INSTALLATION PROCEDURE

Similar documents
INSTALLATION PROCEDURE

INSTALLATION PROCEDURE

INSTALLATION PROCEDURE

Installation Guide Document No Transaction Windows Copyright 2017 Terra Universal Inc. All rights reserved. Revised October 2017

Installation Guide Document No BioSafe Cleanroom Windows Copyright 2017 Terra Universal Inc. All rights reserved. Revised December 2017

Effective This guide supersedes all previous versions

Model Number: 1300 Series

Installation Guide Document No Fire-Rated Pass-throughs Copyright 2017 Terra Universal Inc. All rights reserved. Revised Sept.

OMNICON Antibiotic Potency Testing

END TRUCKS WHEEL SIZES: 9", 12", 15" & 18"

DUST FREE ACTIVE Total Home Air Purification

Fall Protection Catalogue CANADIAN

To Contact PS DOORS:

Quick-Start Operating Guide Document No Process Gas Cooler Copyright 2010 Terra Universal Inc. All rights reserved. Revised October 2010

MODEL NUMBER: 1419 SERIES

Series 5500 Bellows Pump Connectors Catalog 474E

PAIRED LADDER SAFETY GATE Installation Instructions/Operation and Maintenance Manual

Locking Systems International Inc.

92831 TEL: (714) FAX:

PAIRED LADDER SAFETY GATE Installation Instructions/Operation and Maintenance Manual

New Advanced Environmental Air Treatment System

TrueClean ToteTilter TM

Kennedy Valve. A Division of McWane, Inc. AWWA PRODUCTS

INSTALLATION MANUAL RECTANGULAR COLUMN

New Advanced Environmental Air Treatment System

TL-600 MOBILE PHASE HEATER

DRYWALL DOLLY 900 LB. CAPACITY

Distribution Box INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS UGC

Shower Column SHCM Installation Guide

Stretch Wire. P/N Rev. 2. IOM Stretched wire festoon manual

DLB-23 Shower Enclosure Installation and User s guide

HATCHSAFE Installation Instructions/Operation and Maintenance Manual Models: All Models

LADDER SAFETY GATE Installation Instructions/Operation and Maintenance Manual

92831 TEL: (714) FAX:

Pallet Gate Installation Instructions and Operators Manual

Instructions and E00 Series Sampling Module Extenders

3601 E. 34th St. Tucson, AZ USA Tel Fax Web:

HD Firewall Mount 850 all, S/V , C ipd #

NOVELLA. Installation Instructions for Wall Mount Lavatory with Corner Cabinet and Storage System INTRODUCTION

STC BSL & BESL Brass Silencer & Muffler Fittings

TECHNICAL ASSISTANCE TOLL FREE TELEPHONE NUMBER TECHNICAL ASSISTANCE FAX:

Dandy Leveler UDLV-150 & UDLV-500 (New Style)

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

General Information. Southwest Office Edwards Road, Suite B105 Cerritos, CA (Main Phone)

SERVICE PEDESTAL FLOOR-MOUNTED SERVICE PEDESTAL. Installation Manual

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual

Made in U.S.A. Wave Style Bike Rack Submittal Sheet. Materials: 1.5 Schedule 40 Steel Pipe (1.

Thermoelectric Coolers. All Models INSTRUCTION MANUAL. Rev. G 2016 Pentair Equipment Protection P/N

Installation Instructions/Operation and Maintenance Manual. Models PLG-60 PLG-72. PS DOORS Contact Information. Website psdoors.

Wash Down Duty Non-Contact Sensor

Installation, Operating and Maintenance Instructions Incognito Series Air Curtain

1.0 STS-WiFi Operations Manual Outline

INSTALLATION GUIDE MODELS DMV2401 / DMV3001 / DMV3601 DMV4801 / DMV6001 / DMV60DS / DMV72DS

Thermoelectric Cooler

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

STEEL PIPE NIPPLES SEAMLESS Price Sheet PNS-9.16C Effective: September 5, 2016 Cancels Price Sheet PNS-10.15C of October 5, 2015

Product Specifications MRI Trench Duct

BB5-PCA-BK/BB5-PCA-GY Pendant Conduit Adapter

Global Water Instrumentation, Inc.

