PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD

Similar documents
Infrastructure Development and Environment

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

FUNCTIONS OF CORPORATE ENVIRONMENT DEPARTMENT. The various functions of Corporate Environment Department are listed below:

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

Environment Impact Assessment (EIA) Notification 2006

NIMZ Guidelines :- From : CA Ratan Moondra. Presentation on National Investment & Manufacturing Zone

CHECKLIST FOR ENVIRONMENTAL PUBLIC HEARINGS and PUBLIC CONSULTATION UNDER EIA NOTIFICATION,

Environmental Policy Statement:

Outline of the presentation

4x150 MW Surguja Thermal Power Project Near Parsa Village, Udaypur Tehsil, Surguja Dist. Chhattisgarh By Surguja Power Private Limited.

1.1 Name of the Project : 1.2 Proposed Installed Capacity of the Project : MW

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

INLAND WATERWAYS AUTHORITY OF INDIA (Ministry of Shipping, Government of India) Head Office : A-13, Sector 1, Noida

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous

EIA Study and Report Preparation 20 June, Dr. Suneel Pandey Senior Fellow

PROPOSED TERMS OF REFERENCE (TOR) FOR

4. Environmental Legislation. Mr. S. P. Deshmukh, Watumull Institute

What is the scope of PARIVESH Ans. The PARIVESH is a single window system for appraisal and granting Environmental Clearances and Forest Clearances

CIRCULAR. Sub: Instructions for maintenance of transparency and streamlining of procedure for disposal of EC cases in IA Division - Regarding.

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs)

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

BRIHANMUMBAI MAHANAGARPALIKA

Six Monthly Compliance Report (July 2014 to December 2014) and. Status of Environmental Management Plan. for Budhil (70MW) HEP

State Environment Impact Assessment Authority, M.P. (Government of India, Ministry of Environment & Forests)

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

IMPLEMENTATION PROTOCOL FOR DETERMINATION AND NOTIFICATION OF CRITICAL WILDLIFE HABITATS IN NATIONAL PARKS AND WILDLIFE SANCTUARIES

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB

Public Consultation: Environmental Impact Assessment (EIA) Indian Perspective

1.0 The Need for EIA. (a) the project proponent; (b) the regulatory agencies; and, (c) all stakeholders and interest groups.

DENR Coal Ash Update. House Environment Committee March 26, 2015

meeting held on meeting held on The SEAC observed that:

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I

O&M CONFERENCE IPS 2013

4.1 Identificationof Significant or Unacceptable Impacts Requiring Mitigation

Research Initiatives at TxDOT Related to Utilities and Right of Way

PREFEASIBILITY REPORT

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India

Accord Energy Corporation India Pvt. Ltd.

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala

DPR GUIDELINES FOR ERM OF IRRIGATION PROJECTS

Environmental Impact Assessment

Project Planning and Development Process

Proposed Terms of Reference for EIA studies

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India

1 POLICY STATEMENT ON ENVIRONMENTAL CLEARANCE

STANDARD OPERATING PROCEDURE

CONTENTS. PogeNo. Chapter 10: Productivity Approaches. Chapter 11: Human Resources Development in Hydro Sector

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India

Ministry of Environment, Forests & Climate Change Northern Regional Office Dehradun

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA

Ministry of Environment, Forests & Climate Change Northern Regional Office Dehradun Dr. Mahesh K. Verma Sr. Manager (Geol) & OIC

BEFORE THE NATIONAL GREEN TRIBUNAL CENTRAL ZONAL BENCH, BHOPAL

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE

NOTICE INVITING TENDER (NIT)

State. 2. Location: Madhya Pradesh. Total period for which the forest land is proposed to be diverted (in year). 3. Detail of user agency

INTRODUCTION ENVIRONMENTAL STATEMENT

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

EXISTING PROJECT FOR ORDINARY SAND MINING

During the discussions, the Committee finalized the following additional TOR for further study:

No. SEIAA/2015/5519 Dated:

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB. Ministry of Environment and Forests, Government of India

The Project Control Framework Quick reference guide

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE. LOK SABHA STARRED QUESTION No. *142 TO BE ANSWERED ON

No. SEIAA/2016/859 Dated: To M/s Uggarsain BKO, Sh. Varinder Kumar, Village Kakrala, Tehsil & Distt. Patiala.

