INDUS CONSTRUCTION COMPANY

Similar documents
We are Manufacturers,Traders, and Wholesaler of all kinds of Construction equipments, Dewatering Pumpsets, Survey instruments, and Safety solutions.

ULKA PROJECTS PVT. LTD.

Tender Schedule for the Work "Construction of Staff qtrs. at Tainda S/S (1no.)

Unimaac Engineers.

Vardhaman Engineering

BUILDERS CONTRACTORS ENGINEERS

Model Curriculum. 1. Construction Laboratory & Field Technician

Drainage, Road Drainage and Collection Pit A - EXCAVATION:

Infra. 360 Degree Solution Provider for your Construction needs. Engineering. Construction. Project Management.

TENDER DOCUMENT. TENDER No.: BHI/PI-(S)/675/1005 FOR

AFD: Civil: Inq: April 23, 2016

to? A. 1 day B. 2 days C. 3 days D. no days

Health Safety, & Environment

INTRODUCTION WORK FORCE INFORMATION

Corrigendum I dated 02/06/2017

Cement Concrete Tiles and Paving Blocks

OMKAR PUF INSULATION PVT. LTD. RIGID

Tender No: DAFFPL/MOD/FF/ /06 15 th July, 2015

A. you must wear safety goggles B. you must wear hand gloves C. you must wear safety shoes D. you must wear safety helmet

Health and Safety Policy Statement. LONDONGUILD Ltd ELECTRICAL CONTRACTORS. The Palmerston Centre Oxford Road Wealdstone Harrow Middlesex HA3 7RG

REQUIREMENTS FOR CONCRETE MIX DESIGN

2010 HSC Construction Sample Answers

Leading Machine Manufacturers Technology Provider

SAFETY METHOD STATEMENT

100kN Beam; 200kN Beam/Curb; 1600kN Hand operated; 1800kN Econo; 2000kN; 3000kN; 5000kN PREC3FT COMPRESSION AND FLEXURAL TESTING MACHINES

EMPANELMENT OF CONTRACTORS FOR CIVIL WORKS Metropolitan Oil & Gas Pvt. Ltd.

REVISED BY SCHEDULE OF RATES COMMITTEE

Manufacturers of Aluminium Gravity Die Castings. Plot: G/11, Five Star MIDC, Kagal-Hathkangle, Kolhapur Maharashtra, India

NOTICE INVITING QUOTATION

COMPANY PROFILE. of panels set up. We have expert team of qualified engineers & technicians.

d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER- WRD: 4 SCHEDULE OF RATES CANAL CROSS DRAINAGE WORKS FOR THE YEAR : REFERENCE DATA


BAID ENGINEERS PRIVATE LIMITED SISTER CONCERN: INTERNATIONAL CHEMICAL INDUSTRIES

WELCOME. to the Presentation on. Guest Lecture for Course CE- 401 at Department of Civil Engineering (Seminar Room) BUET, Dhaka

AAMCHUR (DRIED MANGO POWDER)

Mason General - CON/Q0103 (Construction)


INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI

HEALTH & SAFETY POLICY

Safal Engineers & Fabrication Plot No. F -35, M. I. D. C. Shiroli, Kolhapur (Maharashtra) Ph: ; Fax:

All rights reserved IJISE (I)

Kirti Hydraulic Morbi

Model Curriculum. (Construction) Transnational. 1. Foreman - Electrical works

TITLE : CONTROL OF CONTRACTORS

Analyze time-cost required for conventional and prefabricated building components

Casting Trusted Worldwide

THE UNIVERSITY OF SOUTHERN MAINE. Personal Protective Equipment (PPE) Program

Core Values: Mission:

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC

Model Curriculum. Beam Carrier - Loader TEXTILE WEAVING WEAVING PEPARATORY TSC/ Q 2601, VERSION 1.0 4

Interiors Sources Decor LLC. Method Statement BLOCK WORK. Civil Works 6/26/2016

KANPUR SMART CITY LIMITED

AN EXAMPLE OF ACOTEC WALL INSTALLATION

V. S. International Pvt. Ltd

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

Code Programme Name Days Month Venue Cadre Contents Faculty ENVIRONMENT,HEALTH,SAFETY Safety techniques followed. Hyderabad/ Nagpur.