... your Material Handling Specialist. MC300HD Conveyor. echnology. with MicroSpan. Technology

Aero Tec Models 700 & 750 (115 vac)

DESCRIPTION SAFETY: WARNINGS ORDERING INFORMATION T01-B INSTALLATION INSTRUCTIONS DROP-IN AND FREESTANDING BATH K-11343T / K-11344T

PORTABLE CHAIR SCALES BEAM and DIGITAL TYPES MODELS 475, 4751, 6475, 6475k and 6475KGEU

INSTALLATION HANDBOOK

Process Returns in VOTW

Model T2642E Wall Mount. Television Wall Mount with Tilt Option

STEEL PIPE COUPLINGS

Quick-Start Operating Guide Document No Exhaust Fume Hood Copyright 2010 Terra Universal Inc. All rights reserved. Revised September 2010

92831 TEL: (714) FAX:

Electrostatic Technology, Inc. A Subsidiary of Nordson Corporation

User Guide M Rev A 09/15

INSTALLATION MANUAL SURFACE-MOUNTED HEADWALL

WARNING. Introduction ! ATTENTION

FLOODGATE DIMENSION CHART ( WALL MOUNT) HEAD SIZE FLANGE BOLT REQUIRED APPROX RAISE HOLE (NB) DIA CENTRES TO OPEN WEIGHT KG BY

TEST & MEASUREMENT TOOL LIMITED WARRANTY Every Test & Measurement Tool is warranted for five (5) years from the date of purchase *.

AIR OPERATED GAS BOOSTERS

INSTALLATION INSTRUCTIONS RETAIL PRO HORIZONTAL SLIDING DOOR

ENMET Corporation PO Box 979 Ann Arbor, MI GS-24-DF. Manual October 2003 MCN-314, 12/05/03

LOAD RAMP 1000 LB. CAPACITY

Model PVIV-PROBE-KIT. Electrical Contact Probe. User's Manual

Installation and Care Guide

Made in U.S.A. Moai Bike Rack Submittal Sheet. Materials: Finishes: Mount Options: Capacity: Setbacks: 2 Bikes

V 2.0 ASSEMBLY GUIDE. TS Platform Scale Series 2

Vertical Antenna Fixed Base Assembly

c a s s i d y price list october 2018

HDI 2200 Choke Position Indicator

QUAD Rectangular Hinged Door Shower Enclosure Installation Instructions

N-SERIES SUBWOOFERS USER MANUAL

NOTICE: To the prices and terms quoted, there will be added any manufacturers or sales tax payable on the transaction under any effective statute.

NOTICE: To the prices and terms quoted, there will be added any manufacturers or sales tax payable on the transaction under any effective statute.

precision pipe fittings

Gustafsons HV2. High Velocity Duct for Residential Properties

L505 VISUAL LEVEL INDICATOR. Dip-Tape Visual Level Indicator INSTALLATION AND OPERATIONS MANUAL

Installation Instructions

SINGLE SWING DOOR PAIRED SWING DOOR

v 2.4 CHANDLER West Sunset Ave. Springdale, AR

SHCM SHOWER COLUMN INSTALLATION INSTRUCTIONS

Transcription:

INSTALLATION PROCEDURE VOLU-probe/1SS for Round Ducts WARRANTY Air Monitor Corporation (hereinafter referred to as "Seller") warrants that at the time of shipment, products sold pursuant to this contract will be free from defects in materials and workmanship, and will conform to the specifications furnished or approved in writing by Seller. No warranty is given that delivered products will conform to catalog sheets, data sheets, and the like, which are subject to change without notice. Seller will repair or replace, at its option, any products listed under this warranty which is returned freight prepaid to Seller and within the earlier of one (1) year after start-up or fifteen (15) months after shipment, prove upon test and examination by Seller to be defective within the terms of this warranty. The warranty period for any item repaired or replaced shall be for the time remaining on the warranty period for the original components. Purchaser shall notify Seller in writing of such defect within sixty (60) days of discovery of the defect. This warranty does not extend to any product sold by Seller which has been the subject of misuse, neglect, accident, damage or malfunction caused by interconnection with equipment manufactured by others, improper installation or storage, or used in violation of instructions furnished by Seller, nor does it extend to any product which has been repaired or altered by persons not expressly approved by Seller. Nor does Seller warrant equipment against normal deterioration due to environment; nor items such as thermocouples, electrodes, and similar items subject to wear or burnout through usage. Adjustments for items or equipment not manufactured by Seller shall be made to the extent of any warranty of the manufacturer or supplier thereof. Seller shall not be liable for any special or consequential damages or for loss of damage directly or indirectly arising from the use of the products. The warranty set forth above is in lieu of all other warranties either express or implied and constitutes the full extent of Air Monitor Corporation's liability to the customer, or any other party for breach of warranty. THERE ARE NO EXPRESS WARRANTIES EXCEPT AS SET FORTH HEREIN. THERE ARE NO IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE, WHICH ARE PARTICULARLY DISCLAIMED.