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

INDIA: Dahej Liquefied Natural Gas Terminal Project

CHECKLIST FOR SUBMISSION AND SCRUTINY OF DPR

GOVERNMENT OF RAJASTHAN

GOVERNMENT RAJASTHAN POLICY FOR PROMOTING GENERATION THROUGH NON-CONVENTIONAL ENERGY SOURCES Sl. No 1 Order Energy Deptt. letter no. F.

Ex-Ante Evaluation (for Japanese ODA Loan)

No. SEIAA/3757 Dated: To Sh. Bhushan Kumar, M/s Mangla BKO, Bhagat Ram Joshi Street, Near PNB, Barnala.

TECHNICAL SPECIFICATIONS NTPC LIMITED

WHAT IS SUSTAINABLE DEVELOPMENT FRAMEWORK?

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

ROAD DEVELOPMENT AGENCY

PROPOSED TERMS OF REFERENCE

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

Looking beyond the boundaries: An approach for Water Neutral Electricity Production

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

PFC CONSULTING LIMITED (A wholly owned subsidiary of Power Finance Corporation Limited) Empanelment of Consulting Organizations.

AGENDA ITEM NO. F. No. 8-20/2015-FC

To M/s Jai Ganesh BKO, Sh. Mohinder Kumar, # 1057, Sec-21-B, Chandigarh.

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB


Site Hadbast No (5-16), 97 (7-16), 102/1 (2-9)

File No /2008-FC

No //6/2/2(1-1), 27//14(7-11), 15(7-7), 16(8-0), 33//4/3(2-4),5(8-0),6/1

Summary of Preparatory Study

Tanahu Hydropower Limited

NOTICE INVITING BIDS (NIB) (International Competitive Bidding)

UPSC ESE/IES Civil Engineering Syllabus

The Chairman welcomed all the members of the Committee and thereafter agenda items were taken up for deliberations.

Proposed Water Pipeline Route

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

Transcription:

PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD Presentation By N.K.Srivastava General Manager (Engg. Services & R&M) 20.04.2012

PROJECT DEVELOPMENT AT NTPC PROJECT IS DEVELOPED IN TWO STAGES FEASIBILITY REPORT (FR) APPROVAL INVESTMENT APPROVAL FEASIBILITY REPORT SITE SPECIFIC STUDIES/INVESTIGATIONS DEVELOPMENT OF PLANT LAYOUT BOQ & WRITE UP OF PLANT SYSTEM COST ESTIMATE FINANCIAL APPRAISAL APPROVAL BY PROJECT SUB COMMITTEE OF BOARD OF DIRECTORS

PROJECT DEVELOPMENT AT NTPC CLEARANCES REQUIRED FOR FR LAND COMMITMENT WATER COMMITMENT COMFORT LETTERS FROM BENEFICIARY STATES COAL LINKAGE (COAL MINES/COAL DATA) INVESTMENT APPROVAL APPROVAL OBTAINED AFTER AVAILIBILITY OF FOLLOWING MOEF CLEARANCE AAI CLEARANCE DEFENCE CLEARANCE PPA WITH BENEFICIARY STATES FUEL SUPPLY AGREEMENTS BIDS FOR MAIN PLANT FINANCIAL APPRAISAL APPROVAL BY BOARD OF DIRECTORS

PROJECT DEVELOPMENT AT NTPC IDENTIFICATION OF POTENTIAL SITES DETAILED SITE SELECTION & PRE-FR TOR OF EIACLEARANCE BY MOEF SITE SPECIFIC STUDIES / INVESTIGATION FEASIBILITY REPORT STATUTORY CLEARANCES/ COMMITMENTS COST ESTIMATES & FINANCIAL ANALYSIS INVESTMENT APPROVAL OF THE PROJECT FINANCIAL APPRAISAL BY FIs