Network Rail Project No: Issue: 002 Date 11/07/2017 Work Package Plan Arena Tunnel LSM773 Prepared by: Start Date: 15/07/17 Finish Date: 23/07/17

National Bank of Agriculture and Rural Development, Head Office, Mumbai Department of Premises, Security and Procurement

GUJARAT ENERGY TRANSMISSION CORPORATION LTD TR CIRCLE OFFICE JUNAGADH. COMPLETION PERIOD.

Model Curriculum. (Construction) 1. Foreman - Electrical works

A. only after an accident. B. upon job completion C. only when told by supervisor. D. whenever one feels like it

Residential Complex with Siporex Slabs & Blocks, Mumbai

Kirti Hydraulic Morbi

Good Quality at a Competitive Price.

PROJECT PROFILE ON HACKSAW BLADE MANUFACTURING

Location. Distance from : Registered Office and Works

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt:

NCCER Progress Blvd, Alachua, Florida Phone: (888)

Practice Notes For Construction Managers PNCM 7: Timber Formwork First Issue, January 2006

Municipal solid / hazardous waste

National Bank of Agriculture and Rural Development, Head Office, Mumbai Department of Premises, Security and Procurement

Model Curriculum. 1. Scaffolder - System. Construction Real Estate and Infrastructure Construction Scaffolding CON/Q0305, V1.0 4

GOVERNMENT OF ODISHA PANCHAYTI RAJ DEPARTMENT. Construction of Culvert on Sunamudi Nalla (2 Span RCC slab)

Operate Manual. DA-1600i Stud Welding Machine. DA-2000i Stud Welding Machine. DA-2500i Stud Welding Machine

Model Curriculum. Soft Flow Dyeing Machine Operator SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL:

FORM OF TENDER: RFT NO: 21/2019 TERMS OF REFERENCE. For DESIGN AND BUILD OF LEVUKA EXPRESS OFFICE

Table of Contents. A Operate and monitor Micro Hydel Power Plant (MHP) plant 04

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

Estimate FOR THE SEPTIC TANK

Model Curriculum. 1. Supervisor Electrical Works

Shed Nos: 38 & 39, Plot Nos: 26 & 27, Phase: II, Industrial Development Area, Cherlapally, Hyderabad Telangana

PROJECT PROFILE FOR MANUFACTURE OF AGRICULTURAL IMPLEMENTS

QUALIFICATIONS PACK OCCUPATIONAL STANDARDS FOR CONSTRUCTION INDUSTRY

New and Young Worker Employer Guide. Protecting yourself from the financial and emotional costs that occur when a worker is injured on the job.

Auto Tubes and Flaps

Transnational Skill Standards Foreman Electrical Works (Construction)

ERECTION AND DISMANTLING OF TRANSMISSION LINE TOWERS & TOWER LIKE STRUCTURES AT TOWER TESTING STATION OF CPRI, BANGALORE

MODEL CURRICULUM GEMS & JEWELLERY IMITATION JEWELLERY WELDING G&J/Q1403, V1.0 3 SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL:

Shreyas Trading Company

VISHALFAB (INDIA) PVT. LTD. (An ISO 9001:2008 Certified Company)

Invitation for Pre-Qualification of Bidders for Mounded Pressurized Storage Vessels for LPG TENDER NO. : E&P:PQR:MSV/10-11/ 01 DATED

FLOORWORX TECHNICAL TRAINING PROGRAMME 2018

Model Curriculum. Conventional. 1. Assistant Scaffolder - Construction Real Estate and Infrastructure Construction Scaffolding CON/Q0313, V1.

