RADIANT PANEL SYSTEM PLANNING & INSTALLATION. Roth Radiant Heating Systems

Similar documents
Expanded AmDry Installation Guide

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION

AquaHeat Installation Guide

SubRay Radiant. Header Sticks Sleepers Corner Sweeps Grippers Tape Conduction Layer C-Covers. Subfloor System

Covelo Canyon INSTALLATION INSTRUCTIONS

Roth Compact system. German quality since Installation 1/6

L. W. Mountain, Inc. Floating Glue Installation Instructions *For use with engineered floors only*

Installation Guidelines: Magnolia

Hill Country Innovations Installation Guide for Engineered Hardwood

INSTALLATION INSTRUCTIONS LAMINATE

HIGUERA HARDWOODS SOLID STRAND WOVEN FLOORING PRE-INSTALLATION JOBSITE REQUIREMENTS

Installation Instructions for SuperFast Hurricane

5G Click Floating Floor Installation Instructions

On load-bearing floors with LK Slotted Board EPS 16

INSTALLATION INSTRUCTIONS

RAUPANEL DRY SYSTEM HIGH PERFORMANCE PANEL SYSTEM

INSTALLATION METHODS ENGINEERED FLOORING FLOATING, GLUED-DOWN OR NAILED INSTALLATION METHODS

Laminate Flooring Charlestowne Collection

VESDURA ENGINEERED VINYL PLANK INSTALLATION GUIDE

RAUBOARD RADIANT HEATING SYSTEMS HEAT TRANSFER PANEL PRODUCT INSTRUCTION. Construction Automotive Industry

WATER TUFF VINYL FLOORING ATTENTION! READ BEFORE INSTALLING! Angle-Tap Installation Instructions

INSTALLATION GUIDE. Please read all the instructions before you begin the installation. Improper installation will void warranty.

INSTALLATION INSTRUCTIONS

1. PREPARATION 2. INSTALLATION 3. FINISHING 4. MAINTENANCE

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Please Note: PhoneStar was previously branded as Phonewell

Verify colour and finish before installation. Once the floor is installed, it is deemed to have been inspected, approved and accepted.

ThermMAT. Please read these instructions in conjunction with the Guarantee Card enclosed with your ThermFloor heating system.

INSTALLING MrPEX TUBING

Wellmade. - Installation Guide. General Information. Pre-Installation

Scuba Seal Installation / Floor Care Instructions With Video Link

COMPOSITE (WPC) ENGINEERED VINYL FLOORING INSTALLATION

Installation Instructions Vinyl Glue Down Flooring - Pro

ThermoFin U SPEC - DATA

ATTENTION! READ BEFORE INSTALLING!

Wellmade HDPC Engineered Vinyl Plank/Tile Installation Guide

Pry Bar or Pull bar Hammer Spacing Wedges Rubber Mallet Safety Equipment (Goggles and Mask)

Mega Clic Laminate Floor Installation Instructions

DO-IT-YOURSELF SELF ADHESIVE PLANK INSTALLATION

Luxury Vinyl Planks with Interlocking Joints (Glueless) Installation Instructions

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Floor Insulation Underlayment Section Sound Control Matting

1. Division 09 Section "Rough Carpentry."

HDWPC Flooring Installation Guidelines

Container Installation Guide

Wooden suspended floors

INSTALLATION INSTRUCTIONS

KINETICS INSTALLATION GUIDELINES ISOLayment QT-F (FLAT)

Accent Floor Heating. Tmat System Installation Manual. Floor heating system

ALL DRAWINGS/ILLUSTRATIONS ARE LOCATED AT THE END OF THE INSTRUCTIONS.

LOOSE LAY INSTALLATION GUIDE PAGE 1 of 6

Installation and Planning Guide

INSTALLATION INSTRUCTIONS

INSTALLATION GUIDE 5 EASY STEPS TO PLACE & QUIET. Primary Acoustics ) ) ) ) ) \ \ \ \ \

Installation Guide. LooseLay Flooring

Rigid Core (White Label) Planks with Interlocking Joints (Glueless) Installation Instructions

Container Installation Guide

ENGINEERED WATERPROOF FLOORING GENERAL INSTALLATION INSTRUCTIONS FOR VÄLINGE 2G LOCKING FLOORING

ATTENTION! READ BEFORE INSTALLING!

Installation instruction

ENKASONIC FLOOR UNDERLAYMENT 9110

ATTENTION! READ BEFORE INSTALLING!

UNDERLAYMENT INSTALLATION INSTRUCTIONS

Installation ECOWORX / ECOLOGIX INSTALLATION 1. CONDITION YOUR SITE AND TEST 2. PREPARE THE FLOOR

Mohawk SolidTech. SolidTech Installation Guidelines. Preparation

Installation Instructions for Hercules Rib 52

The use of wood putty, wood filler and wood stain for enhancement of the flooring should be accepted as normal.