TYPICAL STUDIES AND INVESTIGATIONS GEO-TECHNICAL INVESTIGATION HYDROLOGICAL & METEROLOGICAL STUDIES BATHYMETRIC SURVEY/ OCEANOGRAPHIC STUDIES TOPOGRAPHICAL SURVEY FR PREPARATION MODEL STUDIES FOR CW SYSTEM MGR & RAILWAY SIDING STUDIES AREA DRAINAGE STUDIES SEISMIC STUDIES

LAND INPRINCIPLE LAND AVAILABILITY CONFIRMATION FROM STATE REVENUE DEPARTMENT ACQUISITION OF LAND APPLICATION FOR ACQUISITION OF LAND UNDER L (A) ACT AFTER FREEZING THE LAND BOUNDARIES ON COMPLETION OF TOPOGRAPHICAL SURVEY & GEOTECHNICAL INVESTIGATION SECTION-4 (1) - INTENT FOR ACQUISITION (CLEARING OBJECTIONS WITHIN 30 DAYS) SECTION-6 DECLARATION OF INTENDED ACQUISITION SECTION-7/17 ORDERS FOR ACQUISITION & COMPENSATION AMOUNT DISBURSEMENT SECTION-9 AWARD OF LAND

LAND ISSUES SETTLEMENT OF COMPENSATION AMOUNT CONVERSION OF BANDOBASTI / GMK LAND INTO PRIVATE LAND THE ACQUISITION PROCESS IS VERY LENGTHY AND TAKES CONSIDERABLE TIME (6 MONTHS 2 YEARS) SUGGESTION STATE GOVT. TO CREATE A DEDICATED GROUP FOR LAND ACQUISITION FOR LARGE CAPACITY TPPS HEADED BY CIRCLE OFFICER UNDER THE DISTRICT COLLECTOR

WATER WATER COMMITMENT FROM STATE GOVT. OUT OF ITS QUOTA IN INTER STATE RIVERS IDENTIFIED FOR INDUSTRIAL USE WATER AVAILABILITY CONCURRENCE FROM CENTRAL WATER COMMISSION / MINISTRY OF WATER RESOURCES ISSUES IN SEVERAL INSTANCES, STATE GOVT. HAS WITHDRAWN WATER COMMITMENT EITHER DURING PROJECT DEVELOPMENT STAGE OR EVEN DURING IMPLEMENTATION STAGE STATE GOVT. DELAY IN FURNISHING CLARIFICATIONS TO CWC QUERIES THEREBY DELAY IN CWC CONCURRENCE.

WATER WATER COMMITMENT FROM STATE GOVT. OUT OF ITS QUOTA IN INTER STATE RIVERS IDENTIFIED FOR INDUSTRIAL USE (TIME TAKEN IS 2 MONTHS 1 YEAR) WATER AVAILABILITY CONCURRENCE FROM CENTRAL WATER COMMISSION / MINISTRY OF WATER RESOURCES (TIME TAKEN IS 4 MONTHS MORE THAN ONE YEAR) ISSUES IN SEVERAL INSTANCES, STATE GOVT. HAS WITHDRAWN WATER COMMITMENT EITHER DURING PROJECT DEVELOPMENT STAGE OR EVEN DURING IMPLEMENTATION STAGE STATE GOVT. DELAY IN FURNISHING CLARIFICATIONS TO CWC QUERIES THEREBY DELAY IN CWC CONCURRENCE.