NATIONAL CERTIFICATE (VOCATIONAL) NQF LEVEL

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD

COSVR256 HL53 04 Install lightning conductor systems

CDM Action Plan. This is a Construction Phase Plan for the following project:

SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR

MODULE 7 PERSONAL PROTECTIVE EQUIPMENT IN CONSTRUCTION INDUSTRY. Project: BG1-LEO

Transcription:

Details of The Firm Name of Company Year of Establishment Type of Firm Key Contact Person Office Address Telephone No. E-mail Address PAN No. VAT TIN. CST TIN. SERVICE TAX No. PF No. Banker's Name Website : ICC Indus Construction Pvt Ltd : 2009 : : B. B. SHINDE induscons43@gmail.com info@indusconstruction.com : 303, Neel Enclave, Plot No. 1, Sector 09, Khanda Colony, New Panvel (W), Navi Mumbai - 410 206 (Maharashtra). : 022/ 27459482, 27454514 : info@indusconstruction.com : AAEPS8577Q : 27600739437V wef 16.12.2009 : 27600739437C wef 16.12.2009 : AAEPS8577QST001 : MH / VASHI / 119836 : IDBI Bank : www.indusconstruction.com

Our Valuable Clients USV Limited PepsiCo Holdings Pvt. Ltd. LG Electronics Pvt. Ltd. Larsen & Toubro Ltd. Ad lab Entertainment Ltd. Durabuild Technologies Pvt. Ltd. Shalina Laboratories IPCA Laboratories Seven Seas Holdings Ltd.

OUR MAJOR ACHIEVEMENTS USV Limited. Completed Peptide facility Construction work at Chiplun.

OUR MAJOR ACHIEVEMENTS LG Electronics India Pvt. Ltd. Completed STP facility at Ranjangaon, Pune. Water retaining structures completed within time frame and commissioned successfully. Completion of Bus Parking road work 6000 sqm within 30 days.

OUR MAJOR ACHIEVEMENTS Pepsico holdings India Pvt. Ltd. Completed - Boiler and Husk warehouse facility at Pune.

OUR MAJOR ACHIEVEMENTS Seven Seas Holding Ltd. Construction of factory building 134m x 28m is completed along with equipment foundations, Area 4500 Sqm, Work in progress

OUR MAJOR ACHIEVEMENTS Seven Seas Holding Ltd. Construction of factory building 134m x 28m is completed along with equipment foundations, Area 4500 Sqm, Work in progress

OUR MAJOR ACHIEVEMENTS Larsen & Toubro Limited, (Heavy Engineering Division) Phase 1 completed within schedule.

CURRENT ASSIGNMENTS Larsen & Toubro Ltd. (Heavy Engineering Division ) MIDC, Talegaon Dabhade, Talegaon, Dist. Pune. Phase 2 defense facility construction. Seven Seas Holdings Ltd. Plot No. L8, Near Biopharm, next to Kingfisher, Taloja, Tal. Panvel, Dist Raigad, Maharashtra. Steel cutting facility, 4500 Sqm built up, In Progress. USV Limited Plot No. H/17, H/18, Dabhel, OIDC, Mahatma Gandhi Udyog Nagar, Daman Ho., Daman-396216. Pharmaceutical Pilot plant facility at Daman.

TURNOVER April 2010 to March 2011 ` 9,22,70,598.00 April 2011 to March 2012 ` 18,33,40,938.00 April 2012 to March 2013 ` 24,89,23,490.00

OUR SPECIALISATION Specialized industrial contractors Strong team of RCC, Structural, Interior finishing Good experience in concrete and bitumen road work Clean room constructions Completion of the projects in time observing quality and safety standards Value addition in each and every activity Trained team to handle safety aspects in the construction activities

OUR MANPOWER STRENGTH Office Staff Project Co- ordinator Purchase Manager Purchase Assistant Billing and Tendering Engineer Account Manager HR Manager Accountants Office Assistant 01 01 02 01 01 01 02 01 Site Staff Project Managers Sr. Engineers Jr. Engineers Supervisors Sr. Foreman Store and Site Accountants Safety Officer Plant & Machine Operators Electrician Skilled and unskilled workmen at site 06 04 15 16 10 10 08 12 05 460

DETAILS OF CONSTRUCTION EQUIPMENT, MACHINERY & TOOLS Sr. No. 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Description Batching plant 800E310 Tough Rider ECO MODEL( 2MT Capacity) Concrete Mixer 10/7 Electrical Concrete mixer 10/7 Diesel Weigh batchers Cement Concrete Vibrator with Needle Concrete Breaker All Sizes Drill Machine All Sizes Kota & Granite Cutting Machine Steel Cutting & Bending Machine Concrete Road Surface Screeds Vibratory Water Pumps Earth Rammers Sintex / MS Tanks Sand Screening Steel Scaffoldings & Shuttering Material Wheel Barrows Welding Machines Single Phase & Three Phase Gas Cutting Sets Steel Cutting Machine 14" dia & 9" dia Hoist with Tower Core Cutting Machine Tractor with Trolley Polishing Machine JCB 3 DX with Braker D. G. set 62 KVA, 40 KVA Quantity 03 06 10 04 08 16 18 12 22 04 04 10 08 10 06 8000 70 04 04 19 02 01 02 05 02 02 Unit Sets Sets Nos Sq. Mtr. Sets Sets Sets