INSTALLATION INSTRUCTIONS

PLATON FOUNDATION WRAP

MFMA Guide Specification for Sleeper and Sleeper with Plywood Floor Systems

Existing Floors & Low Profile Systems

LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR DRYBACK FLOORING

ENGINEERED LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

Quik Trak design and installation manual

GenieMat Technical Installation Manual

OVERLAY TM. Under floor heating that fits over existing floors

FiberFloor Glueless and Full Spread Installation Instructions

ALETTE GLUE DOWN INSTALLATION INSTRUCTIONS

RAUPANEL RADIANT HEATING SYSTEMS HEAT TRANSFER PANEL PRODUCT INSTRUCTIONS. Construction Automotive Industry

adjustable fusion shower pan surface mounted on subfloor installation guide

ATTENTION! READ BEFORE INSTALLING!

1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.

SINCE 1995 CONSTRUKT / SUITE LINE INSTALLATION GUIDE

Texline Ideal loose lay

StrataWorx Tile. Installation Guidelines 1. CONDITION YOUR SITE AND TEST 2. PREPARE THE FLOOR

ENGINEERED HARDWOOD FLOORS Glue, Staple Or Nail Down Installation

USG Tile & Flooring Solutions. Lightweight cement board. Easy to cut and fasten. Faster installation USG DUROCK BRAND CEMENT BOARD INSTALLATION GUIDE

Concrete 1,8 2,0 Anidrite 0,3 0,5

Installation Procedure of Floating floors

SOUND REDUCER INSTALLATION MANUAL. Manufactured in the U.S.A. by: Ecore. Revised 08/28/2017 Supersedes all previous versions Check website for updates

Transcription:

RADIANT PANEL SYSTEM PLANNING & INSTALLATION Roth Radiant Heating Systems

INTRODUCTION The Roth Radiant Panel System was developed for the wood frame houses of the North American and Scandinavian markets. It was designed for easy installation over any new or existing sub-floor, wood or concrete, and for use with many different floor coverings, such as carpet, tile or hardwood. This is done without the structural changes needed to accommodate the additional load of lightweight concrete and with minimal effects to the finished floor height. It is ideal for retrofit systems, but it s also great for new construction when you don t want the weight, expense or water problems of lightweight concrete. The efficient design of the system, heavy gauge, full-face aluminum sheet on top and EPS insulating foam on the bottom, focuses the heat exactly where you want it directly under the finished floor so that the system can run at the lowest temperature possible. The quick recovery time makes this system one of the few times that temperature setback makes sense in radiant floor heating. These are just some of the advantages you will receive from the intelligent design and high quality of the Roth Radiant Panel System. RADIANT PANEL SYSTEM MANUAL PLANNING & INSTALLATION ROTH HEATING SYSTEMS

1 Planning Roth Radiant Panel Systems can be installed on all types of sub-floors, which comply with the current building regulations for load-bearing structures. If the system is going to be installed upon an existing surface material (e.g. vinyl mat, ceramic tiles, etc.), it must be approved by the flooring contractor. The floor panel system has a normal operating range of 60-140 F (15-60 C), depending on the radiant heating system design and finished floor material. Underlayment, vapor barriers, water-proof membranes, etc. should be selected with the actual operating temperatures in mind. Be sure to discuss the design parameters with the flooring contractor prior to installation. Before starting the installation, you need to plan your loop layout and manifold locations. We also recommend installing tubing in every track to achieve the best heat distribution. Try to plan the pattern so that the Master Panels are aligned to allow the loop supply to run along the outer wall. If installing a wood floor over the panel, align the panel so the loops are running in the opposite direction of the wood flooring material. In wet areas, such as bathrooms, etc., where a water-tight layer is requested, the membrane should be installed above the panel system. Always coordinate these installations with the flooring contractor. 2 Delivery Content The Roth Radiant Panel System is delivered in one box consisting of: Master Panels, 10 pcs., 24" x 48" PLEASE NOTE: Panel System for ⅜ tubing is ¾ thick. Panel System for ½ tubing is 1 thick. Radius Panels, 3 pcs., 16" x 24" Each panel is perforated and can easily be snapped into 2 pieces (total of 6 pieces). Transition Panels, 3 pcs. 16" x 24" Each panel is perforated and can easily be snapped into 4 pieces (total of 12 pieces).