WATER SUGGESTIONS STATE GOVT. TO EXPEDITE RESPONSE TO CWC CLARIFICATIONS STATE GOVT. TO ENSURE WATER COMMITMENT TO BE VALID FOR LIFE OF THE PLANT

NOC FROM AAI APPLICATION IS SUBMITTED TO NEAREST AIRPORT WITH COPY TO REGIONAL AAI AAI EXAMINE THE PROPOSAL W.R.T. DISTANCE FROM NEAREST AIRPORT / AIR STRIP AS PER THEIR RECORD THE COMMITTEE WITHIN AAI RECOMMEND THE HEIGHT OF TALLEST STRUCTURE, TO BE CLEARED IN THE NOC (TIME TAKEN 3-8 MONTHS)

NOC FROM MINISTRY OF DEFENCE APPLICATION IS SUBMITTED TO MINISTRY OF DEFENCE (MOD) MOD FORWARD TO AIR HQ, NAVAL HQ AND ARMY HQ. AFTER RECEIPT OF COMMENTS / CLEARANCES MOD ISSUE THE NOC. TIME TAKEN (6 MONTHS 1 YEAR)

Forest Clearance Applicable only if Forest Land is involved. Routing of proposal Submission by the User Agency to DFO. Scrutiny & Forwarding by DFO to Nodal Officer, Forest Deptt. Forwarding by Nodal Officer to Secretary (Forest), State Govt. Forwarding of the proposal by State Govt. to MOEF. The proposal is considered by Forest Advisory Committee (FAC) of MOEF. Accord of In-principle Forest Clearance by MOEF. Submission of Compliance Report to MOEF for certain conditions stipulated in In-principle Clearance. Accord of Final Forest Clearance by MOEF

Environmental Clearance: Steps Approval of Draft Terms of Reference for EIA Submission of Proposal to MOEF Expert Appraisal Committee Meeting Approval of Draft TOR Award and Preparation of EIA Report Application to SPCB for Public Consultation. Scrutiny Publication of Notice for Public Hearing Public Hearing Issue of Minutes of Meeting of Public Hearing by SPCB Application to MOEF for Appraisal Expert Appraisal Committee Meeting Scrutiny/ Clarifications etc. Accord of Env. Clearance By MOEF

Suggestions MOEF may prescribe a model TOR for EIA Studies All queries may be raised during one meeting of the Expert Committee Forest Clearance for the Project may not be linked with the Forest Clearance of linked coal mine/ water resource project Forest Department may develop Land Bank for Afforestation purpose

ENVIRONMENTAL ISSUES: Thermal Power Plants Land Acquisition: Loss of Forests & Agricultural Land Loss of Livelihood & Homes Fuel Transport, Storage, Handling & Combustion: Air/ Water/ Noise Pollution Global Warming Water Use (Cooling & Others): Hot Water Discharge Release of Industrial/ Domestic Effluents Water Pollution Generation of Combustion Residue (Ash) Pollution of Surface/ Ground Water Conversion of Bio-productive Land into Waste Land Air/ Water/ Noise Pollution

ENVIRONMENTAL ISSUES: Hydro Power Plants Land Acquisition: Construction of Project Facilities & Submergence Area Loss of Forests & Agricultural Land Loss of Livelihood & Homes Impounding of Water Conversion of River to Reservoir Barrier to Free Flow of Water & Free Movement of Aquatic Species Global Warming (Methane) Large Scale Construction Activities Requirement of Construction Materials Air/ Water/ Noise Pollution Generation of Construction Debris/ Excavated Surplus Materials Heavy Traffic Deployment of Huge Labour Force

SCHEDULE FOR PROJECT FORMULATION ACTIONS Thermal Zero Date - Project Initiation and Identification of Potential Sites Main Plant Award related activities (Month from zero date) Green Field Expn. Project Investment Approval activities (Month from zero date) Green Field Expn. Project Site Selection/Pre FR 3 0 Specs. Preparation 10 7 Studies/Investigations and Statutory Clearances 10 7 FR Preparation 12 9 Financial Appraisal 12 9 FSC for Main Plant 13 10 FR Finalisation 13 10 NIT 14 11 Public Hearing (SPCB) 15 12 OBD 17 14 Environmental Clearance 19 16 Financial Appraisal 18 15 Main Plant Package Award 20 17 Investment Approval 19 16