INSPECTION & HANDLING. VOLU-probes should be carefully inspected for damage prior to installation. Report damage to your Freight Department, or contact delivery carrier. Almost any means of handling can be utilized depending on the length and weight of the probes. Probes may be handled while in any position, however, it is important not to drop or mishandle the probes such that damage is done to the sensing holes, tubular members, signal connection fittings, end studs, or mounting plates. ORIENTATION OF PROBES. Using the AIRFLOW directional arrow on the probe mounting flange to determine correct orientation, install VOLU-probes with sensing holes facing airflow. INSTALLING VOLU-probes. To achieve published performance standards, the location of VOLU-probes in ductwork must comply with the Minimum Requirements for Installation submittal sheet (Page 7). VOLU-probe must be mounted so that the sensing holes on the probes are at the centers of equal areas in the duct. If three probes are furnished (as illustrated below), the angle between each probe is 60º. If two probes are furnished, the angle between probes in 90º. The radial dimension (R) between probes is determined by the formula R=C/2N where C is the duct circumference and N the number of probes. VOLU-probe insertion holes (F) and end support holes (G) must be cut in the duct on center lines. End support conditions for the VOLU-probe/1SS are illustrated below: - 2 -

FASTENERS. Gasket mounting surfaces should be clean and burr free. VOLU-probe mounting plates are predrilled for 5/16 mounting fasteners. Air Monitor recommends the use of 5/16-18 bolts, nuts, and lock washers (or flat washers and lock nuts). Fasteners should be stainless steel to be compatible with probes. DIMENSIONAL SPECIFICATIONS. VOLU-probe/1SS THREAD SEALANT. Appropriate thread sealant should be selected depending on maximum air temperature. Use of a high temperature pipe sealant at the probe signal fittings is recommended. Teflon tape or equivalent products are not recommended for high temperature applications. -3-

INTERCONNECTING TUBING. Interconnecting tubing and fitting makeup is to be no smaller than the probe connection fitting furnished; either 1/4" or 1/2". Refer to illustrations below for typical tubing configurations. a

SIGNAL TUBING. Signal tubing commences at the total and static pressure takeoff connections at the center of the interconnecting tubing array shown in Details B and C. Two signal tubing conditions are possible; tubing with an AUTO-purge panel and tubing without an AUTO-purge or CAMS panel. If an AUTO-purge panel or CAMS panel is not furnished, signal tubing for total and static pressure take-off connections may be 1/4" O.D. if the distance from the measuring device to the transmitter is 200' or less. If an AUTO-purge panel is furnished, the total and static pressure signal tubing should be sized per the following Table: Distance from Takeoff Fittings to Purge Panel Under 25 ft. 25 ft. to 50 ft. Tubing Size Under 25 ft. 25 ft. to 50 ft. It is not recommended that AUTO-purge panels be located more than 50 feet from takeoff connections. Signal tubing from the purge panel to a transmitter should be sized 1/4" if the distance is 200' or less. CAUTION:After tubing is completed, signal lines should be leak tested prior to operation. Care must be taken not to overpressurize measuring device. -5-

AIRBORNE CONTAMINANTS. The levels of air filtration and cleanliness associated with commercial HVAC Systems, whether supply/return/ exhaust/outside air, are satisfactory for operation of the VOLU-probe. Industrial applications containing airborne contaminants may require periodic manual or automatic cleaning using compressed air applied to the signal fittings, and/or removal from the duct or stack for physical cleaning. MINIMUM REQUIREMENTS FOR INSTALLATION. Note: VOLU-probe locations shown are NOT ideal. They indicate the minimum clearance required from air turbulence producing sources. Wherever possible, the VOLU-probe should be installed where greater runs of straight duct (or clearances) than shown exist. 2 H x W Rectangular Duct: x = Circular Duct: x = Duct Diameter H + W -6-

CUSTOMER SERVICE. Air Monitor Corporation provides in-house technical support for all our products: Monday through Friday, 7 am to 5 pm (pst) Phone: 707-544-2706 or 1-800-AIRFLOW / Fax: 707-526-2825 If after contacting the Customer Service Department it is determined that equipment will require return to Air Monitor Corporation for further repair, a Return Authorization number will be issued. A Confirmation of Return Authorization with shipping instructions will be sent via facsimile or e-mail. Equipment to be returned to Air Monitor should be returned in its original shipping container if possible. If this is not possible, ensure equipment is packaged sufficiently to protect it during shipment. Caution: All damage occurring during transit is the Customer s responsibility. List the Return Authorization (R/A) number on the packing list and clearly mark this number on the outside of each shipping container. Costs associated with the return of equipment to Air Monitor Corporation are the customer s responsibility regardless whether the repair/return is under warranty. Once the Customer Service Department determines that the equipment repair is under warranty, the item will be repaired and returned to the customer at no charge. If the equipment is not under warranty, customer will need to approve a repair quote which will be invoiced along with return shipping charges. 1050 Hopper Avenue Santa Rosa, CA 95403 707-544-2706 www.airmonitor.com INSTAL12 (11/13) -7-