3 Installation of the Panel The sub-floor must be smooth, clean and level. Surface irregularities should not exceed more than 0.02" per foot. The Roth Radiant Panel System should be secured to the subfloor with countersunk screws or a foam board compatible adhesive. Apply the adhesive according to the manufacturer s instructions. Start the installation by laying the radius panel first. If you need an extra track you can start with a transition panel. A strip of plywood can be installed on the perimeter for tack strip when carpet is the finished floor material. It is important to plan the installation in advance to be sure that you have the correct number of tracks when installing the tubing. Transition and radius panels can be installed upside down as filler pieces. When securing the panels to a wood subfloor, we recommend using at least eight (8) countersunk screws spaced 12 (30 cm) apart and 6 (15 cm) from the edges. When installing over concrete, you can use countersunk concrete fasteners in the same pattern. Be aware that floor conditions may require use of additional fasteners. The panels can also be secured with latex base adhesives compatible with foam board products. These are applied with either a caulking gun or notched trowel. Follow the manufacturer s instructions for application. Curing time can vary widely between brands of adhesive and with the temperature and humidity conditions at the time of installation.

Continue to lay the master panels. When cutting the master panels, mark the plate and saw it with EPS side up. You can use any saw with a fine-toothed metal blade. After cutting the panel, remove any burrs. When cutting the last master panel in the first row, use the rest of the panel to start the next row. This will provide staggered joints for the field panels. After completion of the panel installation in an area, use a vacuum to clean up thoroughly before installing the tubing. Dirt and debris in the tracks can create noise when the system is put into operation.

4 Installation of PEX-tubing Start the tubing installation by connecting the PEX tubing to the manifold. Loops can be pre-cut if you have figured the correct leader length (from the manifold to the actual heated area) when designing the system with our software. The Radiant Heating Tubing Requirements Report will give you the information to cut the loops from full rolls of tubing with the least amount of waste. Install the tubes by unrolling the coil and stepping the tubes into the tracks in the panels. Use hard shoes or a wooden piece on top of the tubes in order to fasten the tubes in the tracks. Be sure to use a block when using a hammer or mallet to set the tubing to avoid denting the aluminum surface. Follow the loop layout you have planned and connect the return tube to the manifold. It is very important that the tubes are snapped down completely into the tracks. When installing the tubing in the radius panels it is important to pull the tubing tightly around the bends. This will allow a space for tubing expansion during operation and greatly decrease the chance of noise during operation. When laying the tubing into the transition pieces we recommend using a bead of silicone adhesive to secure the tubing because the tubing is loose in these pieces. We recommend installation of the panel and tubing when ambient temperatures are above 40 F (4.5 C).

5 Pressure Test/Start-up After installation of the panel and tubing, but before laying the finished floor, you need to perform a pressure test. Fill the system with air or water and maintain a pressure of 2 to 3 times the working pressure of the system, about 25 to 50 psi (1.7 to 3.4 bar) for 6 hours. Use a leak detection solution (if testing with air) to locate and repair any leaks in the system. A small leak can take a long time to register on a 60 psi (4 bar) gauge. Please note: If the system cannot be started up after the pressure test and there is a danger of freeze, you must use air or a glycol solution! Do not use plain water! Run the system at normal operating pressure at about 140 F (60 C) for 30 minutes to allow the tubing to relax and settle into the tracks. Noise can occur at this time but will reduce as the tubing settles. If the noise persists, locate the source and apply some silicone adhesive to the tubing at that location. After the start-up is complete, the finished flooring can be installed. 6 Sample Flooring Installations Tile/Stone: Roth recommends using a tile underlayment product in all ceramic tile installations. Underlayment should be secured and seams finished per manufacturer s instructions. It is also a good idea to use plasticizer additives with the mastic and grout for more flexibility during operation of the heating system. Laminate Wood Flooring: Thin laminate flooring may require the use of an underlayment material to provide additional support above the tubing/grooves. This should be discussed with the flooring contractor during the planning phase. Carpeting/Vinyl Flooring: Never use untempered hardboard as an underlayment. Underlayment should be stable under the temperature and humidity conditions expected for your project. Untempered hardboard may swell with humidity. Hardwood: Nail strips may not be needed if the flooring contractor uses longer nails/staples. This should be discussed with the flooring contractor prior to installation of the panel. Never use an asphalt impregnated paper, or any impregnated paper that can produce odors when exposed to heat between the panel and the hardwood. These are sample installations only! It is always important to coordinate any radiant heating with the flooring contractor prior to panel installation! The flooring contractor will then be able to incorporate any special requirements felt needed for the installation.

Distributed by: 268 Bellew Ave South Watertown, NY 13601 Call 888-266-7684 US, 800-969-7684 CAN Fax: 866-462-2914 www.roth-america.com info@roth-usa.com Roth reserves the right to change model specifications and descriptions used in this document at any time, without notice. Part Number #2300100024