-1499 Tools and Equipment: - Standard leveling devices - Hacksaw - Power miter saw w/ reversed fine tooth blade - PVC Contact Cement - Standard Contractor s tools NOTE: Call the Rulon Technical Department for clarification of Endure installation or for special conditions such as pools, gyms, exterior installations etc. Ceiling Components: Endure #900 Strip Shown Supplied by Rulon: -#900 Ceiling Strips -#880 Carriers -#890 Carrier Connectors -#850S Splicing Material -#870 Perimeter Trim Supplied by others: -#12 Gauge Hanger Wire -Hanger inserts -Fasteners, as needed -Acoustical Blanket (when specified) -PVC Cement [1] REV: June 26, 2015

Step 1: Perimeter Installation Establish the ceiling height with laser, water-level, or other appropriate method. Mark location. Install #870 Perimeter Trim at ceiling height with appropriate fastener. Step 2: Carrier Placement (Interior) Mark Carrier locations, as specified. Carriers spacing should not exceed 3 [914 mm] O.C. Spacing differs for exterior applications or special conditions such as pools or gyms. Carriers shall be suspended starting 6 [152 mm] from one wall, and ending within 6 [152 mm] of the opposite wall. Carriers shall run perpendicular to the direction of the Endure ceiling strips. Step 3: Attaching Hangers (Interior) Install hanger inserts (i.e.; screw eyes, star anchors, or eye pins shot or hammered into structure or clips attached to beam flanges) at 4 [1219 mm] O.C. Hang #12-Gauge wire hangers from the inserts. Hanger wires need to be hung directly from building structure, unless otherwise covered in the Rulon shop drawings or reviewed and approved by the Rulon Engineering Department. [2] REV: June 26, 2015

Step 4: Carrier Suspension Hang carriers from ceiling hangers. Level. For exterior ceiling such as soffits, drivethrus, etc., wind uplift may necessitate the use of hold-downs. Call Rulon for recommended methods of installation and refer to Rulon Shop Drawings if applicable. Step 5: Extending Endure Carrier At junctions between carriers, insert one #890 carrier connector. Attach carrier connector inside carriers as shown. Stagger locations of splice. Carrier connector is for alignment only. Support carrier as needed near splice. Step 6: Ceiling Strip Attachment Beginning at one wall, connect the #900 Ceiling Strips to the carrier, in sequence. If acoustical blankets are to be installed, they should be placed above the ceiling, as the installation progresses. Light cutouts should also be made as the ceiling is installed. It will be necessary to apply downward pressure to the ceiling carriers when snapping strips onto carrier. [3] REV: June 26, 2015

Step 9: Adjustment, Cleaning, and Repair Step 7: Ceiling Strip Splices When it is necessary to continue ceiling strips, align strip ends by placing a piece of #850S splice strip inverted, and centered, behind the #900 ceiling strips. This should be done when the strip is installed, prior to the installation of adjacent strips. PVC cement shall be used to secure the splice pieces.. Ensure adhesive does not contact visible surfaces. Strips shall be cut with a power miter saw having a reversed, fine tooth blade. Field check all strips (including full length strips) for a 90 degree cut end, and trim as necessary, to assure tight butt joints. To ensure a tight end match between all strips to be butted together, it is recommended strips be overlapped slightly and cut at the same time. Step 8: Allowance for Expansion Trim Endure strips at perimeter to allow for expansion and contraction. Dimension A varies between ¼ [6 mm] and ½ [13 mm] for an 18 [5486 mm] long Endure ceiling, depending upon installation temperature. Contact the Rulon Technical Department for Clarification. a. The contractor shall make final adjustments to level or contours b. Upon completions of the ceiling installation, the contractor shall clean all Endure strips and borders of dirt, dust, grease, oils, fingerprints, etc. using warm, soapy water followed by a rinse. c. All work that cannot be successfully cleaned and repaired shall be removed & replaced. [4] REV: June 26, 2015