DETAILS OF QUALITY CONTROL EQUIPMENTS Sr. No. 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 Description Cube Testing Machine Cube Mould ISI mark Slump Cone with rod Auto Level with stand Theodolite with stand Electronic weigh balance Measuring Cylinders 500 ml Measuring Cylinders 250 ml. Measuring Cylinders 1000 ml. Screw Gauge Sieves 20 cm brass (600 mic, 300 mic, 150 mic pan, 75 mic) G. I. Sieves (Size 40mm, 20mm, 10mm, 4.75mm, 31.5 mm, 1.18 mm, Pan) Vernier Caliper Core Cutter with Dolly Electrical Hot Oven with Thermoster Steel Jar - 500ml, 1000ml Scoop Measurement Tapes Density Basket Quantity 8 60 6 6 3 4 8 8 8 2 Sets 12 8 Set 3 3 Nos 1 No 4 4 Nos 2 3..

ENVIROMENT HEALTH AND SAFETY AT, we believe that every accident is a result of several same kinds of recurrences which may or may not result into injury. Therefore, it is very important to identify such unsafe action or unsafe condition and make it safe before something go wrong in short Prevention is better than cure. Our goal is ZERO LOSS TIME ACCIDENT. POLICY STATEMENT It is Indus Construction Company's Policy to provide and implement safe and healthy work environment for conducting its business and thereby achieve zero loss time accident and loss to the property, environment by observing strict compliance of the statutory requirements. SAFETY TRAINING AT SITE 1. Induction Training : Every worker of Indus Construction Company is provided with induction training for the rules, regulations and introduction to safety at work site for the new employees before joining the work. 2. Tool Box Training : On site training is given to the people working at site. This includes training on 'permit system,' 'working on height', 'prevention of unsafe acts and conditions', 'hot work', 'use of PPE'S' etc. 3. Mass Training & Awards/Rewards : A mass training cum motivational program is arranged once in a month and the employees are presented with rewards for their performance in safety.

ENVIROMENT HEALTH AND SAFETY FIRST AID First aid is limited to providing immediate medical aid by a supervisor or co-worker. First aid care is the assistance provided to an injured or ill employee by a supervisor or a co-worker, but only with the express purpose of controlling the loss of blood, sustaining breathing, and reducing the effects of shock. FIRST AID BOXES Sufficient first aid boxes will be provided the contents of which will be as a minimum: 1. Individually wrapped sterile adhesive dressings 2. Individually wrapped triangular bandages 3. Safety pins 4. Individually wrapped sterile undedicated wound dressings 5. General medication i.e. medicines for headaches, cold, muscular aches, relaxants etc. PERSONAL PROTECTIVE EQUIPMENT HARD HATS : It is compulsory to everyone to wear safety helmets before entering to the work site. SAFETY BELTS : Whenever employees are working 2m above respective floor height, it is mandatory for him to wear a safety belt and fasten it properly while working. Supervisor is equally responsible for the safety of the people. OTHER PPE Hand protection gloves Leg protection safety shoes Eye protection safety goggles Respiratory protection nose masks Ear protection ear plugs SCAFFOLDS : We use only MS scaffolding.

QUALITY POLICY

ORGANISATION CHART

Head office 303, Neel Enclave, Plot No. 1, Sector 09, Khanda Colony, New Panvel (W),

Head office 303, Neel Enclave, Plot No. 1, Sector 09, Khanda Colony, New Panvel (W),

ICC Indus Construction Pvt Ltd 303, Neel Enclave, Plot No. 1, Sector 09, Khanda Colony, New Panvel (W), Navi Mumbai - 410 206 (Maharashtra). Tel. No. : 022/ 27459482, 27454514 www.indusconstruction.com